User contributions
From HallCWiki
Jump to navigationJump to search- 10:35, 1 July 2022 diff hist +124 CaFe Preparation
- 10:34, 1 July 2022 diff hist +91 N File:CAFE rate AND run plan 07012022.pdf Put everything together (Optimization summary + Rate calculation for SRC and MF + Run plan) current
- 10:32, 1 July 2022 diff hist -1 CaFe Preparation
- 10:31, 1 July 2022 diff hist -2 CaFe Preparation
- 10:30, 1 July 2022 diff hist +69 CaFe Preparation
- 07:46, 20 June 2022 diff hist +148 CaFe Preparation
- 07:43, 20 June 2022 diff hist +147 N File:CaFe run 05182022.pdf The final production run plan using the most updated target information from Meekin in which we use 3% RL of Fe target and maximum current is 80 uA current
- 09:19, 1 March 2022 diff hist +156 CaFe Preparation →CaFe Kinematics Optimization
- 09:17, 1 March 2022 diff hist +92 N File:CaFe run plan 02232022.pdf Different run plans base on different condition (Iron target thickness and max beam current) current
- 10:56, 22 February 2022 diff hist -2 CaFe Preparation →CaFe presentations ==
- 10:56, 22 February 2022 diff hist +184 CaFe Preparation →Weekly Meeting Information
- 10:52, 22 February 2022 diff hist +100 CaFe Preparation →CaFe Kinematics Optimization
- 10:51, 22 February 2022 diff hist +244 N File:CAFE new run plan REPORT 02182022 update.pdf - reoptimize the CaFe to determine the kinematic with 10.6 GeV beam and 8.55 Pe (for the optic matrix) - Doing rate estimation for MF and SRC for optimized kin - Apply Em < 50 MeV in this round to cut off the RC tail when we do rate estimation. current
- 10:48, 22 February 2022 diff hist +30 CaFe Preparation →CaFe Kinematics Optimization
- 13:48, 7 July 2020 diff hist +25 ERR E12-11-107-LAD review