Difference between revisions of "Fall 2017 Commissioning Plan"

From HallCWiki
Jump to navigationJump to search
m
Line 5: Line 5:
 
= Talks at Dec 17th Analysis Meeting =
 
= Talks at Dec 17th Analysis Meeting =
 
*[https://hallcweb.jlab.org/DocDB/0009/000937/001/HGC_Update_17dec.pdf SHMS HGC update]
 
*[https://hallcweb.jlab.org/DocDB/0009/000937/001/HGC_Update_17dec.pdf SHMS HGC update]
 +
*[https://hallcweb.jlab.org/DocDB/0009/000938/001/Calorimeter-aerogel-cherenkov-update.pdf SHMS/HMS Calo, HMS Cherenkov and SHMS Aerogel update]
 
*HMS/SHMS scintillator update
 
*HMS/SHMS scintillator update
 
*[https://logbooks.jlab.org/entry/3504491 BCM calibration]
 
*[https://logbooks.jlab.org/entry/3504491 BCM calibration]

Revision as of 12:24, 15 December 2017

Fall 2017 Commissioning Plan

  • The plan of the full SHMS/HMS commissioning.
  • Git repo with run plans for the various tasks. To contribute a plan, fork the repo to your githu account.

Talks at Dec 17th Analysis Meeting

Table of commissioning analysis

Task Person Comment
BCM calibration Eric C./Deepak
Raster calibration Melanie/Burcu
HMS Trigger efficiency Eric P. /Burcu
SHMS Trigger efficiency Eric P./ Abishek
Heavy gas HMS calibration Hamlet
Mode 10 run was taken SHMS Eric P.
SHMS Carbon elastic Holly
HMS elastic delta Deb
SHMS sieve point Holly


Table of Commissioning Tasks

Task Person Comment Time
Harp Scans, BPM and Raster Checkout M. Jones
HMS & SHMS Hodoscope Checkout S. Malace
HMS & SHMS 3/4 Trigger & TOF Efficiency Checkout S. Malace
SHMS Quartz Plane Checkout S. Malace
HMS & SHMS DC Checkout, Tracking Efficiency and Alignment H. Szumila-Vance, C. Yero
HMS & SHMS Heavy Gas Cherenkov Checkout E. Pooser, R. Ambrose
HMS & SHMS Pre-Shower/Shower Checkout H. Mkrtchyan, A. Asaturyan, V. Berdnikov
SHMS Aerogel Checkout H. Mkrtchyan, A. Asaturyan, V. Berdnikov
HMS & SHMS Trigger Efficiency Checkout B. Sawatzky, E. Pooser, C. Yero
Beam Energy M. Jones, D. Mack
BCM Calibration D. Mack, D. Bhetuwal
Target Boiling D. Gaskell
Carbon Elastic with Sieve for Final SHMS Tune Determination M. Jones, H. Szumila-Vance
Carbon Elastic Scan for Delta Matrix Optimization H. Bhatt, D. Dutta
Carbon Inelastics with Sieve for Ytgt, Y’tgt and X’tgt (Need 20 deg for Ytgt) M. Jones, H. Szumila-Vance
Sieve Check After Cycling SHMS Magnets from Positive to Negative and Back M. Jones
Determine SHMS Central Momentum and Angle with Set of Elastic ep Data A. Karki, S. Basnet, D. Dutta Heepcheck Planning
Inelastic Carbon Xn Measurements with Overlapping Momentum Settings for Acceptance Check M. Jones, B. Duran
GEM Front Sieve to Better Understand HB. Do Optics with p+ to Check Optics L. Kabir, D. Dutta
Initial and Final Coincidence Timing Checkout and Optimization B. Sawatzky, E. Pooser, C. Yero
Electronic Dead Time Checkout B. Sawatzky, E. Pooser, C. Yero
Single Kaon Production. Coincidence p and K Production