  • 225916 03/31/11 23:57 jhlee Scanner is off *maybe* after run 11008
  • 225915 03/31/11 23:50 qwanalysis Analysis: Run 11014 - Plots and Summary Table for 100k Events.
  • 225914 03/31/11 23:48 qwanalysis Analysis: Run 11015 - Plots and Summary Table for 100k Events.
  • 225909 03/31/11 23:32 buddhini DS bellows temperatures and DS vaccume
  • 225908 03/31/11 23:21 qwanalysis Analysis: Run 11013 - Plots and Summary Table for 100k Events.
  • 225907 03/31/11 22:56 rob no pickup from scanner motion controller seen in current-mode signals
  • 225906 03/31/11 22:51 jhlee charge feedback is off at the begining of the run 11015
  • 225905 03/31/11 22:45 jhlee EB crashed at the end of Run 11014
  • 225903 03/31/11 22:39 rajotte bcm6 drifting again...
  • 225900 03/31/11 21:45 jhlee late entry : Injector run 2283 is ended around 19:13
  • 225899 03/31/11 21:38 qwanalysis Analysis: Run 11011 - Plots and Summary Table for 100k Events.
  • 225898 03/31/11 21:38 jhlee/buddhi re: Analysis: Changes in "qwanalysis" script.
  • 225896 03/31/11 21:33 rajotte Improvement of MD_all width at higher current (150-155 uA)
  • 225894 03/31/11 20:50 jhlee Shift Checklist Screenshot
  • 225893 03/31/11 20:49 Nuruzzaman Analysis: Changes in "qwanalysis" script.
  • 225892 03/31/11 20:46 jhlee During this run 21300, IHWP status is changed
  • 225889 03/31/11 20:35 jhlee Log entry for the transition run of IHWP out
  • 225888 03/31/11 20:33 qwanalysis Analysis: Run 11010 - Plots and Summary Table for 100k Events.
  • 225881 03/31/11 20:00 jhlee Bellows temps and Vacuum
  • 225880 03/31/11 19:51 qwanalysis Analysis: Run 11009 - Plots and Summary Table for 100k Events.
  • 225875 03/31/11 18:46 brads Please fix the y-axes on the bellows stripchart(s)
  • 225872 03/31/11 18:13 rob md7+ teed through scope for this run and next
  • 225871 03/31/11 18:07 qwanalysis Analysis: Run 11008 - Plots and Summary Table for 100k Events.
  • 225868 03/31/11 17:59 buddhini DS bellows temperatures and DS vaccume
  • 225867 03/31/11 17:45 jhlee Injector Run 2283 is started (Hall A on, Hall B off)
  • 225866 03/31/11 17:40 jhlee re: re: vc-git module prevents users to write files on cdaql cluster
  • 225863 03/31/11 17:25 brads re: vc-git module prevents users to write files on cdaql cluster
  • 225862 03/31/11 17:24 jhoskins I have updated the Collaboration
  • 225861 03/31/11 17:20 mack BMod trigger reference
  • 225860 03/31/11 17:17 jhlee vc-git module prevents users to write files on cdaql cluster
  • 225859 03/31/11 17:06 kamyers Analysis: General Note: we are currently using qwk_charge = (bcm1+bcm2)/2
  • 225858 03/31/11 17:04 buddhini Changed the qw:bellowstemp3 high alarm limits
  • 225855 03/31/11 16:31 rakithab Shift Summary: Day Shift summary
  • 225854 03/31/11 16:31 jhlee Bellows Temperature
  • 225851 03/31/11 16:28 cdaq Beam Time Accounting
  • 225850 03/31/11 16:26 qwanalysis Analysis: Run 11007 - Plots and Summary Table for 100k Events.
  • 225849 03/31/11 16:09 buddhini Target : Set QWT_miA alarlms to 'no-alarm'
  • 225848 03/31/11 16:06 buddhini Target : Screen shots at the begining of swing shift
  • 225845 03/31/11 15:40 gaskell Compton: beam modulation signal ok I guess
  • 225844 03/31/11 15:25 rakithab DS Lumi yileds different from nominal settings. (Double peaked). For runs took during the day shift
  • 225843 03/31/11 15:14 qwanalysis Analysis: Run 11006 - Plots and Summary Table for 100k Events.
  • 225841 03/31/11 15:01 jhlee Beam modulation is on requested by Dave G.
  • 225837 03/31/11 14:45 rakithab tempertatures on DS bellows at 155uA.
  • 225836 03/31/11 14:31 rakithab CAEN HV and Generaltools snapshots
  • 225835 03/31/11 14:30 donjones Compton: deleted first three laserwise cycles of run 21276
  • 225834 03/31/11 14:06 qwanalysis Analysis: Run 11005 - Plots and Summary Table for 100k Events.
  • 225833 03/31/11 14:01 qwanalysis Analysis: Run 11004 - Plots and Summary Table for 100k Events.
  • 225832 03/31/11 14:00 Jiawei Forgot to put the titles of these plots
  • 225831 03/31/11 13:52 Jiawei quick check of the nonlinearities of recent runs
  • 225826 03/31/11 13:34 gaskell Compton: beam modulation signal
  • 225825 03/31/11 13:32 rakithab DS beamline vaccume and tempertatures on DS bellows.
  • 225824 03/31/11 13:29 gaskell/raki Moller: Summary for Thursday March 31
  • 225822 03/31/11 13:00 qwanalysis Analysis: Run 11003 - Plots and Summary Table for 100k Events.
  • 225819 03/31/11 12:40 rakithab Turned Beam Modulation OFF
  • 225818 03/31/11 12:37 rakithab BPM and Halo rates after moller backout
  • 225817 03/31/11 12:36 rakithab Turned Qweak Current mode HV ON
  • 225816 03/31/11 12:33 rakithab Turned Feedback and Beam Mod ON
  • 225814 03/31/11 12:28 rakithab Compton electron detector is moved to position 8.6890
  • 225811 03/31/11 12:14 rakithab Setting Pockels Cell values for IHWP IN
  • 225810 03/31/11 12:12 narayan Compton: EB0 Crashed
  • 225809 03/31/11 12:03 rakithab Moller measurement finished. Restore to Qweak running conditions.
  • 225805 03/31/11 11:29 rakithab Changed Pockels cell values to IHWP nominal settings
  • 225792 03/31/11 10:34 mack Possible alternative BMod signal to send to Compton
  • 225784 03/31/11 09:07 rakithab Stoped the Charge feedback
  • 225783 03/31/11 09:04 rakithab Changed BCM gain settings for Moller
  • 225781 03/31/11 09:02 pqwang Target: Target moved out to home position, Target Screenshots & Status
  • 225780 03/31/11 09:00 rakithab Turned off Beam modulation
  • 225779 03/31/11 08:58 rakithab Qweak HV OFF for Moller
  • 225777 03/31/11 08:52 rajotte end of injector run 2282
  • 225776 03/31/11 08:52 qwanalysis Analysis: Run 11000 - Plots and Summary Table for 100k Events.
  • 225775 03/31/11 08:43 qwanalysis Analysis: Run 10999 - Plots and Summary Table for 100k Events.
  • 225774 03/31/11 08:41 cdaq Beam Time Accounting
  • 225772 03/31/11 08:40 gaskell Moller: epics before Moller
  • 225769 03/31/11 08:33 rajotte starting injector run (Hall A&B off)
  • 225767 03/31/11 08:12 rajotte owl shift summary
  • 225766 03/31/11 08:11 gaskell Compton: runs 21288 to 21291 have no modulation signal to Compton
  • 225765 03/31/11 08:09 AK Opper & N Turned OFF Beam Modulation
  • 225763 03/31/11 08:00 rajotte end of injector run 2281
  • 225762 03/31/11 07:50 rajotte !!!!WARNING: Previous swing shift with wrong HWP status in hlog title entry
  • 225758 03/31/11 07:27 rajotte snapshot General tools & HV
  • 225757 03/31/11 07:17 rajotte MCC: beam off 5 minutes for quick test
  • 225755 03/31/11 06:56 qwanalysis Analysis: Run 10998 - Plots and Summary Table for 100k Events.
  • 225754 03/31/11 06:55 rajotte starting injector run 2281
  • 225753 03/31/11 06:43 rajotte pedestal plots
  • 225750 03/31/11 06:26 rajotte starting pedestal run during MCC QE test
  • 225747 03/31/11 06:07 qwanalysis Analysis: Run 10996 - Plots and Summary Table for 100k Events.
  • 225746 03/31/11 06:03 Nuruzzaman Analysis: Beam Modualtion ramp voltage discrepancy.
  • 225745 03/31/11 05:42 Nuruzzaman Target: Target GUI and strip charts screenshots
  • 225740 03/31/11 04:50 qwanalysis Analysis: Run 10995 - Plots and Summary Table for 100k Events.
  • 225735 03/31/11 03:53 qwanalysis Analysis: Run 10994 - Plots and Summary Table for 100k Events.
  • 225731 03/31/11 03:31 rajotte end of injector run 2280
  • 225728 03/31/11 03:02 rajotte starting injector run 2280
  • 225726 03/31/11 02:48 qwanalysis Analysis: Run 10993 - Plots and Summary Table for 100k Events.
  • 225725 03/31/11 02:39 rajotte fast feedback off for part of run 10992
  • 225722 03/31/11 01:48 qwanalysis Analysis: Run 10992 - Plots and Summary Table for 100k Events.
  • 225717 03/31/11 00:39 cdaq Beam Time Accounting
  • 225716 03/31/11 00:38 qwanalysis Analysis: Run 10991 - Plots and Summary Table for 100k Events.
  • 225715 03/31/11 00:31 Nuruzzaman Target: Target GUI and strip charts screen shots at the beginning of owl shift.
  • 225714 03/31/11 00:30 jhoskins Beam Modulation Configuration file updated
  • 225709 03/31/11 00:14 rajotte changing HWP status
  • 225704 03/31/11 00:01 jhoskins Swing Shift summary
  • Wednesday

  • 225703 03/30/11 23:57 buddhini Target: screen shots at the end of swing shift
  • 225702 03/30/11 23:49 buddhini General tools and HV settings
  • 225701 03/30/11 23:40 jhoskins Analysis 10988
  • 225698 03/30/11 23:20 buddhini DS beamline vaccume and DS bellows temperatures
  • 225697 03/30/11 22:54 jhoskins Analysis 10987
  • 225692 03/30/11 22:21 Updated slug plots for slug 68
  • 225691 03/30/11 21:52 rakithab Analysis: Updated Runlet plots for slug 68
  • 225686 03/30/11 21:18 jhoskins Analysis 10986
  • 225685 03/30/11 21:09 rakithab Analysis: Updated the last 24h runs
  • 225684 03/30/11 21:03 rakithab Analysis: Started the script to create the slug 68 root file
  • 225683 03/30/11 20:47 jhoskins Analysis 10985
  • 225678 03/30/11 19:59 mack opportunistic access requests
  • 225677 03/30/11 19:47 jhoskins Analysis 10984
  • 225676 03/30/11 19:43 mack Weeks after Tweaks: BCM1,2 back down to 120 ppm or so
  • 225673 03/30/11 19:34 buddhini DS beamline vaccume and tempertatures on DS bellows.
  • 225668 03/30/11 19:25 mack BPM screen shows no obvious saturation at 150 microA
  • 225667 03/30/11 19:02 jhoskins Analysis 10983
  • 225664 03/30/11 18:21 jhoskins Analysis 10982
  • 225661 03/30/11 17:52 rajotte qwac shifters needed (second try with emails)
  • 225660 03/30/11 17:48 brads Small temp pertubations at 7, 11 o'clock aren't correlated with beam motion
  • 225657 03/30/11 16:50 kamyers Analysis: some database plots for 10958-10981 (since we've resumed production)
  • 225656 03/30/11 16:44 buddhini Analysis: Run 10980 Analysis plots
  • 225653 03/30/11 16:17 sxyang Day Shift summary
  • 225652 03/30/11 16:14 cdaq Beam Time Accounting
  • 225651 03/30/11 16:13 buddhini Target: Target screen shots at the begining of the swing shift
  • 225649 03/30/11 16:07 smithg Target: added an alarm for the bellows temp
  • 225647 03/30/11 15:46 sxyang Screenshots of HV and GeneralTools GUIs
  • 225646 03/30/11 15:43 sxyang Analysis: Run 10981-Plots
  • 225643 03/30/11 15:04 rakithab IHWP state changed from OUT-IN
  • 225637 03/30/11 14:51 rakithab Feedback was not running properly during the run 10978
  • 225636 03/30/11 14:48 brads RC update for Wed; Run plan for today. Reminder of RC meeting at 3:30pm
  • 225634 03/30/11 14:04 sxyang Analysis: Run 10978-Plots
  • 225632 03/30/11 13:45 rakithab DS beamline vacuum and temperatures on DS Bellows
  • 225631 03/30/11 12:53 sxyang analysis: plots for production run 10977
  • 225626 03/30/11 12:23 wdconinc Compton: Autoanalyzer with 4 jobs to cdaql3
  • 225625 03/30/11 11:59 sxyang Analysis: Run 10976-Plots
  • 225623 03/30/11 11:37 sxyang beam is back
  • 225621 03/30/11 11:30 sxyang beam will be off for 1-2 hours
  • 225620 03/30/11 10:55 sxyang Analysis: Run 10975-Plots
  • 225619 03/30/11 10:43 sxyang beam off for another 15 mins
  • 225616 03/30/11 10:26 rakithab DS beamline vacuum and temperatures on DS Bellows
  • 225611 03/30/11 09:57 sxyang beam off for about 15 minutes
  • 225609 03/30/11 09:43 brads OWL shift temps -- better y-scales
  • 225608 03/30/11 09:36 qwanalysis Analysis: Run 10973 - Plots and Summary Table for 100k Events.
  • 225604 03/30/11 09:10 sxyang Analysis: Run 10972-Plots
  • 225603 03/30/11 09:03 rakithab Target: Target GUI and strip charts screen shots
  • 225602 03/30/11 08:40 rajotte QwAC shifters needed
  • 225601 03/30/11 08:34 rob bellows temperatures are 40-85 C
  • 225600 03/30/11 08:18 Armstrong qw:bellowstemp3 is still at 85 F
  • 225597 03/30/11 08:08 Nuruzzaman Shift Summary: Owl Shift summary 03/30/2011
  • 225596 03/30/11 08:01 cdaq Beam Time Accounting
  • 225595 03/30/11 07:47 Nuruzzaman Status of the 3H09 vacuum and bellows temperature for Owl shift
  • 225594 03/30/11 07:29 qwanalysis Analysis: Run 10971 - Plots and Summary Table for 100k Events.
  • 225593 03/30/11 07:28 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
  • 225590 03/30/11 07:20 rakithab Beam: When changing IHWP please follow the instructions
  • 225585 03/30/11 06:27 qwanalysis Analysis: Run 10970 - Plots and Summary Table for 100k Events.
  • 225584 03/30/11 06:17 Nuruzzaman Changed Half Wave Plate to OUT.
  • 225581 03/30/11 06:11 cdaq Run 10969 Pedestal Data
  • 225575 03/30/11 05:24 qwanalysis Analysis: Run 10968 - Plots and Summary Table for 100k Events.
  • 225572 03/30/11 04:19 qwanalysis Analysis: Run 10967 - Plots and Summary Table for 100k Events.
  • 225569 03/30/11 04:11 Nuruzzaman General tools and HV GUI screen shots.
  • 225566 03/30/11 03:16 qwanalysis Analysis: Run 10966 - Plots and Summary Table for 100k Events.
  • 225561 03/30/11 02:12 qwanalysis Analysis: Run 10965 - Plots and Summary Table for 100k Events.
  • 225560 03/30/11 01:58 Nuruzzaman We are taking scanner data during this run.
  • 225559 03/30/11 01:57 Nuruzzaman QTOR tripped. Its back now.
  • 225554 03/30/11 01:01 qwanalysis Analysis: Run 10964 - Plots and Summary Table for 100k Events.
  • 225549 03/30/11 00:36 qwanalysis Analysis: Run 10963 - Plots and Summary Table for 100k Events.
  • 225548 03/30/11 00:04 cdaq Beam Time Accounting
  • Tuesday

