Log entry time 16:51:06 on October 13, 2006

Entry number 124266

keyword=RC Summary report Thurs/Friday Oct 13

RC Report Saturday/Sunday

RC summary Thursday/Friday 10-13-2006

Betsy Beise



First report from a green run coordinator. Thanks for the training Serge and have a safe trip. This report is mostly normal production running.

The IHWP state was changed from OUT to IN on Friday around 9:00 AM. Beam spin is longitudinal. After the BCM monitor controller was swapped and Joe Beaufait redid some of the connectors in the counting house area, the temperature control appears to have stabilized.  BCM/BPM calibration on Friday, along with some loss of time for Hall B tuning.   Also, Darko noticed a residual rate, with a time constant of about a minute after the beam goes off,  in the new quartz tubes in Octant 5 ( Cer ).

See the plans of PD/MCC on the White Board for next week -- we should expect a few hours of down time each day shift.

DAILY 8AM  MEETINGS ARE MOVING TO CEBAF CENTER, Room F113 STARTING MONDAY OCT 16.



Beam and running conditions

1
) Good beam conditions on Thursday after beam restored around 3 PM, all through the night except for close to 6 AM just before beam trip. Lost some hours on Fri AM due to MCC work on Hall B beam.

2) Beam parameters should be  nominal (60 micro-A, good halo and Parity Quality within specification).

3) The IHWP was switched from OUT to IN on Friday at 9 AM (just before run 31437).  

4) Recommendation(s): 
 


Achievements during this 24 hour period :


1) Charge accumulated (runs 31432-31436), about 0.8 C. Total accumulated charge is 45 C (for Longitudinal).

3) Calibration of BPM/BCM Friday noon-3PM.  Brief investigation of saturation effects in the CAV2 y signal is scheduled for 4PM Friday.

4) Weekly checks of data files last done on Wed 11-Oct  (Checks)



Medium term plans and work underway

A) Installation of HKS drift chamber
B) IHWP state changes planned this Week
C) Moeller measurement on Thursday next Week as part of Beam Study (suggested by Jay Benesch, see white board, to be coordinated with MCC by Dave/Tanja)

D) Background studies (Flyswatter
w/ and wo/ Radiator) to be scheduled.


List of shift report summary
 

Thursday Swing     Th-Swing  and  cdaq-ThS
 Friday Owl    Fr-Owl    and  cdaq-FrO
 
Friday Day    Fr-Day     and  cdaq-FrD  


Betsy Beise
 Pager : 584-0120
 Cell
:  876-1791
 e-mail : beise@umd.edu