Commissioning Plan 2017
From HallCWiki
Jump to navigationJump to searchHMS/SHMS Magnet Cycling Procedures
HMS
- ALWAYS set DIPOLE by NMR coming DOWN from 900 A
- Set QUADS by initially setting to a current of 200 A above the set currents (or the maximum current of 1100 A for Q1 if set current + 200 > 1100), and then coming DOWN.
SHMS
- General principal: A magnet will be “on loop” if it has been taken to Imax (11 GeV) and stays on the descending branch of the hysteresis loop. Otherwise it is "off loop"
- Cycle procedure: Go to Imax and descend to target current.
- Action logic table
Status/Action | Magnet status is “on loop” | Magnet status is “off loop” |
Increasing abs(p) at this polarity | Cycle | Cycle |
Decreasing abs(p) at this polarity | Descend to target current | Cycle |
Changing polarity | Set to 0 current, switch polarity, cycle | Set to 0 current, switch polarity, cycle |
Beam energy of 2.2 GeV
Initial conditions
- HMS/SHMS angle surveys.
- Beamline BPM and Harp surveys. Check offsets in MCC database.
- HMS/SHMS Conditions:
HMS/SHMS collimator: | PION , COLLIMATOR |
---|---|
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run 2.2 GeV beam four 4 days and switch to 3 pass.
- Run 6.4 GeV beam and switch to 5 pass.
- Run 10.6 GeV beam.
Beam Checkout with Superharps and Beam Position Monitors
- Experts: Mark Jones, Deb Biswas, Thir Guatam
- Expected time: 3 hours
- Goals: Initial measurement of beam spot size. Followed by calibration of girder BPMs at 5,30 and 60uA. Measure raster size with superharps.
- Conditions:
beam current: | 5,30 and 60 μA |
---|---|
fast raster: | off |
target: | none |
- Runplan: pdf file
Center beam on C-hole target
- Experts:
- Expected time: 1 hour
- Goal: Center beam on carbon hole target
- Conditions:
beam current: | 5 μA |
---|---|
fast raster: | 3x3mm |
target: | carbon hole |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run plan: Procedure
Initial HMS/SHMS Detector Checkout
- SHMS/HMS optics experts:
- HMS DC experts:
- Expected time: 1 hour
- Goal: Initial checkout of the HMS/SHMS detectors. Working well enough for carbon elastics data and initial checkout of the SHMS/HMS tunes.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- General Run Plan:
- HMS focal plane plots
- SHMS focal plane plots
- HMS physics plots
- SHMS physics plots
- Need to have rough calibration of BCM1 and BCM2.
- First check trigger rates ( SHMS/HMS expects 4kHz/5kHz good electrons at 20uA and )
- Check background triggers rate
- Confirm the HMS DC tracking is working properly and efficiency is high.
- Compare HMS/SHMS focal plane plots to MC simulation.
Wire Chamber
- SHMS Run plan:
- HMS Run plan:
Shower Counter
Scintillator
- SHMS Run plan:
- HMS Run plan:
Cerenkov
- SHMS Heavy Gas Cherenkov: Run Plan
- HMS Run plan:
Aerogel
- SHMS Run plan:Files
Initial checkout of SHMS/HMS tune
- Experts: M Jones, H. Szumila
- Expected time: 1 hour
- Goal: Check tune with sieve
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE , CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Plots of focal plane for HMS focal plane and SHMS focal plane
- For SHMS use these plots to help guide the setting of the quadrupoles.
