Jefferson Lab Hall C Logbook for March 11 - runstarts omitted
Main INDEX
Thursday
225916 03/31/11 23:57 jhlee Scanner is off *maybe* after run 11008
225915 03/31/11 23:50 qwanalysis Analysis: Run 11014 - Plots and Summary Table for 100k Events.
225914 03/31/11 23:48 qwanalysis Analysis: Run 11015 - Plots and Summary Table for 100k Events.
225909 03/31/11 23:32 buddhini DS bellows temperatures and DS vaccume
225908 03/31/11 23:21 qwanalysis Analysis: Run 11013 - Plots and Summary Table for 100k Events.
225907 03/31/11 22:56 rob no pickup from scanner motion controller seen in current-mode signals
225906 03/31/11 22:51 jhlee charge feedback is off at the begining of the run 11015
225905 03/31/11 22:45 jhlee EB crashed at the end of Run 11014
225903 03/31/11 22:39 rajotte bcm6 drifting again...
225900 03/31/11 21:45 jhlee late entry : Injector run 2283 is ended around 19:13
225899 03/31/11 21:38 qwanalysis Analysis: Run 11011 - Plots and Summary Table for 100k Events.
225898 03/31/11 21:38 jhlee/buddhi re: Analysis: Changes in "qwanalysis" script.
225896 03/31/11 21:33 rajotte Improvement of MD_all width at higher current (150-155 uA)
225894 03/31/11 20:50 jhlee Shift Checklist Screenshot
225893 03/31/11 20:49 Nuruzzaman Analysis: Changes in "qwanalysis" script.
225892 03/31/11 20:46 jhlee During this run 21300, IHWP status is changed
225889 03/31/11 20:35 jhlee Log entry for the transition run of IHWP out
225888 03/31/11 20:33 qwanalysis Analysis: Run 11010 - Plots and Summary Table for 100k Events.
225881 03/31/11 20:00 jhlee Bellows temps and Vacuum
225880 03/31/11 19:51 qwanalysis Analysis: Run 11009 - Plots and Summary Table for 100k Events.
225875 03/31/11 18:46 brads Please fix the y-axes on the bellows stripchart(s)
225872 03/31/11 18:13 rob md7+ teed through scope for this run and next
225871 03/31/11 18:07 qwanalysis Analysis: Run 11008 - Plots and Summary Table for 100k Events.
225868 03/31/11 17:59 buddhini DS bellows temperatures and DS vaccume
225867 03/31/11 17:45 jhlee Injector Run 2283 is started (Hall A on, Hall B off)
225866 03/31/11 17:40 jhlee re: re: vc-git module prevents users to write files on cdaql cluster
225863 03/31/11 17:25 brads re: vc-git module prevents users to write files on cdaql cluster
225862 03/31/11 17:24 jhoskins I have updated the Collaboration
225861 03/31/11 17:20 mack BMod trigger reference
225860 03/31/11 17:17 jhlee vc-git module prevents users to write files on cdaql cluster
225859 03/31/11 17:06 kamyers Analysis: General Note: we are currently using qwk_charge = (bcm1+bcm2)/2
225858 03/31/11 17:04 buddhini Changed the qw:bellowstemp3 high alarm limits
225855 03/31/11 16:31 rakithab Shift Summary: Day Shift summary
225854 03/31/11 16:31 jhlee Bellows Temperature
225851 03/31/11 16:28 cdaq Beam Time Accounting
225850 03/31/11 16:26 qwanalysis Analysis: Run 11007 - Plots and Summary Table for 100k Events.
225849 03/31/11 16:09 buddhini Target : Set QWT_miA alarlms to 'no-alarm'
225848 03/31/11 16:06 buddhini Target : Screen shots at the begining of swing shift
225845 03/31/11 15:40 gaskell Compton: beam modulation signal ok I guess
225844 03/31/11 15:25 rakithab DS Lumi yileds different from nominal settings. (Double peaked). For runs took during the day shift
225843 03/31/11 15:14 qwanalysis Analysis: Run 11006 - Plots and Summary Table for 100k Events.
225841 03/31/11 15:01 jhlee Beam modulation is on requested by Dave G.
225837 03/31/11 14:45 rakithab tempertatures on DS bellows at 155uA.
225836 03/31/11 14:31 rakithab CAEN HV and Generaltools snapshots
225835 03/31/11 14:30 donjones Compton: deleted first three laserwise cycles of run 21276
225834 03/31/11 14:06 qwanalysis Analysis: Run 11005 - Plots and Summary Table for 100k Events.
225833 03/31/11 14:01 qwanalysis Analysis: Run 11004 - Plots and Summary Table for 100k Events.
225832 03/31/11 14:00 Jiawei Forgot to put the titles of these plots
225831 03/31/11 13:52 Jiawei quick check of the nonlinearities of recent runs
225826 03/31/11 13:34 gaskell Compton: beam modulation signal
225825 03/31/11 13:32 rakithab DS beamline vaccume and tempertatures on DS bellows.
225824 03/31/11 13:29 gaskell/raki Moller: Summary for Thursday March 31
225822 03/31/11 13:00 qwanalysis Analysis: Run 11003 - Plots and Summary Table for 100k Events.
225819 03/31/11 12:40 rakithab Turned Beam Modulation OFF
225818 03/31/11 12:37 rakithab BPM and Halo rates after moller backout
225817 03/31/11 12:36 rakithab Turned Qweak Current mode HV ON
225816 03/31/11 12:33 rakithab Turned Feedback and Beam Mod ON
225814 03/31/11 12:28 rakithab Compton electron detector is moved to position 8.6890
225811 03/31/11 12:14 rakithab Setting Pockels Cell values for IHWP IN
225810 03/31/11 12:12 narayan Compton: EB0 Crashed
225809 03/31/11 12:03 rakithab Moller measurement finished. Restore to Qweak running conditions.
225805 03/31/11 11:29 rakithab Changed Pockels cell values to IHWP nominal settings
225792 03/31/11 10:34 mack Possible alternative BMod signal to send to Compton
225784 03/31/11 09:07 rakithab Stoped the Charge feedback
225783 03/31/11 09:04 rakithab Changed BCM gain settings for Moller
225781 03/31/11 09:02 pqwang Target: Target moved out to home position, Target Screenshots & Status
225780 03/31/11 09:00 rakithab Turned off Beam modulation
225779 03/31/11 08:58 rakithab Qweak HV OFF for Moller
225777 03/31/11 08:52 rajotte end of injector run 2282
225776 03/31/11 08:52 qwanalysis Analysis: Run 11000 - Plots and Summary Table for 100k Events.
225775 03/31/11 08:43 qwanalysis Analysis: Run 10999 - Plots and Summary Table for 100k Events.
225774 03/31/11 08:41 cdaq Beam Time Accounting
225772 03/31/11 08:40 gaskell Moller: epics before Moller
225769 03/31/11 08:33 rajotte starting injector run (Hall A&B off)
225767 03/31/11 08:12 rajotte owl shift summary
225766 03/31/11 08:11 gaskell Compton: runs 21288 to 21291 have no modulation signal to Compton
225765 03/31/11 08:09 AK Opper & N Turned OFF Beam Modulation
225763 03/31/11 08:00 rajotte end of injector run 2281
225762 03/31/11 07:50 rajotte !!!!WARNING: Previous swing shift with wrong HWP status in hlog title entry
225758 03/31/11 07:27 rajotte snapshot General tools & HV
225757 03/31/11 07:17 rajotte MCC: beam off 5 minutes for quick test
225755 03/31/11 06:56 qwanalysis Analysis: Run 10998 - Plots and Summary Table for 100k Events.
225754 03/31/11 06:55 rajotte starting injector run 2281
225753 03/31/11 06:43 rajotte pedestal plots
225750 03/31/11 06:26 rajotte starting pedestal run during MCC QE test
225747 03/31/11 06:07 qwanalysis Analysis: Run 10996 - Plots and Summary Table for 100k Events.
225746 03/31/11 06:03 Nuruzzaman Analysis: Beam Modualtion ramp voltage discrepancy.
225745 03/31/11 05:42 Nuruzzaman Target: Target GUI and strip charts screenshots
225740 03/31/11 04:50 qwanalysis Analysis: Run 10995 - Plots and Summary Table for 100k Events.
225735 03/31/11 03:53 qwanalysis Analysis: Run 10994 - Plots and Summary Table for 100k Events.
225731 03/31/11 03:31 rajotte end of injector run 2280
225728 03/31/11 03:02 rajotte starting injector run 2280
225726 03/31/11 02:48 qwanalysis Analysis: Run 10993 - Plots and Summary Table for 100k Events.
225725 03/31/11 02:39 rajotte fast feedback off for part of run 10992
225722 03/31/11 01:48 qwanalysis Analysis: Run 10992 - Plots and Summary Table for 100k Events.
225717 03/31/11 00:39 cdaq Beam Time Accounting
225716 03/31/11 00:38 qwanalysis Analysis: Run 10991 - Plots and Summary Table for 100k Events.
225715 03/31/11 00:31 Nuruzzaman Target: Target GUI and strip charts screen shots at the beginning of owl shift.
225714 03/31/11 00:30 jhoskins Beam Modulation Configuration file updated
225709 03/31/11 00:14 rajotte changing HWP status
225704 03/31/11 00:01 jhoskins Swing Shift summary
Wednesday
225703 03/30/11 23:57 buddhini Target: screen shots at the end of swing shift
225702 03/30/11 23:49 buddhini General tools and HV settings
225701 03/30/11 23:40 jhoskins Analysis 10988
225698 03/30/11 23:20 buddhini DS beamline vaccume and DS bellows temperatures
225697 03/30/11 22:54 jhoskins Analysis 10987
225692 03/30/11 22:21 Updated slug plots for slug 68
225691 03/30/11 21:52 rakithab Analysis: Updated Runlet plots for slug 68
225686 03/30/11 21:18 jhoskins Analysis 10986
225685 03/30/11 21:09 rakithab Analysis: Updated the last 24h runs
225684 03/30/11 21:03 rakithab Analysis: Started the script to create the slug 68 root file
225683 03/30/11 20:47 jhoskins Analysis 10985
225678 03/30/11 19:59 mack opportunistic access requests
225677 03/30/11 19:47 jhoskins Analysis 10984
225676 03/30/11 19:43 mack Weeks after Tweaks: BCM1,2 back down to 120 ppm or so
225673 03/30/11 19:34 buddhini DS beamline vaccume and tempertatures on DS bellows.
225668 03/30/11 19:25 mack BPM screen shows no obvious saturation at 150 microA
225667 03/30/11 19:02 jhoskins Analysis 10983
225664 03/30/11 18:21 jhoskins Analysis 10982
225661 03/30/11 17:52 rajotte qwac shifters needed (second try with emails)
225660 03/30/11 17:48 brads Small temp pertubations at 7, 11 o'clock aren't correlated with beam motion
225657 03/30/11 16:50 kamyers Analysis: some database plots for 10958-10981 (since we've resumed production)
225656 03/30/11 16:44 buddhini Analysis: Run 10980 Analysis plots
225653 03/30/11 16:17 sxyang Day Shift summary
225652 03/30/11 16:14 cdaq Beam Time Accounting
225651 03/30/11 16:13 buddhini Target: Target screen shots at the begining of the swing shift
225649 03/30/11 16:07 smithg Target: added an alarm for the bellows temp
225647 03/30/11 15:46 sxyang Screenshots of HV and GeneralTools GUIs
225646 03/30/11 15:43 sxyang Analysis: Run 10981-Plots
225643 03/30/11 15:04 rakithab IHWP state changed from OUT-IN
225637 03/30/11 14:51 rakithab Feedback was not running properly during the run 10978
225636 03/30/11 14:48 brads RC update for Wed; Run plan for today. Reminder of RC meeting at 3:30pm
225634 03/30/11 14:04 sxyang Analysis: Run 10978-Plots
225632 03/30/11 13:45 rakithab DS beamline vacuum and temperatures on DS Bellows
225631 03/30/11 12:53 sxyang analysis: plots for production run 10977
225626 03/30/11 12:23 wdconinc Compton: Autoanalyzer with 4 jobs to cdaql3
225625 03/30/11 11:59 sxyang Analysis: Run 10976-Plots
225623 03/30/11 11:37 sxyang beam is back
225621 03/30/11 11:30 sxyang beam will be off for 1-2 hours
225620 03/30/11 10:55 sxyang Analysis: Run 10975-Plots
225619 03/30/11 10:43 sxyang beam off for another 15 mins
225616 03/30/11 10:26 rakithab DS beamline vacuum and temperatures on DS Bellows
225611 03/30/11 09:57 sxyang beam off for about 15 minutes
225609 03/30/11 09:43 brads OWL shift temps -- better y-scales
225608 03/30/11 09:36 qwanalysis Analysis: Run 10973 - Plots and Summary Table for 100k Events.
225604 03/30/11 09:10 sxyang Analysis: Run 10972-Plots
225603 03/30/11 09:03 rakithab Target: Target GUI and strip charts screen shots
225602 03/30/11 08:40 rajotte QwAC shifters needed
225601 03/30/11 08:34 rob bellows temperatures are 40-85 C
225600 03/30/11 08:18 Armstrong qw:bellowstemp3 is still at 85 F
225597 03/30/11 08:08 Nuruzzaman Shift Summary: Owl Shift summary 03/30/2011
225596 03/30/11 08:01 cdaq Beam Time Accounting
225595 03/30/11 07:47 Nuruzzaman Status of the 3H09 vacuum and bellows temperature for Owl shift
225594 03/30/11 07:29 qwanalysis Analysis: Run 10971 - Plots and Summary Table for 100k Events.
225593 03/30/11 07:28 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225590 03/30/11 07:20 rakithab Beam: When changing IHWP please follow the instructions
225585 03/30/11 06:27 qwanalysis Analysis: Run 10970 - Plots and Summary Table for 100k Events.
225584 03/30/11 06:17 Nuruzzaman Changed Half Wave Plate to OUT.
225581 03/30/11 06:11 cdaq Run 10969 Pedestal Data
225575 03/30/11 05:24 qwanalysis Analysis: Run 10968 - Plots and Summary Table for 100k Events.
225572 03/30/11 04:19 qwanalysis Analysis: Run 10967 - Plots and Summary Table for 100k Events.
225569 03/30/11 04:11 Nuruzzaman General tools and HV GUI screen shots.
225566 03/30/11 03:16 qwanalysis Analysis: Run 10966 - Plots and Summary Table for 100k Events.
225561 03/30/11 02:12 qwanalysis Analysis: Run 10965 - Plots and Summary Table for 100k Events.
225560 03/30/11 01:58 Nuruzzaman We are taking scanner data during this run.
225559 03/30/11 01:57 Nuruzzaman QTOR tripped. Its back now.
225554 03/30/11 01:01 qwanalysis Analysis: Run 10964 - Plots and Summary Table for 100k Events.
225549 03/30/11 00:36 qwanalysis Analysis: Run 10963 - Plots and Summary Table for 100k Events.
225548 03/30/11 00:04 cdaq Beam Time Accounting
Tuesday
225547 03/29/11 23:58 rakithab Shift Summary: Swing Shift summary
225545 03/29/11 23:53 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225541 03/29/11 23:05 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON at 150uA
225540 03/29/11 22:56 jpan Analysis: Run#10962
225537 03/29/11 22:41 rakithab Injector run 2277 ended
225534 03/29/11 22:07 rakithab Started injector run 2277. Hall A is OFF. Hall B is ON
225533 03/29/11 21:58 jpan Analysis: Run#10961
225532 03/29/11 21:52 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON at 150uA
225530 03/29/11 21:47 jpan Analysis: Run#10960
225528 03/29/11 21:41 rakithab Run number mismatch in the RCGUI after the recent CODA crash
225525 03/29/11 21:22 rakithab Turned ON beam modulation before the run 10961
225524 03/29/11 21:21 rakithab Missed helicity gates. TS hanged up during the run 10960
225520 03/29/11 21:03 jpan Target: With full beam current, sometimes the HPH reserved power less than 100 W.