  • 225547 03/29/11 23:58 rakithab Shift Summary: Swing Shift summary
  • 225545 03/29/11 23:53 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
  • 225541 03/29/11 23:05 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON at 150uA
  • 225540 03/29/11 22:56 jpan Analysis: Run#10962
  • 225537 03/29/11 22:41 rakithab Injector run 2277 ended
  • 225534 03/29/11 22:07 rakithab Started injector run 2277. Hall A is OFF. Hall B is ON
  • 225533 03/29/11 21:58 jpan Analysis: Run#10961
  • 225532 03/29/11 21:52 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON at 150uA
  • 225530 03/29/11 21:47 jpan Analysis: Run#10960
  • 225528 03/29/11 21:41 rakithab Run number mismatch in the RCGUI after the recent CODA crash
  • 225525 03/29/11 21:22 rakithab Turned ON beam modulation before the run 10961
  • 225524 03/29/11 21:21 rakithab Missed helicity gates. TS hanged up during the run 10960
  • 225520 03/29/11 21:03 jpan Target: With full beam current, sometimes the HPH reserved power less than 100 W.
  • 225519 03/29/11 20:51 narayan Compton: e-detector at standard position
  • 225518 03/29/11 20:48 rakithab CAEN HV settings and general tools snapshots
  • 225517 03/29/11 20:47 narayan Compton: this run stopped due to ROC2 hangup
  • 225516 03/29/11 20:42 jpan Analysis: Run#10959, 150 uA production run
  • 225515 03/29/11 20:35 rakithab BPM and Halo rates at 150uA
  • 225514 03/29/11 20:31 brads Small vacuum changes tied to beam on/off events
  • 225513 03/29/11 20:30 jpan Analysis: Run#10958, QTOR on, 75 uA
  • 225507 03/29/11 20:15 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON
  • 225506 03/29/11 20:11 donjones compton vertical scan
  • 225503 03/29/11 19:53 rakithab QTOR ramped to 8921A while beam ON and bellows flanges temperatures at the plateau
  • 225502 03/29/11 19:34 rakithab QTOR ramp cancelled for now
  • 225498 03/29/11 19:18 rakithab DS beamline vacuum and temperatures plateau on DS Bellows
  • 225497 03/29/11 18:47 rakithab Beam positions and halo rates at 75uA QTOR OFF
  • 225494 03/29/11 18:30 rakithab Beam extraction region BLM beam trips
  • 225493 03/29/11 18:26 rakithab Injector run 2276 was taken to test the Real Time engine.
  • 225492 03/29/11 18:23 rakithab Downstream beamline vacuum and temperatures on downstream bellows flanges
  • 225491 03/29/11 18:00 rakithab BPMs and Halo rates at 75uA QTOR OFF
  • 225489 03/29/11 17:56 rakithab Started the charge feedback program
  • 225487 03/29/11 17:33 brads Run plan for Tuesday, Wednesday
  • 225486 03/29/11 17:27 rakithab Turned HV ON for Halo, current mode MD and Lumi
  • 225485 03/29/11 17:21 jpan Target: Move target from Home=out of beam postion to H2 Cell
  • 225484 03/29/11 17:19 rakithab Beam dump presssure after the fix
  • 225483 03/29/11 17:10 rob HV GUI alive again after reset of g0ioc2
  • 225482 03/29/11 17:09 brads Dump vacuum gauge head replaced -- noisy VCG3H09Dtr looks good now
  • 225481 03/29/11 17:07 rob can't start HV GUI on any cdaql
  • 225480 03/29/11 17:06 jpan Target: Move target from H2 cell to Home-out of beam position
  • 225479 03/29/11 16:21 jhlee Day Shift Summary
  • 225478 03/29/11 16:03 cdaq Beam Time Accounting
  • 225477 03/29/11 15:34 brads Dump vacuum rise could be noise from scanner test
  • 225476 03/29/11 15:30 rob scanner GUI now accessible from downstairs
  • 225475 03/29/11 15:21 rob scanner controller off: no immediate change in vacuum
  • 225474 03/29/11 15:05 beaufait spark investigation Qtor
  • 225473 03/29/11 14:18 brads RC update for Tuesday
  • 225472 03/29/11 14:11 benesch 16" gate valve closed ~0230
  • 225471 03/29/11 14:01 brads Temperatures at bellows during Monday night beam (summary of observations)
  • 225470 03/29/11 13:59 rob no entries to the hall during the change in downstream vacuum.
  • 225469 03/29/11 13:52 benesch why did downstream vacuum go bad?
  • 225468 03/29/11 13:22 cdaq Run 10954 Pedestal Data
  • 225465 03/29/11 13:00 Spayde Analysis: New Test Database
  • 225464 03/29/11 12:30 narayan Target: mid shift screenshot
  • 225463 03/29/11 10:44 jpan Scanner has been moved back to upstream of MD
  • 225461 03/29/11 08:02 Nuruzzaman/P Owl Shift Summary 03/29/2011
  • 225460 03/29/11 08:02 cdaq Beam Time Accounting
  • 225459 03/29/11 07:28 pqwang Target GUI and strip charts screenshots at the end of owl shift
  • 225458 03/29/11 02:24 qwanalysis Analysis: Run 10952 - Plots and Summary Table for 100k Events.
  • 225457 03/29/11 02:21 Nuruzzaman Turned OFF all the High Voltages
  • 225456 03/29/11 02:17 Nuruzzaman QTOR ramped down to Zero.
  • 225455 03/29/11 01:30 Nuruzzaman Analysis: Plots for pedestal run 10953
  • 225454 03/29/11 01:03 cdaq Beam Time Accounting
  • 225450 03/29/11 00:35 brads No significant temp change during QTor scan
  • Monday

  • 225447 03/28/11 23:58 jpan Target GUI and strip charts screenshots at the end of swing shift
  • 225446 03/28/11 23:55 jhoskins Shift Summary: Swing Shift summary
  • 225443 03/28/11 23:42 brads Photo of heat-effected bolt after disassembly this afternoon
  • 225442 03/28/11 23:38 brads Photo of fan on bellows region
  • 225437 03/28/11 23:06 brads BPM positions
  • 225436 03/28/11 22:56 brads Vacuum burps at target chamber (since we started)
  • 225435 03/28/11 22:56 rob temp3 is beam right, not beam left
  • 225434 03/28/11 22:45 jhoskins HV GUI / Tools
  • 225433 03/28/11 22:44 brads Initial vacuum and temps at 75uA (max authorized beam current for tonight)
  • 225430 03/28/11 22:31 brads Temp plateaus at 50uA: temp3 is 50C, the rest are 20C lower
  • 225429 03/28/11 22:26 brads Photos of thermocouple locations
  • 225428 03/28/11 22:15 jpan The vacuum looks stable at 50 uA beam current
  • 225427 03/28/11 21:54 jpan Target: Another vacuum plot
  • 225425 03/28/11 21:49 brads Plateau at 15deg rise in temp3 (34C): beam left, downstream bellows flange at 25uA on target
  • 225424 03/28/11 21:39 brads 25 uA on target saw small rise in vacuum pressure after beam trip, then fell back to nominal value
  • 225423 03/28/11 21:28 rakithab I mean run 10946!
  • 225422 03/28/11 21:25 rakithab Target: Run 225418 is with LH2 OutOfBeam
  • 225421 03/28/11 21:22 jhlee Analysis: start autoanalyzers on cdaql3/5
  • 225420 03/28/11 21:21 brads No water cooling on bellows flanges tonight, we _do_ have a fan on the bellows region
  • 225419 03/28/11 21:16 jpan Target: Target moved from HOME=Out-of-Beam to Hydrogen-Cell position
  • 225417 03/28/11 20:59 brads Thermocouples in place -- position map to EPICS values
  • 225416 03/28/11 20:56 jhoskins QTOR and detectors on
  • 225415 03/28/11 20:52 jhoskins Hall closed up -- preparing to get beam back
  • 225414 03/28/11 18:47 jpan Target: The DS vacuum status - about 1.4e-5 Torr at this moment
  • 225413 03/28/11 18:00 jpan Target GUI and strip charts screenshots
  • 225410 03/28/11 17:48 rob md led checkout: pass
  • 225409 03/28/11 17:44 smithg Target: Target unparked. DS vacuum continues to improve.
  • 225403 03/28/11 17:30 Jiawei Summary of the raster study runs
  • 225402 03/28/11 17:23 jhoskins Qweak Readiness checklist
  • 225398 03/28/11 16:50 smithg Target: Unparking the tgt now to be ready for 150 uA later tonight
  • 225397 03/28/11 16:49 jhoskins New COO in counting house.
  • 225396 03/28/11 16:29 smithg DS bellows seal has been replaced. Pumping.
  • 225395 03/28/11 16:21 jpan Target GUI and strip charts screenshots
  • 225394 03/28/11 16:12 brads Update to COO -- Please read section B.1 (last page)
  • 225393 03/28/11 16:10 Jiawei raster frequency study is done. Everything is set back to the normal configurations
  • 225391 03/28/11 16:05 sxyang Screenshots of HV and GeneralTools GUI.
  • 225388 03/28/11 16:03 cdaq Beam Time Accounting
  • 225387 03/28/11 16:02 sxyang Day Shift Summary
  • 225360 03/28/11 14:38 beaufait tc hookup
  • 225358 03/28/11 14:34 Jiawei 10927 number of samples = 20
  • 225352 03/28/11 10:45 smithg Target: replaced H2 bottle
  • 225351 03/28/11 10:15 rakithab Target: Beam dump vacuum alarm during venting.
  • 225350 03/28/11 10:14 gaskell Compton: turned on laser
  • 225346 03/28/11 08:55 rakithab Target: Target GUI and strip charts screen shots
  • 225344 03/28/11 08:08 cdaq Beam Time Accounting
  • 225340 03/28/11 07:51 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
  • 225324 03/28/11 00:15 cdaq Beam Time Accounting
  • 225323 03/28/11 00:14 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
  • Sunday

  • 225322 03/27/11 20:53 wdconinc Compton: Autoanalyzer should be invoked automatically again
  • 225317 03/27/11 16:06 jpan Target GUI and strip charts screenshots
  • 225316 03/27/11 16:02 cdaq Beam Time Accounting
  • 225315 03/27/11 12:16 EmmanuelK Target: Target GUI and strip charts screenshots for Day shift
  • 225314 03/27/11 12:14 EmmanuelK Target: Pump current alarm - ro error?
  • 225313 03/27/11 08:03 cdaq Beam Time Accounting
  • 225312 03/27/11 07:13 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
  • 225308 03/27/11 00:03 cdaq Beam Time Accounting
  • 225307 03/27/11 00:01 jpan Target: Target GUI and strip charts screenshots
  • Saturday

  • 225292 03/26/11 16:17 cdaq Beam Time Accounting
  • 225291 03/26/11 16:03 jpan Target GUI and strip charts screenshots
  • 225290 03/26/11 16:02 EmmanuelK Target: Scattering Chamber vacuum through Day shift
  • 225285 03/26/11 12:19 EmmanuelK Target: Day shift screenshots
  • 225284 03/26/11 08:04 cdaq Beam Time Accounting
  • 225283 03/26/11 07:12 rakithab Target: Target GUI and strip charts screenshots
  • 225282 03/26/11 00:11 rakithab Target: Target GUI and strip charts screenshots
  • 225281 03/26/11 00:02 cdaq Beam Time Accounting
  • Friday

  • 225280 03/25/11 23:44 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
  • 225279 03/25/11 21:24 brads Compton HV had tripped, HV gui wouldn't stay connected, or shut up -- set channels to OFF and exitted the GUI
  • 225278 03/25/11 16:56 brads re: Ops/JRRP checklist for CW from 0810 Friday meeting
  • 225277 03/25/11 16:02 buddhini Target : scattering chamber vaccume over the day shift and over the days from 23/3-25/3
  • 225276 03/25/11 16:02 cdaq Beam Time Accounting
  • 225275 03/25/11 15:55 buddhini Target screen shots at the end of Day shift
  • 225274 03/25/11 15:51 jhlee snapshots for shift checklist
  • 225273 03/25/11 15:40 brads Temperature spec. for Al flange
  • 225272 03/25/11 15:37 buddhini Analysis: FFT and position differences along injector in run 2274 that was taken when Hall A was taking beam
  • 225271 03/25/11 15:19 benesch Beam: Ops/JRRP checklist for CW from 0810 Friday meeting
  • 225270 03/25/11 15:18 gaskell Compton: laser LBO optimization complete
  • 225269 03/25/11 14:36 brads RC update/plans for Friday through the weekend
  • 225268 03/25/11 14:30 buddhini Turned off HVs
  • 225267 03/25/11 13:56 cdaq Run 10909 : Analysis and Plots
  • 225266 03/25/11 13:44 smacewan New Documentation Wiki Page
  • 225265 03/25/11 11:48 jpan Scanner has been moved to downstream
  • 225264 03/25/11 11:06 buddhini Hall C is now in restricted access
  • 225263 03/25/11 11:00 gaskell Compton: started LBO optimization on laser
  • 225262 03/25/11 10:25 buddhini Analysis: FFT of Injector beam X and Y during e:50k to 100k on Injector run 2273
  • 225261 03/25/11 09:55 jhlee tuned xorg.conf on cdaql3
  • 225260 03/25/11 09:40 buddhini Target : Increased the 15k supply from 15g/s to 25 g/s on cryos request
  • 225259 03/25/11 08:16 cdaq Beam Time Accounting
  • 225258 03/25/11 08:14 buddhini Started injector run 2274 while Hall A is taking beam (I = 4.9uA)
  • 225257 03/25/11 07:50 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
  • 225256 03/25/11 00:09 cdaq Beam Time Accounting
  • Thursday

  • 225255 03/24/11 23:50 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
  • 225254 03/24/11 23:01 jpan End injector run 2273
  • 225253 03/24/11 22:01 jpan Injector run 2273 is started
  • 225252 03/24/11 21:24 jpan end injector run 2272
  • 225251 03/24/11 20:52 jpan start injector run 2272
  • 225250 03/24/11 20:35 brads RC update for Thursday
  • 225249 03/24/11 20:13 jpan Target GUI and strip charts screenshots, 8:10 pm
  • 225248 03/24/11 18:44 Ramesh Re:Test with Qtor On and Off effect on beam orbit
  • 225247 03/24/11 18:04 Ramesh general tools and HV screenshot
  • 225245 03/24/11 17:43 Ramesh Test with Qtor On and Off effect on beam orbit
  • 225244 03/24/11 17:29 cdaq Beam Time Accounting
  • 225243 03/24/11 17:21 jpan The VCG3H09BTr pressure is increasing
  • 225242 03/24/11 17:03 smithg putting pieces of the puzzle together
  • 225239 03/24/11 16:38 Ramesh Some links for beam dump images from Accel Elog
  • 225234 03/24/11 16:28 saw Qtor ramping to zero
  • 225233 03/24/11 16:25 sxyang Day Shift Summary
  • 225232 03/24/11 16:18 benesch Beam: beam looks fine on hall C dump viewer
  • 225231 03/24/11 16:16 buddhini Shift check list HV and Genereal tool screen shots.
  • 225230 03/24/11 15:58 saw Ramping Qtor to 8921
  • 225229 03/24/11 15:53 buddhini Target screen shots at the end of the day shift
  • 225224 03/24/11 14:56 sxyang hall is under power permit
  • 225219 03/24/11 14:37 saw Write run comments carefully
  • 225218 03/24/11 14:15 sxyang hall under controlled access
  • 225216 03/24/11 13:00 buddhini Moved the target home out of the beam
  • 225215 03/24/11 12:41 buddhini Target screen shots at the middle of the day shift
  • 225214 03/24/11 12:13 sxyang screenshot of bpm
  • 225213 03/24/11 12:12 sxyang screenshort of bpm
  • 225212 03/24/11 08:10 buddhini Target screen shots at the begining of the day shift
  • 225211 03/24/11 08:04 cdaq Beam Time Accounting
  • 225210 03/24/11 06:53 pqwang Target: Target GUI and strip charts screenshots at 7 am
  • 225209 03/24/11 00:01 cdaq Beam Time Accounting
  • Wednesday

  • 225208 03/23/11 22:53 rakithab Target: Target GUI and strip charts screenshots
  • 225203 03/23/11 19:51 wdconinc Compton: PMT dark box: no baseline shift at high rate with low signal size
  • 225202 03/23/11 19:03 cdaq Beam Time Accounting
  • 225201 03/23/11 19:02 rob reduced HV on AUX002, AUX003
  • 225196 03/23/11 17:15 mack/ywang late entry: scan of 5 MeV FC position dependence
  • 225193 03/23/11 17:03 covrig Target: 4K status
  • 225190 03/23/11 16:16 sxyang Screenshots of HV and General Tools GUIs.
  • 225189 03/23/11 16:13 rakithab Target: Target GUI and strip charts screenshots
  • 225188 03/23/11 16:12 sxyang Day shift summary
  • 225187 03/23/11 14:49 beaufait MDP
  • 225186 03/23/11 14:48 beaufait MDP
  • 225185 03/23/11 14:47 beaufait MDP
  • 225184 03/23/11 14:31 beaufait qtor prep
  • 225183 03/23/11 14:19 Jiawei Target: abnormal 4k flow fluctuation again
  • 225180 03/23/11 12:46 rob scanner networking issue resolved: upstairs fiber transceiver was off
  • 225179 03/23/11 12:42 jhlee Rearrange cronjobs on cdaql cluster
  • 225178 03/23/11 12:34 jhlee correction : Rearrange the output path of QwAnalyzer on cdaql cluster
  • 225177 03/23/11 12:30 jhlee Rearrange the output path of QwAnalyzer on cdaql cluster
  • 225176 03/23/11 12:27 brads cdaql8 is OK
  • 225175 03/23/11 11:53 sxyang cdaql8 power off
  • 225174 03/23/11 11:15 sxyang target 4K flow rate fluctuates
  • 225173 03/23/11 10:31 narayan Compton: e-detector parked
  • 225171 03/23/11 09:56 Jiawei Target: 4K flow was unstable, now is back
  • 225170 03/23/11 09:36 cdaq Beam Time Accounting
  • 225169 03/23/11 09:13 jbrock Beamline Vacuum Stat
  • 225168 03/23/11 07:44 pqwang Target: Target GUI and strip charts screenshots
  • 225167 03/23/11 07:42 Armstrong correction
  • 225166 03/23/11 07:27 Armstrong VCG3H09DTr vacuum since 16:45 yesterday
  • 225165 03/23/11 01:12 jhlee ROOT writing performace test on cdaql3
  • 225164 03/23/11 00:02 cdaq Beam Time Accounting
  • Tuesday

