Jefferson Lab Hall C Logbook for March 09 - runstarts omitted

  • Main INDEX

    Tuesday

  • 179236 03/31/09 16:03 Reinhold Inventory of Gep/SANE frame
  • Monday

  • 179235 03/30/09 17:35 kenyon HMS Bore Vacuum
  • Thursday

  • 179231 03/26/09 01:30 reinhold Decabled frame/ left electronics in place
  • Wednesday

  • 179230 03/25/09 18:44 reinhold We are decabeliing Gep/Sane frame
  • Monday

  • 179227 03/23/09 09:01 saw IOC for SOS and Moller HV removed
  • Friday

  • 179225 03/20/09 18:48 gaskell Moller (involuntary) warmup
  • Thursday

  • 179223 03/19/09 15:25 beaufait HCLIST COMPLETED sos power supply removal
  • 179222 03/19/09 15:23 beaufait HCLIST CANCELLED Disconnect power to SOS
  • 179221 03/19/09 15:23 beaufait HCLIST CANCELLED Disconnect power to SOS
  • 179220 03/19/09 15:22 beaufait HCLIST COMPLETED Moller solenoid power supply switch investigation
  • 179219 03/19/09 15:21 beaufait HCLIST COMMENT ON Moller solenoid power supply switch investigation
  • 179218 03/19/09 12:20 saw EPICS Archiver stopped
  • Tuesday

    
    

    Monday

  • 179206 03/16/09 11:22 cdaq Beam Time Accounting
  • 179205 03/16/09 11:11 W. Luo BigCal HV off, turn off crates on BigCal plateform and in bunker
  • 179197 03/16/09 10:29 Fowler HMS Power Supplies & Rotation
  • 179184 03/16/09 09:11 jmaxwell Target: Magnet Ramped Down, Leads Locked
  • 179183 03/16/09 08:48 M Jones Turned off HV to HMS and BETA detectors
  • 179182 03/16/09 08:40 jmaxwell Target: Ramp Down Interestingness
  • 179181 03/16/09 07:58 jmaxwell Target: Ramping Procedure Starting
  • 179180 03/16/09 07:54 jmaxwell Target: Magnet PS Firmware Ramp Limits Changed
  • 179179 03/16/09 07:19 whit Actually set to rotate HMS to 35
  • 179178 03/16/09 07:16 whit HMS is at zero on all magnets
  • 179177 03/16/09 07:07 cdaq Beam Time Accounting
  • 179176 03/16/09 07:04 jmaxwell Last Shift Summary
  • 179175 03/16/09 07:03 whit Ramping HMS magnets to zero
  • 179174 03/16/09 07:01 jmaxwell SANE IS OVER
  • 179172 03/16/09 06:52 Hoyoung Target: overall polarization of top target
  • 179171 03/16/09 06:33 Hoyoung Target: Cryo screen
  • 179170 03/16/09 06:31 Hoyoung Target: PDP screen P=59.8%
  • 179167 03/16/09 05:30 Hoyoung Target: Cryo screen
  • 179166 03/16/09 05:29 Hoyoung Target: PDP screen P=61.3%
  • 179161 03/16/09 04:33 whit FINAL CHECKLIST SCAN!
  • 179160 03/16/09 04:32 Hoyoung Target: Cryo screen
  • 179159 03/16/09 04:31 Hoyoung Target: PDP screen P=63.1%
  • 179158 03/16/09 04:14 whit BPM screens
  • 179155 03/16/09 03:33 Hoyoung Target: Cryo screen
  • 179154 03/16/09 03:32 Hoyoung Target: PDP screenshot P=64.7%
  • 179153 03/16/09 03:22 whit New end of run sound
  • 179150 03/16/09 02:30 Hoyoung Target: Cryo screen
  • 179149 03/16/09 02:28 Hoyoung Target: PDP screen P=66.9%
  • 179146 03/16/09 01:37 Hoyoung Target: Cryo screen
  • 179145 03/16/09 01:36 Hoyoung Target: PDP screen P=69.0%
  • 179144 03/16/09 00:50 jmaxwell ROCs reporting
  • 179142 03/16/09 00:45 whit Asked for beam off while fixing DAQ
  • 179141 03/16/09 00:44 jmaxwell ROCs not reporting
  • 179140 03/16/09 00:40 Hoyoung Target: PDP reboot
  • 179138 03/16/09 00:13 Hoyoung Target: Cryo screen
  • 179137 03/16/09 00:12 cdaq Beam Time Accounting
  • 179136 03/16/09 00:11 Hoyoung Target: PDP screen P=73.9%
  • 179134 03/16/09 00:05 anusha Evening shift summery-Sunday 15 March 2009
  • Sunday

  • 179132 03/15/09 23:58 narayan Target PDP Screenshot
  • 179131 03/15/09 23:44 anusha HMS CONTROL PANEL had two alarms and got fixed.
  • 179130 03/15/09 23:40 lassiter HMS Q1 Valve 6
  • 179129 03/15/09 23:33 J Mulholland Marquis Not reading Beam Current Since cdaql6 crash
  • 179128 03/15/09 23:20 anusha DATA ACQUISITION COMPUTER CRASHED. Still the beam showing screen doesn't work
  • 179123 03/15/09 21:48 narayan target pdp screen and info
  • 179121 03/15/09 21:43 anusha BPM medm Screen
  • 179120 03/15/09 21:13 narayan target PDP screenshot
  • 179119 03/15/09 21:13 narayan target cryo screenshot
  • 179117 03/15/09 20:48 narayan Target info and screenshot
  • 179116 03/15/09 20:19 narayan PDP Screenshot
  • 179115 03/15/09 19:28 jmaxwell Target: Anneal Done, Access for Bypass
  • 179114 03/15/09 18:36 jmaxwell Target: Starting Anneal Procedure
  • 179111 03/15/09 18:07 narayan target pdp screenshot
  • 179109 03/15/09 17:49 narayan run valve closed
  • 179107 03/15/09 17:33 narayan PDP screenshot, carbon target in
  • 179106 03/15/09 17:28 NARAYAN Target cryo screenshot
  • 179104 03/15/09 17:20 narayan Target polarization lost: screenshot PDP
  • 179103 03/15/09 16:00 cdaq Beam Time Accounting
  • 179102 03/15/09 15:58 hamlet Day Shift Summary, 15 March 2009
  • 179101 03/15/09 15:50 slifer Target: pdp
  • 179097 03/15/09 14:11 hamlet Beam OFF since 14:00. MCC have IOC problem.
  • 179096 03/15/09 14:07 Rondon RUN PLAN - Sun. 3/15 day/eve to END of run
  • 179092 03/15/09 12:53 slifer Target: pdp
  • 179090 03/15/09 11:19 slifer Target: Target: moved to Top/Negative
  • 179089 03/15/09 10:54 slifer Target: encoder?
  • 179087 03/15/09 10:30 hamlet End data taking on Bottom target. Will start polarize Top NH3.
  • 179085 03/15/09 10:11 slifer Target: PDP uwave variation
  • 179082 03/15/09 09:02 slifer Target: pdp
  • 179079 03/15/09 08:06 cdaq Beam Time Accounting
  • 179078 03/15/09 08:01 slifer Target: striptools
  • 179077 03/15/09 08:00 slifer Target: pdp
  • 179076 03/15/09 07:59 slifer Target: day shift controls
  • 179075 03/15/09 07:42 whit OWL Shift Summary
  • 179074 03/15/09 07:37 xqiu BCM and BPM
  • 179072 03/15/09 06:50 J Mulholland Target: Screenshot of Bottom Polarizing
  • 179071 03/15/09 06:10 J Mulholland Target: Polarizing Target PDP Screenshot
  • 179070 03/15/09 06:04 J Mulholland Target: Target Moved to Bottom
  • 179069 03/15/09 06:03 J Mulholland Target: Anneal done
  • 179068 03/15/09 04:37 qiu Beam current
  • 179067 03/15/09 04:35 qiu BCM and BPM present
  • 179066 03/15/09 04:27 J Mulholland Target: Picking up magnet current
  • 179065 03/15/09 04:17 J Mulholland Target: Anneal PRocedure Started
  • 179063 03/15/09 04:11 J Mulholland Target: PDP Screenshot
  • 179060 03/15/09 03:46 qiu also about run 73017
  • 179059 03/15/09 03:44 qiu run 73017
  • 179058 03/15/09 03:15 qiu run 73017 check HMS histograms
  • 179057 03/15/09 03:15 J Mulholland Target: PDP Screenshots
  • 179056 03/15/09 03:14 J Mulholland Target: Cryo Strip Charts
  • 179053 03/15/09 02:16 J Mulholland Target: Cryo Strip charts
  • 179052 03/15/09 02:15 J Mulholland Target: PDP Screen
  • 179051 03/15/09 02:09 qiu run 73016
  • 179050 03/15/09 01:13 J Mulholland Target: PDP screenshot
  • 179049 03/15/09 01:12 J Mulholland Target: Cryo strip chart
  • 179046 03/15/09 00:23 Rondon Bottom polarization
  • 179045 03/15/09 00:15 J Mulholland Target: PDP screenshot
  • 179044 03/15/09 00:11 J Mulholland Target: PDP screenshot
  • 179043 03/15/09 00:10 J Mulholland Target: Cryo screenshot
  • 179042 03/15/09 00:07 Rondon RUN PLAN - Sun. 3/15 owl/day/eve
  • 179041 03/15/09 00:03 cdaq Beam Time Accounting
  • 179040 03/15/09 00:00 Hoyoung Evening shift summary
  • Saturday

