- 11:44, 15 April 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Updated end of 3-pass and final 4-pass running)
- 09:13, 4 April 2024 Hyde talk contribs uploaded File:C2097 NPS Survey02Apr2024.pdf (April 2 Survey results of Calo relative to SHMS. Disagrees by 0.3 deg from previous?)
- 12:59, 19 March 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Updated plan with all 4-pass running starting late April.)
- 11:34, 13 March 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Updated 3-pass plan)
- 12:46, 6 March 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Revision of KinC_x25_4)
- 14:58, 22 February 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Revised schedule of Calo Repair and Pb shield removal (Feb 22))
- 13:01, 20 February 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Revised 5-Pass plan. Modified dates of Wing removal. Added Calo work on columns 24-29.)
- 09:54, 5 February 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Updated "Wings-off" date to 6-Mar-2024)
- 12:47, 2 February 2024 Hyde talk contribs uploaded a new version of File:NPS Completion 2024.pdf (Edits to angle restrictions. Added positron running)
- 10:59, 2 February 2024 Hyde talk contribs uploaded File:NPS Completion 2024.pdf
- 08:26, 30 October 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (Changed layout)
- 15:05, 5 October 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (replace micro C with C for acummulated charge)
- 13:48, 5 October 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (More NPS Details)
- 14:27, 21 September 2023 Hyde talk contribs uploaded a new version of File:NPS DVCS RunPlan.pdf (Updated details on KinC_x50_2 Updated Elastic Kinematics with 9.5 m calo at 5-pass)
- 13:04, 21 September 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (Changed HMS units from kG to T A few other cosmetic changes)
- 08:12, 13 September 2023 Hyde talk contribs uploaded a new version of File:NPS DVCS RunPlan.pdf (Modified setting KinC_x25_3 to KinC_x25_3' (larger NPS-HMS separation))
- 12:49, 11 September 2023 Hyde talk contribs uploaded a new version of File:NPS VTP DAQ.pdf (Corrected Units of some variables. Added readout parameters)
- 07:35, 11 September 2023 Hyde talk contribs uploaded a new version of File:NPS DVCS RunPlan.pdf (minor tweaks)
- 12:14, 8 September 2023 Hyde talk contribs uploaded a new version of File:NPS VTP DAQ.pdf (Updated suggested Gain parameter, file locations...)
- 08:04, 7 September 2023 Hyde talk contribs uploaded File:Phoebus.png (From cuawiki page on NPS Slow Controls)
- 09:45, 6 September 2023 Hyde talk contribs uploaded File:NPS VTP DAQ.pdf (Version 6 September 2023. A brief guide to the structure of the FADC/VTP/V1495 DAQ for the NPS Calorimeter)
- 06:57, 4 September 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (Update document title)
- 17:08, 3 September 2023 Hyde talk contribs uploaded a new version of File:Runsheet dvcs NPS.pdf (Corrected link)
- 17:04, 3 September 2023 Hyde talk contribs uploaded File:Runsheet dvcs NPS.pdf (Initial run sheet for NPS-DVCS Sept 2023)
- 09:52, 3 September 2023 Hyde talk contribs uploaded a new version of File:NPS DVCS RunPlan.pdf (Initial calorimeter setting at 9.5 m)
- 10:07, 28 August 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Added alternate kinematics KinC_x25_3' in Column AC to increase gap between NPS and HMS. Other minor tweaks, additions.)
- 10:00, 28 August 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Added alternate kinematics KinC_x25_3' in Column AC to increase gap between NPS and HMS. Other minor tweaks, additions.)
- 08:57, 28 August 2023 Hyde talk contribs uploaded a new version of File:NPS DVCS RunPlan.pdf (Modified 8-Aug-2023, 10:00 am to add calibration summary tables)
- 08:24, 28 August 2023 Hyde talk contribs uploaded File:NPS DVCS RunPlan.pdf (Run Plan, Version 28 Aug 2023, 9:24 am Eastern Time U.S.)
- 12:32, 22 August 2023 Hyde talk contribs uploaded File:C2082 NPS-Survey.pdf (Survey Report on alignment of NPS Calo track with SHMS Carriage readback)
- 09:14, 7 August 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Re-adjusted x=0.60 to full PAC allocation Added addition details (summary by beam energy, etc).)
- 08:34, 10 July 2023 Hyde talk contribs uploaded a new version of File:NPS ElasticCalibrations.pdf (Update with 4 pass and 5 pass calorimeter calibration settings, both at 9 m)
- 12:17, 19 June 2023 Hyde talk contribs uploaded File:NPS base irradiation resultsv2.pdf (Note on irradiation tests of the NPS PMT bases. V. Berdnikov, D. Mack)
- 12:15, 19 June 2023 Hyde talk contribs uploaded File:NPS Background Dose.pdf (Summary of previous MC estimates of DVCS background rates, and Hall A running experience)
- 13:58, 9 June 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Tweaked the run-times based on formula for momentum acceptance: HMS below 6.6 GeV, delta acceptance [-0.08, 0.08] HMS >/= 6.6 GeV, delta acceptance [-0.4, 0.08] Added line to introduce 2% HMS momentum offset relative to nominal DVCS kinematics for HMS...)
- 12:00, 8 June 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Adjust xB from 0.5 to 0.48 and from 0.6 to 0.58 to match two high momentum HMS settings to existing pionLT optics data. Also adjust KinC_x25_3 to achieve minimum 23.5 deg separation HMS-SHMS)
- 14:22, 6 June 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Include DIS rates, including with HMS Sieve slit Update to kinematics, cross sections, run times)
- 13:42, 5 June 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Updated formatting of main spreadsheet: DVCS-Kin)
- 13:34, 5 June 2023 Hyde talk contribs uploaded a new version of File:DVCS-kin-NPS-2023 v0.xlsx (Updated DVCS cross section calculations, count rate estimates, durations of each setting)
- 13:37, 26 May 2023 Hyde talk contribs uploaded File:NPS ElasticCalibrations.pdf (Note on Run plan for PbWO4 calibrations via H(e,e'_{Calo} p_{HMS}) and HMS momentum calibrations via H(e,e'_{HMS})p measurements.)
- 13:31, 26 May 2023 Hyde talk contribs uploaded File:DVCS-kin-NPS-2023 v1.xlsx ("Pessimistic" scenario for NPS DVCS 2023 run: Lower CEBAF 3, 4, 5-pass energies: 6.281, 8.330, 10.368 GeV (corrected for synchrotron losses).)
- 13:27, 26 May 2023 Hyde talk contribs uploaded File:DVCS-kin-NPS-2023 v0.xlsx (Spreadsheet of DVCS kinematics and related info for 2023 NPS run. Full CEBAF energy (5 pass ~10.6 GeV))