  • 225163 03/22/11 21:52 Page Target: Operator is still awake :)
  • 225160 03/22/11 19:45 wdconinc Compton: Upgraded qwcompton auto-analyzer in ~/compton/QwAnalysis
  • 225155 03/22/11 18:15 Page vacuum stripcharts...NO alarms going off !
  • 225154 03/22/11 18:07 Carlini Beam: Beamline Vacuum status
  • 225149 03/22/11 17:07 jhlee Analysis: setup qwanalyzer on cdaql3
  • 225148 03/22/11 16:46 covrig Target: status
  • 225145 03/22/11 16:20 gaskell Compton: Added modulation "ramp" signal to Compton DAQ
  • 225141 03/22/11 16:06 cdaq Beam Time Accounting
  • 225137 03/22/11 15:48 jpan Target: The 15K mass flow was decreased further, right now is about 12 g/s and the HPH power is ~350 W
  • 225136 03/22/11 15:08 jpan Target: Target GUI and strip charts screenshots @ 3:05 pm, pretty quiet so far
  • 225135 03/22/11 15:04 smithg vacuum status
  • 225134 03/22/11 14:52 rakithab CAEN HV settings and General tools snapshots
  • 225132 03/22/11 11:35 gaskell Compton: added 1MHz clock to Compton DAQ
  • 225129 03/22/11 11:02 jpan Target: Adjust the QW_FI_15K low limit a little bit (from 14.00 to 13.50) temporarily, will change it back later
  • 225128 03/22/11 10:59 rakithab Beam: Injector studies ELOG entry
  • 225127 03/22/11 10:56 wdconinc Compton: Data written to tape
  • 225126 03/22/11 10:55 rakithab Beam: Injector Run 2271 ended.
  • 225125 03/22/11 10:20 jpan The 15K mass flow was decreased to ~14 g/s.
  • 225124 03/22/11 10:02 jpan Target: The 15 K mass flow drops during last few minutes
  • 225123 03/22/11 09:54 jpan Target: Cryo called and asked our vacuum status
  • 225122 03/22/11 09:53 rakithab Injector run 2271 started.
  • 225121 03/22/11 09:43 Armstrong Target Operators: please fill out BTA
  • 225120 03/22/11 09:37 cdaq Beam Time Accounting
  • 225118 03/22/11 06:06 pqwang Target: Target GUI and strip charts screenshots at 6 am
  • 225117 03/22/11 06:04 pqwang White boxes on EPICS Scaler GUI
  • Monday

  • 225116 03/21/11 21:47 wdconinc Analysis: cdaql3 environment set up for Qweak analysis
  • 225115 03/21/11 21:23 Page Target: Screen shots - quiet night so far
  • 225114 03/21/11 21:20 wdconinc Compton: Restored data_tracker (on cdaql6)
  • 225113 03/21/11 21:16 beaufait pump control cable
  • 225112 03/21/11 20:04 mack plots from event mode light leak check
  • 225111 03/21/11 17:56 dalton Status
  • 225110 03/21/11 17:34 brads New cdaql3 is now online
  • 225108 03/21/11 17:28 Page Target: Target 'parked' at 20 g/s of 15K, 16 g/s 4K
  • 225107 03/21/11 17:00 Page Target: Progress at reducing 15K flow
  • 225104 03/21/11 16:39 cdaq Beam Time Accounting
  • 225103 03/21/11 16:36 benesch Beam: 70 MHz IF amp update
  • 225102 03/21/11 16:22 rob Analysis: pmtltg saturates in its new position
  • 225101 03/21/11 16:18 Page Target: Screen shot, start of swing shift
  • 225100 03/21/11 16:16 Page 4 pm - overall status (unclear)
  • 225099 03/21/11 16:09 sxyang screen shots of target GUI
  • 225098 03/21/11 16:00 gaskell Compton: turned off laser
  • 225097 03/21/11 15:24 rob segmented analysis test done
  • 225096 03/21/11 14:50 sxyang 15K supply flow rate did not change much
  • 225095 03/21/11 14:02 rakithab CAEN HV and General Tools snapshots
  • 225094 03/21/11 13:54 sxyang 15K flow
  • 225093 03/21/11 13:26 kenyon Drag pump
  • 225092 03/21/11 13:18 jhlee turn off autoanalyzers and disable them in cronjob
  • 225091 03/21/11 13:16 rob segmented analysis test started on cdaql5
  • 225089 03/21/11 12:28 donjones Compton: PD cable unplugged
  • 225088 03/21/11 12:05 sxyang flow rate changed
  • 225087 03/21/11 10:41 cdaq Beam Time Accounting
  • 225084 03/21/11 10:21 cdaq Beam Time Accounting
  • 225083 03/21/11 10:20 smacewan Attempt to tidy up the Wiki:
  • 225082 03/21/11 10:16 cdaq Beam Time Accounting
  • 225081 03/21/11 10:12 Armstrong Date wrong on old BTA submission
  • 225080 03/21/11 10:06 cdaq Beam Time Accounting
  • 225079 03/21/11 10:04 cdaq Run 10920 Pedestal Data
  • 225078 03/21/11 10:03 cdaq Beam Time Accounting
  • 225075 03/21/11 08:48 brads Gas system flowing again
  • 225074 03/21/11 08:08 cdaq Beam Time Accounting
  • 225073 03/21/11 06:49 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
  • 225064 03/21/11 00:43 narayan gas system interlock alarm
  • Sunday

  • 225062 03/20/11 21:46 Page Target: target screens, 21:45
  • 225061 03/20/11 20:36 Page Scattering chamber vacuum settled down
  • 225060 03/20/11 20:16 Page VBV3H09A valve status
  • 225059 03/20/11 18:23 Page Vacuum history and valve status
  • 225058 03/20/11 17:28 Page Target: scattering chamber vacuum plan for tonight
  • 225057 03/20/11 16:56 Page Target: Scattering chamber vacuum getting worse
  • 225056 03/20/11 15:37 dalton Molecular drag pump trip, can't restart
  • 225055 03/20/11 15:14 birchall Target: Vacuum in scattering chamber and upstream
  • 225054 03/20/11 14:23 birchall Target: Screenshot at 2:20 pm
  • 225053 03/20/11 07:55 pqwang Target: Screen shot at end of owl shift
  • 225052 03/20/11 00:10 jhlee renice all copy process on cdaql4 and cdaql8
  • 225051 03/20/11 00:01 jhoskins QTOR ramped to zero
  • Saturday

  • 225050 03/19/11 23:57 jhoskins Swing Shift Summary
  • 225049 03/19/11 22:12 jhoskins MD w/wo lights on runs :10918, 10919
  • 225048 03/19/11 21:47 dalton Owl shift SL cancelled, some other shifts on standby
  • 225038 03/19/11 18:16 dalton Bad vacuum in downstream region
  • 225037 03/19/11 18:06 narayan/wdco Compton: Integrated photon and electron detector DAQ
  • 225034 03/19/11 17:21 jhoskins vacuum went bad again after spiking a few times.
  • 225033 03/19/11 17:09 mack non-invasive BCM1,2 changes
  • 225032 03/19/11 17:04 jhoskins Mark going into hall to reset turbo pump again
  • 225031 03/19/11 16:51 JHoskins Vacuum improved
  • 225030 03/19/11 16:21 cdaq Beam Time Accounting
  • 225029 03/19/11 16:19 rakithab Shift Summary: Day Shift summary
  • 225028 03/19/11 16:03 jpan Target GUI and strip charts screenshots at the end of day shift
  • 225027 03/19/11 15:43 jpan Controlled access to reset downstream vacuum pump 3H09C
  • 225026 03/19/11 15:38 jpan The vacuum history in the past 2 hrs.
  • 225025 03/19/11 15:33 rakithab Beam dump vacuum pressure reached 7.2e-3uTorr .
  • 225024 03/19/11 15:13 jpan Target: Bad downstream vacuum
  • 225023 03/19/11 15:06 rakithab turned off the beam modulation
  • 225022 03/19/11 14:59 rakithab Analysis: summary of the pedestal extraction: Run 10916
  • 225020 03/19/11 14:54 cdaq Run 10916 Pedestal Data
  • 225018 03/19/11 14:48 wdconinc Compton: Data disk filling up, no tape backup due to RIP cdaql3
  • 225015 03/19/11 14:31 wdconinc Compton: Restarted firstpass autoanalyzer after ccomptl1 reboot
  • 225014 03/19/11 14:21 jpan Analysis - run#10915
  • 225013 03/19/11 14:10 jpan Here is the plot for MD sensitivity to Y (run#10914)
  • 225006 03/19/11 13:03 jpan Analysis - run#10914
  • 225005 03/19/11 12:46 rakithab CAEN HV and general tools snapshots
  • 225004 03/19/11 12:42 jpan Oops, here is the plot for MD sensitivity to Y (run#10912)
  • 225001 03/19/11 12:19 jpan The position sensitivies of MDALLBARS in x and y seem larger during run#10913
  • 224998 03/19/11 12:16 wdconinc Compton: DAQ systems work better when cables are plugged in
  • 224996 03/19/11 12:02 jpan Analysis - run#10913
  • 224989 03/19/11 11:33 rakithab Injector run 2270 ended.
  • 224985 03/19/11 11:04 jpan Analysis - run#10912
  • 224984 03/19/11 11:03 rakithab Injector run 2270 started
  • 224983 03/19/11 10:41 rakithab CODA:EB4 crashed at the end of the run 10911
  • 224979 03/19/11 10:23 rakithab devel.2011.03.13 updated: Scripts FlipPCValues, SetLargeNegative_A_q and SetLargePositive_A_q
  • 224978 03/19/11 10:08 jpan Analysis - run#10911
  • 224977 03/19/11 09:34 rakithab Analysis: Run 10910 is the IHWP OUT -> IN transition run with large charge asymmetry
  • 224974 03/19/11 09:27 rakithab Changed to IHWP IN before the run 10910
  • 224968 03/19/11 09:23 narayan Compton: e-detector
  • 224966 03/19/11 09:18 jpan Target: Vacuum behaviour during last swing shift
  • 224964 03/19/11 08:54 jpan Analysis - run#10909
  • 224963 03/19/11 08:47 rakithab Halo and Target Beam Positions
  • 224962 03/19/11 08:25 rakithab Turned ON beam modulation during the run 10909
  • 224960 03/19/11 08:19 cdaq Beam Time Accounting
  • 224956 03/19/11 08:07 narayan Shift Summary: Owl Shift summary
  • 224955 03/19/11 07:59 Nuruzzaman Target: Target GUI and strip charts screen shots, end of OWL shift.
  • 224953 03/19/11 07:31 Nuruzzaman Analysis: Plots for production run 10908
  • 224947 03/19/11 06:49 Nuruzzaman Shift Cheklist: HV and General tools.
  • 224946 03/19/11 06:30 Nuruzzaman Analysis: Plots for production run 10907
  • 224939 03/19/11 05:28 Nuruzzaman Analysis: Plots for production run 10906
  • 224938 03/19/11 05:24 Nuruzzaman Analysis: Plots for production run 10905
  • 224933 03/19/11 04:18 Nuruzzaman Analysis: Plots for pedestal run 10902
  • 224931 03/19/11 04:00 narayan QTOR tripped and recovered
  • 224930 03/19/11 03:51 Nuruzzaman Analysis: Plots for production run 10904
  • 224929 03/19/11 03:44 Nuruzzaman QTOR trip, ramping up.
  • 224924 03/19/11 03:21 Nuruzzaman Analysis: Plots for production run 10903
  • 224923 03/19/11 03:14 mack BCM1,2 noise
  • 224906 03/19/11 02:20 narayan Compton: ROC1 keeps going unresponsive
  • 224903 03/19/11 02:11 Nuruzzaman Analysis: Plots for production run 10901
  • 224902 03/19/11 01:53 buddhini Shift Summary: Swing shift
  • 224880 03/19/11 00:45 cdaq Beam Time Accounting
  • 224878 03/19/11 00:39 Nuruzzaman 03/19/2011 00.34: Changed Half Wave Plate from IN to OUT.
  • 224874 03/19/11 00:22 Nuruzzaman Target: Target GUI and strip charts screen shots, beginning of OWL shift.
  • 224873 03/19/11 00:03 buddhini Analysis: Run 10900 : analysis plots
  • Friday