225519 03/29/11 20:51 narayan Compton: e-detector at standard position
225518 03/29/11 20:48 rakithab CAEN HV settings and general tools snapshots
225517 03/29/11 20:47 narayan Compton: this run stopped due to ROC2 hangup
225516 03/29/11 20:42 jpan Analysis: Run#10959, 150 uA production run
225515 03/29/11 20:35 rakithab BPM and Halo rates at 150uA
225514 03/29/11 20:31 brads Small vacuum changes tied to beam on/off events
225513 03/29/11 20:30 jpan Analysis: Run#10958, QTOR on, 75 uA
225507 03/29/11 20:15 rakithab DS beamline vacuum and temperatures plateau on DS Bellows with QTOR ON
225506 03/29/11 20:11 donjones compton vertical scan
225503 03/29/11 19:53 rakithab QTOR ramped to 8921A while beam ON and bellows flanges temperatures at the plateau
225502 03/29/11 19:34 rakithab QTOR ramp cancelled for now
225498 03/29/11 19:18 rakithab DS beamline vacuum and temperatures plateau on DS Bellows
225497 03/29/11 18:47 rakithab Beam positions and halo rates at 75uA QTOR OFF
225494 03/29/11 18:30 rakithab Beam extraction region BLM beam trips
225493 03/29/11 18:26 rakithab Injector run 2276 was taken to test the Real Time engine.
225492 03/29/11 18:23 rakithab Downstream beamline vacuum and temperatures on downstream bellows flanges
225491 03/29/11 18:00 rakithab BPMs and Halo rates at 75uA QTOR OFF
225489 03/29/11 17:56 rakithab Started the charge feedback program
225487 03/29/11 17:33 brads Run plan for Tuesday, Wednesday
225486 03/29/11 17:27 rakithab Turned HV ON for Halo, current mode MD and Lumi
225485 03/29/11 17:21 jpan Target: Move target from Home=out of beam postion to H2 Cell
225484 03/29/11 17:19 rakithab Beam dump presssure after the fix
225483 03/29/11 17:10 rob HV GUI alive again after reset of g0ioc2
225482 03/29/11 17:09 brads Dump vacuum gauge head replaced -- noisy VCG3H09Dtr looks good now
225481 03/29/11 17:07 rob can't start HV GUI on any cdaql
225480 03/29/11 17:06 jpan Target: Move target from H2 cell to Home-out of beam position
225479 03/29/11 16:21 jhlee Day Shift Summary
225478 03/29/11 16:03 cdaq Beam Time Accounting
225477 03/29/11 15:34 brads Dump vacuum rise could be noise from scanner test
225476 03/29/11 15:30 rob scanner GUI now accessible from downstairs
225475 03/29/11 15:21 rob scanner controller off: no immediate change in vacuum
225474 03/29/11 15:05 beaufait spark investigation Qtor
225473 03/29/11 14:18 brads RC update for Tuesday
225472 03/29/11 14:11 benesch 16" gate valve closed ~0230
225471 03/29/11 14:01 brads Temperatures at bellows during Monday night beam (summary of observations)
225470 03/29/11 13:59 rob no entries to the hall during the change in downstream vacuum.
225469 03/29/11 13:52 benesch why did downstream vacuum go bad?
225468 03/29/11 13:22 cdaq Run 10954 Pedestal Data
225465 03/29/11 13:00 Spayde Analysis: New Test Database
225464 03/29/11 12:30 narayan Target: mid shift screenshot
225463 03/29/11 10:44 jpan Scanner has been moved back to upstream of MD
225461 03/29/11 08:02 Nuruzzaman/P Owl Shift Summary 03/29/2011
225460 03/29/11 08:02 cdaq Beam Time Accounting
225459 03/29/11 07:28 pqwang Target GUI and strip charts screenshots at the end of owl shift
225458 03/29/11 02:24 qwanalysis Analysis: Run 10952 - Plots and Summary Table for 100k Events.
225457 03/29/11 02:21 Nuruzzaman Turned OFF all the High Voltages
225456 03/29/11 02:17 Nuruzzaman QTOR ramped down to Zero.
225455 03/29/11 01:30 Nuruzzaman Analysis: Plots for pedestal run 10953
225454 03/29/11 01:03 cdaq Beam Time Accounting
225450 03/29/11 00:35 brads No significant temp change during QTor scan
Monday
225447 03/28/11 23:58 jpan Target GUI and strip charts screenshots at the end of swing shift
225446 03/28/11 23:55 jhoskins Shift Summary: Swing Shift summary
225443 03/28/11 23:42 brads Photo of heat-effected bolt after disassembly this afternoon
225442 03/28/11 23:38 brads Photo of fan on bellows region
225437 03/28/11 23:06 brads BPM positions
225436 03/28/11 22:56 brads Vacuum burps at target chamber (since we started)
225435 03/28/11 22:56 rob temp3 is beam right, not beam left
225434 03/28/11 22:45 jhoskins HV GUI / Tools
225433 03/28/11 22:44 brads Initial vacuum and temps at 75uA (max authorized beam current for tonight)
225430 03/28/11 22:31 brads Temp plateaus at 50uA: temp3 is 50C, the rest are 20C lower
225429 03/28/11 22:26 brads Photos of thermocouple locations
225428 03/28/11 22:15 jpan The vacuum looks stable at 50 uA beam current
225427 03/28/11 21:54 jpan Target: Another vacuum plot
225425 03/28/11 21:49 brads Plateau at 15deg rise in temp3 (34C): beam left, downstream bellows flange at 25uA on target
225424 03/28/11 21:39 brads 25 uA on target saw small rise in vacuum pressure after beam trip, then fell back to nominal value
225423 03/28/11 21:28 rakithab I mean run 10946!
225422 03/28/11 21:25 rakithab Target: Run 225418 is with LH2 OutOfBeam
225421 03/28/11 21:22 jhlee Analysis: start autoanalyzers on cdaql3/5
225420 03/28/11 21:21 brads No water cooling on bellows flanges tonight, we _do_ have a fan on the bellows region
225419 03/28/11 21:16 jpan Target: Target moved from HOME=Out-of-Beam to Hydrogen-Cell position
225417 03/28/11 20:59 brads Thermocouples in place -- position map to EPICS values
225416 03/28/11 20:56 jhoskins QTOR and detectors on
225415 03/28/11 20:52 jhoskins Hall closed up -- preparing to get beam back
225414 03/28/11 18:47 jpan Target: The DS vacuum status - about 1.4e-5 Torr at this moment
225413 03/28/11 18:00 jpan Target GUI and strip charts screenshots
225410 03/28/11 17:48 rob md led checkout: pass
225409 03/28/11 17:44 smithg Target: Target unparked. DS vacuum continues to improve.
225403 03/28/11 17:30 Jiawei Summary of the raster study runs
225402 03/28/11 17:23 jhoskins Qweak Readiness checklist
225398 03/28/11 16:50 smithg Target: Unparking the tgt now to be ready for 150 uA later tonight
225397 03/28/11 16:49 jhoskins New COO in counting house.
225396 03/28/11 16:29 smithg DS bellows seal has been replaced. Pumping.
225395 03/28/11 16:21 jpan Target GUI and strip charts screenshots
225394 03/28/11 16:12 brads Update to COO -- Please read section B.1 (last page)
225393 03/28/11 16:10 Jiawei raster frequency study is done. Everything is set back to the normal configurations
225391 03/28/11 16:05 sxyang Screenshots of HV and GeneralTools GUI.
225388 03/28/11 16:03 cdaq Beam Time Accounting
225387 03/28/11 16:02 sxyang Day Shift Summary
225360 03/28/11 14:38 beaufait tc hookup
225358 03/28/11 14:34 Jiawei 10927 number of samples = 20
225352 03/28/11 10:45 smithg Target: replaced H2 bottle
225351 03/28/11 10:15 rakithab Target: Beam dump vacuum alarm during venting.
225350 03/28/11 10:14 gaskell Compton: turned on laser
225346 03/28/11 08:55 rakithab Target: Target GUI and strip charts screen shots
225344 03/28/11 08:08 cdaq Beam Time Accounting
225340 03/28/11 07:51 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225324 03/28/11 00:15 cdaq Beam Time Accounting
225323 03/28/11 00:14 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
Sunday
225322 03/27/11 20:53 wdconinc Compton: Autoanalyzer should be invoked automatically again
225317 03/27/11 16:06 jpan Target GUI and strip charts screenshots
225316 03/27/11 16:02 cdaq Beam Time Accounting
225315 03/27/11 12:16 EmmanuelK Target: Target GUI and strip charts screenshots for Day shift
225314 03/27/11 12:14 EmmanuelK Target: Pump current alarm - ro error?
225313 03/27/11 08:03 cdaq Beam Time Accounting
225312 03/27/11 07:13 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225308 03/27/11 00:03 cdaq Beam Time Accounting
225307 03/27/11 00:01 jpan Target: Target GUI and strip charts screenshots
Saturday
225292 03/26/11 16:17 cdaq Beam Time Accounting
225291 03/26/11 16:03 jpan Target GUI and strip charts screenshots
225290 03/26/11 16:02 EmmanuelK Target: Scattering Chamber vacuum through Day shift
225285 03/26/11 12:19 EmmanuelK Target: Day shift screenshots
225284 03/26/11 08:04 cdaq Beam Time Accounting
225283 03/26/11 07:12 rakithab Target: Target GUI and strip charts screenshots
225282 03/26/11 00:11 rakithab Target: Target GUI and strip charts screenshots
225281 03/26/11 00:02 cdaq Beam Time Accounting
Friday
225280 03/25/11 23:44 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225279 03/25/11 21:24 brads Compton HV had tripped, HV gui wouldn't stay connected, or shut up -- set channels to OFF and exitted the GUI
225278 03/25/11 16:56 brads re: Ops/JRRP checklist for CW from 0810 Friday meeting
225277 03/25/11 16:02 buddhini Target : scattering chamber vaccume over the day shift and over the days from 23/3-25/3
225276 03/25/11 16:02 cdaq Beam Time Accounting
225275 03/25/11 15:55 buddhini Target screen shots at the end of Day shift
225274 03/25/11 15:51 jhlee snapshots for shift checklist
225273 03/25/11 15:40 brads Temperature spec. for Al flange
225272 03/25/11 15:37 buddhini Analysis: FFT and position differences along injector in run 2274 that was taken when Hall A was taking beam
225271 03/25/11 15:19 benesch Beam: Ops/JRRP checklist for CW from 0810 Friday meeting
225270 03/25/11 15:18 gaskell Compton: laser LBO optimization complete
225269 03/25/11 14:36 brads RC update/plans for Friday through the weekend
225268 03/25/11 14:30 buddhini Turned off HVs
225267 03/25/11 13:56 cdaq Run 10909 : Analysis and Plots
225266 03/25/11 13:44 smacewan New Documentation Wiki Page
225265 03/25/11 11:48 jpan Scanner has been moved to downstream
225264 03/25/11 11:06 buddhini Hall C is now in restricted access
225263 03/25/11 11:00 gaskell Compton: started LBO optimization on laser
225262 03/25/11 10:25 buddhini Analysis: FFT of Injector beam X and Y during e:50k to 100k on Injector run 2273
225261 03/25/11 09:55 jhlee tuned xorg.conf on cdaql3
225260 03/25/11 09:40 buddhini Target : Increased the 15k supply from 15g/s to 25 g/s on cryos request
225259 03/25/11 08:16 cdaq Beam Time Accounting
225258 03/25/11 08:14 buddhini Started injector run 2274 while Hall A is taking beam (I = 4.9uA)
225257 03/25/11 07:50 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225256 03/25/11 00:09 cdaq Beam Time Accounting
Thursday
225255 03/24/11 23:50 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225254 03/24/11 23:01 jpan End injector run 2273
225253 03/24/11 22:01 jpan Injector run 2273 is started
225252 03/24/11 21:24 jpan end injector run 2272
225251 03/24/11 20:52 jpan start injector run 2272
225250 03/24/11 20:35 brads RC update for Thursday
225249 03/24/11 20:13 jpan Target GUI and strip charts screenshots, 8:10 pm
225248 03/24/11 18:44 Ramesh Re:Test with Qtor On and Off effect on beam orbit
225247 03/24/11 18:04 Ramesh general tools and HV screenshot
225245 03/24/11 17:43 Ramesh Test with Qtor On and Off effect on beam orbit
225244 03/24/11 17:29 cdaq Beam Time Accounting
225243 03/24/11 17:21 jpan The VCG3H09BTr pressure is increasing
225242 03/24/11 17:03 smithg putting pieces of the puzzle together
225239 03/24/11 16:38 Ramesh Some links for beam dump images from Accel Elog
225234 03/24/11 16:28 saw Qtor ramping to zero
225233 03/24/11 16:25 sxyang Day Shift Summary
225232 03/24/11 16:18 benesch Beam: beam looks fine on hall C dump viewer
225231 03/24/11 16:16 buddhini Shift check list HV and Genereal tool screen shots.
225230 03/24/11 15:58 saw Ramping Qtor to 8921
225229 03/24/11 15:53 buddhini Target screen shots at the end of the day shift
225224 03/24/11 14:56 sxyang hall is under power permit
225219 03/24/11 14:37 saw Write run comments carefully
225218 03/24/11 14:15 sxyang hall under controlled access
225216 03/24/11 13:00 buddhini Moved the target home out of the beam
225215 03/24/11 12:41 buddhini Target screen shots at the middle of the day shift
225214 03/24/11 12:13 sxyang screenshot of bpm
225213 03/24/11 12:12 sxyang screenshort of bpm
225212 03/24/11 08:10 buddhini Target screen shots at the begining of the day shift
225211 03/24/11 08:04 cdaq Beam Time Accounting
225210 03/24/11 06:53 pqwang Target: Target GUI and strip charts screenshots at 7 am
225209 03/24/11 00:01 cdaq Beam Time Accounting
Wednesday
225208 03/23/11 22:53 rakithab Target: Target GUI and strip charts screenshots
225203 03/23/11 19:51 wdconinc Compton: PMT dark box: no baseline shift at high rate with low signal size
225202 03/23/11 19:03 cdaq Beam Time Accounting
225201 03/23/11 19:02 rob reduced HV on AUX002, AUX003
225196 03/23/11 17:15 mack/ywang late entry: scan of 5 MeV FC position dependence
225193 03/23/11 17:03 covrig Target: 4K status
225190 03/23/11 16:16 sxyang Screenshots of HV and General Tools GUIs.
225189 03/23/11 16:13 rakithab Target: Target GUI and strip charts screenshots
225188 03/23/11 16:12 sxyang Day shift summary
225187 03/23/11 14:49 beaufait MDP
225186 03/23/11 14:48 beaufait MDP
225185 03/23/11 14:47 beaufait MDP
225184 03/23/11 14:31 beaufait qtor prep
225183 03/23/11 14:19 Jiawei Target: abnormal 4k flow fluctuation again
225180 03/23/11 12:46 rob scanner networking issue resolved: upstairs fiber transceiver was off
225179 03/23/11 12:42 jhlee Rearrange cronjobs on cdaql cluster
225178 03/23/11 12:34 jhlee correction : Rearrange the output path of QwAnalyzer on cdaql cluster
225177 03/23/11 12:30 jhlee Rearrange the output path of QwAnalyzer on cdaql cluster
225176 03/23/11 12:27 brads cdaql8 is OK
225175 03/23/11 11:53 sxyang cdaql8 power off
225174 03/23/11 11:15 sxyang target 4K flow rate fluctuates
225173 03/23/11 10:31 narayan Compton: e-detector parked
225171 03/23/11 09:56 Jiawei Target: 4K flow was unstable, now is back
225170 03/23/11 09:36 cdaq Beam Time Accounting
225169 03/23/11 09:13 jbrock Beamline Vacuum Stat
225168 03/23/11 07:44 pqwang Target: Target GUI and strip charts screenshots
225167 03/23/11 07:42 Armstrong correction
225166 03/23/11 07:27 Armstrong VCG3H09DTr vacuum since 16:45 yesterday
225165 03/23/11 01:12 jhlee ROOT writing performace test on cdaql3
225164 03/23/11 00:02 cdaq Beam Time Accounting
Tuesday
225163 03/22/11 21:52 Page Target: Operator is still awake :)
225160 03/22/11 19:45 wdconinc Compton: Upgraded qwcompton auto-analyzer in ~/compton/QwAnalysis
225155 03/22/11 18:15 Page vacuum stripcharts...NO alarms going off !
