Difference between revisions of "Main Page"

From HallCWiki
Jump to navigationJump to search
(Reorganized a bit)
(→‎Beamline: Remove FSD info (was for Qweak))
Line 38: Line 38:
  
 
== Beamline ==
 
== Beamline ==
*[[Hallc_beamline_fsd_guide | Guidance ]] for decision on masking the FSD. Decision will be be made by the Hall Leader Steve Wood or, in his absence, Greg Smith.
 
  
 
== HMS Detectors ==
 
== HMS Detectors ==

Revision as of 13:50, 28 February 2017

Hallcheader.jpg


Hall C Links

Hall C

Hall C is one of four experimental halls at JLab.

Hall C Computing.

Hall C in the Press.

Basic Equipment in Hall C

Beamline

HMS Detectors

SHMS Detectors

DAQ

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)

Online Replay

Data Analysis

Monte Carlo

Hall C at 12 GeV

Spring 2017 Commissioning Plans