RC Meeting and Runplan, Tuesday, August 28
From HallCWiki
Jump to navigationJump to search- Status
- More work to tune beam into Hall C yesterday evening - did not converge. Little/no beam to Hall C on OWL shift due to other issues.
- One hypothesis is that one or more quads that were worked over summer have wrong polarity (note: checks during day shift indicate polarities ok)
- Controlled Access today while RF recovery ongoing
- IHA3H07A fixed (encoder cable connected)
- Quad polarity check
- Walkthrough training
- SHMS PMT check
- Target fan stopped during DAY shift - warmed up target a little, fan restarted
- More work to tune beam into Hall C yesterday evening - did not converge. Little/no beam to Hall C on OWL shift due to other issues.
- Run plan
- Tuesday SWING, Tuesday OWL and DAY
- Beam optics tuning
- Big BPM calibration/checkout test plan
- After initial setup - SHMS steering plan will be executed (please call RC if not already on site). When MCC asks, ramp up magnets (one at a time) to settings for -8.5 GeV.
- Beam checkout
- For the following, see detailed run plan here: [1]
- Detector and trigger checkout. Call experts before start (after hole-target is centered): Malace, Pooser, Berdnikov, Ambrose for detector checkout, Sawatzky, Malace, Pooser, Huber, Trotta for trigger checkout)
- Calibration runs
- Tuesday SWING, Tuesday OWL and DAY