225154 03/22/11 18:07 Carlini Beam: Beamline Vacuum status
225149 03/22/11 17:07 jhlee Analysis: setup qwanalyzer on cdaql3
225148 03/22/11 16:46 covrig Target: status
225145 03/22/11 16:20 gaskell Compton: Added modulation "ramp" signal to Compton DAQ
225141 03/22/11 16:06 cdaq Beam Time Accounting
225137 03/22/11 15:48 jpan Target: The 15K mass flow was decreased further, right now is about 12 g/s and the HPH power is ~350 W
225136 03/22/11 15:08 jpan Target: Target GUI and strip charts screenshots @ 3:05 pm, pretty quiet so far
225135 03/22/11 15:04 smithg vacuum status
225134 03/22/11 14:52 rakithab CAEN HV settings and General tools snapshots
225132 03/22/11 11:35 gaskell Compton: added 1MHz clock to Compton DAQ
225129 03/22/11 11:02 jpan Target: Adjust the QW_FI_15K low limit a little bit (from 14.00 to 13.50) temporarily, will change it back later
225128 03/22/11 10:59 rakithab Beam: Injector studies ELOG entry
225127 03/22/11 10:56 wdconinc Compton: Data written to tape
225126 03/22/11 10:55 rakithab Beam: Injector Run 2271 ended.
225125 03/22/11 10:20 jpan The 15K mass flow was decreased to ~14 g/s.
225124 03/22/11 10:02 jpan Target: The 15 K mass flow drops during last few minutes
225123 03/22/11 09:54 jpan Target: Cryo called and asked our vacuum status
225122 03/22/11 09:53 rakithab Injector run 2271 started.
225121 03/22/11 09:43 Armstrong Target Operators: please fill out BTA
225120 03/22/11 09:37 cdaq Beam Time Accounting
225118 03/22/11 06:06 pqwang Target: Target GUI and strip charts screenshots at 6 am
225117 03/22/11 06:04 pqwang White boxes on EPICS Scaler GUI
Monday
225116 03/21/11 21:47 wdconinc Analysis: cdaql3 environment set up for Qweak analysis
225115 03/21/11 21:23 Page Target: Screen shots - quiet night so far
225114 03/21/11 21:20 wdconinc Compton: Restored data_tracker (on cdaql6)
225113 03/21/11 21:16 beaufait pump control cable
225112 03/21/11 20:04 mack plots from event mode light leak check
225111 03/21/11 17:56 dalton Status
225110 03/21/11 17:34 brads New cdaql3 is now online
225108 03/21/11 17:28 Page Target: Target 'parked' at 20 g/s of 15K, 16 g/s 4K
225107 03/21/11 17:00 Page Target: Progress at reducing 15K flow
225104 03/21/11 16:39 cdaq Beam Time Accounting
225103 03/21/11 16:36 benesch Beam: 70 MHz IF amp update
225102 03/21/11 16:22 rob Analysis: pmtltg saturates in its new position
225101 03/21/11 16:18 Page Target: Screen shot, start of swing shift
225100 03/21/11 16:16 Page 4 pm - overall status (unclear)
225099 03/21/11 16:09 sxyang screen shots of target GUI
225098 03/21/11 16:00 gaskell Compton: turned off laser
225097 03/21/11 15:24 rob segmented analysis test done
225096 03/21/11 14:50 sxyang 15K supply flow rate did not change much
225095 03/21/11 14:02 rakithab CAEN HV and General Tools snapshots
225094 03/21/11 13:54 sxyang 15K flow
225093 03/21/11 13:26 kenyon Drag pump
225092 03/21/11 13:18 jhlee turn off autoanalyzers and disable them in cronjob
225091 03/21/11 13:16 rob segmented analysis test started on cdaql5
225089 03/21/11 12:28 donjones Compton: PD cable unplugged
225088 03/21/11 12:05 sxyang flow rate changed
225087 03/21/11 10:41 cdaq Beam Time Accounting
225084 03/21/11 10:21 cdaq Beam Time Accounting
225083 03/21/11 10:20 smacewan Attempt to tidy up the Wiki:
225082 03/21/11 10:16 cdaq Beam Time Accounting
225081 03/21/11 10:12 Armstrong Date wrong on old BTA submission
225080 03/21/11 10:06 cdaq Beam Time Accounting
225079 03/21/11 10:04 cdaq Run 10920 Pedestal Data
225078 03/21/11 10:03 cdaq Beam Time Accounting
225075 03/21/11 08:48 brads Gas system flowing again
225074 03/21/11 08:08 cdaq Beam Time Accounting
225073 03/21/11 06:49 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225064 03/21/11 00:43 narayan gas system interlock alarm
Sunday
225062 03/20/11 21:46 Page Target: target screens, 21:45
225061 03/20/11 20:36 Page Scattering chamber vacuum settled down
225060 03/20/11 20:16 Page VBV3H09A valve status
225059 03/20/11 18:23 Page Vacuum history and valve status
225058 03/20/11 17:28 Page Target: scattering chamber vacuum plan for tonight
225057 03/20/11 16:56 Page Target: Scattering chamber vacuum getting worse
225056 03/20/11 15:37 dalton Molecular drag pump trip, can't restart
225055 03/20/11 15:14 birchall Target: Vacuum in scattering chamber and upstream
225054 03/20/11 14:23 birchall Target: Screenshot at 2:20 pm
225053 03/20/11 07:55 pqwang Target: Screen shot at end of owl shift
225052 03/20/11 00:10 jhlee renice all copy process on cdaql4 and cdaql8
225051 03/20/11 00:01 jhoskins QTOR ramped to zero
Saturday
225050 03/19/11 23:57 jhoskins Swing Shift Summary
225049 03/19/11 22:12 jhoskins MD w/wo lights on runs :10918, 10919
225048 03/19/11 21:47 dalton Owl shift SL cancelled, some other shifts on standby
225038 03/19/11 18:16 dalton Bad vacuum in downstream region
225037 03/19/11 18:06 narayan/wdco Compton: Integrated photon and electron detector DAQ
225034 03/19/11 17:21 jhoskins vacuum went bad again after spiking a few times.
225033 03/19/11 17:09 mack non-invasive BCM1,2 changes
225032 03/19/11 17:04 jhoskins Mark going into hall to reset turbo pump again
225031 03/19/11 16:51 JHoskins Vacuum improved
225030 03/19/11 16:21 cdaq Beam Time Accounting
225029 03/19/11 16:19 rakithab Shift Summary: Day Shift summary
225028 03/19/11 16:03 jpan Target GUI and strip charts screenshots at the end of day shift
225027 03/19/11 15:43 jpan Controlled access to reset downstream vacuum pump 3H09C
225026 03/19/11 15:38 jpan The vacuum history in the past 2 hrs.
225025 03/19/11 15:33 rakithab Beam dump vacuum pressure reached 7.2e-3uTorr .
225024 03/19/11 15:13 jpan Target: Bad downstream vacuum
225023 03/19/11 15:06 rakithab turned off the beam modulation
225022 03/19/11 14:59 rakithab Analysis: summary of the pedestal extraction: Run 10916
225020 03/19/11 14:54 cdaq Run 10916 Pedestal Data
225018 03/19/11 14:48 wdconinc Compton: Data disk filling up, no tape backup due to RIP cdaql3
225015 03/19/11 14:31 wdconinc Compton: Restarted firstpass autoanalyzer after ccomptl1 reboot
225014 03/19/11 14:21 jpan Analysis - run#10915
225013 03/19/11 14:10 jpan Here is the plot for MD sensitivity to Y (run#10914)
225006 03/19/11 13:03 jpan Analysis - run#10914
225005 03/19/11 12:46 rakithab CAEN HV and general tools snapshots
225004 03/19/11 12:42 jpan Oops, here is the plot for MD sensitivity to Y (run#10912)
225001 03/19/11 12:19 jpan The position sensitivies of MDALLBARS in x and y seem larger during run#10913
224998 03/19/11 12:16 wdconinc Compton: DAQ systems work better when cables are plugged in
224996 03/19/11 12:02 jpan Analysis - run#10913
224989 03/19/11 11:33 rakithab Injector run 2270 ended.
224985 03/19/11 11:04 jpan Analysis - run#10912
224984 03/19/11 11:03 rakithab Injector run 2270 started
224983 03/19/11 10:41 rakithab CODA:EB4 crashed at the end of the run 10911
224979 03/19/11 10:23 rakithab devel.2011.03.13 updated: Scripts FlipPCValues, SetLargeNegative_A_q and SetLargePositive_A_q
224978 03/19/11 10:08 jpan Analysis - run#10911
224977 03/19/11 09:34 rakithab Analysis: Run 10910 is the IHWP OUT -> IN transition run with large charge asymmetry
224974 03/19/11 09:27 rakithab Changed to IHWP IN before the run 10910
224968 03/19/11 09:23 narayan Compton: e-detector
224966 03/19/11 09:18 jpan Target: Vacuum behaviour during last swing shift
224964 03/19/11 08:54 jpan Analysis - run#10909
224963 03/19/11 08:47 rakithab Halo and Target Beam Positions
224962 03/19/11 08:25 rakithab Turned ON beam modulation during the run 10909
224960 03/19/11 08:19 cdaq Beam Time Accounting
224956 03/19/11 08:07 narayan Shift Summary: Owl Shift summary
224955 03/19/11 07:59 Nuruzzaman Target: Target GUI and strip charts screen shots, end of OWL shift.
224953 03/19/11 07:31 Nuruzzaman Analysis: Plots for production run 10908
224947 03/19/11 06:49 Nuruzzaman Shift Cheklist: HV and General tools.
224946 03/19/11 06:30 Nuruzzaman Analysis: Plots for production run 10907
224939 03/19/11 05:28 Nuruzzaman Analysis: Plots for production run 10906
224938 03/19/11 05:24 Nuruzzaman Analysis: Plots for production run 10905
224933 03/19/11 04:18 Nuruzzaman Analysis: Plots for pedestal run 10902
224931 03/19/11 04:00 narayan QTOR tripped and recovered
224930 03/19/11 03:51 Nuruzzaman Analysis: Plots for production run 10904
224929 03/19/11 03:44 Nuruzzaman QTOR trip, ramping up.
224924 03/19/11 03:21 Nuruzzaman Analysis: Plots for production run 10903
224923 03/19/11 03:14 mack BCM1,2 noise
224906 03/19/11 02:20 narayan Compton: ROC1 keeps going unresponsive
224903 03/19/11 02:11 Nuruzzaman Analysis: Plots for production run 10901
224902 03/19/11 01:53 buddhini Shift Summary: Swing shift
224880 03/19/11 00:45 cdaq Beam Time Accounting
224878 03/19/11 00:39 Nuruzzaman 03/19/2011 00.34: Changed Half Wave Plate from IN to OUT.
224874 03/19/11 00:22 Nuruzzaman Target: Target GUI and strip charts screen shots, beginning of OWL shift.
224873 03/19/11 00:03 buddhini Analysis: Run 10900 : analysis plots
Friday
224872 03/18/11 23:59 buddhini Analysis: Opps! this is for run 10898
224871 03/18/11 23:58 buddhini Analysis: Run 10899 : analysis plots
224870 03/18/11 23:36 buddhini Analysis: Run 10834 : DS and US Lumi yields and asymmetryies
224869 03/18/11 23:36 smithg Target: recommend closing 16" GV during beam off vacuum excursions
224868 03/18/11 23:35 Armstrong Does Beam Modulation mess up the Compton DAQ?
224867 03/18/11 23:34 buddhini Analysis: Run 10898 : Main detector properties
224866 03/18/11 23:32 buddhini Analysis: Run 10898 : Beam Properties
224863 03/18/11 23:24 buddhini Turned on Beam Modulation around 260k event of run 10900
224860 03/18/11 23:04 buddhini Stopped the COMPTON photon detector CODA after a long series of TS and ROC error messages..
224859 03/18/11 23:03 Armstrong Target Screenshots
224858 03/18/11 23:02 Armstrong Target Screenshots & Status
224850 03/18/11 22:37 Armstrong More vacuum bizzare behaviour
224842 03/18/11 22:19 buddhini Turned off bMOd again. It was started with run 10899 but again Compton daq got error messages.
224838 03/18/11 22:07 buddhini Moved the Optologic Box power suplies to a spot down in the power strip.
224836 03/18/11 21:50 dalton Compton: okay it's working
224833 03/18/11 21:44 dalton Compton: ccomptl1 reboot
224831 03/18/11 21:38 buddhini Beam modulation was turned off around 700k events in run 10898
224819 03/18/11 21:21 buddhini Started beam modulation.
224807 03/18/11 20:43 buddhini Analysis: Run 10897 : DS and US Lumi yields and asymmetryies
224806 03/18/11 20:42 buddhini Analysis: Run 10897 : Main detector properties
224802 03/18/11 20:41 buddhini Analysis: Run 10897 : Beam Properties
224799 03/18/11 19:47 buddhini Analysis: Run 10896 : DS and US Lumi yields and asymmetryies
224798 03/18/11 19:47 mack Looks like BCM1,2 got their mojo back
224796 03/18/11 19:46 buddhini Analysis: Run 10896 : Main detector properties
224795 03/18/11 19:45 buddhini Analysis: Run 10896 : Beam Properties
224794 03/18/11 19:45 buddhini Again a bad entry. So ignore this post.
224790 03/18/11 19:33 buddhini Analysis: Run 10895 : Beam Properties
224789 03/18/11 19:29 dalton Compton: HELP! I can't configure CODA
224788 03/18/11 19:21 buddhini End of injector run 2269
224781 03/18/11 19:11 buddhini The reason for the large double difference in run 10893
224779 03/18/11 18:55 buddhini Analysis: Run 10895 : DS and US Lumi yields and asymmetryies
224778 03/18/11 18:54 buddhini Analysis: Run 10895 : Main detector properties
224777 03/18/11 18:53 buddhini Analysis: Run 10895 : Beam Properties
224776 03/18/11 18:48 buddhini sorry! this is a wrong post!
224775 03/18/11 18:42 buddhini QwFeedback has been running happily.
224774 03/18/11 18:40 buddhini Started injector 2269
224773 03/18/11 18:38 buddhini Analysis: Run 10894 : DS and US Lumi yields and asymmetryies
224772 03/18/11 18:37 buddhini Analysis: Run 10894 : BCM double differences
224771 03/18/11 18:37 buddhini Analysis: Run 10894 : Main detector properties
224770 03/18/11 18:36 buddhini Run 10894 : Beam Properties
224769 03/18/11 18:31 buddhini Beam positions
224768 03/18/11 18:23 buddhini Halo rates from archiver
224767 03/18/11 18:16 buddhini BCM double differences inproved
224765 03/18/11 18:09 Armstrong Shift Summary: screen shots
224761 03/18/11 17:59 buddhini High halo rates
224760 03/18/11 17:58 Armstrong Beam has large halo
224759 03/18/11 17:57 buddhini Compton rates and cavity power fluctuations
224757 03/18/11 17:45 Armstrong QTor trip
224756 03/18/11 17:39 buddhini Beam back. Taking production data!
224752 03/18/11 17:24 Pitt/Mei Report of work done on DSLUMI5 during access
224751 03/18/11 17:22 cdaq Run 10892 Pedestal Data
224748 03/18/11 17:16 buddhini Injector capture is fixed. May ge beam back in another 20-30 mins.