  • 179038 03/14/09 23:21 narayan Target : pdp screenshot
  • 179034 03/14/09 22:16 Nuruzzaman/N Cryo Screenshot
  • 179033 03/14/09 22:15 Nuruzzaman/N PDP Screenshot
  • 179032 03/14/09 21:23 Hoyoung Beam: Back to 90nA
  • 179031 03/14/09 21:21 Nuruzzaman/N PDP Screenshot. Polarization=80.1%
  • 179030 03/14/09 21:01 Hoyoung Beam: Increased to 100nA
  • 179029 03/14/09 20:52 Hoyoung Run 73013 is for positive polarization
  • 179028 03/14/09 20:51 Nuruzzaman/N Cryo Screenshot
  • 179027 03/14/09 20:50 Hoyoung Run 73012 is bottom target run
  • 179026 03/14/09 20:46 Hoyoung Beam: We are taking 70nA to check centering
  • 179025 03/14/09 20:45 Nuruzzaman/N PDP Screenshot with TOP(3.321) Target
  • 179024 03/14/09 20:44 chench BPM, BCM screenshots
  • 179022 03/14/09 20:38 Nuruzzaman/N Target Moved to Top(3.321)
  • 179021 03/14/09 20:19 jmaxwell Target: Top?
  • 179019 03/14/09 20:14 Nuruzzaman/N PDP Screen just before going to TOP Traget
  • 179018 03/14/09 20:05 Hoyoung Beam: Increased to 105nA
  • 179017 03/14/09 19:59 Nuruzzaman/N Cryo Screenshot with chenged runvalve
  • 179016 03/14/09 19:59 Nuruzzaman/N PDP Screenshot
  • 179015 03/14/09 19:04 Nuruzzaman/N Cryo Screenshot
  • 179014 03/14/09 19:03 Nuruzzaman/N PDP Screenshot
  • 179013 03/14/09 18:24 Nuruzzaman/N Cryo Screenshot
  • 179012 03/14/09 18:23 Nuruzzaman/N PDP Screenshot
  • 179011 03/14/09 18:15 Hoyoung Beam: decrease current into 90nA
  • 179009 03/14/09 17:48 Hoyoung Half plane is in
  • 179005 03/14/09 17:32 Nuruzzaman/N Cryo Screenshot
  • 179004 03/14/09 17:27 Nuruzzaman/N Lost Polarization due to Nose level drop
  • 179002 03/14/09 17:17 Nuruzzaman/N PDP Screenshot
  • 179001 03/14/09 17:12 Hoyoung Beam: Increased to 100nA
  • 179000 03/14/09 17:08 Nuruzzaman/N Cryo Screenshot
  • 178998 03/14/09 17:07 Nuruzzaman/N PDP Screenshot
  • 178997 03/14/09 16:40 Nuruzzaman/N Target Moved to Bottom(1.631)
  • 178995 03/14/09 16:34 chench HMS s1+ADC ped in grun=73009
  • 178994 03/14/09 16:10 Nuruzzaman/N PDP Screenshot
  • 178993 03/14/09 16:09 slifer Target: pdp screenshot prior to anneal
  • 178992 03/14/09 16:09 Nuruzzaman/N Cryo Screenshot
  • 178991 03/14/09 16:08 Nuruzzaman/N Strip Charts' Screenshot
  • 178988 03/14/09 16:01 cdaq Beam Time Accounting
  • 178987 03/14/09 15:56 hamlet Day Shift Summary, 14 March 2009
  • 178985 03/14/09 15:30 J Mulholland Target: Move to carbon
  • 178984 03/14/09 15:29 J Mulholland Target: Anneal Finished. Nose filling and cold
  • 178983 03/14/09 15:24 hamlet Ready to go Beam permit
  • 178980 03/14/09 14:14 hamlet Beam OFF to Anneal target. Controlled access to check BigCal electronics
  • 178979 03/14/09 14:09 J Mulholland Target: Anneal Procedure begun, moved to top target
  • 178975 03/14/09 13:37 Rondon Target: RUN PLAN - Sat. 3/14 day/eve to Sun. 3/15 owl/day
  • 178974 03/14/09 13:36 slifer Target: striptools
  • 178973 03/14/09 12:31 hamlet Beam current have been changed to 105 nA at beginning of the run 73005.
  • 178969 03/14/09 10:19 M Jones Bigcal groups 5AB and 6AB are flaky
  • 178968 03/14/09 10:17 slifer Target: strip tools
  • 178967 03/14/09 10:17 hamlet End run 73003. Lost target polarization.
  • 178966 03/14/09 10:16 slifer Target: loss of polarization
  • 178964 03/14/09 09:35 slifer Target: run valve
  • 178961 03/14/09 08:17 cdaq Beam Time Accounting
  • 178960 03/14/09 08:05 slifer Target: Strip tools
  • 178959 03/14/09 08:04 slifer Target: poltarg controls
  • 178958 03/14/09 07:59 slifer Target: PDP Screenshot
  • 178957 03/14/09 07:48 whit Shift Summary
  • 178955 03/14/09 07:39 bhovik PDP Top Target
  • 178954 03/14/09 07:38 bhovik Top Target PDP
  • 178953 03/14/09 07:22 veilleux quads have been set incorrectly since run 72993
  • 178952 03/14/09 07:18 bhovik changing to TOP target
  • 178950 03/14/09 07:06 saw Quads set wrong?
  • 178949 03/14/09 06:44 veilleux bigcal plot does not match golden run
  • 178948 03/14/09 06:31 bhovik Target Control
  • 178947 03/14/09 06:30 bhovik PDP screen
  • 178944 03/14/09 04:41 veilleux checklist scan
  • 178943 03/14/09 04:34 veilleux BCM and BPM
  • 178942 03/14/09 04:19 bhovik Target Control
  • 178941 03/14/09 04:18 bhovik PDP SCREEN
  • 178938 03/14/09 03:29 veilleux hms angle labelled incorrectly
  • 178937 03/14/09 03:11 bhovik Problem was fixed
  • 178936 03/14/09 03:01 jmaxwell Target: Encoder not working?
  • 178935 03/14/09 02:53 whit HMS x vs y focal plane
  • 178934 03/14/09 02:43 whit run 72998 is not NH3 but 10mm hole
  • 178933 03/14/09 02:42 bhovik Graphs
  • 178932 03/14/09 02:41 bhovik Target Control Picture
  • 178931 03/14/09 02:40 bhovik PDP screen
  • 178929 03/14/09 02:17 bhovik Magnet Current
  • 178928 03/14/09 01:46 whit PDP target encoder position not working
  • 178927 03/14/09 01:42 whit 10mm hole target
  • 178921 03/14/09 00:57 whit Filling the nose
  • 178920 03/14/09 00:42 veilleux raster plots for runs 72983 and 72996
  • 178919 03/14/09 00:40 whit rebooted lower target camera
  • 178917 03/14/09 00:30 bhovik Target was moved to 10 mm hole
  • 178916 03/14/09 00:26 whit Slow Raster is ON
  • 178914 03/14/09 00:06 cdaq Beam Time Accounting
  • 178913 03/14/09 00:03 P Carter swing shift summary
  • Friday

  • 178912 03/13/09 23:39 Rondon RUN PLAN - Fri. 3/13 eve to Sat. 3/14 owl/day/eve
  • 178911 03/13/09 23:36 xqiu run72995
  • 178910 03/13/09 23:33 P Carter Last two runs are carbon target, not NH3
  • 178909 03/13/09 23:16 qiu 72994tracker
  • 178908 03/13/09 23:13 qiu run72994
  • 178905 03/13/09 22:55 run 72994 track
  • 178904 03/13/09 22:37 P Carter Beam: New beam positions
  • 178902 03/13/09 21:21 Rondon Beam: Trying to get previous beam positions
  • 178901 03/13/09 20:32 Rondon Beam: Cannot set requested Y beam positions; suggested new ones
  • 178900 03/13/09 20:20 P Carter Beam: MCC beam y position woes
  • 178899 03/13/09 19:56 Rondon Target: Removed non-existent nose and separator levels from strip charts
  • 178898 03/13/09 18:56 Rondon Target: Moved to C target for C (no He) data; encoder 2.867
  • 178897 03/13/09 18:55 J Mulholland Target: Anneal Finished and Target Cooled
  • 178896 03/13/09 18:42 Rondon Target: Anneal chart
  • 178895 03/13/09 18:33 Rondon Beam: Slow raster and beam Y position oscillations
  • 178894 03/13/09 18:27 Rondon Beam: Beam Y position oscillations due to slow raster
  • 178893 03/13/09 17:30 J Mulholland Target: Moved to top for anneal
  • 178892 03/13/09 17:30 P Carter Power cycled NMR; dipole field correct now
  • 178890 03/13/09 17:04 P Carter HMS dipole isn't changing field
  • 178889 03/13/09 16:44 J Mulholland Target: Communication problems and R&S reboot
  • 178888 03/13/09 16:29 Rondon Target: strip charts - TR91107 OK?
  • 178887 03/13/09 16:15 Rondon Target: Start of shift - cryo screen
  • 178886 03/13/09 16:15 saw Day shift summary
  • 178884 03/13/09 16:05 Rondon Target: PDP start of shift - starting anneal
  • 178883 03/13/09 16:02 cdaq Beam Time Accounting
  • 178882 03/13/09 16:01 saw Beam: Carbon target in, requesting 125 nA
  • 178881 03/13/09 15:51 saw Start of Aneal
  • 178879 03/13/09 15:29 saw Beam: Polarization 62.4, requested current increase to 105nA
  • 178878 03/13/09 15:27 narayan strip chart screenshot
  • 178877 03/13/09 15:22 hamlet Wire Chamber Gas Alarm
  • 178876 03/13/09 15:11 narayan target cryo screenshot
  • 178875 03/13/09 15:10 narayan Target PDP screenshot
  • 178874 03/13/09 14:24 saw Wire Chamber Gas Alarm
  • 178873 03/13/09 14:14 Rondon HMS settings for next cycle
  • 178870 03/13/09 13:57 narayan target pdp screenshot
  • 178869 03/13/09 13:56 narayan target: cryo screenshot
  • 178868 03/13/09 13:06 narayan Target cryo screenshot
  • 178866 03/13/09 13:03 narayan Target PDP screenshot
  • 178865 03/13/09 10:37 saw Beam: Beam still down due to 1L09 problem
  • 178863 03/13/09 10:03 saw Analysis: Location of analyzer crash
  • 178862 03/13/09 09:40 narayan Target : cryo screenshot
  • 178861 03/13/09 09:34 saw Beam: Beam position move requested
  • 178860 03/13/09 09:33 Rondon Beam: The beam x postions should be those in the run plan
  • 178859 03/13/09 09:30 narayan PDP screenshot
  • 178858 03/13/09 09:30 J Mulholland Target: Polarization Loss due to Nose Level Drop
  • 178856 03/13/09 09:11 saw Target: Lost polarization
  • 178854 03/13/09 09:02 saw Beam: Beam position check
  • 178853 03/13/09 08:59 Fowler HMS GUI Restarted
  • 178852 03/13/09 08:35 narayan Target PDP screenshot
  • 178851 03/13/09 08:32 saw HMS GUI Crash
  • 178850 03/13/09 08:09 saw Run stop and start during no beam
  • 178847 03/13/09 08:05 cdaq Beam Time Accounting
  • 178846 03/13/09 08:03 Hoyoung Owl shift summary
  • 178845 03/13/09 07:35 Hoyoung HMS GUI crash
  • 178844 03/13/09 07:04 bhovik Strip Chart
  • 178843 03/13/09 07:02 bhovik Target Control
  • 178842 03/13/09 07:01 bhovik PDP screen
  • 178841 03/13/09 06:19 bhovik PDP screen
  • 178839 03/13/09 05:58 Hoyoung Beam: No beam more than 40 minutes
  • 178837 03/13/09 05:21 whit New gold run
  • 178835 03/13/09 05:06 whit HMS DC HV tripped off
  • 178833 03/13/09 04:40 bhovik PDP screenshot
  • 178832 03/13/09 04:39 bhovik Target control
  • 178831 03/13/09 04:32 whit Analyzer crashes during full replay
  • 178830 03/13/09 04:13 Hoyoung During Run 72986, beam decreased to 90nA
  • 178829 03/13/09 04:06 bhovik TOP TARGET PDP
  • 178828 03/13/09 03:50 Whit Hms s1x + ADC Ped Check
  • 178826 03/13/09 02:57 bhovik Moved to TOP target Positive polarization
  • 178824 03/13/09 01:58 Hoyoung During run 72984, HMS NMR field was regulating
  • 178823 03/13/09 01:58 Hoyoung During run 72984, HMS NMR field was regulating
  • 178820 03/13/09 01:07 bhovik Target Control
  • 178819 03/13/09 01:06 bhovik PDP screen
  • 178818 03/13/09 00:58 jmaxwell Slow Raster ADC Image
  • 178816 03/13/09 00:34 Rondon RUN PLAN - Update for Fri. 3/13 owl/day/eve
  • 178815 03/13/09 00:34 bhovik Strip Charts
  • 178814 03/13/09 00:21 bhovik Target: PDP Screen snapshot
  • 178813 03/13/09 00:21 bhovik Target Control
  • 178812 03/13/09 00:05 Hoyoung LED off
  • 178811 03/13/09 00:02 P Carter swing shift summary
  • 178810 03/13/09 00:02 cdaq Beam Time Accounting
  • Thursday

