Wednesday, February 07, 2017
From HallCWiki
Jump to navigationJump to searchMeeting Information
- Location CC L102
- DocDB
Agenda
System Owners
HMS
- Drift Chambers: E. Pooser
- Hodoscopes: S. Malace, M. Jones
- Shower: H. Mkrtchyan, Yerevan
- HGC: B. Sawatzky
SHMS
- Drift Chambers: E. Christy, D. Biswas
- Hodoscopes: S. Malace, M. Jones
- Shower/Pre-shower: H. Mkrtchyan, Yerevan
- Aerogel Cerenkov: A. Mkrtchyan, T. Horn
- NGC: D. Day, E. Pooser
- HGC: G. Huber, B. Li
General Questions to be Addressed by Individual Groups
- What is the current status on the Hardware?
- Identify any remaining bad detectors/channels. (Show a quick slide that indicates status?)
- Are there plans to repair them prior to the KPP run, or after KPP?
- What is the status of the Software associated with your detector?
- Have you successfully run the analyzer and been able to identify signals for your detector?
- Have the HV <-> ADC <-> TDC channel mappings all been verified to be correct?
- Have any relevant survey/position information been updated your detector's PARAM files?
- Have all calibration constants been updated in the PARAM files (ie. gains, time offsets, etc...)?
- If beam is needed to finalize these params, is the software chain ready to go to generate them quickly?
- Can you think of anything else that needs to be completed before we take beam?
- Missing software you need?
- Missing survey/position information to complete the PARAM files?
Specific Questions to be Addressed
- HMS & SHMS Drift Chambers
- Can we acquire tracks from the cosmic data yet?
- NGC
- Are the HV signal cables hooked up?