224746 03/18/11 17:01 smacewan Fixed qwick analyzers
224744 03/18/11 16:54 mack attempting to address BCM1,2 noise increase: unplugged RII HDC power supplies at about 13:35
224743 03/18/11 16:53 narayan Compton
224738 03/18/11 16:18 buddhini No beam for another hour (hopefully)
224737 03/18/11 16:02 cdaq Beam Time Accounting
224736 03/18/11 16:01 AK Opper Shift Summary: Day Shift summary
224734 03/18/11 15:51 Armstrong vacuum and beam correlation redux
224732 03/18/11 15:49 Jiawei Target: late entry: moved to LH2 target
224731 03/18/11 15:42 Pitt/Mei DSLUMI5 works finally!
224730 03/18/11 15:30 AK Opper Beam
224728 03/18/11 15:23 AK Opper status
224727 03/18/11 15:19 buddhini Analysis: Charge asymmetry fluctuations seen in the injector during run 2268 taken last night.
224722 03/18/11 14:27 jmammei QwAC shifts
224720 03/18/11 14:04 AK Opper status
224718 03/18/11 13:43 dalton RC daily summary
224716 03/18/11 13:15 smithg posted a few of Andy's pics to the docdb
224714 03/18/11 13:04 AK Opper HWP
224713 03/18/11 13:00 AK Opper Going to low current running
224712 03/18/11 12:58 Jiawei Target: Moved to DS 4% Al target
224711 03/18/11 12:57 Armstrong Vacuum and beam correlation
224710 03/18/11 12:46 jhlee Analysis: modified first100k to reduce a workload on cdaql4
224708 03/18/11 12:43 benesch Beam: 3H07A harp trace
224707 03/18/11 12:41 AK Opper status
224706 03/18/11 12:41 gaskell Moller results, Friday March 18, 2011
224700 03/18/11 12:01 gaskell Moller done: backing out
224688 03/18/11 11:35 gaskell Moller: epics info during IHWP=OUT running (smaller AQ)
224680 03/18/11 11:11 gaskell Moller: adjusted PITA voltages, RHWP
224675 03/18/11 10:59 gaskell Moller: epics info during IHWP=OUT running
224674 03/18/11 10:58 jhlee several first100k test result
224669 03/18/11 10:30 rakithab Analysis: QwFeedback: devel version is Updated for the PITA slope for IHWP IN state
224668 03/18/11 10:30 gaskell Moller: epics info during IHWP=IN running
224663 03/18/11 10:12 rakithab Beam: Analysis: PITA slope calculated from the large charge asymmetries for IHWP IN state
224661 03/18/11 10:08 Jiawei Target: silent the raster alarm for moller study
224652 03/18/11 09:54 kenyon Pictures from window change out
224642 03/18/11 09:28 jhlee fixed the run number mismatch
224633 03/18/11 09:11 gaskell Moller setup
224632 03/18/11 09:10 AK Opper HV off
224631 03/18/11 09:06 Jiawei Target: Target: move out of beam
224615 03/18/11 08:46 AK Opper & N Run Control run number
224604 03/18/11 08:27 Armstrong Vacuum in VCG3H09DTr for last 2 days
224594 03/18/11 08:02 Dutta Shift Summary: Owl Shift summary
224593 03/18/11 08:02 cdaq Beam Time Accounting
224592 03/18/11 08:02 Nuruzzaman Target: Target GUI and strip charts screen shots at end of OWL shift
224589 03/18/11 07:55 Nuruzzaman QTOR Hall probe oscillation during OWL shift.
224586 03/18/11 07:41 Nuruzzaman Analysis: Plots for production run 10860.
224583 03/18/11 07:27 Dutta Run number mismatch
224578 03/18/11 07:23 Dutta DAQ crashed with TS unresponsive and end of run failed
224577 03/18/11 07:23 Nuruzzaman Beam current and vacuum 3H09D status for OWL shift.
224572 03/18/11 06:37 Nuruzzaman Analysis: Plots for production run 10859.
224562 03/18/11 05:50 Nuruzzaman Analysis: Plots for production run 10858.
224559 03/18/11 05:08 Dutta End of run failed for run 10857, due to EB crash
224550 03/18/11 04:51 Nuruzzaman Target: Target GUI and strip charts screen shots
224549 03/18/11 04:44 Nuruzzaman Analysis: Plots for production run 10857.
224538 03/18/11 03:37 Nuruzzaman Analysis: Plots for production run 10856.
224513 03/18/11 02:24 Nuruzzaman Analysis: Plots for rn 10855, back to production run.
224505 03/18/11 02:05 Nuruzzaman Analysis: Plots for rn 10854, during large charge asymmetry test.
224497 03/18/11 01:56 Nuruzzaman Analysis: Plots for rn 10853, during large charge asymmetry test.
224494 03/18/11 01:47 Nuruzzaman Analysis: Plots for rn 10852, during large charge asymmetry test.
224491 03/18/11 01:43 Nuruzzaman Analysis: Plots for rn 10851, during large charge asymmetry test.
224489 03/18/11 01:38 Nuruzzaman Analysis: Plots for rn 10850, during raster frequency test.
224486 03/18/11 01:36 Nuruzzaman Analysis: Plots for rn 10849, during raster frequency test.
224485 03/18/11 01:36 mack perhaps due to small drifts in beam position
224479 03/18/11 01:27 Nuruzzaman Analysis: Plots for rn 10848, during raster frequency test.
224478 03/18/11 01:23 Nuruzzaman Analysis: Plots for rn 10847, during raster frequency test.
224476 03/18/11 01:22 Nuruzzaman Analysis: Plots for rn 10846, during raster frequency test.
224474 03/18/11 01:20 Dutta Beam: IHWP moved to IN position
224473 03/18/11 01:20 Nuruzzaman Analysis: Plots for rn 10845, during raster frequency test.
224472 03/18/11 01:19 pking Summary of raster frequency study on LH2
224470 03/18/11 01:16 Nuruzzaman Analysis: Plots for rn 10844, during raster frequency test.
224468 03/18/11 01:13 Nuruzzaman Analysis: Plots for rn 10842, during raster frequency test.
224467 03/18/11 01:11 Nuruzzaman Analysis: Plots for rn 10841, during raster frequency test.
224466 03/18/11 01:08 Nuruzzaman Analysis: MD barsum for run 10839 & 10840
224462 03/18/11 01:04 buddhini Shift Summary: Swing shift
224459 03/18/11 00:44 Nuruzzaman Target: Target GUI and strip charts screen shots
224456 03/18/11 00:27 buddhini Shift check list
224451 03/18/11 00:09 cdaq Beam Time Accounting
224449 03/18/11 00:05 buddhini Run 10837 : Cause for the non-gaussian distributions in LUMIs
Thursday
224442 03/17/11 23:30 buddhini end of injector run 2268
224440 03/17/11 23:26 cdaq Beam Time Accounting
224437 03/17/11 23:21 buddhini Started injector run 2268
224436 03/17/11 23:17 buddhini Analysis: Run 10837 : DS and US Lumi yields and asymmetryies
224435 03/17/11 23:16 sxyang analysis: plots for production run 10831
224434 03/17/11 23:16 buddhini Analysis: Run 10837 : Main detector properties
224433 03/17/11 23:14 buddhini Analysis: Run 10837 : Beam Properties
224430 03/17/11 23:04 sxyang analysis: plots for production run 10838
224425 03/17/11 22:50 buddhini Beam off for the start of Pauls raster frequency tests.
224421 03/17/11 22:45 sxyang analysis: plots for production run 10836
224418 03/17/11 22:38 buddhini Raster changed to 3.5 x 3.5
224413 03/17/11 22:26 buddhini Analysis: Run 10836 : DS and US Lumi yields and asymmetryies
224412 03/17/11 22:24 sxyang analysis: plots for production run 10835
224411 03/17/11 22:17 buddhini Analysis: Run 10836 : Beam Properties
224410 03/17/11 22:02 buddhini Analysis: Run 18035 : Cause of the tail in md3pos yield distribution.
224405 03/17/11 21:40 buddhini Run 10835 : DS and US Lumi yields and asymmetryies
224404 03/17/11 21:39 buddhini Analysis: Run 10835 : Main detector properties
224403 03/17/11 21:38 buddhini Analysis: Run 10835 : Beam Properties
224402 03/17/11 21:20 buddhini Analysis: Run 10834 : DS and US Lumi yields and asymmetryies
224401 03/17/11 21:16 buddhini BCM charge asymmetry width fluctuations
224400 03/17/11 20:55 sxyang missing plot from analysis of run 10834
224399 03/17/11 20:52 sxyang analysis: plots for production run 10834
224396 03/17/11 20:21 buddhini The first 100K rootfiles of these runs were not properly closed.
224393 03/17/11 20:13 sxyang bad runs
224392 03/17/11 20:11 buddhini BPM positions
224391 03/17/11 20:03 buddhini Beam modulation is OFF from run 10834
224390 03/17/11 19:53 sxyang analysis: plots for production run 10828
224388 03/17/11 19:46 buddhini Actually QTOR had crashed not tripped. So we did the QTOR crash recovery and now it is ramping up again.
224386 03/17/11 19:38 buddhini QTOR tripped! Reset and ramping up again.
224383 03/17/11 19:26 buddhini Turned off beam modulation. Killed coda and restarted.
224374 03/17/11 19:05 buddhini Beam modulation is now ON.
224371 03/17/11 19:02 buddhini Beam modulation was off during run 10289.
224370 03/17/11 18:57 pking Analysis: Modified first100k script to properly call the new analyzer (no more zero_tokens support)
224367 03/17/11 18:35 sxyang pretty good vacuum
224365 03/17/11 18:20 dalton Return of beam help vacuum
224364 03/17/11 18:15 buddhini Started the charge feedback
224363 03/17/11 18:15 sxyang the result of pump leakage check
224359 03/17/11 18:03 sxyang moved the LH2 target in again
224358 03/17/11 18:02 buddhini Got 50 uA beam
224357 03/17/11 18:00 sxyang moved the target out of beam position
224356 03/17/11 17:52 buddhini Target: Late entry, target was moved home to take tune beam.
224355 03/17/11 17:38 Ramesh Analysis: bcm1,2,5,6 yield for run range 9812-10120
224354 03/17/11 17:33 buddhini Analysis: FFT plots of X and Y in injector run 2267
224353 03/17/11 17:30 sxyang moved to LH2 target
224352 03/17/11 17:24 buddhini Hall C comming out of controlled access. Going to beam permit.
224351 03/17/11 17:21 pking Analysis: Updated QwAnalysis/1.08 prminput and Extensions to reversion 2678
224350 03/17/11 17:07 pking Analysis: Changed "QwAnalysis/devel" to be a link to "QwAnalysis/1.08"
224349 03/17/11 16:38 cdaq Beam Time Accounting
224348 03/17/11 16:25 buddhini Hall is still in controlled access. Waiting for the leack checks to finish.
224347 03/17/11 16:10 rajotte Day Shift summary
224346 03/17/11 15:49 AK Opper Target: Target screen shot
224345 03/17/11 15:27 rajotte general tool & HV snapshot
224344 03/17/11 15:10 gaskell Moller cooldown complete
224343 03/17/11 13:33 pking Corrected the inhibit logic for the helicity error buzzer.
224339 03/17/11 12:41 Pitt Work on DSLUMI5 during earlier access
224336 03/17/11 12:16 buddhini Analysis: FFT of injector bpm X and Y signals during run 2263
224333 03/17/11 11:19 AK Opper Target: 4K JT
224332 03/17/11 10:47 Armstrong update: called for full sweep
224329 03/17/11 10:18 AK Opper Still more on Beam Dump pressure
224328 03/17/11 10:07 AK Opper more on Beam Dump pressure
224327 03/17/11 10:07 pking Analysis: Restored qweak_maindet_pedestal.10229-.map on cdaq machines
224326 03/17/11 09:58 AK Opper Beam: Beam Dump pressure
224325 03/17/11 09:31 rajotte Access to work on LUMI5
224324 03/17/11 09:28 rajotte first100k run 10821
224323 03/17/11 09:23 AK Opper QTOR alarm set point
224320 03/17/11 09:20 magee Coulomb counter works - not on general tools screen
224319 03/17/11 09:17 pking Analysis: Main detector pedestal file for 10229 is gone
224318 03/17/11 08:58 saw Qtor high limit is too Low
224316 03/17/11 08:42 AK Opper QTOR current diff
224314 03/17/11 08:39 AK Opper Target: Target change
224312 03/17/11 08:35 gaskell starting Moller cooldown
224311 03/17/11 08:35 magee Analysis: NEW shift Coulomb counter
224310 03/17/11 08:31 rakithab Shift Summary: OWL Shift summary
224308 03/17/11 08:27 rajotte End of injector run 2267
224307 03/17/11 08:22 rajotte first100k run 10820
224306 03/17/11 08:03 cdaq Beam Time Accounting
224305 03/17/11 07:58 rakithab Analysis: QwFeedback: devel version is Updated for the PITA slope for IHWP OUT state
224302 03/17/11 07:47 gaskell Compton: GSO test runs 3/17/2011
224299 03/17/11 07:40 Nuruzzaman Analysis: Plots for production run 10819 with 30 uA at begining 100 uA during the end.
224298 03/17/11 07:39 narayan Compton: e-detector status
224297 03/17/11 07:36 narayan Compton: e-detector HV taken upto 500V
224296 03/17/11 07:35 rakithab Analysis: PITA slope calculated from the large charge asymmetries
224295 03/17/11 07:33 Nuruzzaman Beam current and QTOR status for OWL shift.
224294 03/17/11 07:29 Nuruzzaman Target: Target GUI and strip-chart screen shots, end of owl shift.
224280 03/17/11 06:43 Nuruzzaman Analysis: Plots for production run 10818 with 30 uA.
224279 03/17/11 06:39 rakithab Beam: Large Charge asymmetry runs summary
224277 03/17/11 06:38 gaskell Compton: new FADC out, old FADC in
224268 03/17/11 06:18 Nuruzzaman Analysis: Plots for production run 10817.
224267 03/17/11 06:15 rakithab QTOR recovered
224265 03/17/11 05:59 rakithab trying to recover
224261 03/17/11 05:46 gaskell Compton: GSO rates at 1700 V, 150 uA
224260 03/17/11 05:45 rakithab Turned Feedback ON at the beginning of the run 10817
224258 03/17/11 05:43 rakithab Set PC to norminal state. Large charge asymmetry runs were finished.
224257 03/17/11 05:42 rakithab EB 4 crashed at the end of the run 10816.
224254 03/17/11 05:35 rakithab Large negative charge asym. Set PC hardware counts to offset of 1000
224250 03/17/11 05:29 rakithab Large negative charge asym. Set PC hardware counts to offset of 2500
224243 03/17/11 05:18 gaskell Compton: backgrounds and scintillator HV
224239 03/17/11 05:00 rakithab Large positive charge asym. Set PC hardware counts to offset of 1000
224237 03/17/11 04:51 rakitha Large positive charge asym. Set PC hardware counts to offset of 2500
224233 03/17/11 04:47 rakithab Turned off charge feedback for the large charge asym. runs
224231 03/17/11 04:46 rakithab PC values before large charge asym runs
224230 03/17/11 04:43 narayan Compton: Beam modulation turned off during run # 10810
224229 03/17/11 04:28 rakithab Beam: Late Entry:Beam Loss issues are fixed now.
224228 03/17/11 04:22 Nuruzzaman QTOR Hall probe was showing communication error. Fixed now.
224225 03/17/11 04:12 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
224224 03/17/11 04:07 Nuruzzaman Analysis: Plots for production run 10810.
224223 03/17/11 04:00 rakithab Turned ON the beam modulation
224222 03/17/11 03:47 rakithab Beam tune at 150uA
224219 03/17/11 03:39 rakithab CAEN HV and General tools snapshots
224218 03/17/11 03:08 rakithab Analysis: MD yields appear to be unrealistic in the text summaries.
224217 03/17/11 03:07 mack position differences look encouraging
224213 03/17/11 02:25 rakitha MCC taking the beam OFF for hall c due to beam loss issues
224211 03/17/11 02:08 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
224210 03/17/11 02:04 Nuruzzaman Analysis: Plots for production run 10807 with LH2.
