Pol He-3 Target Information
From HallCWiki
Jump to navigationJump to searchTarget Operator Instructions
FIXME: ADD LINKS/DOCS/WHATEVER HERE
System Description
Checklists
- Checklist before starting Target Work inside the Enclosure
- Backout Checklist after Hall Access for Target Work
- Backout Checklist after Target Work inside Enclosure
Expert Information
Pol He3 Field Mapping Data
Circular Raster Information
- Raster Status Presentation Mark J., Bob M. (Dec 10, 2018 Collaboration Meeting)
Reboot Switches
- Reboot Switch Operation --How to use reboot switches
- hcreboot5 --Devices in the Pol He3 Rack behind the Green Wall
- hcreboot6 --Devices in the two racks under the pivot
Reset Target Ladder Motion Control
Cable/RTD/Signal Maps
NOTE: If you update a map below Click on a the previous hclog entry and either add a comment pointing to your new entry, or use the 'Follow-up' link on the old entry to make a new entry. That will make it easier to track when/why things change.
- Note: There is a dictionary of EPICS PVs with descriptions at
- ~coda/coda/scripts/EPICS_logging/polhe3-epics.txt
- Laser Fiber End RTDs:
- Hardware notes: https://logbooks.jlab.org/entry/3747838
- Final Map: https://logbooks.jlab.org/entry/3747950
- RTDs on cell:
- Visual gauge photo: https://logbooks.jlab.org/entry/3747509 (12/06/2019 - 03:48)
- RTD head settings: https://logbooks.jlab.org/entry/3747508