  • 178809 03/12/09 23:49 jmaxwell Target: Picked up Magnet Field
  • 178808 03/12/09 23:48 vahe Checklist
  • 178807 03/12/09 23:25 vahe Target 10mm hole
  • 178806 03/12/09 23:20 vahe BCM and BPM
  • 178805 03/12/09 23:16 jmaxwell Target: Moved to Bottom
  • 178804 03/12/09 23:14 jmaxwell Target: Encoder Position Changes
  • 178795 03/12/09 22:28 jmaxwell Target: Moved 10mm Hole
  • 178792 03/12/09 22:09 M Jones Moller results.
  • 178791 03/12/09 21:59 vahe Target 10mm hole
  • 178787 03/12/09 21:10 cdaq Beam Time Accounting
  • 178781 03/12/09 20:12 narbe Target: Moved to 10mm Hole
  • 178778 03/12/09 19:57 narbe Target: Moved to Empty, preparing for Moeller run
  • 178773 03/12/09 18:47 P Carter ended run because beam was off
  • 178769 03/12/09 18:16 J Mulholland Analysis: Note for future polarization analysis
  • 178768 03/12/09 18:09 vahe BigCal
  • 178767 03/12/09 18:08 P Carter Beam: asked for 120 nA
  • 178766 03/12/09 18:05 vahe BigCal
  • 178764 03/12/09 17:33 narbe Target: Moved to Carbon
  • 178763 03/12/09 16:59 P Carter Beam: Pulsed beam has arrived
  • 178762 03/12/09 16:28 saw Removed Empty Argonne bottle
  • 178761 03/12/09 16:13 narbe Target: Screen shots for cryo and strip charts
  • 178760 03/12/09 16:11 saw Day Shift summary
  • 178759 03/12/09 16:06 Rondon RUN PLAN - Update for Thurs. 3/12 to Fri. 3/13 owl/day
  • 178758 03/12/09 16:04 narayan target
  • 178756 03/12/09 15:50 narayan Target moved to EMPTY position
  • 178754 03/12/09 14:33 saw Beam: Set slow raster for 4.733 GeV beam
  • 178753 03/12/09 10:20 narayan Target: monitor mode
  • 178752 03/12/09 10:00 saw Set HMS to 2.2 GeV electrons, 16.01 degrees
  • 178751 03/12/09 09:24 saw HMS DC and Tracker HV on
  • 178750 03/12/09 09:12 narayan Target: decay plan complete
  • 178749 03/12/09 08:54 saw Moved CAEN RS232 cable from HMS Cane crate 1 to 2
  • 178748 03/12/09 08:50 saw HV status check
  • 178747 03/12/09 08:17 Hoyoung Owl shift summary
  • 178746 03/12/09 07:45 Hoyoung Target: Top target decay overall status
  • 178745 03/12/09 05:56 Hoyoung Target: RB1 off
  • 178744 03/12/09 05:00 Hoyoung Target: RB2 off
  • 178743 03/12/09 03:21 Hoyoung Target: RB3 off
  • 178742 03/12/09 01:02 Hoyoung Target: Top target decay started
  • 178741 03/12/09 00:27 Hoyoung Target: Cryo screen
  • 178740 03/12/09 00:26 Hoyoung Target: PDP screen
  • 178739 03/12/09 00:12 jmaxwell Target: Move to Top, Pumps On, Polarizing
  • Wednesday

  • 178738 03/11/09 22:50 Rondon RUN PLAN - Update for Thurs. 3/12
  • 178737 03/11/09 21:48 ccbutu RB1 Pump Turned OFF & Roughing turned ON
  • 178736 03/11/09 21:35 reinhold 1L04 Vacuum Update
  • 178735 03/11/09 20:21 ccbutu RB2 Pump Turned OFF
  • 178734 03/11/09 19:27 ccbutu Open RB3 Bypass valve!
  • 178733 03/11/09 18:54 ccbutu Tracker PMT #7 replaced and fixed the connectors
  • 178732 03/11/09 18:40 jmaxwell Target: RB3 Off
  • 178731 03/11/09 17:40 jmaxwell Target: Decay Plans
  • 178730 03/11/09 16:50 ccbutu Tracker HV OFF
  • 178729 03/11/09 16:24 jmaxwell Target: Turning off microwaves to watch decay
  • 178728 03/11/09 16:20 Rondon Target: Try computing the CC form the polarization decay curve
  • 178727 03/11/09 11:46 J Mulholland Target: Magnet leads reconnected briefly (pol drop)
  • 178726 03/11/09 10:40 M Jones Check gas flow in HMS
  • 178725 03/11/09 10:17 bhovik Beam: Should be corrected
  • 178724 03/11/09 09:15 smithg PDP screen grab
  • 178723 03/11/09 09:13 smithg Target: cryo screen grab
  • 178722 03/11/09 08:17 Bosted Owl shift summary
  • 178721 03/11/09 08:09 cdaq Beam Time Accounting
  • 178720 03/11/09 01:23 Bosted HMS: DC1 and 2 tripped. I reset them
  • 178719 03/11/09 01:22 Bosted Beam: Still waiting for beam
  • 178718 03/11/09 01:21 bOSTED Target: Started polarizing bottom NH3 to negative
  • 178717 03/11/09 00:07 jpchen Swing shift summary
  • 178716 03/11/09 00:07 cdaq Beam Time Accounting
  • Tuesday

  • 178714 03/10/09 23:48 jpchen accelerator 1L04 vacuum update
  • 178713 03/10/09 22:56 Bosted Analysis: Changed minimum hits from 5 to 4 in HMS htracking.param
  • 178712 03/10/09 22:41 Rondon RUN PLAN - Update for Wed. 3/11
  • 178711 03/10/09 16:47 J Mulholland Target: Moved back to bottom for a while
  • 178710 03/10/09 16:04 P Carter day shift summary
  • 178709 03/10/09 16:03 cdaq Beam Time Accounting
  • 178708 03/10/09 15:49 P Carter beamline sweep in progress
  • 178707 03/10/09 15:12 J Mulholland Target: Moved to top to take TE data
  • 178706 03/10/09 14:28 P Carter voltage trip
  • 178705 03/10/09 08:52 narbe Target: Target being kept in steady state mode
  • 178704 03/10/09 08:47 narbe Beam: Update on status of beam
  • 178703 03/10/09 08:07 cdaq Beam Time Accounting
  • 178702 03/10/09 07:42 puckett shift summary
  • 178701 03/10/09 07:31 Bosted Target: TE for bottom
  • 178700 03/10/09 05:00 posik shift worker check list
  • 178699 03/10/09 00:50 jmaxwell Target: Pumps On, Going to Try Polarizing
  • 178698 03/10/09 00:39 J Mulholland Target: Moved to Empty for a few baselines
  • 178697 03/10/09 00:37 Rondon RUN PLAN - Tue. 3/10 owl/day
  • 178696 03/10/09 00:34 J Mulholland Target: TE data for 3-10-2009
  • 178695 03/10/09 00:24 J Mulholland Target: TE From 3-06
  • Monday