- For HMS sieve, rate 340 Hz at 20uA
- For SHMS sieve, rate of 285 Hz at 20 uA
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: 2 hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- Run Plan: MCC procedure
Carbon 4.4 inelastic with HMS
- Experts: M. Jones, H. Szumila
- Expected time: 1 hour
- Goal: Determine the vertical beam position with carbon 4.4 inelastic
- Conditions:
beam current: | 3 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS collimator: | SIEVE |
HMS trigger: | SCIN 3/4 |
HMS angle/momentum | 13.5 deg, -2.105 GeV/c |
- HMS Run Plan:pdf
Fine tune SHMS with Carbon 4.4 inelastic
- Experts: M. Jones, H. Szumila
- Expected time: 1 hour
- Goal: Fine tune the SHMS quads and dipole with carbon 4.4 inelastic
- Conditions:
beam current: | 3 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
SHMS collimator: | CENTERED SIEVE |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum | 13.5 deg, -2.105 GeV/c |
- SHMS Run Plan: pdf
SHMS Delta checkout with Carbon Elastic ground state
- Experts: M. Jones, H. Smuzila
- Expected time: 3 hour
- Goal: To take data with carbon elastic ground state and first excited state to test delta resolution.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
SHMS collimator: | CENTERED SIEVE |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum | 7.5 deg, 2.1 GeV/c |
- Run Plan:
SHMS/HMS Delta Matrix calibration
- Experts: M. Jones, H. Smuzila
- Expected time: 12 hour
- Goal: To
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | Pion , Collimator |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 13.5 deg, various |
SHMS angle/momentum | 13.5 deg, various |
- Run Plan:
- Try with different vertical and horizontal beam positions.
1H(eep) Coincidence SHMS (proton) and HMS (electron)
- Experts: D. Dutta, S. Basnet, A. Karki
- Expected time: 1 hour
- Goal: Setup coincidence timimg. Kinematic for HEEPcheck. Measure cross section.
- Conditions:
beam current: | 5-60 μA |
---|---|
fast raster: | 1x1mm |
target: | 10cm LH2, 10cm dummy |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 65.1 deg, -0.936 GeV/c |
SHMS angle/momentum | 25.0 deg, +2.012 GeV/c |
- Run Plan:
1H(eep) Coincidence SHMS (electron) and HMS (proton)
- Experts: D. Dutta, S. Basnet, A. Karki
- Expected time: 1 hour
- Goal: Setup coincidence timimg. Kinematic for HEEPcheck. Measure cross section.
- Conditions:
beam current: | 5-60 μA |
---|---|
fast raster: | 1x1mm |
target: | 10cm LH2, 10cm dummy |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 53.3 deg, +0.957 GeV/c |
SHMS angle/momentum | 25.0 deg, -1.816 GeV/c |
- Run Plan:
SHMS Angle and Position Matrix Optimization
- Experts:
- Expected time: 2 hour
- Goal: SHMS angle and position matrix optimization
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon, optics targets |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25. deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run Plan:
Beam energy of 6.4 GeV
Initial conditions
- HMS/SHMS Conditions:
HMS/SHMS collimator: | PION , COLLIMATOR |
---|---|
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Superharp Scan
- Experts: Mark Jones
- Expected time: 1/2 hour
- Goal: Verify beam spot size
- Conditions:
beam current: | 5 μA |
---|---|
fast raster: | off |
target: | none |
- Ask MCC to do superharp scan with superharps IHA3H07A and IHA3H07B and put entry in ELOG. Record the 3 BPMs positions (3H07A,3H07B,3H07C) during scan.
- Want beam spot with sigma_x and sigma_y below 200 um ( beam pass 1-4) and below 300 um for beam pass 5.
- Verify Girder BPM position to Harp positions.