224207 03/17/11 01:37 Nuruzzaman Analysis: Plots for pedestal run 10805.
224206 03/17/11 01:36 rakithab Beam loss issues preventing Hall C beam going over 130uA. Keep trying to go to the 150uA
224205 03/17/11 01:34 rakithab Halo rates and BPM positions at about 130uA
224204 03/17/11 01:09 narayan Compton: e-detector lowered
224199 03/17/11 00:49 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D.
224198 03/17/11 00:42 rakitha Turned charge feedback ON, taking a run (10804) during beam ramp up
224196 03/17/11 00:40 jhoskins Swing Shift summary
224195 03/17/11 00:36 rakithab Turned current mode MD, Lumi and Halo ON
224194 03/17/11 00:22 cdaq Beam Time Accounting
224193 03/17/11 00:17 jhlee turn on autoanalyzers on cdaql5/7/8 and add them into cronjob for parity runs
224192 03/17/11 00:16 Nuruzzaman Target: Target GUI and strip charts screen shots
Wednesday
224191 03/16/11 23:59 kamyers bcm and DAQ ready for production mode
224190 03/16/11 23:43 Armstrong Target: Move back to lH2; have about 1950 W
224189 03/16/11 23:39 kamyers Dilution Measurement Part II Summary
224188 03/16/11 23:29 jhoskins KAtherine/Mack Program is finished -- switching back
224184 03/16/11 23:16 Armstrong Target: move to DS 2% Be target
224181 03/16/11 22:45 jhoskins GeneralTools && HV GUI
224178 03/16/11 22:40 rajotte First 25% sample slug numbers entered in the database for DS 4% Al
224173 03/16/11 21:46 kamyers effect of Hall A turning on
224172 03/16/11 21:43 jhlee turn off autoanalyzers
224171 03/16/11 21:37 Armstrong Target: set alarm limits on VCG3H09D
224168 03/16/11 21:20 Armstrong Target: horizontal motion problem; go to DS centering hole
224165 03/16/11 21:15 cdaq Raster Map and BPMs : Run 10796, event range 295000 - 315000
224164 03/16/11 21:13 cdaq Raster Map and BPMs : Run 10796, event range 40000 - 60000
224162 03/16/11 21:04 Pitt Lumi pedestals from Run 10872
224161 03/16/11 20:58 Pitt DSLUMI5 work today
224160 03/16/11 20:50 Pitt Region 2 rotator work
224144 03/16/11 19:58 Armstrong Target: move to 0.5% DS C target; checked Fan differential Pressure mask
224142 03/16/11 19:51 jhoskins Target Centering scan : DONE
224140 03/16/11 19:50 cdaq Raster Map and BPMs : Run 10787, event range 35000 - 55000
224137 03/16/11 19:41 cdaq Raster Map and BPMs : Run 10786, event range 30000 - 50000
224135 03/16/11 19:35 Armstrong Target: move to DS centering hole
224134 03/16/11 19:18 kamyers turned off ROC's 9 and 10
224130 03/16/11 18:59 cdaq Beam Time Accounting
224128 03/16/11 18:53 kamyers turned on ROC's 9 and 10
224127 03/16/11 18:46 jhoskins Preparing to sweep hall and close up
224126 03/16/11 18:44 kamyers whoops, switched mps before this run was over
224124 03/16/11 18:43 rob MD event-mode checks out okay
224123 03/16/11 18:43 kamyers switched to fake 10 Hz mps
224122 03/16/11 18:40 mack some preparatory checklist items
224121 03/16/11 18:32 Armstrong Target: screen shot with filled target
224120 03/16/11 18:22 Armstrong Target: move out of beam
224119 03/16/11 17:31 smithg,lecke Target: Subcooling now
224118 03/16/11 17:13 rob helicity error buzzer now plays nice with tracking DAQ
224117 03/16/11 17:12 Pitt Region 2 HDC leakage currents and FAST OR rates
224115 03/16/11 17:08 Pitt Region 2 HDC checkout after rotator work
224114 03/16/11 16:40 brads cpslow.jlab.org backup location and instructions
224113 03/16/11 16:33 sxyang Snapshots of HV and GeneralTools GUI
224112 03/16/11 16:29 sxyang Day Shift Summary
224111 03/16/11 16:27 jhoskins Lumis turned on. Took lumi pedestal for Mark P.
224107 03/16/11 16:17 smithg,lecke Target: Evaporator seems to be helping cooldown
224104 03/16/11 16:10 dalton Runplan overnight
224102 03/16/11 15:51 jhlee Backplan Disbribution Card and its signal distribution cards are back
224096 03/16/11 14:59 smithg,opper Target: Cooldown not working
224094 03/16/11 14:46 brads cpslow is back up
224090 03/16/11 14:05 rob MD current-mode HV off
224089 03/16/11 13:19 gaskell Compton: quit laser controls
224084 03/16/11 11:13 smithg/opper Target: cooldown status
224083 03/16/11 10:52 Leckey R3 in 1+5 Position
224075 03/16/11 09:54 Dalton Beam: Feedback slope changed
224074 03/16/11 09:30 smithg/opper Target: started cooldown
224073 03/16/11 09:13 Pitt Message from PD: Thursday beam studies moved to today
224072 03/16/11 09:12 sxyang restricted access
224071 03/16/11 09:08 sxyang still waiting for the restricted access
224070 03/16/11 09:04 sxyang hall c controlled access
224069 03/16/11 08:50 Smith, Opper Target: Beamline valve
224068 03/16/11 08:46 Pitt Hall will go to restricted access
224067 03/16/11 08:41 sxyang ramp the QTOR down
224066 03/16/11 08:36 Pitt Plan for Wednesday day shift
224065 03/16/11 08:29 narayan Compton: detector parked
224064 03/16/11 08:01 cdaq Beam Time Accounting
224063 03/16/11 08:00 Dutta Shift Summary: Owl Shift summary
224062 03/16/11 07:59 Dutta Shift Summary: Owl Shift summary
224058 03/16/11 07:50 Nuruzzaman Target: Target GUI and strip charts screen shot at the end of owl shift
224055 03/16/11 07:40 Nuruzzaman Analysis: Plots for run 10769
224050 03/16/11 07:18 Pitt Evolving target full part of "dilution" measurement
224043 03/16/11 06:41 Nuruzzaman Analysis: Plots for run 10768
224031 03/16/11 06:13 Nuruzzaman Analysis: Plots for run 10767
224030 03/16/11 05:51 Dutta Beam: IHWP changed from IN to OUT
224027 03/16/11 05:25 dalton Compton: Ramping up HV on GSO
224025 03/16/11 05:10 Nuruzzaman Analysis: Plots for run 10766
224022 03/16/11 04:33 Nuruzzaman Analysis: Plots for run 10765
224011 03/16/11 03:11 Nuruzzaman Target: Target GUI and strip charts screen shots
224010 03/16/11 03:05 Nuruzzaman Analysis: Plots for run 10764
224001 03/16/11 02:06 Nuruzzaman Analysis: Plots for run 10763
223994 03/16/11 00:56 Nuruzzaman Analysis: Plots for run 10762
223993 03/16/11 00:40 buddhini Analysis: Run 10761 : DS Lumi Properties
223992 03/16/11 00:39 buddhini Analysis: Run 10761 : Main detector properties.
223991 03/16/11 00:39 buddhini Analysis: Run 10761 : Beam Properties
223990 03/16/11 00:33 pking Summary of raster frequency study
223989 03/16/11 00:33 buddhini Weird signal bumps in DS lumis
223988 03/16/11 00:32 rakithab Shift Summary: Swing Shift summary
223987 03/16/11 00:24 buddhini Analysis: Run 10760 : DS Lumi Properties
223986 03/16/11 00:22 Dutta Main det. yields for run 10761
223985 03/16/11 00:20 Nuruzzaman Target: Target GUI and strip charts screen shots
223984 03/16/11 00:18 buddhini Analysis: Run 10760 : Main detector properties.
223983 03/16/11 00:17 buddhini Analysis: Run 10760 : Beam Properties
223981 03/16/11 00:13 buddhini Analysis: Run 10759 : DS Lumi Properties
223980 03/16/11 00:12 buddhini Analysis: Run 10759 : Main detector properties.
223979 03/16/11 00:11 buddhini Analysis: Run 10759 : Beam Properties
223978 03/16/11 00:08 cdaq Beam Time Accounting
223977 03/16/11 00:08 buddhini Analysis: Run 10758 : DS Lumi Properties
223976 03/16/11 00:07 buddhini Analysis: Run 10758 : Main detector properties.
223975 03/16/11 00:05 buddhini Opps! This is actually from run 10757
223974 03/16/11 00:04 buddhini Analysis: Run 10758 : Beam Properties
223972 03/16/11 00:00 buddhini Analysis: Run 10757 : DS Lumi Properties
Tuesday
223971 03/15/11 23:59 buddhini Analysis: Run 10757 : Main detector properties.
223970 03/15/11 23:58 budd Analysis: Run 10756 : Beam Properties
223968 03/15/11 23:53 budd Analysis: Run 10756 : DS Lumi Properties
223966 03/15/11 23:51 buddhini Analysis: Run 10756 : Main detector properties.
223965 03/15/11 23:50 buddhini Analysis: Run 10756 : Beam Properties
223964 03/15/11 23:44 buddhini Analysis: Run 10755 : DS Lumi Properties
223962 03/15/11 23:40 buddhini Analysis: Run 10755 : Main detector properties.
223961 03/15/11 23:39 buddhini Analysis: Run 10755 : Beam Properties
223959 03/15/11 23:32 buddhini Analysis: Run 10754 : DS Lumi Properties
223958 03/15/11 23:30 buddhini Run 10754 : Main detector properties.
223957 03/15/11 23:29 buddhini Run 10754 : Beam Properties
223954 03/15/11 23:18 rakithab DAQ: EB4 crashed. CODA reset at the end of the run 10757
223944 03/15/11 22:32 rakithab CAEN HV and Qweak Generaltools snaps
223943 03/15/11 22:29 buddhini Run 10751 : DS Lumi Y sensitivities
223941 03/15/11 22:26 buddhini Run 10751 : DS Lumi Properties
223940 03/15/11 22:25 buddhini Run 10751 : Main detector properties.
223939 03/15/11 22:23 buddhini Run 10751 : Beam Properties
223935 03/15/11 22:02 rakithab High halo rates observed with new optics settings
223934 03/15/11 22:00 rakithab QwFeedback: charge feedback is running
223932 03/15/11 21:53 rakithab DS 4% Al target Production running set
223931 03/15/11 21:48 rakithab Scanner parked at 0,0 mm
223930 03/15/11 21:46 cdaq Raster Map and BPMs : Run 10750, event range 0 - 20000
223926 03/15/11 21:35 cdaq Raster Map and BPMs : Run 10749, event range 5000 - 25000
223925 03/15/11 21:34 covrig Target: reset the h-motion step counter
223922 03/15/11 21:28 cdaq Raster Map and BPMs : Run 10748, event range 0 - 20000
223920 03/15/11 21:23 buddhini Target : Moved to 4% DS Al target
223919 03/15/11 21:17 cdaq Raster Map and BPMs : Run 10747, event range 0 - 20000
223916 03/15/11 21:14 rakithab Beam on DS centering hole
223915 03/15/11 21:10 rakithab Scanner moved to 0, -90 mm
223914 03/15/11 21:01 buddhini Target: Moved to DS centering hole
223913 03/15/11 21:00 rakithab Ramping QTOR to 8921A
223912 03/15/11 20:23 Pitt Link to Jay Benesh Log Entry about Moller off optics
223911 03/15/11 20:23 rakithab Raster map 1.0 uA, with a 12x12 mm2 raster
223908 03/15/11 20:16 rakithab Switched to fake 1Hz MPS
223907 03/15/11 20:14 rakithab Ramping QTOR to zero for the raster map
223906 03/15/11 20:12 rakithab BPM tune before raster map
223905 03/15/11 20:06 Rakithab New Tune with the Moller Quads OFF
223904 03/15/11 20:04 Pitt Run plan for remainder of swing and Wednesday Owl
223903 03/15/11 19:41 Pitt Moller Quad Power Supply Situation
223902 03/15/11 19:40 rakithab Beam: Tune beam in the Hall C
223901 03/15/11 19:33 pking Analysis: Moved "QwAnalysis/devel" to "QwAnalysis/devel.2011.03.13" and made a link to it.
223900 03/15/11 18:06 rakithab Beam: Hall C Beam Permit delayed due to Moller Quads power supply OFF
223899 03/15/11 18:04 smithg Target: FIXED! Waa-hoo!
223898 03/15/11 17:21 rakithab Hall C is going to Beam Permit
223897 03/15/11 16:53 rakithab QTOR ramping up to 8921A
223896 03/15/11 16:47 gaskell Moller and Compton: power outage
223895 03/15/11 16:47 saw Qtor reset after power outage
223894 03/15/11 16:22 rakithab Target: Target IOC rebooted
223893 03/15/11 16:13 cdaq Beam Time Accounting
223892 03/15/11 16:09 Armstrong Alarm: HMS A/C Blower Fault
223891 03/15/11 16:00 AK Opper Shift Summary: Day Shift summary
223890 03/15/11 15:27 buddhini Complete list of runs taken during todays injector studies (ctd)
223889 03/15/11 15:09 suhring Hall C Voltage Tap Change
223888 03/15/11 15:07 buddhini List of runs taken during todays injector studies.
223887 03/15/11 14:58 saw Rebooted vmec15
223886 03/15/11 14:38 jhlee why TS0 does have connection to cagwhlc.acc.jlab.org?
223885 03/15/11 14:35 jhlee trigger supervisor returns here here here errors and more
223884 03/15/11 14:26 buddhini Finished injector studies.
223881 03/15/11 13:32 Armstrong How to turn off Fast Raster and how to check its frequencies
223880 03/15/11 12:56 pking Tested retuning raster frequencies; backed out of changes
223879 03/15/11 12:38 buddhini Starting Rotatable Half Wave Plate (RHWP) studies.
223878 03/15/11 12:34 buddhini Changed accelerator MPS back to 960 Hz.
223877 03/15/11 12:31 pking Fast raster "Vertical" frequency generator was not active; restored normal behavior
223876 03/15/11 12:21 jhlee update pedestal files for main detector with Revision 2654 on cdaq cluster
223875 03/15/11 12:13 Pitt/Macewan Reconnected DSLUMI5 current mode base
223874 03/15/11 12:03 buddhini Started injector data analysis on ou-qweak4. Please don't start any other analysis in there.
223873 03/15/11 12:01 smithg Target: The mains IS too high!
223872 03/15/11 11:50 buddhini Changed accelerator MPS to 120 Hz for injector studies.
223870 03/15/11 11:37 buddhini Injector run 2238 was taken when Riad was changing helicity magnets dac settings
223866 03/15/11 11:11 cdaq Run 10743 Pedestal Data
223860 03/15/11 10:43 smacewan GeneralTools QTor change
223859 03/15/11 10:31 saw re: R3 Rotator Controlls OK - Hall C Switch
223858 03/15/11 10:26 buddhini Running injector daq via an ops machine for injector studies. Please don't use it for anything else.
223857 03/15/11 10:25 AK Opper Injector DAQ
223856 03/15/11 10:21 smacewan/opp restarted qwfeedback
223853 03/15/11 10:07 jhoskins re: R3 Rotator Controlls OK
223852 03/15/11 10:04 Armstrong Note on Region 3 Rotator controls
223851 03/15/11 09:59 brads re: R3 Rotator Controlls OK
223850 03/15/11 09:47 Leckey R3 Rotator Controlls OK
223849 03/15/11 09:35 AK Opper QTOR at zero amps
223848 03/15/11 09:28 smacewan Rebooted g0ioc2 :: HV GUI's back online
223847 03/15/11 09:15 smacewan HV GUI Still down. Cannot open *any* hv GUI's
223846 03/15/11 09:15 Armstrong Sweep is complete
223845 03/15/11 09:14 AK Opper EPICS Scaler IOC
223844 03/15/11 09:09 AK Opper Beam: BCM 1 & 2 gains
223843 03/15/11 08:12 cdaq Beam Time Accounting
223842 03/15/11 08:10 Armstrong Target status
223841 03/15/11 08:00 Dutta Called for controlled access
223839 03/15/11 07:57 Dutta Shift Summary: Owl Shift summary
223838 03/15/11 07:39 Dutta DAQ crashed
223837 03/15/11 07:38 Nuruzzaman Target: QWT_DSdmB status for OWL shift.
