All the talks and files from this review have been archived in the Hall C Document Database HallC-doc-808-v1.
Contents
Hall C Experimental Readiness Review 2016
Experiments: E12-06-107, E12-10-002, E12-10-003, E12-10-008, E12-09- 017, E12-09-011 and E12-09-002
Time and Location
- Date: August 24-25, 2016
- Location: CEBAF Center F224-225
- ERR Charge: (pdf)
- ERR Committee: Jim Napolitano (Chair), Larry Cardman, Cesar Luongo, Xiangdong Wei, Sergey Furletov, Yulia Furletova, Lubomir Pentchev, Mike Spata, Vashek Vylet, Bob May, Ed Folts (Observer), Javier Gomez (Observer)
Other Hall C Experiment Readiness Reviews
- SHMS Q2/Q3/Dipole magnet review, October 12, 2016
- E12-06-105, E12-10-008, E12-16-007 review, June 8, 2017
- A1n and d2n (polarized 3He), March 18, 2018
- ERR_E12-11-107-LAD review, July 29, 2020
- NPS ERR, May 15, 2019
- Link to Ed Folt's document from Hall C ERR
Agenda (talks)
Wednesday August 24, 2016
- 8:30 (30) Executive Session
- 9:00 (10) Opening and Charge - P. Rossi
- 9:10 (10+5) Hall and Scope Overview - C. Keppel
- 9:25 (15+5) Hall C 12 GeV Project Status - Charge Items 8,3 - H. Fenker
- 9:45 (15) - Coffee Break
- 10:00 Experiment Overviews - Charge Items 8,7
- 10:00 (5+5) E12-06-107 - D. Dutta
- 10:10 (5+5) E12-10-002 - I. Niculescu
- 10:20 (5+5) E12-10-003 - M. Jones
- 10:30 (5+5) E12-10-008 - D. Gaskell
- 10:40 (5+5) E12-09-017 - R. Ent
- 10:50 (5+5) E12-09-011 - T. Horn
- 11:00 (5+5) E12-09-002 - W. Armstrong
- 11:10 SHMS Detector Systems - Charge Items 8,3,1
- 11:10 (15+5) Overview (15+5) - S. Wood
- 11:30 (10+10) Shower Counters - H. Mkrtchyan
- 11:50 (10+10) Aerogel Detectors - A. Mkrtchyan
- 12:10 (10+10) Wire Chambers - E. Christy
- 12:30 - Lunch
- 1:30 SHMS Detector Systems - Continued
- 1:30 (10+10) Scintillation Counters - G. Niculescu
- 1:50 (10+10) Quartz Hodoscope - A. Ahmidouch
- 2:10 (10+10) Noble Gas Cherenkov - D. Day
- 2:30 (10+10) Heavy Gas Cherenkov - G. Huber
- 3:35 (15) Coffee Break
- 3:50 (15+10) DAQ and Trigger, Computing – Charge Items 3,7 - B. Sawatzky
- 4:15 (15+10) SHMS Optics and Commissioning - Charge Items 3,7,8 - M. Jones
- 4:40 (15+10) HMS status of the detectors - Charge Items 8,3,1 - S. Malace
- 5:05 (20+15) HMS: operation at high momentum (20+15) - Charge Items 8,3,1 - S. Lassiter
Thursday August 25, 2016
- 8:15 (30) Executive Session
- 8:45 (15+10) Beamline Instrumentation Overview - Charge Items 7,3,1 - D. Gaskell
- 9:10 (10+10) Beam Delivery - Charge Item 5 - J. Benesch
- 9:30 (20+15) Small Angle Operation - Charge Item 2 - Roger Carlini
- 10:05 (10+10) Target System – Charge Items 8,1 - D. Meekins
- 10:25 (15) Coffee Break
- 10:40 (10+10) Target Operations and Training (10+10) – Charge Items 7,8 - G. Smith
- 11:00 (10+10) Radiation Assessment - Charge Item 6 - P. Degtiarenko
- 11:20 (15+15) Hall Checkout (15+15) - Charge Item 7 - W. Kellner
- 11:50 (30+15) Documentation (30+15) – Charge Item 4 - S. Wood
- 12:35 Executive Session & Lunch
- 4:30 (30) Closeout
Documentation Drafts
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD) (Built from GitHub Commit c7ece46025f4a947ea4de54961ef46dc55bb0678)
- Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
- Standard Equipment Manual (Built from GitHub Commit c7ece46025f4a947ea4de54961ef46dc55bb0678)
- Radiation Safety Assessment Document (From Spring 2016 beam test)
- Hall C Howtos and References (Some operations manual references found here)
- Hall C Document Database (Some operations manual references found here)
Checklists
- Hall C Spectrometer Pre-Run Checklist
- HMS Magnet Pre-Run Checkout
- SHMS Magnet Pre-Run Checkout
- Detector Readiness Checklist
Miscellaneous Materials
- Generic Magnet Install/Test Schedules
- Beamline Responsibilities Chart (Figure 2.5 of Standard Equipment Manual)