  • 224872 03/18/11 23:59 buddhini Analysis: Opps! this is for run 10898
  • 224871 03/18/11 23:58 buddhini Analysis: Run 10899 : analysis plots
  • 224870 03/18/11 23:36 buddhini Analysis: Run 10834 : DS and US Lumi yields and asymmetryies
  • 224869 03/18/11 23:36 smithg Target: recommend closing 16" GV during beam off vacuum excursions
  • 224868 03/18/11 23:35 Armstrong Does Beam Modulation mess up the Compton DAQ?
  • 224867 03/18/11 23:34 buddhini Analysis: Run 10898 : Main detector properties
  • 224866 03/18/11 23:32 buddhini Analysis: Run 10898 : Beam Properties
  • 224863 03/18/11 23:24 buddhini Turned on Beam Modulation around 260k event of run 10900
  • 224860 03/18/11 23:04 buddhini Stopped the COMPTON photon detector CODA after a long series of TS and ROC error messages..
  • 224859 03/18/11 23:03 Armstrong Target Screenshots
  • 224858 03/18/11 23:02 Armstrong Target Screenshots & Status
  • 224850 03/18/11 22:37 Armstrong More vacuum bizzare behaviour
  • 224842 03/18/11 22:19 buddhini Turned off bMOd again. It was started with run 10899 but again Compton daq got error messages.
  • 224838 03/18/11 22:07 buddhini Moved the Optologic Box power suplies to a spot down in the power strip.
  • 224836 03/18/11 21:50 dalton Compton: okay it's working
  • 224833 03/18/11 21:44 dalton Compton: ccomptl1 reboot
  • 224831 03/18/11 21:38 buddhini Beam modulation was turned off around 700k events in run 10898
  • 224819 03/18/11 21:21 buddhini Started beam modulation.
  • 224807 03/18/11 20:43 buddhini Analysis: Run 10897 : DS and US Lumi yields and asymmetryies
  • 224806 03/18/11 20:42 buddhini Analysis: Run 10897 : Main detector properties
  • 224802 03/18/11 20:41 buddhini Analysis: Run 10897 : Beam Properties
  • 224799 03/18/11 19:47 buddhini Analysis: Run 10896 : DS and US Lumi yields and asymmetryies
  • 224798 03/18/11 19:47 mack Looks like BCM1,2 got their mojo back
  • 224796 03/18/11 19:46 buddhini Analysis: Run 10896 : Main detector properties
  • 224795 03/18/11 19:45 buddhini Analysis: Run 10896 : Beam Properties
  • 224794 03/18/11 19:45 buddhini Again a bad entry. So ignore this post.
  • 224790 03/18/11 19:33 buddhini Analysis: Run 10895 : Beam Properties
  • 224789 03/18/11 19:29 dalton Compton: HELP! I can't configure CODA
  • 224788 03/18/11 19:21 buddhini End of injector run 2269
  • 224781 03/18/11 19:11 buddhini The reason for the large double difference in run 10893
  • 224779 03/18/11 18:55 buddhini Analysis: Run 10895 : DS and US Lumi yields and asymmetryies
  • 224778 03/18/11 18:54 buddhini Analysis: Run 10895 : Main detector properties
  • 224777 03/18/11 18:53 buddhini Analysis: Run 10895 : Beam Properties
  • 224776 03/18/11 18:48 buddhini sorry! this is a wrong post!
  • 224775 03/18/11 18:42 buddhini QwFeedback has been running happily.
  • 224774 03/18/11 18:40 buddhini Started injector 2269
  • 224773 03/18/11 18:38 buddhini Analysis: Run 10894 : DS and US Lumi yields and asymmetryies
  • 224772 03/18/11 18:37 buddhini Analysis: Run 10894 : BCM double differences
  • 224771 03/18/11 18:37 buddhini Analysis: Run 10894 : Main detector properties
  • 224770 03/18/11 18:36 buddhini Run 10894 : Beam Properties
  • 224769 03/18/11 18:31 buddhini Beam positions
  • 224768 03/18/11 18:23 buddhini Halo rates from archiver
  • 224767 03/18/11 18:16 buddhini BCM double differences inproved
  • 224765 03/18/11 18:09 Armstrong Shift Summary: screen shots
  • 224761 03/18/11 17:59 buddhini High halo rates
  • 224760 03/18/11 17:58 Armstrong Beam has large halo
  • 224759 03/18/11 17:57 buddhini Compton rates and cavity power fluctuations
  • 224757 03/18/11 17:45 Armstrong QTor trip
  • 224756 03/18/11 17:39 buddhini Beam back. Taking production data!
  • 224752 03/18/11 17:24 Pitt/Mei Report of work done on DSLUMI5 during access
  • 224751 03/18/11 17:22 cdaq Run 10892 Pedestal Data
  • 224748 03/18/11 17:16 buddhini Injector capture is fixed. May ge beam back in another 20-30 mins.
  • 224746 03/18/11 17:01 smacewan Fixed qwick analyzers
  • 224744 03/18/11 16:54 mack attempting to address BCM1,2 noise increase: unplugged RII HDC power supplies at about 13:35
  • 224743 03/18/11 16:53 narayan Compton
  • 224738 03/18/11 16:18 buddhini No beam for another hour (hopefully)
  • 224737 03/18/11 16:02 cdaq Beam Time Accounting
  • 224736 03/18/11 16:01 AK Opper Shift Summary: Day Shift summary
  • 224734 03/18/11 15:51 Armstrong vacuum and beam correlation redux
  • 224732 03/18/11 15:49 Jiawei Target: late entry: moved to LH2 target
  • 224731 03/18/11 15:42 Pitt/Mei DSLUMI5 works finally!
  • 224730 03/18/11 15:30 AK Opper Beam
  • 224728 03/18/11 15:23 AK Opper status
  • 224727 03/18/11 15:19 buddhini Analysis: Charge asymmetry fluctuations seen in the injector during run 2268 taken last night.
  • 224722 03/18/11 14:27 jmammei QwAC shifts
  • 224720 03/18/11 14:04 AK Opper status
  • 224718 03/18/11 13:43 dalton RC daily summary
  • 224716 03/18/11 13:15 smithg posted a few of Andy's pics to the docdb
  • 224714 03/18/11 13:04 AK Opper HWP
  • 224713 03/18/11 13:00 AK Opper Going to low current running
  • 224712 03/18/11 12:58 Jiawei Target: Moved to DS 4% Al target
  • 224711 03/18/11 12:57 Armstrong Vacuum and beam correlation
  • 224710 03/18/11 12:46 jhlee Analysis: modified first100k to reduce a workload on cdaql4
  • 224708 03/18/11 12:43 benesch Beam: 3H07A harp trace
  • 224707 03/18/11 12:41 AK Opper status
  • 224706 03/18/11 12:41 gaskell Moller results, Friday March 18, 2011
  • 224700 03/18/11 12:01 gaskell Moller done: backing out
  • 224688 03/18/11 11:35 gaskell Moller: epics info during IHWP=OUT running (smaller AQ)
  • 224680 03/18/11 11:11 gaskell Moller: adjusted PITA voltages, RHWP
  • 224675 03/18/11 10:59 gaskell Moller: epics info during IHWP=OUT running
  • 224674 03/18/11 10:58 jhlee several first100k test result
  • 224669 03/18/11 10:30 rakithab Analysis: QwFeedback: devel version is Updated for the PITA slope for IHWP IN state
  • 224668 03/18/11 10:30 gaskell Moller: epics info during IHWP=IN running
  • 224663 03/18/11 10:12 rakithab Beam: Analysis: PITA slope calculated from the large charge asymmetries for IHWP IN state
  • 224661 03/18/11 10:08 Jiawei Target: silent the raster alarm for moller study
  • 224652 03/18/11 09:54 kenyon Pictures from window change out
  • 224642 03/18/11 09:28 jhlee fixed the run number mismatch
  • 224633 03/18/11 09:11 gaskell Moller setup
  • 224632 03/18/11 09:10 AK Opper HV off
  • 224631 03/18/11 09:06 Jiawei Target: Target: move out of beam
  • 224615 03/18/11 08:46 AK Opper & N Run Control run number
  • 224604 03/18/11 08:27 Armstrong Vacuum in VCG3H09DTr for last 2 days
  • 224594 03/18/11 08:02 Dutta Shift Summary: Owl Shift summary
  • 224593 03/18/11 08:02 cdaq Beam Time Accounting
  • 224592 03/18/11 08:02 Nuruzzaman Target: Target GUI and strip charts screen shots at end of OWL shift
  • 224589 03/18/11 07:55 Nuruzzaman QTOR Hall probe oscillation during OWL shift.
  • 224586 03/18/11 07:41 Nuruzzaman Analysis: Plots for production run 10860.
  • 224583 03/18/11 07:27 Dutta Run number mismatch
  • 224578 03/18/11 07:23 Dutta DAQ crashed with TS unresponsive and end of run failed
  • 224577 03/18/11 07:23 Nuruzzaman Beam current and vacuum 3H09D status for OWL shift.
  • 224572 03/18/11 06:37 Nuruzzaman Analysis: Plots for production run 10859.
  • 224562 03/18/11 05:50 Nuruzzaman Analysis: Plots for production run 10858.
  • 224559 03/18/11 05:08 Dutta End of run failed for run 10857, due to EB crash
  • 224550 03/18/11 04:51 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 224549 03/18/11 04:44 Nuruzzaman Analysis: Plots for production run 10857.
  • 224538 03/18/11 03:37 Nuruzzaman Analysis: Plots for production run 10856.
  • 224513 03/18/11 02:24 Nuruzzaman Analysis: Plots for rn 10855, back to production run.
  • 224505 03/18/11 02:05 Nuruzzaman Analysis: Plots for rn 10854, during large charge asymmetry test.
  • 224497 03/18/11 01:56 Nuruzzaman Analysis: Plots for rn 10853, during large charge asymmetry test.
  • 224494 03/18/11 01:47 Nuruzzaman Analysis: Plots for rn 10852, during large charge asymmetry test.
  • 224491 03/18/11 01:43 Nuruzzaman Analysis: Plots for rn 10851, during large charge asymmetry test.
  • 224489 03/18/11 01:38 Nuruzzaman Analysis: Plots for rn 10850, during raster frequency test.
  • 224486 03/18/11 01:36 Nuruzzaman Analysis: Plots for rn 10849, during raster frequency test.
  • 224485 03/18/11 01:36 mack perhaps due to small drifts in beam position
  • 224479 03/18/11 01:27 Nuruzzaman Analysis: Plots for rn 10848, during raster frequency test.
  • 224478 03/18/11 01:23 Nuruzzaman Analysis: Plots for rn 10847, during raster frequency test.
  • 224476 03/18/11 01:22 Nuruzzaman Analysis: Plots for rn 10846, during raster frequency test.
  • 224474 03/18/11 01:20 Dutta Beam: IHWP moved to IN position
  • 224473 03/18/11 01:20 Nuruzzaman Analysis: Plots for rn 10845, during raster frequency test.
  • 224472 03/18/11 01:19 pking Summary of raster frequency study on LH2
  • 224470 03/18/11 01:16 Nuruzzaman Analysis: Plots for rn 10844, during raster frequency test.
  • 224468 03/18/11 01:13 Nuruzzaman Analysis: Plots for rn 10842, during raster frequency test.
  • 224467 03/18/11 01:11 Nuruzzaman Analysis: Plots for rn 10841, during raster frequency test.
  • 224466 03/18/11 01:08 Nuruzzaman Analysis: MD barsum for run 10839 & 10840
  • 224462 03/18/11 01:04 buddhini Shift Summary: Swing shift
  • 224459 03/18/11 00:44 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 224456 03/18/11 00:27 buddhini Shift check list
  • 224451 03/18/11 00:09 cdaq Beam Time Accounting
  • 224449 03/18/11 00:05 buddhini Run 10837 : Cause for the non-gaussian distributions in LUMIs
  • Thursday

  • 224442 03/17/11 23:30 buddhini end of injector run 2268
  • 224440 03/17/11 23:26 cdaq Beam Time Accounting
  • 224437 03/17/11 23:21 buddhini Started injector run 2268
  • 224436 03/17/11 23:17 buddhini Analysis: Run 10837 : DS and US Lumi yields and asymmetryies
  • 224435 03/17/11 23:16 sxyang analysis: plots for production run 10831
  • 224434 03/17/11 23:16 buddhini Analysis: Run 10837 : Main detector properties
  • 224433 03/17/11 23:14 buddhini Analysis: Run 10837 : Beam Properties
  • 224430 03/17/11 23:04 sxyang analysis: plots for production run 10838
  • 224425 03/17/11 22:50 buddhini Beam off for the start of Pauls raster frequency tests.
  • 224421 03/17/11 22:45 sxyang analysis: plots for production run 10836
  • 224418 03/17/11 22:38 buddhini Raster changed to 3.5 x 3.5
  • 224413 03/17/11 22:26 buddhini Analysis: Run 10836 : DS and US Lumi yields and asymmetryies
  • 224412 03/17/11 22:24 sxyang analysis: plots for production run 10835
  • 224411 03/17/11 22:17 buddhini Analysis: Run 10836 : Beam Properties
  • 224410 03/17/11 22:02 buddhini Analysis: Run 18035 : Cause of the tail in md3pos yield distribution.
  • 224405 03/17/11 21:40 buddhini Run 10835 : DS and US Lumi yields and asymmetryies
  • 224404 03/17/11 21:39 buddhini Analysis: Run 10835 : Main detector properties
  • 224403 03/17/11 21:38 buddhini Analysis: Run 10835 : Beam Properties
  • 224402 03/17/11 21:20 buddhini Analysis: Run 10834 : DS and US Lumi yields and asymmetryies
  • 224401 03/17/11 21:16 buddhini BCM charge asymmetry width fluctuations
  • 224400 03/17/11 20:55 sxyang missing plot from analysis of run 10834
  • 224399 03/17/11 20:52 sxyang analysis: plots for production run 10834
  • 224396 03/17/11 20:21 buddhini The first 100K rootfiles of these runs were not properly closed.
  • 224393 03/17/11 20:13 sxyang bad runs
  • 224392 03/17/11 20:11 buddhini BPM positions
  • 224391 03/17/11 20:03 buddhini Beam modulation is OFF from run 10834
  • 224390 03/17/11 19:53 sxyang analysis: plots for production run 10828
  • 224388 03/17/11 19:46 buddhini Actually QTOR had crashed not tripped. So we did the QTOR crash recovery and now it is ramping up again.
  • 224386 03/17/11 19:38 buddhini QTOR tripped! Reset and ramping up again.
  • 224383 03/17/11 19:26 buddhini Turned off beam modulation. Killed coda and restarted.
  • 224374 03/17/11 19:05 buddhini Beam modulation is now ON.
  • 224371 03/17/11 19:02 buddhini Beam modulation was off during run 10289.
  • 224370 03/17/11 18:57 pking Analysis: Modified first100k script to properly call the new analyzer (no more zero_tokens support)
  • 224367 03/17/11 18:35 sxyang pretty good vacuum
  • 224365 03/17/11 18:20 dalton Return of beam help vacuum
  • 224364 03/17/11 18:15 buddhini Started the charge feedback
  • 224363 03/17/11 18:15 sxyang the result of pump leakage check
  • 224359 03/17/11 18:03 sxyang moved the LH2 target in again
  • 224358 03/17/11 18:02 buddhini Got 50 uA beam
  • 224357 03/17/11 18:00 sxyang moved the target out of beam position
  • 224356 03/17/11 17:52 buddhini Target: Late entry, target was moved home to take tune beam.
  • 224355 03/17/11 17:38 Ramesh Analysis: bcm1,2,5,6 yield for run range 9812-10120
  • 224354 03/17/11 17:33 buddhini Analysis: FFT plots of X and Y in injector run 2267
  • 224353 03/17/11 17:30 sxyang moved to LH2 target
  • 224352 03/17/11 17:24 buddhini Hall C comming out of controlled access. Going to beam permit.
  • 224351 03/17/11 17:21 pking Analysis: Updated QwAnalysis/1.08 prminput and Extensions to reversion 2678
  • 224350 03/17/11 17:07 pking Analysis: Changed "QwAnalysis/devel" to be a link to "QwAnalysis/1.08"
  • 224349 03/17/11 16:38 cdaq Beam Time Accounting
  • 224348 03/17/11 16:25 buddhini Hall is still in controlled access. Waiting for the leack checks to finish.
  • 224347 03/17/11 16:10 rajotte Day Shift summary
  • 224346 03/17/11 15:49 AK Opper Target: Target screen shot
  • 224345 03/17/11 15:27 rajotte general tool & HV snapshot
  • 224344 03/17/11 15:10 gaskell Moller cooldown complete
  • 224343 03/17/11 13:33 pking Corrected the inhibit logic for the helicity error buzzer.
  • 224339 03/17/11 12:41 Pitt Work on DSLUMI5 during earlier access
  • 224336 03/17/11 12:16 buddhini Analysis: FFT of injector bpm X and Y signals during run 2263
  • 224333 03/17/11 11:19 AK Opper Target: 4K JT
  • 224332 03/17/11 10:47 Armstrong update: called for full sweep
  • 224329 03/17/11 10:18 AK Opper Still more on Beam Dump pressure
  • 224328 03/17/11 10:07 AK Opper more on Beam Dump pressure
  • 224327 03/17/11 10:07 pking Analysis: Restored qweak_maindet_pedestal.10229-.map on cdaq machines
  • 224326 03/17/11 09:58 AK Opper Beam: Beam Dump pressure
  • 224325 03/17/11 09:31 rajotte Access to work on LUMI5
  • 224324 03/17/11 09:28 rajotte first100k run 10821
  • 224323 03/17/11 09:23 AK Opper QTOR alarm set point
  • 224320 03/17/11 09:20 magee Coulomb counter works - not on general tools screen
  • 224319 03/17/11 09:17 pking Analysis: Main detector pedestal file for 10229 is gone
  • 224318 03/17/11 08:58 saw Qtor high limit is too Low
  • 224316 03/17/11 08:42 AK Opper QTOR current diff
  • 224314 03/17/11 08:39 AK Opper Target: Target change
  • 224312 03/17/11 08:35 gaskell starting Moller cooldown
  • 224311 03/17/11 08:35 magee Analysis: NEW shift Coulomb counter
  • 224310 03/17/11 08:31 rakithab Shift Summary: OWL Shift summary
  • 224308 03/17/11 08:27 rajotte End of injector run 2267
  • 224307 03/17/11 08:22 rajotte first100k run 10820
  • 224306 03/17/11 08:03 cdaq Beam Time Accounting
  • 224305 03/17/11 07:58 rakithab Analysis: QwFeedback: devel version is Updated for the PITA slope for IHWP OUT state
  • 224302 03/17/11 07:47 gaskell Compton: GSO test runs 3/17/2011
  • 224299 03/17/11 07:40 Nuruzzaman Analysis: Plots for production run 10819 with 30 uA at begining 100 uA during the end.
  • 224298 03/17/11 07:39 narayan Compton: e-detector status
  • 224297 03/17/11 07:36 narayan Compton: e-detector HV taken upto 500V
  • 224296 03/17/11 07:35 rakithab Analysis: PITA slope calculated from the large charge asymmetries
  • 224295 03/17/11 07:33 Nuruzzaman Beam current and QTOR status for OWL shift.
  • 224294 03/17/11 07:29 Nuruzzaman Target: Target GUI and strip-chart screen shots, end of owl shift.
  • 224280 03/17/11 06:43 Nuruzzaman Analysis: Plots for production run 10818 with 30 uA.
  • 224279 03/17/11 06:39 rakithab Beam: Large Charge asymmetry runs summary
  • 224277 03/17/11 06:38 gaskell Compton: new FADC out, old FADC in
  • 224268 03/17/11 06:18 Nuruzzaman Analysis: Plots for production run 10817.
  • 224267 03/17/11 06:15 rakithab QTOR recovered
  • 224265 03/17/11 05:59 rakithab trying to recover
  • 224261 03/17/11 05:46 gaskell Compton: GSO rates at 1700 V, 150 uA
  • 224260 03/17/11 05:45 rakithab Turned Feedback ON at the beginning of the run 10817
  • 224258 03/17/11 05:43 rakithab Set PC to norminal state. Large charge asymmetry runs were finished.
  • 224257 03/17/11 05:42 rakithab EB 4 crashed at the end of the run 10816.
  • 224254 03/17/11 05:35 rakithab Large negative charge asym. Set PC hardware counts to offset of 1000
  • 224250 03/17/11 05:29 rakithab Large negative charge asym. Set PC hardware counts to offset of 2500
  • 224243 03/17/11 05:18 gaskell Compton: backgrounds and scintillator HV
  • 224239 03/17/11 05:00 rakithab Large positive charge asym. Set PC hardware counts to offset of 1000
  • 224237 03/17/11 04:51 rakitha Large positive charge asym. Set PC hardware counts to offset of 2500
  • 224233 03/17/11 04:47 rakithab Turned off charge feedback for the large charge asym. runs
  • 224231 03/17/11 04:46 rakithab PC values before large charge asym runs
  • 224230 03/17/11 04:43 narayan Compton: Beam modulation turned off during run # 10810
  • 224229 03/17/11 04:28 rakithab Beam: Late Entry:Beam Loss issues are fixed now.
  • 224228 03/17/11 04:22 Nuruzzaman QTOR Hall probe was showing communication error. Fixed now.
  • 224225 03/17/11 04:12 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
  • 224224 03/17/11 04:07 Nuruzzaman Analysis: Plots for production run 10810.
  • 224223 03/17/11 04:00 rakithab Turned ON the beam modulation
  • 224222 03/17/11 03:47 rakithab Beam tune at 150uA
  • 224219 03/17/11 03:39 rakithab CAEN HV and General tools snapshots
  • 224218 03/17/11 03:08 rakithab Analysis: MD yields appear to be unrealistic in the text summaries.
  • 224217 03/17/11 03:07 mack position differences look encouraging
  • 224213 03/17/11 02:25 rakitha MCC taking the beam OFF for hall c due to beam loss issues
  • 224211 03/17/11 02:08 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
  • 224210 03/17/11 02:04 Nuruzzaman Analysis: Plots for production run 10807 with LH2.
  • 224207 03/17/11 01:37 Nuruzzaman Analysis: Plots for pedestal run 10805.
  • 224206 03/17/11 01:36 rakithab Beam loss issues preventing Hall C beam going over 130uA. Keep trying to go to the 150uA
  • 224205 03/17/11 01:34 rakithab Halo rates and BPM positions at about 130uA
  • 224204 03/17/11 01:09 narayan Compton: e-detector lowered
  • 224199 03/17/11 00:49 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D.
  • 224198 03/17/11 00:42 rakitha Turned charge feedback ON, taking a run (10804) during beam ramp up
  • 224196 03/17/11 00:40 jhoskins Swing Shift summary
  • 224195 03/17/11 00:36 rakithab Turned current mode MD, Lumi and Halo ON
  • 224194 03/17/11 00:22 cdaq Beam Time Accounting
  • 224193 03/17/11 00:17 jhlee turn on autoanalyzers on cdaql5/7/8 and add them into cronjob for parity runs
  • 224192 03/17/11 00:16 Nuruzzaman Target: Target GUI and strip charts screen shots
  • Wednesday

