Wednesday, September 20, 2017

From HallCWiki
Revision as of 09:54, 21 September 2017 by Cyero (talk | contribs) (→‎Trigger/DAQ)
Jump to navigationJump to search

Meeting Information

  • Location CC L210A, 11 am
  • DocDB

Blue Jeans Connection Information

  1. Enter Meeting ID: 895800575
  2. Press #

Agenda

  1. Commissioning plan updates from detector systems
  2. Status update from detector owners, calibrations, efficiencies, etc.
    1. Update on new HMS wire chambers — B. Pandey
    2. HV issue with GEM L. Kabir
  3. Review systems owners and update information
  4. Address system specific points of interest for the Fall 2017 run

Minutes

General

Miscellaneous

Beam Line

Trigger/DAQ

The HMS/SHMS 6 trigger input on the TI has been configured to include multiple pre-triggers simultaneously.

HMS

6 GeV Drift Chambers

12 GeV Drift Chambers

Hodoscopes

Aerogel

Heavy Gas Cherenkov

Shower

SHMS

GEM

Nobel Gas Cherenkov

Drift Chambers

Hodoscopes

Heavy Gas Cherenkov

Aerogel Cerenkov

Shower/Pre-shower