  • 178694 03/09/09 23:59 Keppel shift summary
  • 178693 03/09/09 23:57 jmaxwell Target: Top TE Done, Move to Bottom
  • 178692 03/09/09 23:56 cdaq Beam Time Accounting
  • 178691 03/09/09 22:38 saw Logbook changes
  • 178690 03/09/09 22:06 jmaxwell Target: NO Level Probe
  • 178689 03/09/09 22:04 jmaxwell Target: Move to Top for TE, Insert B Tuned
  • 178688 03/09/09 21:51 J Mulholland Target:: Putting the Target in TE mode
  • 178687 03/09/09 21:49 J Mulholland Target: Insert B in, Materials
  • 178686 03/09/09 19:17 jmaxwell n j HCLog Changes
  • 178685 03/09/09 19:04 jmaxwell Target: TE Results from Today
  • 178684 03/09/09 19:03 jmaxwell Target: TE Results from Today
  • 178683 03/09/09 18:35 jmaxwell Target: Top TE done, Move to Bottom
  • 178682 03/09/09 16:57 W. Luo BigCal: lowered HV for (4,09) to 1100.0V and bring back the HV GUI in counting room
  • 178681 03/09/09 16:46 L. Zhu statu: controlled access continues
  • 178680 03/09/09 16:45 Rondon Target: Beam will be back around midnight
  • 178677 03/09/09 16:27 beaufait hms drift chamber.
  • 178676 03/09/09 15:54 W. Luo BigCal: bring BigCal HV GUI down in the hall computer
  • 178675 03/09/09 15:53 cdaq Beam Time Accounting
  • 178674 03/09/09 15:52 jmaxwell Target: Target Work Today
  • 178673 03/09/09 15:40 gaskell Day shift summary
  • 178672 03/09/09 15:18 A. Deur yield plot for day shift runs
  • 178669 03/09/09 15:05 gaskell cdaql5 frozen - reboot
  • 178668 03/09/09 14:17 gaskell beam off for seeral hours
  • 178667 03/09/09 14:15 gaskell going to Controlled Access
  • 178666 03/09/09 14:02 jmaxwell Target: Lifted Magnet Current
  • 178665 03/09/09 13:33 narbe Target: Moved to Top NH3; Setting up for TEs
  • 178664 03/09/09 13:16 gaskell Moller summary
  • 178663 03/09/09 13:11 gaskell Moller backout
  • 178662 03/09/09 13:06 Nuruzzaman Cryo Screenshot
  • 178661 03/09/09 13:05 Nuruzzaman PDP Screenshot
  • 178657 03/09/09 12:18 Nuruzzaman Cryo Screenshot
  • 178656 03/09/09 12:17 Nuruzzaman PDP Screenshot
  • 178652 03/09/09 12:02 jmaxwell Target: TEs Today?
  • 178651 03/09/09 11:38 A. Deur HMS s2y+ ADC pedestal
  • 178650 03/09/09 11:36 narbe Beam: MCC tkaing away a cryomdule, proceeding to take Moeller run
  • 178648 03/09/09 11:34 Nuruzzaman Target moved to Empty(0.201)
  • 178646 03/09/09 11:32 W. Luo BigCal: strange behavior for row 5,6 at the beginning of run 72959
  • 178644 03/09/09 11:23 Rondon RUN PLAN - Update for Mon 3/9
  • 178641 03/09/09 11:01 Nuruzzaman Cryo Screenshot
  • 178640 03/09/09 11:00 Nuruzzaman PDP Screenshot
  • 178639 03/09/09 10:43 ccbutu Tracker Rates & HV .
  • 178635 03/09/09 10:08 Nuruzzaman Cryo Screenshot
  • 178634 03/09/09 10:07 Nuruzzaman PDP Screenshot
  • 178633 03/09/09 09:43 A. Deur Bigcal hot spot is gone
  • 178632 03/09/09 09:36 gaskell gas alarm
  • 178631 03/09/09 09:31 gaskell Run 72959 was TOP target
  • 178630 03/09/09 09:30 A. Deur Ethan bottle low
  • 178627 03/09/09 09:04 fanning Beam Time Accounting
  • 178626 03/09/09 09:04 Nuruzzaman Cryo Screenshot
  • 178625 03/09/09 09:04 Nuruzzaman PDP Screenshot
  • 178624 03/09/09 08:36 A. Deur Hot channels in bigcal
  • 178623 03/09/09 08:25 Nuruzzaman Cryo Screenshot
  • 178622 03/09/09 08:25 Nuruzzaman PDP Screenshot
  • 178621 03/09/09 08:20 Nuruzzaman Strip Chart Screenshot
  • 178619 03/09/09 08:08 whit owl shift summary
  • 178618 03/09/09 08:05 cdaq Beam Time Accounting
  • 178617 03/09/09 03:48 bosted Target: Top target is happy with no beam: reaches over 93% in less than one hour
  • 178616 03/09/09 03:18 Bosted Target: Polarization on Bottom increased to 67% with no beam. Switch to TOP
  • 178615 03/09/09 03:14 whit Switching to top target
  • 178614 03/09/09 02:34 whit junk
  • 178612 03/09/09 02:30 Bosted Target: Struggling to maximize polarization
  • 178608 03/09/09 01:23 Bosted Target: Nose level dropped below TOP, Bottom started to loose pol.
  • 178605 03/09/09 01:02 whit Epics run parameters
  • 178604 03/09/09 01:00 brads hclogscript bug
  • 178603 03/09/09 00:57 jmaxwell Target: Tried Top Microwave Guide for Bottom
  • 178602 03/09/09 00:57 whit MEDM Warning - related to BPM
  • 178601 03/09/09 00:54 Bosted Target: Bottom target polarized to +60%
  • 178600 03/09/09 00:52 whit Lost BPM screens again
  • 178599 03/09/09 00:51 Rondon Sunday entries: go to bottom of page, look for March 09 archive
  • 178598 03/09/09 00:50 jmaxwell Target: Tightening Helped?
  • 178597 03/09/09 00:49 whit No sunday entires??
  • 178596 03/09/09 00:47 brads Sunday's Halog entries will return at 1am...
  • 178595 03/09/09 00:46 Rondon Follow up on current and FOM at low polarization
  • 178594 03/09/09 00:35 Rondon hclog for Sunday 3/8 can be read by looking at the March archive
  • 178593 03/09/09 00:28 Rondon ALL hclog entries for Sunday 3/8 have dissapeared
  • 178592 03/09/09 00:19 jmaxwell Target: Moved to Bottom to Polarize
  • Sunday

  • 178590 03/08/09 23:58 cdaq Beam Time Accounting
  • 178589 03/08/09 23:57 anusha Evening shift summery- Sunday, 08 March 2009
  • 178588 03/08/09 23:52 jmaxwell Target: Access for Bypass Valve, Microwave Guides
  • 178586 03/08/09 23:21 Rondon Target: If overannealed, lower current may give better FOM
  • 178585 03/08/09 23:16 anusha we are in controll access
  • 178584 03/08/09 23:05 jmaxwell Target: Moved to Carbon
  • 178583 03/08/09 22:29 jmaxwell Target: Moved to Bottom
  • 178582 03/08/09 22:24 jmaxwell Target: Anneal Start
  • 178578 03/08/09 21:18 anusha the run 72953 is without He. ONLY CARBON target in place.
  • 178577 03/08/09 21:16 anusha Half Plate OUT.
  • 178573 03/08/09 20:58 albayrak polarisation lost
  • 178569 03/08/09 20:49 M Jones Improvement in the DC2 nhit spectra since upping gas flow
  • 178566 03/08/09 19:42 anusha both Drift Chambers are tripped off.
  • 178564 03/08/09 19:15 jmaxwell Target: Lower Current
  • 178562 03/08/09 18:49 Rondon Target: Suggest trying 85 nA
  • 178560 03/08/09 16:52 jmaxwell Target: Poor Bottom Target Performance
  • 178557 03/08/09 16:01 cdaq Beam Time Accounting
  • 178556 03/08/09 15:59 hamlet Day Shift Summary, 08 March 2009
  • 178555 03/08/09 15:49 hamlet Target polarization still low
  • 178554 03/08/09 15:40 Nuruzzaman PDP Screenshot
  • 178553 03/08/09 15:29 Nuruzzaman Cryo Screenshot
  • 178552 03/08/09 15:28 Nuruzzaman PDP Screenshot
  • 178551 03/08/09 15:27 whit hms tracking eff vs run number
  • 178550 03/08/09 15:24 Nuruzzaman Strip Chart Screenshot
  • 178549 03/08/09 15:22 whit HMS tracking efficiency vs run number
  • 178548 03/08/09 15:16 whit unlinked
  • 178546 03/08/09 14:53 whit NO BPM screen
  • 178545 03/08/09 14:41 Nuruzzaman Cryo Screenshot
  • 178544 03/08/09 14:40 Nuruzzaman Polarizing bottom target
  • 178543 03/08/09 14:30 whit linked to /scratch/cdaq
  • 178542 03/08/09 14:29 narbe Target: Performance of Top NH3 since last anneal
  • 178541 03/08/09 14:14 whit Scratch disk full
  • 178540 03/08/09 14:03 Nuruzzaman Target Moved to Bottom
  • 178539 03/08/09 13:59 hamlet End data taking on Top. Ask MCC for beam OFF. Will polarize Bottom target.
  • 178537 03/08/09 13:40 Nuruzzaman Cryo Screenshot
  • 178536 03/08/09 13:39 Nuruzzaman PDP Screenshot
  • 178535 03/08/09 13:32 Rondon RUN PLAN -- Sun. 3/8 eve to Mon. 3/9 owl/day
  • 178534 03/08/09 13:27 Rondon Suggest taking data at 105 nA
  • 178531 03/08/09 12:30 Nuruzzaman Cryo Screenshot
  • 178530 03/08/09 12:29 Nuruzzaman PDP Screenshot
  • 178527 03/08/09 11:31 Nuruzzaman Cryo Screenshot
  • 178526 03/08/09 11:31 Nuruzzaman PDP Screenshot
  • 178525 03/08/09 11:02 narbe Target: Plot of temps for 03/08/09 anneal
  • 178524 03/08/09 10:35 Nuruzzaman Cryo Screenshot
  • 178523 03/08/09 10:34 Nuruzzaman PDP Screenshot
  • 178522 03/08/09 10:15 whit HMS DC2
  • 178520 03/08/09 09:58 whit HMS Drift Chambers
  • 178519 03/08/09 09:56 Nuruzzaman Cryo Screenshot
  • 178518 03/08/09 09:54 hamlet Ask MCC for Controlled Access to check HMS DC gas flow
  • 178517 03/08/09 09:32 Nuruzzaman PDP Screenshot
  • 178515 03/08/09 09:04 Nuruzzaman Cryo Screen Shot
  • 178514 03/08/09 09:01 Nuruzzaman PDP Screenshot
  • 178513 03/08/09 09:00 Nuruzzaman Screenshot of Strip charts
  • 178511 03/08/09 08:36 hamlet Will be no beam at least 1 hour. MCC have IOC problem.
  • 178509 03/08/09 08:20 Nuruzzaman PDP Screenshot
  • 178508 03/08/09 08:17 cdaq Beam Time Accounting
  • 178507 03/08/09 08:16 Dutta Owl Shift Summary
  • 178505 03/08/09 07:43 T.Walton Monitoring the yield
  • 178504 03/08/09 07:25 Bosted Target: Adjusted separator
  • 178503 03/08/09 07:15 Bosted Target: Lost polarization
  • 178501 03/08/09 06:57 Bosted Target: PDP Snapshot: polarizaing TOP to negative
  • 178499 03/08/09 06:21 jmaxwell Target: Anneal Done, Nose Full, Magnet Current Picked Up, Polarizing
  • 178498 03/08/09 06:18 jmaxwell Target: Access for Bypass
  • 178497 03/08/09 05:55 Dutta Target: Controlled access to close bypass valve
  • 178496 03/08/09 05:09 jmaxwell Target: Move to Top
  • 178495 03/08/09 04:57 jmaxwell Target: Starting Anneal
  • 178493 03/08/09 04:30 Beam: Beam is back
  • 178491 03/08/09 04:25 Dutta Beam: MCC says beam will be off for 1 to 3 hrs
  • 178488 03/08/09 03:50 Bosted Target: Moved to Carbon target. Closed Run valve to zero
  • 178485 03/08/09 03:31 Bosted Target: moved to Empty target
  • 178483 03/08/09 03:07 jmaxwell Target: Anneal This Morning
  • 178481 03/08/09 01:29 Bosted Target: Screen snapshot AND STATUS
  • 178480 03/08/09 01:23 Dutta Beam: Beam off for atleast an hour
  • 178478 03/08/09 00:29 Danagoulian Shift Summary Swing
  • 178475 03/08/09 00:13 cdaq Beam Time Accounting
  • 178474 03/08/09 00:06 Rondon RUN PLAN - UPDATE Sun. 3/8 owl/day/eve
  • Saturday