  • 224191 03/16/11 23:59 kamyers bcm and DAQ ready for production mode
  • 224190 03/16/11 23:43 Armstrong Target: Move back to lH2; have about 1950 W
  • 224189 03/16/11 23:39 kamyers Dilution Measurement Part II Summary
  • 224188 03/16/11 23:29 jhoskins KAtherine/Mack Program is finished -- switching back
  • 224184 03/16/11 23:16 Armstrong Target: move to DS 2% Be target
  • 224181 03/16/11 22:45 jhoskins GeneralTools && HV GUI
  • 224178 03/16/11 22:40 rajotte First 25% sample slug numbers entered in the database for DS 4% Al
  • 224173 03/16/11 21:46 kamyers effect of Hall A turning on
  • 224172 03/16/11 21:43 jhlee turn off autoanalyzers
  • 224171 03/16/11 21:37 Armstrong Target: set alarm limits on VCG3H09D
  • 224168 03/16/11 21:20 Armstrong Target: horizontal motion problem; go to DS centering hole
  • 224165 03/16/11 21:15 cdaq Raster Map and BPMs : Run 10796, event range 295000 - 315000
  • 224164 03/16/11 21:13 cdaq Raster Map and BPMs : Run 10796, event range 40000 - 60000
  • 224162 03/16/11 21:04 Pitt Lumi pedestals from Run 10872
  • 224161 03/16/11 20:58 Pitt DSLUMI5 work today
  • 224160 03/16/11 20:50 Pitt Region 2 rotator work
  • 224144 03/16/11 19:58 Armstrong Target: move to 0.5% DS C target; checked Fan differential Pressure mask
  • 224142 03/16/11 19:51 jhoskins Target Centering scan : DONE
  • 224140 03/16/11 19:50 cdaq Raster Map and BPMs : Run 10787, event range 35000 - 55000
  • 224137 03/16/11 19:41 cdaq Raster Map and BPMs : Run 10786, event range 30000 - 50000
  • 224135 03/16/11 19:35 Armstrong Target: move to DS centering hole
  • 224134 03/16/11 19:18 kamyers turned off ROC's 9 and 10
  • 224130 03/16/11 18:59 cdaq Beam Time Accounting
  • 224128 03/16/11 18:53 kamyers turned on ROC's 9 and 10
  • 224127 03/16/11 18:46 jhoskins Preparing to sweep hall and close up
  • 224126 03/16/11 18:44 kamyers whoops, switched mps before this run was over
  • 224124 03/16/11 18:43 rob MD event-mode checks out okay
  • 224123 03/16/11 18:43 kamyers switched to fake 10 Hz mps
  • 224122 03/16/11 18:40 mack some preparatory checklist items
  • 224121 03/16/11 18:32 Armstrong Target: screen shot with filled target
  • 224120 03/16/11 18:22 Armstrong Target: move out of beam
  • 224119 03/16/11 17:31 smithg,lecke Target: Subcooling now
  • 224118 03/16/11 17:13 rob helicity error buzzer now plays nice with tracking DAQ
  • 224117 03/16/11 17:12 Pitt Region 2 HDC leakage currents and FAST OR rates
  • 224115 03/16/11 17:08 Pitt Region 2 HDC checkout after rotator work
  • 224114 03/16/11 16:40 brads cpslow.jlab.org backup location and instructions
  • 224113 03/16/11 16:33 sxyang Snapshots of HV and GeneralTools GUI
  • 224112 03/16/11 16:29 sxyang Day Shift Summary
  • 224111 03/16/11 16:27 jhoskins Lumis turned on. Took lumi pedestal for Mark P.
  • 224107 03/16/11 16:17 smithg,lecke Target: Evaporator seems to be helping cooldown
  • 224104 03/16/11 16:10 dalton Runplan overnight
  • 224102 03/16/11 15:51 jhlee Backplan Disbribution Card and its signal distribution cards are back
  • 224096 03/16/11 14:59 smithg,opper Target: Cooldown not working
  • 224094 03/16/11 14:46 brads cpslow is back up
  • 224090 03/16/11 14:05 rob MD current-mode HV off
  • 224089 03/16/11 13:19 gaskell Compton: quit laser controls
  • 224084 03/16/11 11:13 smithg/opper Target: cooldown status
  • 224083 03/16/11 10:52 Leckey R3 in 1+5 Position
  • 224075 03/16/11 09:54 Dalton Beam: Feedback slope changed
  • 224074 03/16/11 09:30 smithg/opper Target: started cooldown
  • 224073 03/16/11 09:13 Pitt Message from PD: Thursday beam studies moved to today
  • 224072 03/16/11 09:12 sxyang restricted access
  • 224071 03/16/11 09:08 sxyang still waiting for the restricted access
  • 224070 03/16/11 09:04 sxyang hall c controlled access
  • 224069 03/16/11 08:50 Smith, Opper Target: Beamline valve
  • 224068 03/16/11 08:46 Pitt Hall will go to restricted access
  • 224067 03/16/11 08:41 sxyang ramp the QTOR down
  • 224066 03/16/11 08:36 Pitt Plan for Wednesday day shift
  • 224065 03/16/11 08:29 narayan Compton: detector parked
  • 224064 03/16/11 08:01 cdaq Beam Time Accounting
  • 224063 03/16/11 08:00 Dutta Shift Summary: Owl Shift summary
  • 224062 03/16/11 07:59 Dutta Shift Summary: Owl Shift summary
  • 224058 03/16/11 07:50 Nuruzzaman Target: Target GUI and strip charts screen shot at the end of owl shift
  • 224055 03/16/11 07:40 Nuruzzaman Analysis: Plots for run 10769
  • 224050 03/16/11 07:18 Pitt Evolving target full part of "dilution" measurement
  • 224043 03/16/11 06:41 Nuruzzaman Analysis: Plots for run 10768
  • 224031 03/16/11 06:13 Nuruzzaman Analysis: Plots for run 10767
  • 224030 03/16/11 05:51 Dutta Beam: IHWP changed from IN to OUT
  • 224027 03/16/11 05:25 dalton Compton: Ramping up HV on GSO
  • 224025 03/16/11 05:10 Nuruzzaman Analysis: Plots for run 10766
  • 224022 03/16/11 04:33 Nuruzzaman Analysis: Plots for run 10765
  • 224011 03/16/11 03:11 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 224010 03/16/11 03:05 Nuruzzaman Analysis: Plots for run 10764
  • 224001 03/16/11 02:06 Nuruzzaman Analysis: Plots for run 10763
  • 223994 03/16/11 00:56 Nuruzzaman Analysis: Plots for run 10762
  • 223993 03/16/11 00:40 buddhini Analysis: Run 10761 : DS Lumi Properties
  • 223992 03/16/11 00:39 buddhini Analysis: Run 10761 : Main detector properties.
  • 223991 03/16/11 00:39 buddhini Analysis: Run 10761 : Beam Properties
  • 223990 03/16/11 00:33 pking Summary of raster frequency study
  • 223989 03/16/11 00:33 buddhini Weird signal bumps in DS lumis
  • 223988 03/16/11 00:32 rakithab Shift Summary: Swing Shift summary
  • 223987 03/16/11 00:24 buddhini Analysis: Run 10760 : DS Lumi Properties
  • 223986 03/16/11 00:22 Dutta Main det. yields for run 10761
  • 223985 03/16/11 00:20 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 223984 03/16/11 00:18 buddhini Analysis: Run 10760 : Main detector properties.
  • 223983 03/16/11 00:17 buddhini Analysis: Run 10760 : Beam Properties
  • 223981 03/16/11 00:13 buddhini Analysis: Run 10759 : DS Lumi Properties
  • 223980 03/16/11 00:12 buddhini Analysis: Run 10759 : Main detector properties.
  • 223979 03/16/11 00:11 buddhini Analysis: Run 10759 : Beam Properties
  • 223978 03/16/11 00:08 cdaq Beam Time Accounting
  • 223977 03/16/11 00:08 buddhini Analysis: Run 10758 : DS Lumi Properties
  • 223976 03/16/11 00:07 buddhini Analysis: Run 10758 : Main detector properties.
  • 223975 03/16/11 00:05 buddhini Opps! This is actually from run 10757
  • 223974 03/16/11 00:04 buddhini Analysis: Run 10758 : Beam Properties
  • 223972 03/16/11 00:00 buddhini Analysis: Run 10757 : DS Lumi Properties
  • Tuesday

  • 223971 03/15/11 23:59 buddhini Analysis: Run 10757 : Main detector properties.
  • 223970 03/15/11 23:58 budd Analysis: Run 10756 : Beam Properties
  • 223968 03/15/11 23:53 budd Analysis: Run 10756 : DS Lumi Properties
  • 223966 03/15/11 23:51 buddhini Analysis: Run 10756 : Main detector properties.
  • 223965 03/15/11 23:50 buddhini Analysis: Run 10756 : Beam Properties
  • 223964 03/15/11 23:44 buddhini Analysis: Run 10755 : DS Lumi Properties
  • 223962 03/15/11 23:40 buddhini Analysis: Run 10755 : Main detector properties.
  • 223961 03/15/11 23:39 buddhini Analysis: Run 10755 : Beam Properties
  • 223959 03/15/11 23:32 buddhini Analysis: Run 10754 : DS Lumi Properties
  • 223958 03/15/11 23:30 buddhini Run 10754 : Main detector properties.
  • 223957 03/15/11 23:29 buddhini Run 10754 : Beam Properties
  • 223954 03/15/11 23:18 rakithab DAQ: EB4 crashed. CODA reset at the end of the run 10757
  • 223944 03/15/11 22:32 rakithab CAEN HV and Qweak Generaltools snaps
  • 223943 03/15/11 22:29 buddhini Run 10751 : DS Lumi Y sensitivities
  • 223941 03/15/11 22:26 buddhini Run 10751 : DS Lumi Properties
  • 223940 03/15/11 22:25 buddhini Run 10751 : Main detector properties.
  • 223939 03/15/11 22:23 buddhini Run 10751 : Beam Properties
  • 223935 03/15/11 22:02 rakithab High halo rates observed with new optics settings
  • 223934 03/15/11 22:00 rakithab QwFeedback: charge feedback is running
  • 223932 03/15/11 21:53 rakithab DS 4% Al target Production running set
  • 223931 03/15/11 21:48 rakithab Scanner parked at 0,0 mm
  • 223930 03/15/11 21:46 cdaq Raster Map and BPMs : Run 10750, event range 0 - 20000
  • 223926 03/15/11 21:35 cdaq Raster Map and BPMs : Run 10749, event range 5000 - 25000
  • 223925 03/15/11 21:34 covrig Target: reset the h-motion step counter
  • 223922 03/15/11 21:28 cdaq Raster Map and BPMs : Run 10748, event range 0 - 20000
  • 223920 03/15/11 21:23 buddhini Target : Moved to 4% DS Al target
  • 223919 03/15/11 21:17 cdaq Raster Map and BPMs : Run 10747, event range 0 - 20000
  • 223916 03/15/11 21:14 rakithab Beam on DS centering hole
  • 223915 03/15/11 21:10 rakithab Scanner moved to 0, -90 mm
  • 223914 03/15/11 21:01 buddhini Target: Moved to DS centering hole
  • 223913 03/15/11 21:00 rakithab Ramping QTOR to 8921A
  • 223912 03/15/11 20:23 Pitt Link to Jay Benesh Log Entry about Moller off optics
  • 223911 03/15/11 20:23 rakithab Raster map 1.0 uA, with a 12x12 mm2 raster
  • 223908 03/15/11 20:16 rakithab Switched to fake 1Hz MPS
  • 223907 03/15/11 20:14 rakithab Ramping QTOR to zero for the raster map
  • 223906 03/15/11 20:12 rakithab BPM tune before raster map
  • 223905 03/15/11 20:06 Rakithab New Tune with the Moller Quads OFF
  • 223904 03/15/11 20:04 Pitt Run plan for remainder of swing and Wednesday Owl
  • 223903 03/15/11 19:41 Pitt Moller Quad Power Supply Situation
  • 223902 03/15/11 19:40 rakithab Beam: Tune beam in the Hall C
  • 223901 03/15/11 19:33 pking Analysis: Moved "QwAnalysis/devel" to "QwAnalysis/devel.2011.03.13" and made a link to it.
  • 223900 03/15/11 18:06 rakithab Beam: Hall C Beam Permit delayed due to Moller Quads power supply OFF
  • 223899 03/15/11 18:04 smithg Target: FIXED! Waa-hoo!
  • 223898 03/15/11 17:21 rakithab Hall C is going to Beam Permit
  • 223897 03/15/11 16:53 rakithab QTOR ramping up to 8921A
  • 223896 03/15/11 16:47 gaskell Moller and Compton: power outage
  • 223895 03/15/11 16:47 saw Qtor reset after power outage
  • 223894 03/15/11 16:22 rakithab Target: Target IOC rebooted
  • 223893 03/15/11 16:13 cdaq Beam Time Accounting
  • 223892 03/15/11 16:09 Armstrong Alarm: HMS A/C Blower Fault
  • 223891 03/15/11 16:00 AK Opper Shift Summary: Day Shift summary
  • 223890 03/15/11 15:27 buddhini Complete list of runs taken during todays injector studies (ctd)
  • 223889 03/15/11 15:09 suhring Hall C Voltage Tap Change
  • 223888 03/15/11 15:07 buddhini List of runs taken during todays injector studies.
  • 223887 03/15/11 14:58 saw Rebooted vmec15
  • 223886 03/15/11 14:38 jhlee why TS0 does have connection to cagwhlc.acc.jlab.org?
  • 223885 03/15/11 14:35 jhlee trigger supervisor returns here here here errors and more
  • 223884 03/15/11 14:26 buddhini Finished injector studies.
  • 223881 03/15/11 13:32 Armstrong How to turn off Fast Raster and how to check its frequencies
  • 223880 03/15/11 12:56 pking Tested retuning raster frequencies; backed out of changes
  • 223879 03/15/11 12:38 buddhini Starting Rotatable Half Wave Plate (RHWP) studies.
  • 223878 03/15/11 12:34 buddhini Changed accelerator MPS back to 960 Hz.
  • 223877 03/15/11 12:31 pking Fast raster "Vertical" frequency generator was not active; restored normal behavior
  • 223876 03/15/11 12:21 jhlee update pedestal files for main detector with Revision 2654 on cdaq cluster
  • 223875 03/15/11 12:13 Pitt/Macewan Reconnected DSLUMI5 current mode base
  • 223874 03/15/11 12:03 buddhini Started injector data analysis on ou-qweak4. Please don't start any other analysis in there.
  • 223873 03/15/11 12:01 smithg Target: The mains IS too high!
  • 223872 03/15/11 11:50 buddhini Changed accelerator MPS to 120 Hz for injector studies.
  • 223870 03/15/11 11:37 buddhini Injector run 2238 was taken when Riad was changing helicity magnets dac settings
  • 223866 03/15/11 11:11 cdaq Run 10743 Pedestal Data
  • 223860 03/15/11 10:43 smacewan GeneralTools QTor change
  • 223859 03/15/11 10:31 saw re: R3 Rotator Controlls OK - Hall C Switch
  • 223858 03/15/11 10:26 buddhini Running injector daq via an ops machine for injector studies. Please don't use it for anything else.
  • 223857 03/15/11 10:25 AK Opper Injector DAQ
  • 223856 03/15/11 10:21 smacewan/opp restarted qwfeedback
  • 223853 03/15/11 10:07 jhoskins re: R3 Rotator Controlls OK
  • 223852 03/15/11 10:04 Armstrong Note on Region 3 Rotator controls
  • 223851 03/15/11 09:59 brads re: R3 Rotator Controlls OK
  • 223850 03/15/11 09:47 Leckey R3 Rotator Controlls OK
  • 223849 03/15/11 09:35 AK Opper QTOR at zero amps
  • 223848 03/15/11 09:28 smacewan Rebooted g0ioc2 :: HV GUI's back online
  • 223847 03/15/11 09:15 smacewan HV GUI Still down. Cannot open *any* hv GUI's
  • 223846 03/15/11 09:15 Armstrong Sweep is complete
  • 223845 03/15/11 09:14 AK Opper EPICS Scaler IOC
  • 223844 03/15/11 09:09 AK Opper Beam: BCM 1 & 2 gains
  • 223843 03/15/11 08:12 cdaq Beam Time Accounting
  • 223842 03/15/11 08:10 Armstrong Target status
  • 223841 03/15/11 08:00 Dutta Called for controlled access
  • 223839 03/15/11 07:57 Dutta Shift Summary: Owl Shift summary
  • 223838 03/15/11 07:39 Dutta DAQ crashed
  • 223837 03/15/11 07:38 Nuruzzaman Target: QWT_DSdmB status for OWL shift.
  • 223835 03/15/11 07:35 Nuruzzaman Correction Plots: I submitted few wrong plots. Here are the correct plots.
  • 223834 03/15/11 06:56 Nuruzzaman Analysis: Some plots for run 10738
  • 223832 03/15/11 06:41 Nuruzzaman Generaltools screen shot.
  • 223830 03/15/11 06:25 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 223829 03/15/11 06:05 Nuruzzaman Q1HallP does not show up in EPICS Archiver.
  • 223828 03/15/11 05:57 Nuruzzaman QTOR Status.
  • 223827 03/15/11 05:49 Nuruzzaman Analysis: Main Detector allbarsum asymmetries for run 10735(QTOR OFF) & 10737(QTOR ON)
  • 223826 03/15/11 05:44 Dutta Beam: QTOR was OFF since 21:30, ramped back to 8921
  • 223825 03/15/11 05:36 Nuruzzaman HV GUI is not working.
  • 223816 03/15/11 02:41 Nuruzzaman Target: QWT_DSdmB status after increase in current.
  • 223814 03/15/11 02:05 Nuruzzaman Beam: Beam current increased to 25 uA.
  • 223811 03/15/11 01:54 manos Reanalyzed injector run, Dx, Dy and Aq along injector
  • 223808 03/15/11 00:36 smithg Target: pump controller mains voltage too high
  • 223807 03/15/11 00:34 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 223806 03/15/11 00:33 jhlee reboot ou-qweak4 (INJ analysis pc) and qweakl1 (scanner control pc) in order to do system update.
  • 223805 03/15/11 00:27 jhlee too late entry for boot parameter of vmeregion3
  • 223804 03/15/11 00:04 cdaq Beam Time Accounting
  • Monday

