All public logs
From HallCWiki
Jump to navigationJump to searchCombined display of all available logs of HallCWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 10:34, 1 July 2022 Dien talk contribs uploaded File:CAFE rate AND run plan 07012022.pdf (Put everything together (Optimization summary + Rate calculation for SRC and MF + Run plan))
- 07:43, 20 June 2022 Dien talk contribs uploaded File:CaFe run 05182022.pdf (The final production run plan using the most updated target information from Meekin in which we use 3% RL of Fe target and maximum current is 80 uA)
- 09:17, 1 March 2022 Dien talk contribs uploaded File:CaFe run plan 02232022.pdf (Different run plans base on different condition (Iron target thickness and max beam current))
- 10:51, 22 February 2022 Dien talk contribs uploaded File:CAFE new run plan REPORT 02182022 update.pdf (- reoptimize the CaFe to determine the kinematic with 10.6 GeV beam and 8.55 Pe (for the optic matrix) - Doing rate estimation for MF and SRC for optimized kin - Apply Em < 50 MeV in this round to cut off the RC tail when we do rate estimation.)