  • 178473 03/07/09 23:44 E. Frlez Target: Target NMR screen shot
  • 178472 03/07/09 23:41 E. Frlez Target: Target Cryo screen shot
  • 178471 03/07/09 23:41 E. Frlez Target: Target Cryo screen shot
  • 178470 03/07/09 23:40 E. Frlez Target: Target strip chart screen shot
  • 178469 03/07/09 23:37 Danagoulian Lucite ADC
  • 178466 03/07/09 22:44 Danagoulian BPM medm screen
  • 178465 03/07/09 22:39 Danagoulian TDC spectra
  • 178462 03/07/09 22:10 M Jones Distribution of number of planes hit per event is unchanged for DC2
  • 178461 03/07/09 22:09 M Jones Distribution of number of planes hit per event is unchanged for DC2
  • 178460 03/07/09 21:22 Danagoulian HMS DC
  • 178455 03/07/09 18:29 Danagoulian Beamline magnet is fixed
  • 178453 03/07/09 18:15 jmaxwell Target: Anneal Late Tonight
  • 178452 03/07/09 18:13 E. Frlez Target: Yellow alarms on TD9178=4.5
  • 178451 03/07/09 16:14 E. Frlez Target: Target strip chart screen shot
  • 178450 03/07/09 16:12 E. Frlez Target: Target NMR screen shot
  • 178449 03/07/09 16:10 E. Frlez Target: Target IOC cryo screen shot
  • 178448 03/07/09 16:02 cdaq Beam Time Accounting
  • 178446 03/07/09 15:54 hamlet Day Shift Summary, 07 March 2009
  • 178445 03/07/09 15:40 whit BPM medm screen
  • 178444 03/07/09 15:21 anusha Target: Target IOC Cryo Panel and The Script Charts
  • 178443 03/07/09 15:16 anusha Target PDP Screenshot.
  • 178442 03/07/09 14:58 whit HMS drift chamber
  • 178440 03/07/09 14:28 hamlet Beam OFF due to beam-lime magnet trip
  • 178439 03/07/09 14:20 whit Lowered SANE Cherenkov Threshold
  • 178437 03/07/09 14:11 hamlet Short HV trip of HMS DC1/DC2 during run 72929
  • 178436 03/07/09 13:58 whit Yield
  • 178435 03/07/09 13:28 Rondon RUN PLAN Sat. 3/7 day/eve to Sun. 3/8 owl
  • 178434 03/07/09 13:23 J Mulholland Target: Target Positions
  • 178432 03/07/09 12:58 anusha Target: Target moved to NH3 bottom. Encoder=1.732
  • 178431 03/07/09 12:49 hamlet Moved from Top to Bottom NH3
  • 178430 03/07/09 12:45 whit HMS dc1 update
  • 178428 03/07/09 12:38 hamlet Change HMS angle from 16.0 to 15.4 and momentum from 2.2 to 3.1 GeV/c
  • 178426 03/07/09 11:34 hamlet Status with beam-line magnet
  • 178425 03/07/09 10:43 whit Increased SANE Cherenkov HV - PMT4
  • 178424 03/07/09 10:34 hamlet Beam off due to beam-line magnet
  • 178423 03/07/09 10:26 hamlet Run 72927 is Junk.
  • 178420 03/07/09 10:05 J mulholland Target
  • 178419 03/07/09 10:03 whit HMS shutter down position LED just ouside HMS door not working
  • 178418 03/07/09 10:01 whit Cherenkov gas dewar low
  • 178417 03/07/09 09:58 whit HMS DC1 gas flow
  • 178416 03/07/09 09:34 M Jones DC1 nhits versus x position in chamber 1
  • 178415 03/07/09 09:31 hamlet Ask MCC for Controlled Access to check HMS DC gas flow
  • 178414 03/07/09 09:30 M Jones DC1 is not working properly, my guess gas flow
  • 178412 03/07/09 09:28 whit HMS dc time
  • 178411 03/07/09 09:23 whit HMS tracking efficiency vs run number
  • 178410 03/07/09 08:31 M Jones Make run 72925 the golden run for monitor.kumac
  • 178409 03/07/09 08:08 cdaq Beam Time Accounting
  • 178408 03/07/09 08:06 Bosted Target: PDP screen for last two hours
  • 178407 03/07/09 08:03 hamlet Move 1/2 Plate IN before start run 72926
  • 178404 03/07/09 07:11 Dutta Owl Shift summary
  • 178403 03/07/09 06:48 Dutta Beam: Raster pattern looks good now
  • 178402 03/07/09 06:45 Bosted Target: PDP screen snapshot
  • 178401 03/07/09 06:41 Bosted Target: Moved target again slightly
  • 178397 03/07/09 06:31 Bosted Target: Moved target slightly
  • 178395 03/07/09 06:28 Dutta Beam: Beam seems to be scraping the target cup
  • 178389 03/07/09 04:30 Bosted Target: Target snapshot for past 2 hours
  • 178387 03/07/09 04:26 J Mulholland Target: Microwave leak may be causing problem?
  • 178385 03/07/09 04:12 J Mulholland Target: uwaves power and increase in polarization
  • 178384 03/07/09 03:47 Bosted Target: target screen snapshot. Strange increase in pol.
  • 178379 03/07/09 02:05 ccbutu Tracker HV & Rates
  • 178378 03/07/09 02:04 Bosted Target: PDP Screen snapshot
  • 178373 03/07/09 00:23 J mulholland Target: on call cell
  • 178372 03/07/09 00:19 Rondon RUN PLAN for Sat. 3/7 owl/day/eve to Sun. 3/8 owl
  • 178371 03/07/09 00:03 cdaq Beam Time Accounting
  • 178370 03/07/09 00:03 Danagoulian Shift Summary
  • Friday