223835 03/15/11 07:35 Nuruzzaman Correction Plots: I submitted few wrong plots. Here are the correct plots.
223834 03/15/11 06:56 Nuruzzaman Analysis: Some plots for run 10738
223832 03/15/11 06:41 Nuruzzaman Generaltools screen shot.
223830 03/15/11 06:25 Nuruzzaman Target: Target GUI and strip charts screen shots
223829 03/15/11 06:05 Nuruzzaman Q1HallP does not show up in EPICS Archiver.
223828 03/15/11 05:57 Nuruzzaman QTOR Status.
223827 03/15/11 05:49 Nuruzzaman Analysis: Main Detector allbarsum asymmetries for run 10735(QTOR OFF) & 10737(QTOR ON)
223826 03/15/11 05:44 Dutta Beam: QTOR was OFF since 21:30, ramped back to 8921
223825 03/15/11 05:36 Nuruzzaman HV GUI is not working.
223816 03/15/11 02:41 Nuruzzaman Target: QWT_DSdmB status after increase in current.
223814 03/15/11 02:05 Nuruzzaman Beam: Beam current increased to 25 uA.
223811 03/15/11 01:54 manos Reanalyzed injector run, Dx, Dy and Aq along injector
223808 03/15/11 00:36 smithg Target: pump controller mains voltage too high
223807 03/15/11 00:34 Nuruzzaman Target: Target GUI and strip charts screen shots
223806 03/15/11 00:33 jhlee reboot ou-qweak4 (INJ analysis pc) and qweakl1 (scanner control pc) in order to do system update.
223805 03/15/11 00:27 jhlee too late entry for boot parameter of vmeregion3
223804 03/15/11 00:04 cdaq Beam Time Accounting
Monday
223803 03/14/11 23:59 jhlee From Run 10731, qwparity analyzer l use map files with Revision 2646
223802 03/14/11 23:58 jhoskins Swing Shift
223801 03/14/11 23:57 jhlee update Parity/prminput directory on cdaq cluster
223799 03/14/11 23:39 rakithab Target: Moved to DS 4% Al target
223798 03/14/11 23:17 cdaq Run 10730 Pedestal Data
223797 03/14/11 22:39 jhlee autoanalzyer will pick up runs from 10731
223796 03/14/11 22:36 jhlee start autoanalyzers and add them into cronjob
223795 03/14/11 22:25 rakithab Target: Target IOC rebooted then power cycled
223794 03/14/11 22:24 cdaq Run
223793 03/14/11 22:24 smacewan Target: reset target ioc and cycled power
223792 03/14/11 22:21 Pitt Run plan: Tuesday Owl and Tuesday Day
223791 03/14/11 22:20 jhoskins Rotator arms out of beam[w/notes]
223790 03/14/11 22:20 jhlee turned off ROC9 and ROC10
223789 03/14/11 22:17 rob CM LED checkout passed
223788 03/14/11 22:17 rob CM LED checkout passed
223787 03/14/11 22:13 Pitt Access report - switching back to current mode running
223784 03/14/11 22:04 smithg Target: Pump won't restart
223774 03/14/11 21:22 smithg Target: Refilled loop. Reset valves. Can't restart pump.
223772 03/14/11 20:54 kamyers all EM HV off
223765 03/14/11 20:41 kamyers fixed typo
223762 03/14/11 20:33 kamyers Dilution Measurement Summary (real one)
223760 03/14/11 20:29 jhoskins HVGUI/Gen.Tools
223753 03/14/11 20:07 smithg Target: Evacuated target cell. Turned off pump & HPH. Moved to "LH2"=MT cell.
223734 03/14/11 18:44 smithg Target: moved to 1/2% C tgt
223733 03/14/11 18:42 smithg Target: Moved to DS centering hole
223730 03/14/11 18:39 cdaq Raster Map and BPMs : Run 10707, event range 5000 - 25000
223727 03/14/11 18:20 Pitt HDC leakage currents and Fast OR rates at lowest pressure setting
223726 03/14/11 18:18 Pitt HDC and VDC hit plots
223725 03/14/11 18:13 smithg Target: Action plan for running with cell evacuated
223720 03/14/11 17:53 smithg,covri Target: Striptools for 18.1 psia, 68 K dilution msrmnt
223719 03/14/11 17:46 cdaq Beam Time Accounting
223717 03/14/11 17:29 kamyers BPM locks turned on, updated BPM positions
223715 03/14/11 17:24 kamyers current beam positions
223705 03/14/11 16:45 covrig, smit Target: half pressure target loop
223703 03/14/11 16:42 kamyers Dilution Measurement Summary
223699 03/14/11 16:13 rob second try: md2- repaired
223697 03/14/11 16:07 kamyers Shift Summary: Day Shift Summary
223690 03/14/11 15:17 Armstrong HDCs and VDCs are ON (plot_HDC)
223689 03/14/11 15:12 Armstrong Hokie Fast OR rates at 0.5 nA
223688 03/14/11 15:09 kamyers Region 2 leakage current at 0.5 nA cold ga
223685 03/14/11 14:50 Armstrong VDCs turned back on
223684 03/14/11 14:48 smithg Target: Restrict 15K JT changes to < 1%/min
223683 03/14/11 14:44 kamyers current setpoints for this run
223682 03/14/11 14:42 smithg,opper Target: Target Screenshots & Status
223674 03/14/11 13:23 smithg,opper Target: target status
223672 03/14/11 13:18 cdaq Raster Map and BPMs : Run 10688, event range 50000 - 70000
223670 03/14/11 13:02 smithg,opper Target: liquid has boiled away
223668 03/14/11 12:46 rob md2- down for the count
223666 03/14/11 12:06 rob MD2- signal looks fishy
223663 03/14/11 11:51 smithg,opper Target: warmup continuing but slowly
223654 03/14/11 11:29 rajotte Injector analyzer for run 2237 finished
223653 03/14/11 11:28 kamyers end of run failed, reset event builder
223651 03/14/11 11:10 rob summary of MD HV changes
223650 03/14/11 10:43 smithg,opper Target: Deliberate warmup for dilution msrmnts
223648 03/14/11 10:15 rajotte Starting the analyzer on saturday's injector run 2237
223647 03/14/11 09:57 Pitt Return Halo Monitor High Voltages to Normal
223646 03/14/11 09:25 dalton Compton table scintillators off
223643 03/14/11 09:02 Pitt Beam on and off halo rates
223642 03/14/11 08:59 AK Opper Target: target change
223639 03/14/11 08:53 Pitt Halo voltages - with attachment this time
223638 03/14/11 08:52 Pitt Halo monitor voltages for the 120 nA running
223637 03/14/11 08:46 Pitt Halo voltages before I increase them
223634 03/14/11 08:29 gunning Analysis: raster
223632 03/14/11 08:14 Dutta Shift Summary: Owl Shift summary
223630 03/14/11 08:07 cdaq Beam Time Accounting
223628 03/14/11 08:01 Adesh and Al Target: screens shot
223627 03/14/11 08:00 AK Opper Target: target change
223622 03/14/11 07:51 Adesh Owl shift: Gen. Tools & HV snapshot
223620 03/14/11 07:49 Adesh Turned off EM Lumis & R2 wire chambers HVs.
223619 03/14/11 07:46 Dutta HDC and VDC and Lumi detectors turned OFF
223610 03/14/11 06:17 Adesh Target: Moved to Optics 12345 target
223606 03/14/11 05:51 Adesh Target: Moved to Optics 1235 target
223604 03/14/11 05:26 Adesh Target: Moved to Optics 15 target
223601 03/14/11 05:00 Adesh Target: Moved to Optics 3 target
223598 03/14/11 04:32 Adesh Target: Moved to Optics 135 target
223595 03/14/11 04:04 Adesh Target: Moved to US key target
223593 03/14/11 03:41 Dutta Reset ROC9 and ROC10
223588 03/14/11 03:20 Dutta HDCs tripped
223576 03/14/11 02:52 Dutta For keyhole target, the HDCs also show only half the planes
223575 03/14/11 02:52 Adesh Target: Moved to Optics 135 target
223573 03/14/11 02:46 Dutta for US keyhole target, Yoda and Han do not have hits
223569 03/14/11 02:20 Adesh Target: Moved to US key target
223566 03/14/11 01:52 Adesh Target: Moved to DS 4% Al target
223563 03/14/11 01:20 Dutta End of run failed for Run 10652
223562 03/14/11 01:12 Adesh Target: Moved to US 1% Al target
223561 03/14/11 00:48 Pitt Run Plan for Remainder of Swing Shift and Owl Shift
223560 03/14/11 00:37 Pitt Log of HDC Threshold Scan and VDC High Voltage Scan
223555 03/14/11 00:12 Jiawei General Tools and HV GUIs screenshot
223552 03/14/11 00:09 cdaq Beam Time Accounting
223551 03/14/11 00:06 sxyang Swing Shift summary
223550 03/14/11 00:03 Jiawei Target: End of swing shift screenshot
Sunday
223545 03/13/11 23:44 sxyang typo
223537 03/13/11 23:06 Pitt Reduce Hokie 2 High Voltages - Special Test
223536 03/13/11 22:58 Pitt Details of the Rate Dependent HDC Study - runs 10641 - 10643
223530 03/13/11 22:08 Pitt Region 2 HDC Thresholds
223529 03/13/11 22:06 Pitt Fast Raster off for Runs 10637 - 10640
223527 03/13/11 22:00 sxyang QTOR current change
223523 03/13/11 21:10 sxyang VDC plots
223522 03/13/11 21:07 sxyang hdc plots
223519 03/13/11 20:48 rajotte Runlet and slug plots from Saturday's 70uA run
223518 03/13/11 20:36 sxyang run 10637 is a junk run
223517 03/13/11 20:35 sxyang vdc spectrum
223516 03/13/11 20:29 Pitt HDC problem fixed
223512 03/13/11 20:21 Pitt IHA3H07B superharp scan at 50 pA
223511 03/13/11 20:16 sxyang the qtor rest button
223510 03/13/11 20:15 Pitt "50 pA" beam re-established in the Hall
223509 03/13/11 20:00 Pitt All high voltages on
223508 03/13/11 19:52 sxyang QTOR problem fixed
223507 03/13/11 19:36 Pitt QTOR failing to ramp
223506 03/13/11 19:27 Pitt Access work - some lumis to current mode, HDC electronic channel fix
223495 03/13/11 17:54 leacock added uslumi3- to md3-,
223494 03/13/11 17:53 leacock ramping QTOR to 0A
223492 03/13/11 17:43 Pitt Run Plan for Remainder of Event Mode Run
223475 03/13/11 16:54 leacock ramping QTOR to 8921
223468 03/13/11 16:29 Armstrong QTor Scan - online plot
223459 03/13/11 16:10 cdaq Beam Time Accounting
223456 03/13/11 16:07 Pitt Brief RC Status Report
223453 03/13/11 16:04 rajotte Day Shift summary
223450 03/13/11 15:59 rajotte scaler rates vs Qtor current
223448 03/13/11 15:56 leacock dslumi HV to 1500V
223446 03/13/11 15:55 narayan Target: End of day shift screenshot
223445 03/13/11 15:52 leacock turning off VDC HV
223444 03/13/11 15:52 leacock ramping QTOR to 0A
223439 03/13/11 15:39 leacock dslumi typical spectra triggered on dslumi6
223433 03/13/11 15:22 Pitt Leakage estimate for earlier "50 pA" running
223428 03/13/11 15:08 leacock coda EB crash
223421 03/13/11 14:37 Pitt Leakage check: rates with Hall A and C on
223419 03/13/11 14:23 leacock rates at beginning of lumi EM test
223418 03/13/11 14:15 leacock dslumi HV to 1500V
223417 03/13/11 14:13 rajotte Switched all MD HV off
223416 03/13/11 14:13 Armstrong VDC voltages
223415 03/13/11 14:12 rajotte EB4 not responding. Reset.
223414 03/13/11 14:10 Pitt Turn off HDCs
223413 03/13/11 14:07 Pitt HDC bank missing
223412 03/13/11 14:05 Pitt HDC running conditions at "50 pA"
223411 03/13/11 13:57 rajotte Vader & Leia outstanding wires (not seen before)
223410 03/13/11 13:49 rajotte Snapshot General tools and HVs
223408 03/13/11 13:42 rajotte R3 Drift chamber switch back on
223407 03/13/11 13:32 Pitt Fast raster
223406 03/13/11 13:31 Pitt IHA3H0B superharp scan
223405 03/13/11 13:06 Pitt HAll A and HAll C off
223404 03/13/11 13:05 Pitt Hall A on, HAll C off
223403 03/13/11 13:02 Pitt Hall A,C on ~ 25 pA
223402 03/13/11 12:56 Pitt Fast raster back on at 3.5 x 3.5
223401 03/13/11 12:49 Pitt Lumi monitors on
223400 03/13/11 12:48 Pitt 3H07B superharp scan at 10 nA
223399 03/13/11 12:45 Pitt Fast raster off for superharp scan
223398 03/13/11 12:42 Pitt Turn off trigger scintillator HV
223397 03/13/11 12:41 rajotte Ramping up Qtor to nominal 8921A
223396 03/13/11 12:41 Pitt MD,LUMI voltages off
223393 03/13/11 12:17 narayan Target: pump alarm and its limits
223391 03/13/11 12:15 leacock lumi event mode run plan
223390 03/13/11 12:13 Pitt VDCs trip at QTOR = 1000 A
223389 03/13/11 12:07 narayan R3 drift chamber tripped
223387 03/13/11 12:04 rajotte R3 Drift chamber alarm as we ramp done Qtor to 1000A
223377 03/13/11 11:19 Pitt Main Detector QDC spectra at QTOR = 2000 A
223375 03/13/11 11:14 Pitt Leakage from Hall A at 25 uA
223373 03/13/11 11:08 rajotte Vader and Leia U-plane every other wire missing
223362 03/13/11 10:20 Pitt Daylight Savings Time - with attachment
223361 03/13/11 10:20 Pitt Daylight savings time issues
223359 03/13/11 10:15 Pitt HAll A on, Hall C off scaler rates
223358 03/13/11 10:11 narayan Target: recurring "vmec18 unresponsive" message
223357 03/13/11 10:10 Pitt Hall A beam off, HAll C only
223356 03/13/11 10:08 Pitt Faraday cup in - no beam rates.
223355 03/13/11 10:05 Pitt Beam on rates before Faraday cup check
223353 03/13/11 09:50 cdaq Beam Time Accounting
223349 03/13/11 09:23 narayan Target: "vmec18 unresponsive" message
223338 03/13/11 08:19 Adesh Target: screenshot at the end of owl shift
223337 03/13/11 08:16 Adesh Owl shift: Gen. tools & HV snapshot
223336 03/13/11 08:13 Dutta Shift Summary: Owl Shift summary
223335 03/13/11 08:13 Dutta Shift Summary: Owl Shift summary
223302 03/13/11 05:22 Adesh Target: target computer rebooted itself
223278 03/13/11 01:47 jhlee Analysis of Run 10539 is done,
223263 03/13/11 00:07 Fatiha Shift Summary
223262 03/13/11 00:06 cdaq Beam Time Accounting
223261 03/13/11 00:00 Page Target: Noisy pump frequency readback - increased hi limit to 42 from 40 Hz
Saturday
223258 03/12/11 23:47 Pitt Run plan for Sunday Owl Shift - QTOR scan - Liguid Hydrogen
223251 03/12/11 22:44 Pitt DAQ Settings
223250 03/12/11 22:43 Pitt High Voltages ON
223249 03/12/11 22:39 Page Target: LH2 moved in, etc.