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3.0 GeV/c |
SHMS angle/momentum | 15. deg, -3.0 GeV/c |
Detailed Detector Checkout
- Experts:
- Expected time: ? hour
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Wire Chamber
- SHMS Run plan:
- HMS Run plan:
Shower Counter Calibration Run
- SHMS Run plan:
- HMS Run plan:
Scintillator
- SHMS Run plan:
- HMS Run plan:
Cerenkov
- SHMS Heavy Gas Cherenkov: calibration plan
- HMS Run plan:
Aerogel
- SHMS Run plan:
Set Discriminator Thresholds for PID Trigger
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3.0 GeV/c |
SHMS angle/momentum | 15. deg, -3.0 GeV/c |
Defocused Tune for SHMS
- Experts: Hamlet
- Expected time: 1 hr
- Goal: Have a wider y_fp to calibrate the calorimeter over regions that are not usually hit with the standard hourglass tune.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2 |
SHMS collimator: | Collimator |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum | 25. deg, -3.0 GeV/c, Q2 at 1.2 times normal |
- Run Plan:Documents
BCM Calibration
- Experts: Dave Mack
- Expected time: ? hours
- Goal:
- Conditions:
beam current: | 1-60 μA |
---|---|
fast raster: | off |
target: | none |
- Run Plan:
Target boiling study
- Experts:
- Expected time: hour
- Goal: Measure target boiling
- Conditions:
beam current: | 5-60 μA |
---|---|
fast raster: | 1x1mm |
target: | 10cm LH2, 10cm LD2, carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3 GeV/c |
SHMS angle/momentum | 15. deg, -13 GeV/c |
- Run Plan:
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
1H or 12C(eep) [3 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 3% carbon, 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
1H or 12C(e, e’ π) [2 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 3% carbon, 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 16.8 deg, -3.8 GeV/c |
SHMS angle/momentum | 20.0 deg, +2.7 GeV/c |
1H(e’K) and 1H(e, e’K) [3 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25.0 deg, -2.6 GeV/c |
SHMS angle/momentum | 15.0 deg, +3.6 GeV/c |
Coincidence Checkout [16 hrs]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION/SIEVE , COLLIMATOR/CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
- We will take a set of 1H(e,e’p) measurements to check the angle and dp/p offsets for the spectrometers. Use a current of 50 μA if possible. Rotate both HMS and SHMS to -27.5° again (or keep them there if already at that angle). Keep both HMS and SHMS at a central momentum of -3.609 GeV/c. First use the sieve slit on the SHMS side and the central Carbon optics target. Use the Particle Id. trigger, and measure about 2K singles in SHMS (that should take about one hour). Now install the 10 cm hydrogen target and measure about 2K singles in SHMS (that is again about one hour). Now take a coincidence spectrum in the same situation, again a measurement of about one hour. Remove the sieve slit on the SHMS side and use the large collimator. Measure a coincidence spectrum for one hour (rate should be 4 Hz, so this will get >10K statistics). Now install the sieve slit on the HMS side and measure another coincidence spectrum for a few hours (a few K statistics).
Elastic p(ep) Checkout
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
- Take runs to acquire roughly 10K events for HMS (use the large pion collimator!) at angles of 27.5°, 28.8°, 30.1°, 24.9°, and 26.2°. For SHMS at identical angles but also at angles of 31.8°, 33.5°, 35.2° and 23.2°. Roughly, at the central setting you need 45 minutes to acquire 10K statistics, and less at the lower angles, but perhaps 1.5 hour at 30.1°, and up to 5 hours at the largest SHMS angle of 35.2°.
HMS/SHMS Angle and Position Matrix Optimization
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered Sieve |
HMS/SHMS trigger: | , |
HMS angle/momentum | 25. deg, -3.0 GeV/c |
SHMS angle/momentum | 25. deg, -3.0 GeV/c |
HMS Angle and position matrix optimization for large ytgt
- Experts:
- Expected time:
- Goal: Calibrate HMS ytgt, yptar and xptar for 10cm target.
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | optics targets |
HMS | Sieve , Centered Sieve |
HMS trigger: | , |
HMS angle/momentum | 50. deg, -2.0 GeV/c |
- Run Plan:
Use GEM to check out SHMS optics
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | <1 μA |
---|---|
fast raster: | off |
target: | optics targets |
SHMS collimator: | Collimator |
SHMS trigger: | 3/4 Scin + Cer |
SHMS angle/momentum | 25. deg, -2.0 GeV/c |
- Run Plan:
Check spectrometer pointing
- Experts:
- Expected time:
- Goal: Measure the HMS/SHMS spectrometer pointing
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | Sieve, Centered sieve |
HMS/SHMS trigger: | , |
HMS angle/momentum | 12.-60 deg, -3.0 GeV/c |
SHMS angle/momentum | 7.5-40 deg, -3.0 GeV/c |
Beam energy of 8.8 GeV
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | |
SHMS angle/momentum |
1H(eep)
Beam energy of 10.6 GeV
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
1H(eep)
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | |
SHMS angle/momentum |