  • 178369 03/06/09 23:55 anusha Target: Target PDP Screenshot
  • 178368 03/06/09 23:49 Danagoulian HMS DC1 drift time
  • 178367 03/06/09 23:42 ccbutu Tracker HV & Rates
  • 178366 03/06/09 23:42 ccbutu Tracker HV & Rates
  • 178363 03/06/09 22:40 Martin JOnes bpm screen
  • 178361 03/06/09 22:17 anusha Target: Targed PDP Screenshot.
  • 178360 03/06/09 21:58 anusha Target: I have written RB1 insted of RB3 mistakenly.
  • 178359 03/06/09 21:46 anusha Target: IOC Crashed and RB2 and RB3 turned off.
  • 178356 03/06/09 20:50 Danagoulian MCC performes cavity manual tuning
  • 178354 03/06/09 20:42 anusha Target: Target IOC Cryo and the strip charts
  • 178353 03/06/09 20:38 anusha Target: Target PDP Screenshot
  • 178351 03/06/09 20:21 Danagoulian Target is polarized
  • 178350 03/06/09 19:55 J Mulholland Target: Positions
  • 178349 03/06/09 19:48 Danagoulian First cross hair calibration
  • 178348 03/06/09 19:47 Martin Jones beam alignment
  • 178347 03/06/09 19:47 anusha Target: Target moved to the top NH3. Encoder = 3.462
  • 178345 03/06/09 19:38 Danagoulian Beam is in the hall
  • 178343 03/06/09 18:58 J Mulholland Target: Missing Event Data
  • 178342 03/06/09 18:22 Danagoulian Hall C is ready to take the beam
  • 178341 03/06/09 17:43 J Mulholland Target: Moved to Empty target for crosshair run
  • 178340 03/06/09 16:05 cdaq Beam Time Accounting
  • 178339 03/06/09 15:58 veilleux shift summary
  • 178338 03/06/09 15:40 jmaxwell Target: Magnet Ramped to -77.145A
  • 178334 03/06/09 15:07 Rondon RUN PLAN Fri. 3/6 day/eve to Sat. 3/7 owl
  • 178333 03/06/09 14:59 narbe Target: Want scattered electrons to always be deflected down
  • 178332 03/06/09 14:10 jmaxwell Target: Slow Raster Power Supplies
  • 178331 03/06/09 14:06 narbe Target: Ramp to -10 A successful. Going to try for -60 A.
  • 178330 03/06/09 13:48 narbe Target: Begin intial ramp to -10A
  • 178329 03/06/09 13:30 narbe Target: Been ramping at wrong polarity
  • 178328 03/06/09 12:19 narbe Target: Ramping up to 60 A
  • 178327 03/06/09 12:11 M Jones Set Slow raster for 5.7 GeV beam
  • 178326 03/06/09 12:10 narbe Target: Ramping of magnet started
  • 178325 03/06/09 12:06 J Mulholland Target: Important Microwaves
  • 178324 03/06/09 11:45 narbe Target: Magnet leads connected, preparing for ramp-up
  • 178322 03/06/09 11:28 M Jones Replaced cable for Cer 5 from back of SOS to Cerenkov
  • 178319 03/06/09 10:22 narbe Target: Sweep done of target area
  • 178318 03/06/09 09:43 E. Frlez Target: Cryo screen shot
  • 178317 03/06/09 09:32 bychkov weekly RC report
  • 178316 03/06/09 09:26 veilleux HMS comm. error
  • 178315 03/06/09 08:02 cdaq Beam Time Accounting
  • 178314 03/06/09 07:43 reinhold Owl Shift Summary
  • 178313 03/06/09 07:11 ates Target: PDP Screenshot
  • 178312 03/06/09 07:09 ates Target: Strip Charts Screenshot
  • 178311 03/06/09 07:06 ates Target: IOC screenshot
  • 178310 03/06/09 06:49 reinhold Asking for controlled access in preparation for alignment
  • 178309 03/06/09 06:44 reinhold stopped because MCC has a magnet tripped
  • 178308 03/06/09 06:44 ates Target: Target moved from Empty to Carbon 2.763
  • 178306 03/06/09 06:41 reinhold increase to 120 nA
  • 178305 03/06/09 06:40 reinhold Slow raster on carbon: looks good
  • 178303 03/06/09 06:30 reinhold moved to carbon target; encoder 2.763
  • 178302 03/06/09 06:25 ates Target: Target moved to 0.001
  • 178301 03/06/09 06:25 reinhold Slow raster: Run 72908: 70 nA cross hair Bx=0.0 encoder 0.00: cross centered
  • 178296 03/06/09 06:10 ates Target: Target moved to 0.080
  • 178295 03/06/09 06:06 reinhold BPM screen
  • 178294 03/06/09 06:05 reinhold Slow raster for Bx=0.0 target encoder =0.080
  • 178292 03/06/09 05:57 Slow raster for Bx=0.0 target encoder =0.119
  • 178290 03/06/09 05:57 ates Target: PDP screenshot
  • 178289 03/06/09 05:56 ates Target: IOC screenshot
  • 178287 03/06/09 05:54 ates Target: Strip Charts screenshot
  • 178285 03/06/09 05:53 reinhold Call Narbe: reboot target computer
  • 178283 03/06/09 05:35 reinhold cannot restart VNC viewer
  • 178282 03/06/09 05:26 reinhold Slow raster for Bx=0.0 target encoder =0.160
  • 178280 03/06/09 05:18 ates Target: Target: moved empty target 0.160
  • 178278 03/06/09 05:14 reinhold BPM screen last two hours
  • 178277 03/06/09 05:05 reinhold Access done; ask for beam
  • 178276 03/06/09 05:01 jmaxwell Target: Access for Overfilled Nose
  • 178275 03/06/09 04:41 reinhold slow raster at bx=-1.0
  • 178274 03/06/09 04:38 reinhold slow raster at Bx=+0.5
  • 178273 03/06/09 04:33 reinhold Asked for controlled acces
  • 178268 03/06/09 04:15 reinhold Slow ratser at Bx=-2.0
  • 178266 03/06/09 04:14 slow raster at Bx=-3.0
  • 178264 03/06/09 04:02 reinhold Slow raster distributions
  • 178259 03/06/09 03:50 ates Target: IOC rebooted
  • 178258 03/06/09 03:50 ates Target: IOC rebooted
  • 178256 03/06/09 03:48 reinhold shift beam by 0.5 mm toward negative x
  • 178255 03/06/09 03:48 reinhold set HMS to cosmic in flags file
  • 178251 03/06/09 03:25 reinhold Not getting any real data?
  • 178247 03/06/09 03:13 reinhold ROC14 down
  • 178246 03/06/09 03:07 Donal Target: Main flow
  • 178245 03/06/09 02:53 reinhold Beam position
  • 178244 03/06/09 02:44 reinhold tuned beam is more than asked for
  • 178243 03/06/09 02:42 ates PDP Screenshot
  • 178242 03/06/09 02:41 ates Target: IOC Screenshot
  • 178241 03/06/09 02:40 ates IOC screenshot
  • 178240 03/06/09 02:39 ates Target: Strip Charts Screenshot
  • 178239 03/06/09 02:37 reinhold MCC offers beam
  • 178238 03/06/09 02:31 reinhold Call MCC: ask whether they can send some tuned beam
  • 178237 03/06/09 01:26 reinhold MCC status
  • 178236 03/06/09 00:44 reinhold Changed prescale factors
  • 178235 03/06/09 00:35 reinhold Oscar calls: Answers about runplan
  • 178234 03/06/09 00:29 reinhold Question about runplan
  • Thursday

  • 178233 03/05/09 23:59 cdaq Beam Time Accounting
  • 178232 03/05/09 23:54 Dunne Shift Summary Swing
  • 178231 03/05/09 21:45 dunne HMS Power supply comm error and DC High voltage turned off
  • 178230 03/05/09 20:19 jpchen Hall C in power permit, going to be beam permit
  • 178229 03/05/09 20:12 Rondon RUN PLAN Thurs. 3/5 eve to Fri. 3/6 owl
  • 178228 03/05/09 19:57 W. Luo Cerenkov HV channel problem
  • 178227 03/05/09 19:13 Rondon Lucite HV
  • 178226 03/05/09 19:10 Rondon Beam: The power leads log refers to the BE and BZ chicane magnets
  • 178225 03/05/09 18:39 jmaxwell Target: Target Replaced
  • 178224 03/05/09 18:38 jpchen run valve opened to 0.5
  • 178223 03/05/09 18:36 jpchen requested to MCC to have a sweep
  • 178222 03/05/09 18:32 jpchen moved target to EMPTY
  • 178221 03/05/09 18:31 jpchen Hall work completed
  • 178219 03/05/09 18:17 dunne BETA HV problems
  • 178218 03/05/09 18:06 bychkov power leads connected
  • 178217 03/05/09 16:27 ccbutu Tracker back in
  • 178216 03/05/09 16:01 cdaq Beam Time Accounting
  • 178215 03/05/09 15:56 L. Zhu shift summary
  • 178214 03/05/09 15:03 bychkov entire swing shift for March 5 and owl shift for March 6
  • 178213 03/05/09 14:21 narbe Target: target rotated and fastened
  • 178212 03/05/09 13:29 L. Zhu yields for P=3.585 at 22.3 deg
  • 178211 03/05/09 10:40 jmaxwell Target: Insert Pulled, Microwave Tube Removed
  • 178210 03/05/09 08:58 ccbutu Tracker out & HV off
  • 178209 03/05/09 08:39 Lingyan Zhu status: restrictive access
  • 178208 03/05/09 08:25 narbe Target: Plot of temps for 03/04/09 anneal
  • 178207 03/05/09 08:13 reinhold Owl shift summary
  • 178206 03/05/09 08:04 cdaq Beam Time Accounting
  • 178205 03/05/09 07:53 reinhold Preparing for change to restricted access
  • 178204 03/05/09 07:47 J Mulholland Magnet leads locked
  • 178203 03/05/09 07:41 J Mulholland Target: Ramp Down of Target Magnet Complete
  • 178202 03/05/09 07:09 reinhold Ramp HMS magnets to 0 amps
  • 178201 03/05/09 06:03 J Mulholland Magnet: Ramp Down of Magnet Begins
  • 178200 03/05/09 06:01 E. Frlez Target: NMR screen shot
  • 178199 03/05/09 06:00 E. Frlez Target: Cryo screen shot
  • 178198 03/05/09 05:58 reinhold Going to controlled access
  • 178196 03/05/09 05:21 E. Frlez Target: Cryo IOC reboot
  • 178194 03/05/09 04:14 E. Frlez Target: Lost polarization
  • 178192 03/05/09 03:53 reinhold stopped run 72892 because of HMS DC HV trip
  • 178189 03/05/09 03:15 Slow raster run 72892
  • 178188 03/05/09 02:50 E. Frlez Target: NMR screen shot - re-polarized bottom target
  • 178187 03/05/09 02:47 E. Frlez Target: Microwaves on, repolarized bottom target
  • 178185 03/05/09 02:42 reinhold polarization back at 71.2%; ask for beam
  • 178184 03/05/09 02:18 reinhold target polarazing again
  • 178183 03/05/09 01:24 reinhold Target suddenly lost polarization; asked for beam off
  • 178181 03/05/09 01:19 E. Frlez Target: NMR screenshot
  • 178180 03/05/09 01:02 E. Frlez Target: Cryo Screenshots
  • 178179 03/05/09 00:41 E. Frlez Target: Opened run valve 0.25->0.30
  • 178178 03/05/09 00:34 reinhold run 72891: beam x not stable
  • 178175 03/05/09 00:15 reinhold BPM & BCM screen last two hours
  • 178174 03/05/09 00:11 reinhold Slow raster run 72890
  • 178173 03/05/09 00:02 cdaq Beam Time Accounting
  • 178172 03/05/09 00:01 ccbutu Target: NMR GUI shot at 74.5% polarization and 90nA
  • Wednesday