223248 03/12/11 22:33 Pitt Locks - fast and slow
223247 03/12/11 22:30 Pitt IHA3H07B superharp scan at 10 nA
223244 03/12/11 22:17 Pitt Beam positions at 3 uA with all locks off
223241 03/12/11 22:11 Pitt Beam position at 3 uA, locks on
223240 03/12/11 22:05 Pitt BCM 1/2 Gain Setting to 5
223239 03/12/11 21:58 Fatiha Injector run started at 21:23 and ended at 21:57
223237 03/12/11 21:53 Pitt Injector orbit energy lock not working
223236 03/12/11 21:49 Pitt First 100k Parity Conditions at 70 uA
223235 03/12/11 21:48 Fatiha Late entry: Mark switches to accelerator MPS @ 960 Hz
223234 03/12/11 21:41 Fatiha Charge Asymmetry chart
223233 03/12/11 21:25 Fatiha Injector run started at 21:23
223228 03/12/11 21:12 Pitt Halo and Compton Background Conditions at 70 uA
223224 03/12/11 21:04 Pitt Increasing beam current to 70 uA
223223 03/12/11 21:01 Pitt Raster changed to 4x4 mm^2
223222 03/12/11 21:00 Page Target: White alarms, due to VME15 reboot
223221 03/12/11 20:58 Pitt 3 uA beam current; Fast and Slow locks on
223220 03/12/11 20:45 Pitt Change to BCM gain setting 2
223219 03/12/11 20:42 Page Target: Pump frequency readback got noiser when target moved to HOME
223218 03/12/11 20:41 Pitt Beam positions at 3 uA before locks
223217 03/12/11 20:37 Page Target: Raised yellow alarm for QWT_phytron A by 1 K - temporary
223216 03/12/11 20:32 Pitt High Voltages Off
223215 03/12/11 20:32 Page Target: Moved LH2 out of beam - note Ypot value drifting
223214 03/12/11 20:31 Pitt IHA3H07B Superharp scan at 10 nA
223213 03/12/11 20:15 Pitt QDC spectra with MD OR-OR trigger
223211 03/12/11 20:05 Pitt ADC spectra with MD AND-OR trigger
223206 03/12/11 19:53 Fatiha HVs
223198 03/12/11 19:41 kamyers Jdp error, EB4 error end of run 10528
223184 03/12/11 18:47 magee vdc plots run 10522
223181 03/12/11 18:37 magee vdc plots run 10521
223177 03/12/11 18:04 Pitt Instructions for monitoring Compton when we try 70 uA later tonight
223176 03/12/11 17:49 Fatiha Scanner is set to 0,0
223175 03/12/11 17:38 Fatiha Asked for an other escorted access to rotate to 1 and 5
223173 03/12/11 17:27 Page Target: Screenshot, 10 nA tracking run in progress
223171 03/12/11 17:07 Fatiha Beam back
223170 03/12/11 16:49 Fatiha Hall in escorted access
223169 03/12/11 16:44 Fatiha Faraday Cup Run details (10518)
223168 03/12/11 16:41 Pitt Rates of Lumis, MD, and TS during current scan
223160 03/12/11 16:03 cdaq Beam Time Accounting
223159 03/12/11 16:01 Ramesh Shift Summary
223158 03/12/11 15:58 Ramesh Escorted access to rotate RIII chambers from 3,7 to 2,6 octant positions finished, going to go to beam permit
223156 03/12/11 15:49 Ramesh Gas shade hut temp 33 deg C
223155 03/12/11 15:35 Ramesh Snapshot for shift check list
223154 03/12/11 15:28 Ramesh Asked for escorted access to rotate RIII chambers from 3,7 to 2,6 octant positions
223149 03/12/11 15:08 sxyang vdc plots
223144 03/12/11 14:42 rakithab Scanner moved to 0,-90 position
223143 03/12/11 14:41 Ramesh Second escorted access of the shift for RIII chamber rotation finished, going to go to beam permit
223142 03/12/11 14:23 rakithab Turned on the scanner form the qweak cage
223140 03/12/11 14:21 Ramesh Asked for escorted access to rotate RIII chambers from 4,8 to 3,7 octant positions
223137 03/12/11 14:10 Armstrong VDC: present conditions
223135 03/12/11 14:06 rakithab plot_VDC for the run 10508
223134 03/12/11 14:03 Pitt Main Detector Event Mode Voltages after Changes
223132 03/12/11 14:00 sxyang md spectrum
223130 03/12/11 13:57 sxyang md spectrum
223129 03/12/11 13:57 mack the triumph of 8 bit technology?
223128 03/12/11 13:56 Pitt Increase 5p and 7p main detector event mode voltages
223127 03/12/11 13:52 sxyang md spectrum after first attmept of increasing the voltage
223126 03/12/11 13:52 Pitt Increase some event mode channels further
223125 03/12/11 13:49 Pitt Increase MD Event Mode Voltages by 50 V on several channel
223124 03/12/11 13:44 Pitt Modify MDC Event Mode Voltages
223123 03/12/11 13:44 sxyang md_spectrum
223120 03/12/11 13:20 Pitt Scanner HV on
223118 03/12/11 13:18 smithg Target: EV6814 was also closed a little
223117 03/12/11 13:16 Ramesh First escorted access to rotate RIII chambers finished, going to go beam permit
223115 03/12/11 12:54 Ramesh Asked for escorted access to rotate RIII chambers from 1,5 to 4,8
223112 03/12/11 12:49 Pitt Lumi Event Mode Voltages
223111 03/12/11 12:45 Pitt High voltages on - late entry
223110 03/12/11 12:43 smithg Target: Quenched the irksome flow oscillations!
223105 03/12/11 12:29 rakithab Target: Less cryo and temperature oscillations
223095 03/12/11 12:12 rakithab Target: Moved to LH2 target
223094 03/12/11 12:09 Pitt IHA3H07B superharp scan at 10 nA, 3.5 x 3.5 mm raster
223092 03/12/11 12:04 Pitt IHA3H07B superharp scan at 10 nA
223090 03/12/11 11:55 Pitt IHA3H07B Superharp Scan - all locks off - 3 uA
223088 03/12/11 11:44 Pitt Beam positions with orbit locks off
223087 03/12/11 11:38 Pitt BPM positions with most locks on
223086 03/12/11 11:37 Pitt IHA3H07B Superharp Scan
223085 03/12/11 11:24 Pitt Discussion with Jay about slow and fast locks
223084 03/12/11 11:21 benesch Beam: fast raster isn't off until CH turns the power supply off
223083 03/12/11 11:18 Pitt Fast Raster not completely off
223082 03/12/11 11:04 Pitt Current Beam positions
223081 03/12/11 11:03 Pitt IHA3H07B superharp scan - 3 uA - unrastered
223080 03/12/11 10:29 Pitt Superharp scan 3 uA - IHA3H0B - 3.5 x 3.5 mm raster
223078 03/12/11 10:16 Pitt BPM values with slow orbit lock off
223077 03/12/11 09:52 rakithab Target: Moved target to Out Of Beam position - HOME
223076 03/12/11 09:50 Ramesh Going to do super harp scan at 3 uA
223075 03/12/11 09:48 Pitt Trigger scintillator plots continued
223074 03/12/11 09:46 Pitt Reference histograms for Trigger Scintillator
223073 03/12/11 09:45 benesch Beam: 2.5 minute vacuum oscillation
223072 03/12/11 09:44 Pitt Main Detector QDC Spectra - continued
223070 03/12/11 09:38 Pitt Main Detector QDC spectra
223069 03/12/11 09:35 rakithab Analysis: Started first100k tracking analyzer starting from the run 10494
223066 03/12/11 09:27 cdaq Beam Time Accounting
223063 03/12/11 09:20 Pitt Useful analysis scripts
223058 03/12/11 09:03 rakithab DAQ: Rebooted after TS0 hanged up
223056 03/12/11 08:55 Ramesh Taking forever to end run 10490 due to TS0 warning
223048 03/12/11 08:22 Ramesh End of run 10486 failed
223047 03/12/11 08:13 Dutta Beam: Faraday cup reads 47nA at end of run 10485 (4% DS dummy, QTOR=coarse scan, 7300A)
223046 03/12/11 08:12 Dutta Shift Summary: Shift summary
223043 03/12/11 08:09 Adesh Target: Target GUI and strip charts screenshot at the end of owl shift
223042 03/12/11 08:02 Dutta Beam: Faraday cup reads 42nA at start of run 10485 (4% DS dummy, QTOR=coarse scan, 7300)
223041 03/12/11 08:01 Dutta Beam: Faraday cup reads 42nA at end of run 10484 (4% DS dummy, QTOR=coarse scan, 7000A)
223038 03/12/11 07:55 Dutta Beam: Faraday cup reads 44nA at end of run 10483 (4% DS dummy, QTOR=coarse scan, 6700A)
223037 03/12/11 07:54 Dutta Beam: Faraday cup reads 44nA at start of run 10484 (4% DS dummy, QTOR=coarse scan, 7000)
223034 03/12/11 07:50 Dutta Beam: Faraday cup reads 53nA at start of run 10483 (4% DS dummy, QTOR=coarse scan, 6700A)
223033 03/12/11 07:48 Dutta Beam: Faraday cup reads 53nA at end of run 10482 (4% DS dummy, QTOR=coarse scan, 6500A)
223030 03/12/11 07:44 Dutta Faraday cup reads 46nA at start of run 10482 (4% DS dummy, QTOR=coarse scan, 6500A)
223029 03/12/11 07:44 Dutta Beam: Faraday cup reads 46nA at end of run 10481 (4% DS dummy, QTOR=coarse scan, 5500A)
223026 03/12/11 07:31 Dutta Beam: Faraday cup reads 47nA at start of run 10481 (4% DS dummy, QTOR=coarse scan, 6000A)
223025 03/12/11 07:30 Dutta Beam: Faraday cup reads 47nA at end of run 10480 (4% DS dummy, QTOR=coarse scan, 5500A)
223022 03/12/11 07:23 Dutta Beam: Faraday cup reads 50nA at start of run 10480 (4% DS dummy, QTOR=coarse scan, 5500A)
223020 03/12/11 07:22 Dutta Beam: Faraday cup reads 50nA at end of run 10479 (4% DS dummy, QTOR=coarse scan, 5000A)
223018 03/12/11 07:18 Dutta Beam: Faraday cup reads 54nA at start of run 10479 (4% DS dummy, QTOR=coarse scan, 5000A)
223017 03/12/11 07:17 Dutta Beam: Faraday cup reads 54nA at end of run 10478 (4% DS dummy, QTOR=coarse scan, 4500A)
223014 03/12/11 07:10 Dutta Beam: Faraday cup reads 52nA at start of run 10478 (4% DS dummy, QTOR=coarse scan, 4500A)
223013 03/12/11 07:06 Dutta Beam: Faraday cup reads 52nA at end of run 10477 (4% DS dummy, QTOR=coarse scan, 4000A)
223010 03/12/11 07:02 saw vmec18 rebooted
223009 03/12/11 07:00 Dutta Beam: Faraday cup reads 44nA at start of run 10477 (4% DS dummy, QTOR=coarse scan, 4000A)
223008 03/12/11 06:59 Dutta Beam: Faraday cup reads 44nA at end of run 10476 (4% DS dummy, QTOR=coarse scan, 3500A)
223005 03/12/11 06:57 Dutta Beam: Faraday cup reads 50nA at end of run 10475 (4% DS dummy, QTOR=coarse scan, 3000A)
223004 03/12/11 06:54 Dutta Beam: Faraday cup reads 47nA at start of run 10475 (4% DS dummy, QTOR=coarse scan, 3000A)
223002 03/12/11 06:51 Dutta Beam: Faraday cup reads 50nA at start of run 10476 (4% DS dummy, QTOR=coarse scan, 3500A)
223001 03/12/11 06:51 Pitt Run plan for Saturday day shift
222998 03/12/11 06:44 Dutta Beam: Faraday cup reads 47nA at end of run 10474 (4% DS dummy, QTOR=coarse scan, 2500A)
222996 03/12/11 06:38 Dutta Beam: Faraday cup reads 41nA at start of run 10474 (4% DS dummy, QTOR=coarse scan, 2500A)
222995 03/12/11 06:36 Dutta Beam: Faraday cup reads 41nA at end of run 10473 (4% DS dummy, QTOR=coarse scan, 2000A)
222992 03/12/11 06:30 Dutta Beam: Faraday cup reads 50nA at start of run 10473 (4% DS dummy, QTOR=coarse scan, 2000A)
222987 03/12/11 06:26 Dutta Beam: Faraday cup reads 42nA at end of run 10470(4% DS dummy, QTOR=course scan, 1500A)
222984 03/12/11 06:20 Dutta Beam: Faraday cup reads 54nA at end of run 10470(4% DS dummy, QTOR=course scan, 1500A)
222983 03/12/11 06:18 Dutta Beam: Faraday cup reads 52nA at end of run 10467(4% DS dummy, QTOR=course scan, 1000A)
222976 03/12/11 06:02 Dutta Beam: Faraday cup reads 43nA at start of run 10467(4% DS dummy, QTOR=course scan, 1000A)
222969 03/12/11 05:41 Dutta Beam: Faraday cup reads 88nA at end of run 10464 (4% DS dummy, QTOR scan)
222968 03/12/11 05:26 Dutta Gen tools and hV settings snap shot
222967 03/12/11 05:23 Dutta Beam: target was 4% US dummy
222966 03/12/11 05:20 Dutta Beam: Faraday cup reads 90nA at start of run 10464 (4% DS dummy, QTOR scan)
222965 03/12/11 05:17 Dutta Beam: Faraday cup reads 76nA at end of run 10462 (8% DS dummy, QTOR=8921)
222961 03/12/11 05:13 Dutta Beam: target was 45 US dummy
222959 03/12/11 05:11 Dutta Beam: This entry refers to run 10461
222958 03/12/11 05:09 Dutta Beam: Faraday cup reads 56nA at start of run 10462 (8% DS dummy, QTOR=8921)
222957 03/12/11 05:06 Adesh Target: Moved to DS 8% Al target
222954 03/12/11 05:04 Dutta Beam: Faraday cup reads 58nA at end of run 10461 (pure US dummy, QTOR=8993)
222953 03/12/11 05:03 Dutta Beam: Faraday cup reads 53nA at start of run 10459 (pure US dummy, QTOR=8993)
222950 03/12/11 04:45 Dutta Beam: Beam off for 15 mins
222949 03/12/11 04:33 Dutta Beam: Faraday cup reads 58nA at start of run 10460 (4% US dummy, QTOR=8993)
222947 03/12/11 04:31 Adesh Target: Moved to US 4% Al target
222946 03/12/11 04:27 Dutta Beam: Faraday cup reads 54nA at end of run 10459 (pure US dummy, QTOR=8993)
222944 03/12/11 04:20 Dutta Beam: Faraday cup reads 53nA at start of run 10459 (pure US dummy, QTOR=8993)
222943 03/12/11 04:16 Adesh Target: Moved to US pure Al target
222940 03/12/11 04:12 Dutta Beam: Faraday cup reads 115nA at end of run 10458 (1% US dummy, QTOR scan)
222939 03/12/11 03:51 Dutta Beam: Faraday cup reads 98nA at start of run 10458 (1% uS dummy, QTOR scan)
222937 03/12/11 03:49 Adesh Target: Moved to US 1% Al target
222935 03/12/11 03:45 Dutta Beam: Faraday cup reads 59nA at end of run 10457 (4% US dummy, QTOR=8993)
222934 03/12/11 03:35 Dutta Beam: Faraday cup reads 61nA at start of run 10457 (4% US dummy, QTOR=8993)
222933 03/12/11 03:34 Dutta run 10456 was at QTOR=8921 not 8993
222931 03/12/11 03:32 Adesh Target: Moved to US 4% Al target
222929 03/12/11 03:29 Dutta Beam: Faraday cup reads 79nA at start of run 10456 (4% US dummy, QTOR=8993)
222926 03/12/11 03:23 Dutta Beam: Faraday cup reads 93nA at end of run 10455 (8% DS dummy, QTOR=8921)
222925 03/12/11 03:22 Adesh Target: Moved to DS 8% Al target, 4K mass flow & 4K Inlet temperature readout have white screen
222924 03/12/11 03:20 Dutta Faraday cup reads 84nA at start of run 10455 (8% DS dummy, QTOR=8921)
222921 03/12/11 03:12 Dutta Beam: Faraday cup reads 108nA at end of run 10454 (4% DS dummy, QTOR scan)
222920 03/12/11 02:54 Dutta Beam: Faraday cup reads 99nA at start of run 10454 (4% DS dummy, QTOR scan)
222918 03/12/11 02:51 Adesh Target: Moved to DS 4% Al target
222917 03/12/11 02:50 Dutta Beam: Faraday cup reads 116nA at end of run 10453 (8% DS dummy, QTOR=8921)
222915 03/12/11 02:44 Dutta Faraday cup reads 94nA at start of run 10453 (8% DS dummy, QTOR=8921)
222914 03/12/11 02:43 Adesh Target: late entry Moved to DS 8% Al target
222909 03/12/11 02:25 Dutta Faraday cup reads 93nA at end of run 10451 (2% US dummy, QTOR scan)
222908 03/12/11 02:15 Dutta runs 10439-10447 have wrong prescale
222907 03/12/11 02:07 Dutta Faraday cup reads 87nA at start of run 10451 (2% UP dummy, QTOR scan)
222899 03/12/11 01:47 Adesh Target: Moved to US 2% Al target
222897 03/12/11 01:44 Dutta Beam: Faraday cup reads 110nA at end of run 10447
222896 03/12/11 01:26 jhlee turned off ROC9 and ROC10
222895 03/12/11 01:21 Dutta Beam: Faraday cup reads 120nA at start of run 10447
222893 03/12/11 01:14 Adesh Target: Moved to DS 4% Al target
222892 03/12/11 01:13 Dutta Beam: Faraday cup reads 47 nA at end of run 10466
222890 03/12/11 01:01 Dutta Beam: Faraday cup measures 64 nA at begining of run 10446
222889 03/12/11 01:00 Dutta Beam: Beam current changed to 65 nA
222886 03/12/11 00:53 Dutta Beam: MCC having RF issues
222873 03/12/11 00:29 cdaq Beam Time Accounting
222871 03/12/11 00:21 Adesh Target: moved to 8% DS Al tgt
222870 03/12/11 00:07 jhoskins Swing Shift summary
Friday
222869 03/11/11 23:51 Page Scanner parked, controller and HV off
222868 03/11/11 23:37 Page/Hoskins US centering target map
222864 03/11/11 23:25 Page Target: Moved to US centering target
222863 03/11/11 23:20 Page/Hoskins DS centering target
222860 03/11/11 23:05 Page Target: moved to DS centering target
222859 03/11/11 23:03 Page Target: Target 'parked' (sort of)
222858 03/11/11 22:51 jhoskins QTOR bac to 8921 -- starting centering scan
222857 03/11/11 22:50 Page Raster Map, W plug
222854 03/11/11 22:42 jhoskins Starting W-plug scan [for real this time....]