  • 223803 03/14/11 23:59 jhlee From Run 10731, qwparity analyzer l use map files with Revision 2646
  • 223802 03/14/11 23:58 jhoskins Swing Shift
  • 223801 03/14/11 23:57 jhlee update Parity/prminput directory on cdaq cluster
  • 223799 03/14/11 23:39 rakithab Target: Moved to DS 4% Al target
  • 223798 03/14/11 23:17 cdaq Run 10730 Pedestal Data
  • 223797 03/14/11 22:39 jhlee autoanalzyer will pick up runs from 10731
  • 223796 03/14/11 22:36 jhlee start autoanalyzers and add them into cronjob
  • 223795 03/14/11 22:25 rakithab Target: Target IOC rebooted then power cycled
  • 223794 03/14/11 22:24 cdaq Run
  • 223793 03/14/11 22:24 smacewan Target: reset target ioc and cycled power
  • 223792 03/14/11 22:21 Pitt Run plan: Tuesday Owl and Tuesday Day
  • 223791 03/14/11 22:20 jhoskins Rotator arms out of beam[w/notes]
  • 223790 03/14/11 22:20 jhlee turned off ROC9 and ROC10
  • 223789 03/14/11 22:17 rob CM LED checkout passed
  • 223788 03/14/11 22:17 rob CM LED checkout passed
  • 223787 03/14/11 22:13 Pitt Access report - switching back to current mode running
  • 223784 03/14/11 22:04 smithg Target: Pump won't restart
  • 223774 03/14/11 21:22 smithg Target: Refilled loop. Reset valves. Can't restart pump.
  • 223772 03/14/11 20:54 kamyers all EM HV off
  • 223765 03/14/11 20:41 kamyers fixed typo
  • 223762 03/14/11 20:33 kamyers Dilution Measurement Summary (real one)
  • 223760 03/14/11 20:29 jhoskins HVGUI/Gen.Tools
  • 223753 03/14/11 20:07 smithg Target: Evacuated target cell. Turned off pump & HPH. Moved to "LH2"=MT cell.
  • 223734 03/14/11 18:44 smithg Target: moved to 1/2% C tgt
  • 223733 03/14/11 18:42 smithg Target: Moved to DS centering hole
  • 223730 03/14/11 18:39 cdaq Raster Map and BPMs : Run 10707, event range 5000 - 25000
  • 223727 03/14/11 18:20 Pitt HDC leakage currents and Fast OR rates at lowest pressure setting
  • 223726 03/14/11 18:18 Pitt HDC and VDC hit plots
  • 223725 03/14/11 18:13 smithg Target: Action plan for running with cell evacuated
  • 223720 03/14/11 17:53 smithg,covri Target: Striptools for 18.1 psia, 68 K dilution msrmnt
  • 223719 03/14/11 17:46 cdaq Beam Time Accounting
  • 223717 03/14/11 17:29 kamyers BPM locks turned on, updated BPM positions
  • 223715 03/14/11 17:24 kamyers current beam positions
  • 223705 03/14/11 16:45 covrig, smit Target: half pressure target loop
  • 223703 03/14/11 16:42 kamyers Dilution Measurement Summary
  • 223699 03/14/11 16:13 rob second try: md2- repaired
  • 223697 03/14/11 16:07 kamyers Shift Summary: Day Shift Summary
  • 223690 03/14/11 15:17 Armstrong HDCs and VDCs are ON (plot_HDC)
  • 223689 03/14/11 15:12 Armstrong Hokie Fast OR rates at 0.5 nA
  • 223688 03/14/11 15:09 kamyers Region 2 leakage current at 0.5 nA cold ga
  • 223685 03/14/11 14:50 Armstrong VDCs turned back on
  • 223684 03/14/11 14:48 smithg Target: Restrict 15K JT changes to < 1%/min
  • 223683 03/14/11 14:44 kamyers current setpoints for this run
  • 223682 03/14/11 14:42 smithg,opper Target: Target Screenshots & Status
  • 223674 03/14/11 13:23 smithg,opper Target: target status
  • 223672 03/14/11 13:18 cdaq Raster Map and BPMs : Run 10688, event range 50000 - 70000
  • 223670 03/14/11 13:02 smithg,opper Target: liquid has boiled away
  • 223668 03/14/11 12:46 rob md2- down for the count
  • 223666 03/14/11 12:06 rob MD2- signal looks fishy
  • 223663 03/14/11 11:51 smithg,opper Target: warmup continuing but slowly
  • 223654 03/14/11 11:29 rajotte Injector analyzer for run 2237 finished
  • 223653 03/14/11 11:28 kamyers end of run failed, reset event builder
  • 223651 03/14/11 11:10 rob summary of MD HV changes
  • 223650 03/14/11 10:43 smithg,opper Target: Deliberate warmup for dilution msrmnts
  • 223648 03/14/11 10:15 rajotte Starting the analyzer on saturday's injector run 2237
  • 223647 03/14/11 09:57 Pitt Return Halo Monitor High Voltages to Normal
  • 223646 03/14/11 09:25 dalton Compton table scintillators off
  • 223643 03/14/11 09:02 Pitt Beam on and off halo rates
  • 223642 03/14/11 08:59 AK Opper Target: target change
  • 223639 03/14/11 08:53 Pitt Halo voltages - with attachment this time
  • 223638 03/14/11 08:52 Pitt Halo monitor voltages for the 120 nA running
  • 223637 03/14/11 08:46 Pitt Halo voltages before I increase them
  • 223634 03/14/11 08:29 gunning Analysis: raster
  • 223632 03/14/11 08:14 Dutta Shift Summary: Owl Shift summary
  • 223630 03/14/11 08:07 cdaq Beam Time Accounting
  • 223628 03/14/11 08:01 Adesh and Al Target: screens shot
  • 223627 03/14/11 08:00 AK Opper Target: target change
  • 223622 03/14/11 07:51 Adesh Owl shift: Gen. Tools & HV snapshot
  • 223620 03/14/11 07:49 Adesh Turned off EM Lumis & R2 wire chambers HVs.
  • 223619 03/14/11 07:46 Dutta HDC and VDC and Lumi detectors turned OFF
  • 223610 03/14/11 06:17 Adesh Target: Moved to Optics 12345 target
  • 223606 03/14/11 05:51 Adesh Target: Moved to Optics 1235 target
  • 223604 03/14/11 05:26 Adesh Target: Moved to Optics 15 target
  • 223601 03/14/11 05:00 Adesh Target: Moved to Optics 3 target
  • 223598 03/14/11 04:32 Adesh Target: Moved to Optics 135 target
  • 223595 03/14/11 04:04 Adesh Target: Moved to US key target
  • 223593 03/14/11 03:41 Dutta Reset ROC9 and ROC10
  • 223588 03/14/11 03:20 Dutta HDCs tripped
  • 223576 03/14/11 02:52 Dutta For keyhole target, the HDCs also show only half the planes
  • 223575 03/14/11 02:52 Adesh Target: Moved to Optics 135 target
  • 223573 03/14/11 02:46 Dutta for US keyhole target, Yoda and Han do not have hits
  • 223569 03/14/11 02:20 Adesh Target: Moved to US key target
  • 223566 03/14/11 01:52 Adesh Target: Moved to DS 4% Al target
  • 223563 03/14/11 01:20 Dutta End of run failed for Run 10652
  • 223562 03/14/11 01:12 Adesh Target: Moved to US 1% Al target
  • 223561 03/14/11 00:48 Pitt Run Plan for Remainder of Swing Shift and Owl Shift
  • 223560 03/14/11 00:37 Pitt Log of HDC Threshold Scan and VDC High Voltage Scan
  • 223555 03/14/11 00:12 Jiawei General Tools and HV GUIs screenshot
  • 223552 03/14/11 00:09 cdaq Beam Time Accounting
  • 223551 03/14/11 00:06 sxyang Swing Shift summary
  • 223550 03/14/11 00:03 Jiawei Target: End of swing shift screenshot
  • Sunday

  • 223545 03/13/11 23:44 sxyang typo
  • 223537 03/13/11 23:06 Pitt Reduce Hokie 2 High Voltages - Special Test
  • 223536 03/13/11 22:58 Pitt Details of the Rate Dependent HDC Study - runs 10641 - 10643
  • 223530 03/13/11 22:08 Pitt Region 2 HDC Thresholds
  • 223529 03/13/11 22:06 Pitt Fast Raster off for Runs 10637 - 10640
  • 223527 03/13/11 22:00 sxyang QTOR current change
  • 223523 03/13/11 21:10 sxyang VDC plots
  • 223522 03/13/11 21:07 sxyang hdc plots
  • 223519 03/13/11 20:48 rajotte Runlet and slug plots from Saturday's 70uA run
  • 223518 03/13/11 20:36 sxyang run 10637 is a junk run
  • 223517 03/13/11 20:35 sxyang vdc spectrum
  • 223516 03/13/11 20:29 Pitt HDC problem fixed
  • 223512 03/13/11 20:21 Pitt IHA3H07B superharp scan at 50 pA
  • 223511 03/13/11 20:16 sxyang the qtor rest button
  • 223510 03/13/11 20:15 Pitt "50 pA" beam re-established in the Hall
  • 223509 03/13/11 20:00 Pitt All high voltages on
  • 223508 03/13/11 19:52 sxyang QTOR problem fixed
  • 223507 03/13/11 19:36 Pitt QTOR failing to ramp
  • 223506 03/13/11 19:27 Pitt Access work - some lumis to current mode, HDC electronic channel fix
  • 223495 03/13/11 17:54 leacock added uslumi3- to md3-,
  • 223494 03/13/11 17:53 leacock ramping QTOR to 0A
  • 223492 03/13/11 17:43 Pitt Run Plan for Remainder of Event Mode Run
  • 223475 03/13/11 16:54 leacock ramping QTOR to 8921
  • 223468 03/13/11 16:29 Armstrong QTor Scan - online plot
  • 223459 03/13/11 16:10 cdaq Beam Time Accounting
  • 223456 03/13/11 16:07 Pitt Brief RC Status Report
  • 223453 03/13/11 16:04 rajotte Day Shift summary
  • 223450 03/13/11 15:59 rajotte scaler rates vs Qtor current
  • 223448 03/13/11 15:56 leacock dslumi HV to 1500V
  • 223446 03/13/11 15:55 narayan Target: End of day shift screenshot
  • 223445 03/13/11 15:52 leacock turning off VDC HV
  • 223444 03/13/11 15:52 leacock ramping QTOR to 0A
  • 223439 03/13/11 15:39 leacock dslumi typical spectra triggered on dslumi6
  • 223433 03/13/11 15:22 Pitt Leakage estimate for earlier "50 pA" running
  • 223428 03/13/11 15:08 leacock coda EB crash
  • 223421 03/13/11 14:37 Pitt Leakage check: rates with Hall A and C on
  • 223419 03/13/11 14:23 leacock rates at beginning of lumi EM test
  • 223418 03/13/11 14:15 leacock dslumi HV to 1500V
  • 223417 03/13/11 14:13 rajotte Switched all MD HV off
  • 223416 03/13/11 14:13 Armstrong VDC voltages
  • 223415 03/13/11 14:12 rajotte EB4 not responding. Reset.
  • 223414 03/13/11 14:10 Pitt Turn off HDCs
  • 223413 03/13/11 14:07 Pitt HDC bank missing
  • 223412 03/13/11 14:05 Pitt HDC running conditions at "50 pA"
  • 223411 03/13/11 13:57 rajotte Vader & Leia outstanding wires (not seen before)
  • 223410 03/13/11 13:49 rajotte Snapshot General tools and HVs
  • 223408 03/13/11 13:42 rajotte R3 Drift chamber switch back on
  • 223407 03/13/11 13:32 Pitt Fast raster
  • 223406 03/13/11 13:31 Pitt IHA3H0B superharp scan
  • 223405 03/13/11 13:06 Pitt HAll A and HAll C off
  • 223404 03/13/11 13:05 Pitt Hall A on, HAll C off
  • 223403 03/13/11 13:02 Pitt Hall A,C on ~ 25 pA
  • 223402 03/13/11 12:56 Pitt Fast raster back on at 3.5 x 3.5
  • 223401 03/13/11 12:49 Pitt Lumi monitors on
  • 223400 03/13/11 12:48 Pitt 3H07B superharp scan at 10 nA
  • 223399 03/13/11 12:45 Pitt Fast raster off for superharp scan
  • 223398 03/13/11 12:42 Pitt Turn off trigger scintillator HV
  • 223397 03/13/11 12:41 rajotte Ramping up Qtor to nominal 8921A
  • 223396 03/13/11 12:41 Pitt MD,LUMI voltages off
  • 223393 03/13/11 12:17 narayan Target: pump alarm and its limits
  • 223391 03/13/11 12:15 leacock lumi event mode run plan
  • 223390 03/13/11 12:13 Pitt VDCs trip at QTOR = 1000 A
  • 223389 03/13/11 12:07 narayan R3 drift chamber tripped
  • 223387 03/13/11 12:04 rajotte R3 Drift chamber alarm as we ramp done Qtor to 1000A
  • 223377 03/13/11 11:19 Pitt Main Detector QDC spectra at QTOR = 2000 A
  • 223375 03/13/11 11:14 Pitt Leakage from Hall A at 25 uA
  • 223373 03/13/11 11:08 rajotte Vader and Leia U-plane every other wire missing
  • 223362 03/13/11 10:20 Pitt Daylight Savings Time - with attachment
  • 223361 03/13/11 10:20 Pitt Daylight savings time issues
  • 223359 03/13/11 10:15 Pitt HAll A on, Hall C off scaler rates
  • 223358 03/13/11 10:11 narayan Target: recurring "vmec18 unresponsive" message
  • 223357 03/13/11 10:10 Pitt Hall A beam off, HAll C only
  • 223356 03/13/11 10:08 Pitt Faraday cup in - no beam rates.
  • 223355 03/13/11 10:05 Pitt Beam on rates before Faraday cup check
  • 223353 03/13/11 09:50 cdaq Beam Time Accounting
  • 223349 03/13/11 09:23 narayan Target: "vmec18 unresponsive" message
  • 223338 03/13/11 08:19 Adesh Target: screenshot at the end of owl shift
  • 223337 03/13/11 08:16 Adesh Owl shift: Gen. tools & HV snapshot
  • 223336 03/13/11 08:13 Dutta Shift Summary: Owl Shift summary
  • 223335 03/13/11 08:13 Dutta Shift Summary: Owl Shift summary
  • 223302 03/13/11 05:22 Adesh Target: target computer rebooted itself
  • 223278 03/13/11 01:47 jhlee Analysis of Run 10539 is done,
  • 223263 03/13/11 00:07 Fatiha Shift Summary
  • 223262 03/13/11 00:06 cdaq Beam Time Accounting
  • 223261 03/13/11 00:00 Page Target: Noisy pump frequency readback - increased hi limit to 42 from 40 Hz
  • Saturday