  • 178171 03/04/09 23:59 ccbutu Target: Cryo Screenshots
  • 178170 03/04/09 23:57 abdellah Swing shift summary
  • 178169 03/04/09 23:28 ccbutu Target: Cryo Screenshots
  • 178168 03/04/09 23:28 abdellah HMS wc trip
  • 178165 03/04/09 23:01 ccbutu Target: NMR GUI shot at 74.5% polarization and 90nA
  • 178164 03/04/09 22:47 ccbutu Target: Cryo Screenshots
  • 178161 03/04/09 22:21 ccbutu Target: IOC crashed/rebooted
  • 178160 03/04/09 22:20 ccbutu Target: GUI Target, Polarization 71% at 70nA
  • 178159 03/04/09 21:55 jmaxwell Target: Post Anneal Polarization Screen
  • 178158 03/04/09 21:54 abdellah BPMs
  • 178156 03/04/09 21:18 Rondon RUN PLAN - Wed. 3/4 eve to Thurs. 3/5 owl CORRECTION
  • 178155 03/04/09 21:18 jmaxwell Target: Moved to Bottom
  • 178154 03/04/09 21:08 jmaxwell Target: Moved to Top
  • 178153 03/04/09 20:54 Rondon RUN PLAN - Wed. 3/4 eve to Thurs. 3/5 owl
  • 178152 03/04/09 20:40 narbe Anneal finished, cooling down.
  • 178151 03/04/09 19:44 Rondon Analysis: sane group disk full
  • 178150 03/04/09 19:31 abdellah Beam OFF for a couple of hrs.
  • 178149 03/04/09 18:47 abdellah Beam off
  • 178148 03/04/09 18:46 bychkov day shift on March 5th
  • 178147 03/04/09 18:43 Rondon Beam: Slow raster changes
  • 178144 03/04/09 18:18 abdellah Beam not really back
  • 178141 03/04/09 18:09 Abdellah beam is back
  • 178140 03/04/09 18:04 abdellah Beam off
  • 178136 03/04/09 17:13 M Jones Turned off turbo pump to Moller insulation vaccum
  • 178135 03/04/09 16:59 ccbutu Target: GUI shot at 80% polarization & 90 nA durin run #72884
  • 178134 03/04/09 16:56 ccbutu Target: Screen shot of cry and strip charts
  • 178132 03/04/09 16:22 bhovik Raster Problem.
  • 178131 03/04/09 16:05 cdaq Beam Time Accounting
  • 178129 03/04/09 15:58 bhovik Shift Summary
  • 178128 03/04/09 15:55 Dinko Pocani Target: Target gui screen shot
  • 178126 03/04/09 13:15 Dinko Pocani Target: TGT GUI screenshot
  • 178123 03/04/09 12:02 Dinko Pocani Target: Target gui screen shot
  • 178122 03/04/09 11:55 Rondon Beam: Use BPM RAW positions (sane_bpm_nooffset.adl)
  • 178121 03/04/09 11:18 W. Luo BigCal: trigger group 5CD is working now
  • 178120 03/04/09 11:13 Dinko Pocani Target: Target Screenshot
  • 178119 03/04/09 10:02 Dinko Pocani Target: Fisrt screenshot after switching to TOP target
  • 178118 03/04/09 09:56 Fowler HMS Controls
  • 178117 03/04/09 09:33 cdaq Beam Time Accounting
  • 178115 03/04/09 09:02 Dinko Pocani Target: TGT GUI screenshot
  • 178114 03/04/09 08:34 ccbutu HV & Rates for TRACKER
  • 178111 03/04/09 08:16 Dinko Pocani Target: Cryo Screenshots
  • 178110 03/04/09 08:14 Dinko Pocani Target: Screen shot of PDP gui after beam is restored
  • 178108 03/04/09 08:06 reinhold shift summary
  • 178106 03/04/09 07:06 reinhold Slow raster for run 72879
  • 178105 03/04/09 07:01 narbe Target: Screen shot of PDP gui, -66.6%, 90nA
  • 178102 03/04/09 06:02 narbe Target: Screen shot of PDP gui, -69.8%, 90nA
  • 178100 03/04/09 05:41 reinhold Slow raster for run 72876
  • 178099 03/04/09 05:38 reinhold Call MCC: box supply tripped; beam off for short
  • 178097 03/04/09 05:37 reinhold Slow raster for run 72875
  • 178096 03/04/09 05:30 reinhold BPM & BCM for last 2 hrs
  • 178093 03/04/09 05:22 reinhold switched to second helium bottle (already before 1 am)
  • 178092 03/04/09 05:01 narbe Target: Screen shot of PDP gui, -69.8%, 90nA
  • 178091 03/04/09 04:45 qiu run 72875
  • 178088 03/04/09 04:02 narbe Target: Screen shot of PDP gui, -72.0%, 0nA
  • 178087 03/04/09 03:43 reinhold For now not trying: Beam: Try 00A x = -1.7, 00B x = -2.8
  • 178086 03/04/09 03:11 reinhold Why are we prescaling away the HMS
  • 178085 03/04/09 03:09 gaskell we always read RAW BPM
  • 178082 03/04/09 03:02 reinhold Slow raster plots for runs 72871 to 72874
  • 178081 03/04/09 03:02 narbe Target: Screen shot of PDP gui, -68.0%, 90nA
  • 178080 03/04/09 02:42 narbe Target: Rebooted IOC
  • 178079 03/04/09 02:27 reinhold BPM RAW vs POS
  • 178078 03/04/09 02:14 Rondon Beam: Try 00A x = -1.7, 00B x = -2.8
  • 178077 03/04/09 02:11 narbe Target: ioc reboot
  • 178076 03/04/09 02:08 reinhold MCC reads different BPM variables!
  • 178075 03/04/09 02:04 narbe Target: Screen shot of PDP gui, -72.9%, 90nA
  • 178072 03/04/09 01:50 reinhold Let mcc adjust Y position
  • 178071 03/04/09 01:17 ccbutu HV & Rates Tracker
  • 178070 03/04/09 01:07 reinhold BPM & BCM screens
  • 178069 03/04/09 01:04 narbe Target: Screen shot of PDP gui, -74.9%, 90nA
  • 178065 03/04/09 00:42 reinhold target at -70%, ask for beam
  • 178064 03/04/09 00:17 narbe Target: Screen shot of PDP gui, -4.9%, no beam
  • 178063 03/04/09 00:12 cdaq Beam Time Accounting
  • 178062 03/04/09 00:09 abdellah Swing Shift Summary
  • 178061 03/04/09 00:08 narbe Target: Screenshots of Cryo and strip charts.
  • 178060 03/04/09 00:05 narbe Target: Moved to Bottom NH3 (1.773), begin polarizing
  • Tuesday

  • 178056 03/03/09 23:50 chench Move target up (0.219 -0.239)
  • 178053 03/03/09 23:40 abdellah Crrection: run 72868
  • 178052 03/03/09 23:40 narbe Target: Plot of temps for 03/03/09 anneal
  • 178046 03/03/09 23:05 Abdellah getting ready for beam
  • 178045 03/03/09 22:49 chench Target move to empty
  • 178044 03/03/09 20:50 J Mulholland Target: Magnet Being Ramped
  • 178043 03/03/09 19:10 Rondon RUN PLAN -- UPDATE for Tue. 3/3 eve to Wed. 3/4 day
  • 178042 03/03/09 17:59 jmaxwell Target: Anneal Done, Fridge Cold, Full
  • 178041 03/03/09 17:51 W. Luo BigCal: swap trigger group 5CD calbes to another channel on the 3rd level
  • 178040 03/03/09 17:33 bhovik Analysis: Shift Summary
  • 178037 03/03/09 17:01 M Jones Moller run ( very late entry)
  • 178036 03/03/09 16:52 jmaxwell Target: Moved to Top for Anneal
  • 178035 03/03/09 16:37 chench target PDP screenshot
  • 178034 03/03/09 16:13 chench target cryoscreen
  • 178033 03/03/09 16:03 cdaq Beam Time Accounting
  • 178032 03/03/09 15:00 Dinko Pocani Target: Pre-quench polarization screenshot
  • 178031 03/03/09 14:53 Dinko Pocani Target: Magnet Quench
  • 178027 03/03/09 14:03 Dinko Pocani Target: Hourly target screenshot
  • 178024 03/03/09 13:04 Dinko Pocani Target: Hourly target screenshot
  • 178021 03/03/09 12:08 M Jones Steve Lassiter investigated Q3 problems
  • 178020 03/03/09 11:55 Dinko Pocani Target: Screen shot of PDP gui after 10 minutes of beam
  • 178017 03/03/09 10:08 Dinko Pocani Target: Target Screenshot
  • 178016 03/03/09 10:06 Dinko Pocani Target: Screenshots: cryo + strips
  • 178015 03/03/09 08:59 bychkov Correction to the beam accounting message below
  • 178014 03/03/09 08:17 fanning Beam Time Accounting
  • 178013 03/03/09 08:04 fanning Beam Time Accounting
  • 178012 03/03/09 08:01 cdaq Beam Time Accounting
  • 178011 03/03/09 08:01 reinhold Shift Summary Owl
  • 178010 03/03/09 07:33 reinhold And another HMS Q3 trip; reset
  • 178009 03/03/09 07:32 narbe Target: Screen shot of PDP gui, 71.4%, no beam
  • 178008 03/03/09 06:51 reinhold And HMS Q3 tripped again; reset
  • 178007 03/03/09 06:42 narbe Target: Changed Yale Gain to 1
  • 178006 03/03/09 06:32 narbe Target: Screen shot of PDP gui, 61.7%, no beam
  • 178005 03/03/09 06:10 narbe Target: Clipping of NMR signal
  • 178004 03/03/09 05:48 reinhold Returned heat gun to second floor
  • 178003 03/03/09 05:34 narbe Target: Screen shot of PDP gui, 58.2%, no beam
  • 178002 03/03/09 04:56 reinhold Status: still waiting for beam
  • 178001 03/03/09 04:39 narbe Target: Wrong rate
  • 178000 03/03/09 04:32 narbe Target: Screen shot of PDP gui, 49.5%, no beam
  • 177999 03/03/09 03:36 narbe Target: Screen shot of PDP gui, 29%, no beam
  • 177998 03/03/09 03:18 reinhold Gas flow OK: turned on HMS DC HV
  • 177997 03/03/09 02:41 cdaq Beam Time Accounting
  • 177996 03/03/09 02:41 reinhold Call MCC: beam in ~1h
  • 177995 03/03/09 02:39 narbe Target: Screen shot of PDP gui, 0.3%, no beam
  • 177994 03/03/09 02:32 reinhold Reminder: HMS DC HV still off
  • 177993 03/03/09 02:19 reinhold Q3 reset w/out problem
  • 177992 03/03/09 02:18 reinhold Shift Check List: Frozen Locks, Argone empty
  • 177991 03/03/09 01:45 reinhold HMS Q3 tripped again
  • 177990 03/03/09 01:39 narbe Target: Screen shot of PDP gui, 0.3%, no beam
  • 177989 03/03/09 00:48 reinhold Check with MCC: still a few hours
  • 177988 03/03/09 00:41 reinhold Q3 reset; Control software has issues
  • 177987 03/03/09 00:15 narbe Target: Screen shot of PDP gui, 0.3%, no beam
  • 177986 03/03/09 00:06 narbe Target: Screen-shots of cryo and strip-charts
  • 177985 03/03/09 00:01 narbe Target: Plot of March 1st anneal
  • 177984 03/03/09 00:01 reinhold HMS Q3 interlock
  • Monday

