RC Meeting and Runplan, Saturday, August 25

From HallCWiki
Revision as of 15:06, 25 August 2018 by Gaskelld (Talk | contribs) (Created page with "* '''Status''' ** No beam to hall overnight ** Hoping to send CW to Hall C despite trouble sending 5 pass to Halls B and D ** Progress slowed by dump FSD issue * '''Run plan...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Status
    • No beam to hall overnight
    • Hoping to send CW to Hall C despite trouble sending 5 pass to Halls B and D
    • Progress slowed by dump FSD issue


  • Run plan
    • Saturday SWING-Sunday OWL and DAY
      • Initial beam setup to the hall
      • If MCC asks, the Compton electron detector is OUT
      • Make sure target is OUT
      • After initial setup - SHMS steering plan will be executed (please call RC if not already on site). When MCC asks, ramp up magnets (one at a time) to settings for -6.053 GeV.
      • After completion of SHMS steering plan, proceed with detector and trigger checkout. Call experts before start (Malace, Pooser, Berdnikov, Ambrose for detector checkout, Malace, Poose, Huber, Trotta for trigger checkout)