  • 223258 03/12/11 23:47 Pitt Run plan for Sunday Owl Shift - QTOR scan - Liguid Hydrogen
  • 223251 03/12/11 22:44 Pitt DAQ Settings
  • 223250 03/12/11 22:43 Pitt High Voltages ON
  • 223249 03/12/11 22:39 Page Target: LH2 moved in, etc.
  • 223248 03/12/11 22:33 Pitt Locks - fast and slow
  • 223247 03/12/11 22:30 Pitt IHA3H07B superharp scan at 10 nA
  • 223244 03/12/11 22:17 Pitt Beam positions at 3 uA with all locks off
  • 223241 03/12/11 22:11 Pitt Beam position at 3 uA, locks on
  • 223240 03/12/11 22:05 Pitt BCM 1/2 Gain Setting to 5
  • 223239 03/12/11 21:58 Fatiha Injector run started at 21:23 and ended at 21:57
  • 223237 03/12/11 21:53 Pitt Injector orbit energy lock not working
  • 223236 03/12/11 21:49 Pitt First 100k Parity Conditions at 70 uA
  • 223235 03/12/11 21:48 Fatiha Late entry: Mark switches to accelerator MPS @ 960 Hz
  • 223234 03/12/11 21:41 Fatiha Charge Asymmetry chart
  • 223233 03/12/11 21:25 Fatiha Injector run started at 21:23
  • 223228 03/12/11 21:12 Pitt Halo and Compton Background Conditions at 70 uA
  • 223224 03/12/11 21:04 Pitt Increasing beam current to 70 uA
  • 223223 03/12/11 21:01 Pitt Raster changed to 4x4 mm^2
  • 223222 03/12/11 21:00 Page Target: White alarms, due to VME15 reboot
  • 223221 03/12/11 20:58 Pitt 3 uA beam current; Fast and Slow locks on
  • 223220 03/12/11 20:45 Pitt Change to BCM gain setting 2
  • 223219 03/12/11 20:42 Page Target: Pump frequency readback got noiser when target moved to HOME
  • 223218 03/12/11 20:41 Pitt Beam positions at 3 uA before locks
  • 223217 03/12/11 20:37 Page Target: Raised yellow alarm for QWT_phytron A by 1 K - temporary
  • 223216 03/12/11 20:32 Pitt High Voltages Off
  • 223215 03/12/11 20:32 Page Target: Moved LH2 out of beam - note Ypot value drifting
  • 223214 03/12/11 20:31 Pitt IHA3H07B Superharp scan at 10 nA
  • 223213 03/12/11 20:15 Pitt QDC spectra with MD OR-OR trigger
  • 223211 03/12/11 20:05 Pitt ADC spectra with MD AND-OR trigger
  • 223206 03/12/11 19:53 Fatiha HVs
  • 223198 03/12/11 19:41 kamyers Jdp error, EB4 error end of run 10528
  • 223184 03/12/11 18:47 magee vdc plots run 10522
  • 223181 03/12/11 18:37 magee vdc plots run 10521
  • 223177 03/12/11 18:04 Pitt Instructions for monitoring Compton when we try 70 uA later tonight
  • 223176 03/12/11 17:49 Fatiha Scanner is set to 0,0
  • 223175 03/12/11 17:38 Fatiha Asked for an other escorted access to rotate to 1 and 5
  • 223173 03/12/11 17:27 Page Target: Screenshot, 10 nA tracking run in progress
  • 223171 03/12/11 17:07 Fatiha Beam back
  • 223170 03/12/11 16:49 Fatiha Hall in escorted access
  • 223169 03/12/11 16:44 Fatiha Faraday Cup Run details (10518)
  • 223168 03/12/11 16:41 Pitt Rates of Lumis, MD, and TS during current scan
  • 223160 03/12/11 16:03 cdaq Beam Time Accounting
  • 223159 03/12/11 16:01 Ramesh Shift Summary
  • 223158 03/12/11 15:58 Ramesh Escorted access to rotate RIII chambers from 3,7 to 2,6 octant positions finished, going to go to beam permit
  • 223156 03/12/11 15:49 Ramesh Gas shade hut temp 33 deg C
  • 223155 03/12/11 15:35 Ramesh Snapshot for shift check list
  • 223154 03/12/11 15:28 Ramesh Asked for escorted access to rotate RIII chambers from 3,7 to 2,6 octant positions
  • 223149 03/12/11 15:08 sxyang vdc plots
  • 223144 03/12/11 14:42 rakithab Scanner moved to 0,-90 position
  • 223143 03/12/11 14:41 Ramesh Second escorted access of the shift for RIII chamber rotation finished, going to go to beam permit
  • 223142 03/12/11 14:23 rakithab Turned on the scanner form the qweak cage
  • 223140 03/12/11 14:21 Ramesh Asked for escorted access to rotate RIII chambers from 4,8 to 3,7 octant positions
  • 223137 03/12/11 14:10 Armstrong VDC: present conditions
  • 223135 03/12/11 14:06 rakithab plot_VDC for the run 10508
  • 223134 03/12/11 14:03 Pitt Main Detector Event Mode Voltages after Changes
  • 223132 03/12/11 14:00 sxyang md spectrum
  • 223130 03/12/11 13:57 sxyang md spectrum
  • 223129 03/12/11 13:57 mack the triumph of 8 bit technology?
  • 223128 03/12/11 13:56 Pitt Increase 5p and 7p main detector event mode voltages
  • 223127 03/12/11 13:52 sxyang md spectrum after first attmept of increasing the voltage
  • 223126 03/12/11 13:52 Pitt Increase some event mode channels further
  • 223125 03/12/11 13:49 Pitt Increase MD Event Mode Voltages by 50 V on several channel
  • 223124 03/12/11 13:44 Pitt Modify MDC Event Mode Voltages
  • 223123 03/12/11 13:44 sxyang md_spectrum
  • 223120 03/12/11 13:20 Pitt Scanner HV on
  • 223118 03/12/11 13:18 smithg Target: EV6814 was also closed a little
  • 223117 03/12/11 13:16 Ramesh First escorted access to rotate RIII chambers finished, going to go beam permit
  • 223115 03/12/11 12:54 Ramesh Asked for escorted access to rotate RIII chambers from 1,5 to 4,8
  • 223112 03/12/11 12:49 Pitt Lumi Event Mode Voltages
  • 223111 03/12/11 12:45 Pitt High voltages on - late entry
  • 223110 03/12/11 12:43 smithg Target: Quenched the irksome flow oscillations!
  • 223105 03/12/11 12:29 rakithab Target: Less cryo and temperature oscillations
  • 223095 03/12/11 12:12 rakithab Target: Moved to LH2 target
  • 223094 03/12/11 12:09 Pitt IHA3H07B superharp scan at 10 nA, 3.5 x 3.5 mm raster
  • 223092 03/12/11 12:04 Pitt IHA3H07B superharp scan at 10 nA
  • 223090 03/12/11 11:55 Pitt IHA3H07B Superharp Scan - all locks off - 3 uA
  • 223088 03/12/11 11:44 Pitt Beam positions with orbit locks off
  • 223087 03/12/11 11:38 Pitt BPM positions with most locks on
  • 223086 03/12/11 11:37 Pitt IHA3H07B Superharp Scan
  • 223085 03/12/11 11:24 Pitt Discussion with Jay about slow and fast locks
  • 223084 03/12/11 11:21 benesch Beam: fast raster isn't off until CH turns the power supply off
  • 223083 03/12/11 11:18 Pitt Fast Raster not completely off
  • 223082 03/12/11 11:04 Pitt Current Beam positions
  • 223081 03/12/11 11:03 Pitt IHA3H07B superharp scan - 3 uA - unrastered
  • 223080 03/12/11 10:29 Pitt Superharp scan 3 uA - IHA3H0B - 3.5 x 3.5 mm raster
  • 223078 03/12/11 10:16 Pitt BPM values with slow orbit lock off
  • 223077 03/12/11 09:52 rakithab Target: Moved target to Out Of Beam position - HOME
  • 223076 03/12/11 09:50 Ramesh Going to do super harp scan at 3 uA
  • 223075 03/12/11 09:48 Pitt Trigger scintillator plots continued
  • 223074 03/12/11 09:46 Pitt Reference histograms for Trigger Scintillator
  • 223073 03/12/11 09:45 benesch Beam: 2.5 minute vacuum oscillation
  • 223072 03/12/11 09:44 Pitt Main Detector QDC Spectra - continued
  • 223070 03/12/11 09:38 Pitt Main Detector QDC spectra
  • 223069 03/12/11 09:35 rakithab Analysis: Started first100k tracking analyzer starting from the run 10494
  • 223066 03/12/11 09:27 cdaq Beam Time Accounting
  • 223063 03/12/11 09:20 Pitt Useful analysis scripts
  • 223058 03/12/11 09:03 rakithab DAQ: Rebooted after TS0 hanged up
  • 223056 03/12/11 08:55 Ramesh Taking forever to end run 10490 due to TS0 warning
  • 223048 03/12/11 08:22 Ramesh End of run 10486 failed
  • 223047 03/12/11 08:13 Dutta Beam: Faraday cup reads 47nA at end of run 10485 (4% DS dummy, QTOR=coarse scan, 7300A)
  • 223046 03/12/11 08:12 Dutta Shift Summary: Shift summary
  • 223043 03/12/11 08:09 Adesh Target: Target GUI and strip charts screenshot at the end of owl shift
  • 223042 03/12/11 08:02 Dutta Beam: Faraday cup reads 42nA at start of run 10485 (4% DS dummy, QTOR=coarse scan, 7300)
  • 223041 03/12/11 08:01 Dutta Beam: Faraday cup reads 42nA at end of run 10484 (4% DS dummy, QTOR=coarse scan, 7000A)
  • 223038 03/12/11 07:55 Dutta Beam: Faraday cup reads 44nA at end of run 10483 (4% DS dummy, QTOR=coarse scan, 6700A)
  • 223037 03/12/11 07:54 Dutta Beam: Faraday cup reads 44nA at start of run 10484 (4% DS dummy, QTOR=coarse scan, 7000)
  • 223034 03/12/11 07:50 Dutta Beam: Faraday cup reads 53nA at start of run 10483 (4% DS dummy, QTOR=coarse scan, 6700A)
  • 223033 03/12/11 07:48 Dutta Beam: Faraday cup reads 53nA at end of run 10482 (4% DS dummy, QTOR=coarse scan, 6500A)
  • 223030 03/12/11 07:44 Dutta Faraday cup reads 46nA at start of run 10482 (4% DS dummy, QTOR=coarse scan, 6500A)
  • 223029 03/12/11 07:44 Dutta Beam: Faraday cup reads 46nA at end of run 10481 (4% DS dummy, QTOR=coarse scan, 5500A)
  • 223026 03/12/11 07:31 Dutta Beam: Faraday cup reads 47nA at start of run 10481 (4% DS dummy, QTOR=coarse scan, 6000A)
  • 223025 03/12/11 07:30 Dutta Beam: Faraday cup reads 47nA at end of run 10480 (4% DS dummy, QTOR=coarse scan, 5500A)
  • 223022 03/12/11 07:23 Dutta Beam: Faraday cup reads 50nA at start of run 10480 (4% DS dummy, QTOR=coarse scan, 5500A)
  • 223020 03/12/11 07:22 Dutta Beam: Faraday cup reads 50nA at end of run 10479 (4% DS dummy, QTOR=coarse scan, 5000A)
  • 223018 03/12/11 07:18 Dutta Beam: Faraday cup reads 54nA at start of run 10479 (4% DS dummy, QTOR=coarse scan, 5000A)
  • 223017 03/12/11 07:17 Dutta Beam: Faraday cup reads 54nA at end of run 10478 (4% DS dummy, QTOR=coarse scan, 4500A)
  • 223014 03/12/11 07:10 Dutta Beam: Faraday cup reads 52nA at start of run 10478 (4% DS dummy, QTOR=coarse scan, 4500A)
  • 223013 03/12/11 07:06 Dutta Beam: Faraday cup reads 52nA at end of run 10477 (4% DS dummy, QTOR=coarse scan, 4000A)
  • 223010 03/12/11 07:02 saw vmec18 rebooted
  • 223009 03/12/11 07:00 Dutta Beam: Faraday cup reads 44nA at start of run 10477 (4% DS dummy, QTOR=coarse scan, 4000A)
  • 223008 03/12/11 06:59 Dutta Beam: Faraday cup reads 44nA at end of run 10476 (4% DS dummy, QTOR=coarse scan, 3500A)
  • 223005 03/12/11 06:57 Dutta Beam: Faraday cup reads 50nA at end of run 10475 (4% DS dummy, QTOR=coarse scan, 3000A)
  • 223004 03/12/11 06:54 Dutta Beam: Faraday cup reads 47nA at start of run 10475 (4% DS dummy, QTOR=coarse scan, 3000A)
  • 223002 03/12/11 06:51 Dutta Beam: Faraday cup reads 50nA at start of run 10476 (4% DS dummy, QTOR=coarse scan, 3500A)
  • 223001 03/12/11 06:51 Pitt Run plan for Saturday day shift
  • 222998 03/12/11 06:44 Dutta Beam: Faraday cup reads 47nA at end of run 10474 (4% DS dummy, QTOR=coarse scan, 2500A)
  • 222996 03/12/11 06:38 Dutta Beam: Faraday cup reads 41nA at start of run 10474 (4% DS dummy, QTOR=coarse scan, 2500A)
  • 222995 03/12/11 06:36 Dutta Beam: Faraday cup reads 41nA at end of run 10473 (4% DS dummy, QTOR=coarse scan, 2000A)
  • 222992 03/12/11 06:30 Dutta Beam: Faraday cup reads 50nA at start of run 10473 (4% DS dummy, QTOR=coarse scan, 2000A)
  • 222987 03/12/11 06:26 Dutta Beam: Faraday cup reads 42nA at end of run 10470(4% DS dummy, QTOR=course scan, 1500A)
  • 222984 03/12/11 06:20 Dutta Beam: Faraday cup reads 54nA at end of run 10470(4% DS dummy, QTOR=course scan, 1500A)
  • 222983 03/12/11 06:18 Dutta Beam: Faraday cup reads 52nA at end of run 10467(4% DS dummy, QTOR=course scan, 1000A)
  • 222976 03/12/11 06:02 Dutta Beam: Faraday cup reads 43nA at start of run 10467(4% DS dummy, QTOR=course scan, 1000A)
  • 222969 03/12/11 05:41 Dutta Beam: Faraday cup reads 88nA at end of run 10464 (4% DS dummy, QTOR scan)
  • 222968 03/12/11 05:26 Dutta Gen tools and hV settings snap shot
  • 222967 03/12/11 05:23 Dutta Beam: target was 4% US dummy
  • 222966 03/12/11 05:20 Dutta Beam: Faraday cup reads 90nA at start of run 10464 (4% DS dummy, QTOR scan)
  • 222965 03/12/11 05:17 Dutta Beam: Faraday cup reads 76nA at end of run 10462 (8% DS dummy, QTOR=8921)
  • 222961 03/12/11 05:13 Dutta Beam: target was 45 US dummy
  • 222959 03/12/11 05:11 Dutta Beam: This entry refers to run 10461
  • 222958 03/12/11 05:09 Dutta Beam: Faraday cup reads 56nA at start of run 10462 (8% DS dummy, QTOR=8921)
  • 222957 03/12/11 05:06 Adesh Target: Moved to DS 8% Al target
  • 222954 03/12/11 05:04 Dutta Beam: Faraday cup reads 58nA at end of run 10461 (pure US dummy, QTOR=8993)
  • 222953 03/12/11 05:03 Dutta Beam: Faraday cup reads 53nA at start of run 10459 (pure US dummy, QTOR=8993)
  • 222950 03/12/11 04:45 Dutta Beam: Beam off for 15 mins
  • 222949 03/12/11 04:33 Dutta Beam: Faraday cup reads 58nA at start of run 10460 (4% US dummy, QTOR=8993)
  • 222947 03/12/11 04:31 Adesh Target: Moved to US 4% Al target
  • 222946 03/12/11 04:27 Dutta Beam: Faraday cup reads 54nA at end of run 10459 (pure US dummy, QTOR=8993)
  • 222944 03/12/11 04:20 Dutta Beam: Faraday cup reads 53nA at start of run 10459 (pure US dummy, QTOR=8993)
  • 222943 03/12/11 04:16 Adesh Target: Moved to US pure Al target
  • 222940 03/12/11 04:12 Dutta Beam: Faraday cup reads 115nA at end of run 10458 (1% US dummy, QTOR scan)
  • 222939 03/12/11 03:51 Dutta Beam: Faraday cup reads 98nA at start of run 10458 (1% uS dummy, QTOR scan)
  • 222937 03/12/11 03:49 Adesh Target: Moved to US 1% Al target
  • 222935 03/12/11 03:45 Dutta Beam: Faraday cup reads 59nA at end of run 10457 (4% US dummy, QTOR=8993)
  • 222934 03/12/11 03:35 Dutta Beam: Faraday cup reads 61nA at start of run 10457 (4% US dummy, QTOR=8993)
  • 222933 03/12/11 03:34 Dutta run 10456 was at QTOR=8921 not 8993
  • 222931 03/12/11 03:32 Adesh Target: Moved to US 4% Al target
  • 222929 03/12/11 03:29 Dutta Beam: Faraday cup reads 79nA at start of run 10456 (4% US dummy, QTOR=8993)
  • 222926 03/12/11 03:23 Dutta Beam: Faraday cup reads 93nA at end of run 10455 (8% DS dummy, QTOR=8921)
  • 222925 03/12/11 03:22 Adesh Target: Moved to DS 8% Al target, 4K mass flow & 4K Inlet temperature readout have white screen
  • 222924 03/12/11 03:20 Dutta Faraday cup reads 84nA at start of run 10455 (8% DS dummy, QTOR=8921)
  • 222921 03/12/11 03:12 Dutta Beam: Faraday cup reads 108nA at end of run 10454 (4% DS dummy, QTOR scan)
  • 222920 03/12/11 02:54 Dutta Beam: Faraday cup reads 99nA at start of run 10454 (4% DS dummy, QTOR scan)
  • 222918 03/12/11 02:51 Adesh Target: Moved to DS 4% Al target
  • 222917 03/12/11 02:50 Dutta Beam: Faraday cup reads 116nA at end of run 10453 (8% DS dummy, QTOR=8921)
  • 222915 03/12/11 02:44 Dutta Faraday cup reads 94nA at start of run 10453 (8% DS dummy, QTOR=8921)
  • 222914 03/12/11 02:43 Adesh Target: late entry Moved to DS 8% Al target
  • 222909 03/12/11 02:25 Dutta Faraday cup reads 93nA at end of run 10451 (2% US dummy, QTOR scan)
  • 222908 03/12/11 02:15 Dutta runs 10439-10447 have wrong prescale
  • 222907 03/12/11 02:07 Dutta Faraday cup reads 87nA at start of run 10451 (2% UP dummy, QTOR scan)
  • 222899 03/12/11 01:47 Adesh Target: Moved to US 2% Al target
  • 222897 03/12/11 01:44 Dutta Beam: Faraday cup reads 110nA at end of run 10447
  • 222896 03/12/11 01:26 jhlee turned off ROC9 and ROC10
  • 222895 03/12/11 01:21 Dutta Beam: Faraday cup reads 120nA at start of run 10447
  • 222893 03/12/11 01:14 Adesh Target: Moved to DS 4% Al target
  • 222892 03/12/11 01:13 Dutta Beam: Faraday cup reads 47 nA at end of run 10466
  • 222890 03/12/11 01:01 Dutta Beam: Faraday cup measures 64 nA at begining of run 10446
  • 222889 03/12/11 01:00 Dutta Beam: Beam current changed to 65 nA
  • 222886 03/12/11 00:53 Dutta Beam: MCC having RF issues
  • 222873 03/12/11 00:29 cdaq Beam Time Accounting
  • 222871 03/12/11 00:21 Adesh Target: moved to 8% DS Al tgt
  • 222870 03/12/11 00:07 jhoskins Swing Shift summary
  • Friday

