Target Field and Kepco Info

From HallCWiki
Jump to navigationJump to search

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

SHMS 11 degrees

Field Direction Helm. Lg. Helm. Sm. Vert. Lg. Vert. Sm.
0 0.0 7.280
90 7.406 -0.25
180 -7.350 0
270 -7.364 -0.237

SHMS 11 degrees

Field Direction Helm. Lg. Helm. Sm. Vert. Lg. Vert. Sm.
0
90
180
270

Labview Program Guide

Field Measurements

  • A1n Vertical Field Measurement (March 13th, 2019)

https://logbooks.jlab.org/entry/3804362

Plan for returning from COVID shutdown

  • Work that can begin immediately (June 10th, 2020) Task 1 in HCLIST (http://devweb.acc.jlab.org/CSUEApps/hclist/atlis.php?load=Task&task_id=1818)
    • Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
      • This can be done anywhere, I just need some connectors from Ethan or Jack. Currently the new power supply is in Bill's office.
    • Measure resistance to ground for both coils.
    • Install latest new power supply, add additional circuitry (RLC).
    • Test power supplies in both current and voltage control mode
      • MUST check PS output on scope, with and without RF on.
      • LIKE to check PS output on scope, with and without sense wires attached.
      • LIKE to check PS output on scope, with and without additional circuity (RLC).
    • LABVIEW
      • Determine calibrations: Current to field, field direction equation for epics, function generator output vs PS output, ...
      • Update programs. One for voltage mode, one for current mode


  • After the cell is polarized (Task 9 in HCLIST)
    • Test NMR in both voltage and current mode

Manuals/Documentation