Target Field and Kepco Info

From HallCWiki
Revision as of 10:27, 1 June 2020 by Brads (talk | contribs)
Jump to navigationJump to search

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

Labview Program Guide

Field Measurements

Plan for returning from COVID shutdown

    • Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
    • Measure resistance to ground for both coils
    • Install latest new power supply, add additional circuitry
    • Test power supplies in both current and voltage control mode
    • Look at PS output on scope, with and without RF on.
    • Test NMR in both voltage and current mode
    • Ensure Labview is ready to go for either configuration

Manuals/Documentation