  • 222869 03/11/11 23:51 Page Scanner parked, controller and HV off
  • 222868 03/11/11 23:37 Page/Hoskins US centering target map
  • 222864 03/11/11 23:25 Page Target: Moved to US centering target
  • 222863 03/11/11 23:20 Page/Hoskins DS centering target
  • 222860 03/11/11 23:05 Page Target: moved to DS centering target
  • 222859 03/11/11 23:03 Page Target: Target 'parked' (sort of)
  • 222858 03/11/11 22:51 jhoskins QTOR bac to 8921 -- starting centering scan
  • 222857 03/11/11 22:50 Page Raster Map, W plug
  • 222854 03/11/11 22:42 jhoskins Starting W-plug scan [for real this time....]
  • 222853 03/11/11 22:03 Pitt Changed fake MPS back to 1 Hz
  • 222852 03/11/11 21:56 Pitt Run plan - slight modification
  • 222851 03/11/11 21:39 smithg Target: mea culpa
  • 222850 03/11/11 21:15 Pitt Run plan for Friday swing and Saturday Owl shifts
  • 222849 03/11/11 21:00 Page Scanner power is on - remember to turn it off later
  • 222848 03/11/11 20:40 Page Target: Pump head back, sort of ...
  • 222847 03/11/11 20:17 jhoskins General Tools && HV GUI
  • 222846 03/11/11 20:15 Page Target: Target is NOT ok ....
  • 222845 03/11/11 19:44 cdaq Beam Time Accounting
  • 222844 03/11/11 19:27 jhoskins Escorted access to close target valves
  • 222843 03/11/11 19:25 Pitt More explanation of superharp scans
  • 222842 03/11/11 19:13 rob HV on for raster mapping; scanner in position.
  • 222841 03/11/11 19:07 jhoskins Ramping QTOR to ZERO
  • 222840 03/11/11 19:06 jhoskins Starting W-plug scan
  • 222839 03/11/11 18:58 Pitt IHA3H07B superharp scan
  • 222838 03/11/11 18:40 Pitt Superharp IHA3H07BIR
  • 222837 03/11/11 18:39 smithg Target: vacuum looking just fabulous!
  • 222836 03/11/11 18:30 smithg Target: We have liquid.
  • 222835 03/11/11 18:30 kamyers use 1Hz fake mps for dilution
  • 222833 03/11/11 18:27 brads 'Advanced' hclog make entry page
  • 222828 03/11/11 17:52 jhoskins Status thus far this evening
  • 222827 03/11/11 17:51 gaskell Compton: moved "user" photon signal channel
  • 222825 03/11/11 17:45 smithg Target: condensing at a nice clip
  • 222823 03/11/11 17:31 gaskell Compton: GSO off
  • 222822 03/11/11 17:25 benesch Beam: great 3C20 harp trace
  • 222821 03/11/11 16:58 smithg Target: started condensing
  • 222820 03/11/11 16:30 Page Turned off TS HV's
  • 222819 03/11/11 16:23 saw Qtor at 8921
  • 222818 03/11/11 16:21 mack rest of the Qweak cage RG8 to BNC connectors were tight except for MD2+,3+,4+ LEDs
  • 222817 03/11/11 16:16 Page Beam: Note on injector setup
  • 222816 03/11/11 16:03 mack tightened a connection on the Qweak cage patch panel
  • 222811 03/11/11 15:46 saw Qtor slight trouble, now on at 100A
  • 222810 03/11/11 15:46 mack re-installed shelf for collimator 2 plug (the shelf, not the plug)
  • 222787 03/11/11 15:12 Armstrong References on VDC operation: high voltage and threshold
  • 222785 03/11/11 14:59 rakithab Changed the bcm1 gain to 5 for low current running
  • 222784 03/11/11 14:38 smithg Target: IV status
  • 222783 03/11/11 14:34 smithg Downstream vacuum looks great!
  • 222782 03/11/11 14:08 Pitt Status
  • 222781 03/11/11 13:37 kamyers TS plots - normal
  • 222780 03/11/11 13:22 rakithab CAEN HV and General tools snapshots
  • 222777 03/11/11 13:07 kamyers TS problem from bad connection?
  • 222772 03/11/11 11:54 leacock dslumi config change -- evens 2 cm closer to beam and even preamps 1Mohm
  • 222771 03/11/11 11:45 mack Background detectors moved to superelastic region in octant 3
  • 222770 03/11/11 11:18 covrig Target: started opening the 4K JT
  • 222761 03/11/11 10:21 pking Killed remaining two long running MySQL queries
  • 222757 03/11/11 09:37 kamyers something wrong with TS2
  • 222755 03/11/11 09:26 Jiawei Target: start to open the 15K JT valve to cool down the target
  • 222753 03/11/11 09:08 leacock TS2 rate cut in half at 8:20, crane?
  • 222752 03/11/11 09:01 smithg,Jiawe Target: started cooldown
  • Thursday

  • 222749 03/10/11 23:00 pking MySQL on cdaql6 was spiking up; killed two long running queries.
  • 222731 03/10/11 18:03 Pitt Region 2 Beam Off Leakage Currents
  • 222730 03/10/11 17:13 smithg Target: pumped/purged H2 bollte line after sample was drawn
  • 222725 03/10/11 16:14 jhlee screen shots for day shift
  • 222724 03/10/11 16:13 cdaq Beam Time Accounting
  • 222692 03/10/11 13:58 dalton Compton: FADC swap
  • 222672 03/10/11 12:47 mack/jmei miscellaneous photos of upstream QTOR region
  • 222628 03/10/11 09:57 jhlee HallA is cooling down their target
  • 222626 03/10/11 09:49 Pitt RC Daily Report
  • 222611 03/10/11 08:37 kenyon Exit window photos
  • Wednesday

  • 222610 03/09/11 22:22 rob late entry: md em base released
  • 222609 03/09/11 22:17 mack photo of how RII rotation binds on some Pb donut frosting
  • 222606 03/09/11 19:43 Pitt Status - Exit Window Leak
  • 222579 03/09/11 18:38 smithg reference pumpdown last December looked better
  • 222564 03/09/11 18:12 gaskell Compton: swapped FADC
  • 222562 03/09/11 17:20 smithg Downstream vacuum not recovering very well. Chiller is toast.
  • 222561 03/09/11 17:12 jhlee switch ACC MPS and Parity DAQ
  • 222555 03/09/11 16:46 jhlee update F1TDC status (Mar 9, 2011) and reserve on BDC from the fast electronics group
  • 222554 03/09/11 16:44 covrig Target: closed 4K JT valve
  • 222548 03/09/11 16:34 jhlee update DAQ configuration screen
  • 222547 03/09/11 16:34 jhlee update DAQ configuration screen
  • 222546 03/09/11 16:30 donjones Compton: new scaler channel added for Compton
  • 222544 03/09/11 15:23 benesch Beam: dump viewer
  • 222543 03/09/11 15:21 sxyang the chance of cooling down the target tomorrow
  • 222526 03/09/11 14:11 smithg bellows update
  • 222512 03/09/11 13:27 leacock scanner causes noise in MD
  • 222510 03/09/11 12:32 rob exercising scanner
  • 222506 03/09/11 12:00 Armstrong Coffee machine relocation
  • 222505 03/09/11 08:37 saw Beam: Superharp variables added to the Hall C Epics archiver
  • Tuesday

  • 222504 03/08/11 20:44 smithg Analysis: Estimates of N2 ice formation on the tgt window from the bad vacuum
  • 222503 03/08/11 18:11 Pitt Region 2 Beam Off Leakage Currents
  • 222501 03/08/11 17:35 saw Bellows replacement status
  • 222497 03/08/11 17:27 mack survey of GEM enclosure finds no unusual hot spots near US Lumi 7
  • 222496 03/08/11 17:00 rob MD EM HV off; one LED cable out of place
  • 222494 03/08/11 16:58 rob md5+ event-mode no longer obviously weird.
  • 222491 03/08/11 16:52 leacock cdaql8 mouse missing -- replaced with dead cdaql3's working mouse
  • 222481 03/08/11 16:16 rob MD EM HV on
  • 222479 03/08/11 16:08 R. Michaels status after RC meeting
  • 222461 03/08/11 14:03 jhlee update F1TDC status (Mar 8, 2011)
  • 222460 03/08/11 13:39 pking Analysis: Killed three stuck MySQL queries
  • 222459 03/08/11 13:36 Armstrong Trent A. removes function generator
  • 222453 03/08/11 11:42 smacewan swapped out md5+ em base for a spare
  • 222450 03/08/11 11:21 R. Michaels info about the status
  • 222444 03/08/11 11:10 smacewan switched MD LED cables to 'negative' tubes
  • 222443 03/08/11 10:50 smacewan turned off all em md except for md5+
  • 222442 03/08/11 10:38 jhlee reproduce "token stuck" error with Run 10351
  • 222437 03/08/11 09:54 hamlet The GEM detector and 2 scintiliators taken out from Hall C
  • 222432 03/08/11 09:16 jhlee Run 10334 is bad, see the entry 222416
  • 222427 03/08/11 08:49 jhlee Start Injector Run 2235 for testing
  • 222416 03/08/11 00:59 jhlee Token stuck error of BDC for F1TDCs
  • Monday

  • 222415 03/07/11 20:04 mack minor BPM cable changes in BSY service building
  • 222405 03/07/11 18:50 smacewan Restored previous HV to md5+ em
  • 222404 03/07/11 18:46 smithg vacuum problems
  • 222403 03/07/11 18:39 donjones Compton: disabled error reporting on CPSLOW
  • 222402 03/07/11 18:29 rob changed MD5+ HV from 900V to 1000V
  • 222401 03/07/11 18:11 smithg Target: tgt was moved in, then out to home again
  • 222395 03/07/11 17:51 kamyers TS plots from cosmic run, CFD threshold 20 mV
  • 222394 03/07/11 17:50 rob late entry: switched to parity DAQ: no tracking DAQ while people in hall
  • 222385 03/07/11 17:27 beaufait run prep
  • 222370 03/07/11 16:32 smacewan Rebooted vmec15
  • 222367 03/07/11 16:18 R. Michaels RC meeting results
  • 222357 03/07/11 15:42 mack BPM cable paths were touched
  • 222354 03/07/11 15:31 rob moved MD LED cables to "minus" pmts; HV on
  • 222348 03/07/11 15:16 kamyers switched to fake mps
  • 222345 03/07/11 14:36 smacewan Changed channel 15 on epics_scaler.adl
  • 222344 03/07/11 14:06 kamyers scintillator HV turned on
  • 222343 03/07/11 12:53 smithg Target: closed mv41
  • 222342 03/07/11 11:20 dalton Drive replaced, no outage
  • 222341 03/07/11 10:01 saw Hall C cluster to go down at 11AM
  • Sunday

  • 222340 03/06/11 21:05 mack remaining MD witness plates are in now
  • 222338 03/06/11 15:31 mack nice burn spots on the MD glass witness plates
  • 222337 03/06/11 15:21 EmmanuelK Sunday shift checklist
  • Saturday

  • 222336 03/05/11 21:51 mack Testing out MD EM bases
  • 222335 03/05/11 17:19 narayan shift checklist
  • 222334 03/05/11 15:39 leacock lumi event mode checkout
  • 222333 03/05/11 13:25 leacock plugged in VT scope in cage
  • Friday

  • 222332 03/04/11 19:39 dalton QTor, ramped down and off
  • 222331 03/04/11 18:02 beaufait Qtor repair.
  • 222328 03/04/11 17:40 jhlee Tracking DAQ test is done
  • 222325 03/04/11 16:45 R. Michaels results of today's RC meeting
  • 222322 03/04/11 16:21 cdaq Test
  • 222319 03/04/11 16:14 cdaq Test
  • 222289 03/04/11 14:29 dalton ccomptl1 terminal error
  • 222288 03/04/11 13:23 gaskell/dalt Compton: Hall A GSO detector installed
  • 222287 03/04/11 13:03 leacock shift checklist -- most everything normal
  • 222284 03/04/11 12:38 leacock region 2 checkout
  • 222268 03/04/11 11:13 mack Hall probe zero tempco is indeed significant at these low fields.
  • 222266 03/04/11 11:10 hamlet QTOR field with temperature
  • 222253 03/04/11 10:03 jhlee switch FAKE 1Hz MPS, and unplug missed helicity gate alarm
  • Thursday

  • 222252 03/03/11 18:29 jhlee Swithed to ACC MPS.
  • 222251 03/03/11 18:26 jhlee/rakith finish to test Tracking DAQ
  • 222240 03/03/11 17:24 saw Qtor field stabilty and reproducibility
  • 222223 03/03/11 17:00 rakithab Switched to 1Hz Fake MPS
  • 222218 03/03/11 16:25 R. Michaels RC meeting notes
  • 222217 03/03/11 15:35 jhlee start a work to switch Parity DAQ to Tracking DAQ
  • 222216 03/03/11 11:20 Arthur GEM disconnected
  • 222215 03/03/11 08:43 R. Michaels Info from the RC
  • Wednesday

  • 222214 03/02/11 18:55 wdconinc Compton: Enabled automatic log entries for electron detector DAQ
  • 222206 03/02/11 18:33 benesch Qtor current vs time
  • 222189 03/02/11 16:41 wdconinc Compton: Replaced FADC with 4V input range board
  • 222184 03/02/11 15:50 leacock Target: opened 4K JT valve from 0% to 100%
  • 222180 03/02/11 15:45 leacock ramping QTOR to 8921
  • 222167 03/02/11 14:49 leacock all uslumi bases now have switched BNC connectors
  • Tuesday

  • 222147 03/01/11 17:25 Page This stuff might be helpful if it happens again ...
  • 222145 03/01/11 17:20 jhlee This Run 10283 is not ended properly due to EB crashed
  • 222144 03/01/11 17:19 jhlee use the external clock 20MHz as clock signals of VQWKs
  • 222122 03/01/11 13:15 Armstrong A small clarification to what Buddhini's note said
  • 222121 03/01/11 12:58 jhlee comments about emittances
  • 222120 03/01/11 12:25 buddhini Ended injector run 2234.
  • 222119 03/01/11 12:24 buddhini Relation between position differences and normalized emittance (update)
  • 222118 03/01/11 11:35 buddhini Started injector run 2234 during Jays programe
  • 222117 03/01/11 11:11 buddhini Ended injector run 2233
  • 222116 03/01/11 10:55 pking Reprogrammed g0inj boot parameters
  • 222115 03/01/11 10:51 buddhini Started injector run 2233 during beam studies.
  • 222111 03/01/11 09:08 buddhini/Han We are running the injector daq for injector studies. Please don't try to run it anywhere else.