  • 177983 03/02/09 20:33 J Mulholland No Beam for Swing Shift today
  • 177981 03/02/09 19:09 J Mulholland Target: Some more TE's
  • 177980 03/02/09 18:34 Rondon RUN PLAN - Update for 3/2 Mon. eve to 3/3 Tue. owl
  • 177979 03/02/09 16:10 jmaxwell Target: Top TE Results
  • 177978 03/02/09 14:43 jmaxwell Baseline Comparison
  • 177977 03/02/09 12:34 J Mulholland Target: TE procedures
  • 177976 03/02/09 11:09 bychkov no beam untill 9pm
  • 177975 03/02/09 11:09 J Mulholland Target: Baseline
  • 177974 03/02/09 10:56 gaskell Moler summary for Fe. 28
  • 177973 03/02/09 10:22 fanning Beam Time Accounting
  • 177972 03/02/09 09:58 D. Pocanic Target: Cryo and stripchart screen shots
  • 177971 03/02/09 09:45 D. Pocanic TGT:PDP screen shot at start of shift
  • 177970 03/02/09 09:36 bychkov Beam status
  • 177969 03/02/09 09:11 J mulholland Target: please maintain target status
  • 177968 03/02/09 06:49 bychkov No beam during day shift Monday March 2
  • 177967 03/02/09 06:09 Luwani/Naray Target: PDP snapshot
  • 177966 03/02/09 04:55 Luwani/Naray Target: update
  • 177965 03/02/09 02:21 J Mulholland Target: TE Before Taking Beam and Target Status
  • 177963 03/02/09 01:46 whit No beam for shift.
  • 177962 03/02/09 01:38 jmaxwell Target: TE?
  • 177961 03/02/09 00:52 Luwani Targert: Switched to monitor mode
  • 177960 03/02/09 00:00 cdaq Beam Time Accounting
  • Sunday

  • 177959 03/01/09 23:35 ent shift summary
  • 177958 03/01/09 23:29 ent 4+ more hours?
  • 177957 03/01/09 23:17 mahbub Target: PDP screen top tgt at +72.3% no beam
  • 177956 03/01/09 23:15 mahbub Target: cryoscreens top tgt at +72.3% no beam
  • 177955 03/01/09 22:07 ent accelerator down - no ETR yet
  • 177952 03/01/09 21:24 mahbub Target: PDP screen top tgt at +69.8% with 90 nA
  • 177951 03/01/09 21:22 mahbub Target: cryoscreens top tgt at +70.2% no beam
  • 177950 03/01/09 20:36 mahbub Target: strip chart screens top tgt at +72.9% no beam
  • 177949 03/01/09 20:33 mahbub Target: PDP screen top tgt at +72.9% no beam
  • 177948 03/01/09 20:32 mahbub Target: cryoscreen top tgt at +72.9% no beam
  • 177945 03/01/09 19:01 mahbub Target: PDP screen top tgt at +71.8%
  • 177944 03/01/09 18:59 mahbub Target: cryoscreen top tgt at +71.8%
  • 177943 03/01/09 18:57 ent BPM/BCM screens
  • 177940 03/01/09 18:14 saw Work disk down
  • 177939 03/01/09 17:35 mahbub Target: PDP screen while top tgt being repolarized
  • 177938 03/01/09 17:33 mahbub Target: cryoscreen whie top tgt being repolarized
  • 177936 03/01/09 16:51 mahbub Target: lost polarization again
  • 177935 03/01/09 16:36 mahbub Target: PDP screen after top tgt repolarization
  • 177934 03/01/09 16:16 mahbub Target: cryoscreen during top tgt repolarization
  • 177933 03/01/09 16:10 mahbub Target: Polarization dropped to zero at start of swing shift
  • 177931 03/01/09 16:01 cdaq Beam Time Accounting
  • 177930 03/01/09 16:01 hamlet Day Shift Summary, 01 March 2009.
  • 177929 03/01/09 15:44 M Jones Table of beam positions during recent runs
  • 177928 03/01/09 15:44 M Jones Table of beam positions during recent runs
  • 177927 03/01/09 15:33 M Jones Maybe hitting the downstream beam pipe is causing problems
  • 177926 03/01/09 15:24 chench cryo screenshot
  • 177925 03/01/09 15:20 chench Target Polarization up to 80.4%
  • 177922 03/01/09 15:10 Nuruzzaman Screenshot of Fast & Slow Raster
  • 177921 03/01/09 15:09 hamlet Beam position for Run 72855 and 72856 not good
  • 177920 03/01/09 14:59 Nuruzzaman Histograms are looking totally different
  • 177919 03/01/09 14:46 Nuruzzaman BPM & BCM Screenshots
  • 177918 03/01/09 14:41 chench target cryo screenshot
  • 177917 03/01/09 14:38 chench Target polarization raises up
  • 177915 03/01/09 14:23 chench target polarization down to zeor
  • 177914 03/01/09 14:21 hamlet Ask MCC for beam OFF. Lost target polarization.
  • 177912 03/01/09 14:14 chench Target Condition grun=72855
  • 177910 03/01/09 13:58 hamlet Started polorize Bottom target
  • 177909 03/01/09 13:34 jmaxwell Target: Computer Trouble
  • 177908 03/01/09 13:26 J Mulholland Target: Status
  • 177907 03/01/09 13:23 hamlet We are ready to go Beam Permit
  • 177906 03/01/09 13:12 jmaxwell Target: Mouse Problem
  • 177905 03/01/09 13:09 J Mulholland Target: Magnet leads reconnected
  • 177904 03/01/09 13:02 narbe Target: Run Valve was open 1/3 turn
  • 177903 03/01/09 12:48 J Mulholland Target: Operational Again
  • 177902 03/01/09 12:26 narbe Target: Run valve was actually open
  • 177901 03/01/09 12:04 hamlet Ask Controlled Access for target
  • 177900 03/01/09 12:03 J Mulholland Target: Access to trouble shoot
  • 177899 03/01/09 11:45 J Mulholland Target: PDP Log
  • 177898 03/01/09 11:42 narbe Target: Possible reason for PDP/LabView trouble
  • 177897 03/01/09 11:21 narbe Target: Nose overfilled, NMR cpu/LabView trouble
  • 177896 03/01/09 10:46 chench Target Condition
  • 177895 03/01/09 08:43 hamlet Will move Bottom target In
  • 177894 03/01/09 08:15 hamlet Ask for Beam OFF. Have problem with target computer.
  • 177892 03/01/09 08:03 cdaq Beam Time Accounting
  • 177889 03/01/09 07:53 whit Shift Summary
  • 177888 03/01/09 07:45 T.Walton Monitoring the yield
  • 177885 03/01/09 06:29 adaniel Target: PDP screen
  • 177883 03/01/09 05:49 whit Beam: Beam troubles
  • 177881 03/01/09 04:58 whit Raster
  • 177880 03/01/09 04:48 adaniel Target: IOC screen
  • 177879 03/01/09 04:47 adaniel Target: PDP screen
  • 177877 03/01/09 04:38 J Mulholland Target: PDP screen after polarizing after anneal
  • 177876 03/01/09 03:51 J Mulholland Target: Trouble Pumping down after anneal
  • 177875 03/01/09 02:55 narbe Target: Anneal finished, Cooling frig.
  • 177874 03/01/09 01:47 J Mulholland Target: Check on microwave tuning
  • 177873 03/01/09 01:12 J Mulholland Beam down for unknown period of time
  • 177872 03/01/09 01:12 J Mulholland Target: Starting Anneal Procedure(see note on damage)
  • 177871 03/01/09 00:50 J Mulholland Target: Too Rapid decay of polarization
  • 177869 03/01/09 00:39 Rondon RUN PLANS Typo: 4.7 GeV (not 4.&)
  • 177868 03/01/09 00:34 Rondon RUN PLANS for Sun 3/1 to Mon. 3/2 owl/day
  • 177866 03/01/09 00:21 J Mulholland Target: Position to 3.445 (TOP)
  • 177864 03/01/09 00:15 Luwani monitor yield for top target
  • 177863 03/01/09 00:15 adaniel Target: strip chart
  • 177862 03/01/09 00:12 adaniel Target: IOC screen
  • 177861 03/01/09 00:10 adaniel Target: PDP screen (with picture)
  • 177860 03/01/09 00:08 adaniel Target: PDP screen at start of shift
  • 177859 03/01/09 00:02 cdaq Beam Time Accounting