222853 03/11/11 22:03 Pitt Changed fake MPS back to 1 Hz
222852 03/11/11 21:56 Pitt Run plan - slight modification
222851 03/11/11 21:39 smithg Target: mea culpa
222850 03/11/11 21:15 Pitt Run plan for Friday swing and Saturday Owl shifts
222849 03/11/11 21:00 Page Scanner power is on - remember to turn it off later
222848 03/11/11 20:40 Page Target: Pump head back, sort of ...
222847 03/11/11 20:17 jhoskins General Tools && HV GUI
222846 03/11/11 20:15 Page Target: Target is NOT ok ....
222845 03/11/11 19:44 cdaq Beam Time Accounting
222844 03/11/11 19:27 jhoskins Escorted access to close target valves
222843 03/11/11 19:25 Pitt More explanation of superharp scans
222842 03/11/11 19:13 rob HV on for raster mapping; scanner in position.
222841 03/11/11 19:07 jhoskins Ramping QTOR to ZERO
222840 03/11/11 19:06 jhoskins Starting W-plug scan
222839 03/11/11 18:58 Pitt IHA3H07B superharp scan
222838 03/11/11 18:40 Pitt Superharp IHA3H07BIR
222837 03/11/11 18:39 smithg Target: vacuum looking just fabulous!
222836 03/11/11 18:30 smithg Target: We have liquid.
222835 03/11/11 18:30 kamyers use 1Hz fake mps for dilution
222833 03/11/11 18:27 brads 'Advanced' hclog make entry page
222828 03/11/11 17:52 jhoskins Status thus far this evening
222827 03/11/11 17:51 gaskell Compton: moved "user" photon signal channel
222825 03/11/11 17:45 smithg Target: condensing at a nice clip
222823 03/11/11 17:31 gaskell Compton: GSO off
222822 03/11/11 17:25 benesch Beam: great 3C20 harp trace
222821 03/11/11 16:58 smithg Target: started condensing
222820 03/11/11 16:30 Page Turned off TS HV's
222819 03/11/11 16:23 saw Qtor at 8921
222818 03/11/11 16:21 mack rest of the Qweak cage RG8 to BNC connectors were tight except for MD2+,3+,4+ LEDs
222817 03/11/11 16:16 Page Beam: Note on injector setup
222816 03/11/11 16:03 mack tightened a connection on the Qweak cage patch panel
222811 03/11/11 15:46 saw Qtor slight trouble, now on at 100A
222810 03/11/11 15:46 mack re-installed shelf for collimator 2 plug (the shelf, not the plug)
222787 03/11/11 15:12 Armstrong References on VDC operation: high voltage and threshold
222785 03/11/11 14:59 rakithab Changed the bcm1 gain to 5 for low current running
222784 03/11/11 14:38 smithg Target: IV status
222783 03/11/11 14:34 smithg Downstream vacuum looks great!
222782 03/11/11 14:08 Pitt Status
222781 03/11/11 13:37 kamyers TS plots - normal
222780 03/11/11 13:22 rakithab CAEN HV and General tools snapshots
222777 03/11/11 13:07 kamyers TS problem from bad connection?
222772 03/11/11 11:54 leacock dslumi config change -- evens 2 cm closer to beam and even preamps 1Mohm
222771 03/11/11 11:45 mack Background detectors moved to superelastic region in octant 3
222770 03/11/11 11:18 covrig Target: started opening the 4K JT
222761 03/11/11 10:21 pking Killed remaining two long running MySQL queries
222757 03/11/11 09:37 kamyers something wrong with TS2
222755 03/11/11 09:26 Jiawei Target: start to open the 15K JT valve to cool down the target
222753 03/11/11 09:08 leacock TS2 rate cut in half at 8:20, crane?
222752 03/11/11 09:01 smithg,Jiawe Target: started cooldown
Thursday
222749 03/10/11 23:00 pking MySQL on cdaql6 was spiking up; killed two long running queries.
222731 03/10/11 18:03 Pitt Region 2 Beam Off Leakage Currents
222730 03/10/11 17:13 smithg Target: pumped/purged H2 bollte line after sample was drawn
222725 03/10/11 16:14 jhlee screen shots for day shift
222724 03/10/11 16:13 cdaq Beam Time Accounting
222692 03/10/11 13:58 dalton Compton: FADC swap
222672 03/10/11 12:47 mack/jmei miscellaneous photos of upstream QTOR region
222628 03/10/11 09:57 jhlee HallA is cooling down their target
222626 03/10/11 09:49 Pitt RC Daily Report
222611 03/10/11 08:37 kenyon Exit window photos
Wednesday
222610 03/09/11 22:22 rob late entry: md em base released
222609 03/09/11 22:17 mack photo of how RII rotation binds on some Pb donut frosting
222606 03/09/11 19:43 Pitt Status - Exit Window Leak
222579 03/09/11 18:38 smithg reference pumpdown last December looked better
222564 03/09/11 18:12 gaskell Compton: swapped FADC
222562 03/09/11 17:20 smithg Downstream vacuum not recovering very well. Chiller is toast.
222561 03/09/11 17:12 jhlee switch ACC MPS and Parity DAQ
222555 03/09/11 16:46 jhlee update F1TDC status (Mar 9, 2011) and reserve on BDC from the fast electronics group
222554 03/09/11 16:44 covrig Target: closed 4K JT valve
222548 03/09/11 16:34 jhlee update DAQ configuration screen
222547 03/09/11 16:34 jhlee update DAQ configuration screen
222546 03/09/11 16:30 donjones Compton: new scaler channel added for Compton
222544 03/09/11 15:23 benesch Beam: dump viewer
222543 03/09/11 15:21 sxyang the chance of cooling down the target tomorrow
222526 03/09/11 14:11 smithg bellows update
222512 03/09/11 13:27 leacock scanner causes noise in MD
222510 03/09/11 12:32 rob exercising scanner
222506 03/09/11 12:00 Armstrong Coffee machine relocation
222505 03/09/11 08:37 saw Beam: Superharp variables added to the Hall C Epics archiver
Tuesday
222504 03/08/11 20:44 smithg Analysis: Estimates of N2 ice formation on the tgt window from the bad vacuum
222503 03/08/11 18:11 Pitt Region 2 Beam Off Leakage Currents
222501 03/08/11 17:35 saw Bellows replacement status
222497 03/08/11 17:27 mack survey of GEM enclosure finds no unusual hot spots near US Lumi 7
222496 03/08/11 17:00 rob MD EM HV off; one LED cable out of place
222494 03/08/11 16:58 rob md5+ event-mode no longer obviously weird.
222491 03/08/11 16:52 leacock cdaql8 mouse missing -- replaced with dead cdaql3's working mouse
222481 03/08/11 16:16 rob MD EM HV on
222479 03/08/11 16:08 R. Michaels status after RC meeting
222461 03/08/11 14:03 jhlee update F1TDC status (Mar 8, 2011)
222460 03/08/11 13:39 pking Analysis: Killed three stuck MySQL queries
222459 03/08/11 13:36 Armstrong Trent A. removes function generator
222453 03/08/11 11:42 smacewan swapped out md5+ em base for a spare
222450 03/08/11 11:21 R. Michaels info about the status
222444 03/08/11 11:10 smacewan switched MD LED cables to 'negative' tubes
222443 03/08/11 10:50 smacewan turned off all em md except for md5+
222442 03/08/11 10:38 jhlee reproduce "token stuck" error with Run 10351
222437 03/08/11 09:54 hamlet The GEM detector and 2 scintiliators taken out from Hall C
222432 03/08/11 09:16 jhlee Run 10334 is bad, see the entry 222416
222427 03/08/11 08:49 jhlee Start Injector Run 2235 for testing
222416 03/08/11 00:59 jhlee Token stuck error of BDC for F1TDCs
Monday
222415 03/07/11 20:04 mack minor BPM cable changes in BSY service building
222405 03/07/11 18:50 smacewan Restored previous HV to md5+ em
222404 03/07/11 18:46 smithg vacuum problems
222403 03/07/11 18:39 donjones Compton: disabled error reporting on CPSLOW
222402 03/07/11 18:29 rob changed MD5+ HV from 900V to 1000V
222401 03/07/11 18:11 smithg Target: tgt was moved in, then out to home again
222395 03/07/11 17:51 kamyers TS plots from cosmic run, CFD threshold 20 mV
222394 03/07/11 17:50 rob late entry: switched to parity DAQ: no tracking DAQ while people in hall
222385 03/07/11 17:27 beaufait run prep
222370 03/07/11 16:32 smacewan Rebooted vmec15
222367 03/07/11 16:18 R. Michaels RC meeting results
222357 03/07/11 15:42 mack BPM cable paths were touched
222354 03/07/11 15:31 rob moved MD LED cables to "minus" pmts; HV on
222348 03/07/11 15:16 kamyers switched to fake mps
222345 03/07/11 14:36 smacewan Changed channel 15 on epics_scaler.adl
222344 03/07/11 14:06 kamyers scintillator HV turned on
222343 03/07/11 12:53 smithg Target: closed mv41
222342 03/07/11 11:20 dalton Drive replaced, no outage
222341 03/07/11 10:01 saw Hall C cluster to go down at 11AM
Sunday
222340 03/06/11 21:05 mack remaining MD witness plates are in now
222338 03/06/11 15:31 mack nice burn spots on the MD glass witness plates
222337 03/06/11 15:21 EmmanuelK Sunday shift checklist
Saturday
222336 03/05/11 21:51 mack Testing out MD EM bases
222335 03/05/11 17:19 narayan shift checklist
222334 03/05/11 15:39 leacock lumi event mode checkout
222333 03/05/11 13:25 leacock plugged in VT scope in cage
Friday
222332 03/04/11 19:39 dalton QTor, ramped down and off
222331 03/04/11 18:02 beaufait Qtor repair.
222328 03/04/11 17:40 jhlee Tracking DAQ test is done
222325 03/04/11 16:45 R. Michaels results of today's RC meeting
222322 03/04/11 16:21 cdaq Test
222319 03/04/11 16:14 cdaq Test
222289 03/04/11 14:29 dalton ccomptl1 terminal error
222288 03/04/11 13:23 gaskell/dalt Compton: Hall A GSO detector installed
222287 03/04/11 13:03 leacock shift checklist -- most everything normal
222284 03/04/11 12:38 leacock region 2 checkout
222268 03/04/11 11:13 mack Hall probe zero tempco is indeed significant at these low fields.
222266 03/04/11 11:10 hamlet QTOR field with temperature
222253 03/04/11 10:03 jhlee switch FAKE 1Hz MPS, and unplug missed helicity gate alarm
Thursday
222252 03/03/11 18:29 jhlee Swithed to ACC MPS.
222251 03/03/11 18:26 jhlee/rakith finish to test Tracking DAQ
222240 03/03/11 17:24 saw Qtor field stabilty and reproducibility
222223 03/03/11 17:00 rakithab Switched to 1Hz Fake MPS
222218 03/03/11 16:25 R. Michaels RC meeting notes
222217 03/03/11 15:35 jhlee start a work to switch Parity DAQ to Tracking DAQ
222216 03/03/11 11:20 Arthur GEM disconnected
222215 03/03/11 08:43 R. Michaels Info from the RC
Wednesday
222214 03/02/11 18:55 wdconinc Compton: Enabled automatic log entries for electron detector DAQ
222206 03/02/11 18:33 benesch Qtor current vs time
222189 03/02/11 16:41 wdconinc Compton: Replaced FADC with 4V input range board
222184 03/02/11 15:50 leacock Target: opened 4K JT valve from 0% to 100%
222180 03/02/11 15:45 leacock ramping QTOR to 8921
222167 03/02/11 14:49 leacock all uslumi bases now have switched BNC connectors
Tuesday
222147 03/01/11 17:25 Page This stuff might be helpful if it happens again ...
222145 03/01/11 17:20 jhlee This Run 10283 is not ended properly due to EB crashed
222144 03/01/11 17:19 jhlee use the external clock 20MHz as clock signals of VQWKs
222122 03/01/11 13:15 Armstrong A small clarification to what Buddhini's note said
222121 03/01/11 12:58 jhlee comments about emittances
222120 03/01/11 12:25 buddhini Ended injector run 2234.
222119 03/01/11 12:24 buddhini Relation between position differences and normalized emittance (update)
222118 03/01/11 11:35 buddhini Started injector run 2234 during Jays programe
222117 03/01/11 11:11 buddhini Ended injector run 2233
222116 03/01/11 10:55 pking Reprogrammed g0inj boot parameters
222115 03/01/11 10:51 buddhini Started injector run 2233 during beam studies.
222111 03/01/11 09:08 buddhini/Han We are running the injector daq for injector studies. Please don't try to run it anywhere else.