Sep 25 2024
From HallCWiki
Jump to navigationJump to searchBack to Main Page >> Weekly meetings
Agenda
Notes
- SHMS hcvme04, hcvme06 are ready and upgraded to CODA 3
- Basic DAQ is good to run
- Bill completed the gate and reference time connections for SHMS DC (https://logbooks.jlab.org/entry/4317022)
- Took HMS cosmic runs with adjust trigger time (https://logbooks.jlab.org/entry/4317449): hodoscope and calorimeter good hits look different from previous runs
- Added Aerogel to HV GUI
To do
- Add ET to CODA configuration
- Saturate the DAQ using a high rate pulser to see the maximum data rate
- Would need more than one ERs to achieve higher maximum data rate.
- Bill will keep working on the triggers with cosmic