Uploads by Hyde
From HallCWiki
Jump to navigationJump to searchThis special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
13:31, 26 May 2023 | DVCS-kin-NPS-2023 v1.xlsx (file) | 134 KB | "Pessimistic" scenario for NPS DVCS 2023 run: Lower CEBAF 3, 4, 5-pass energies: 6.281, 8.330, 10.368 GeV (corrected for synchrotron losses). | 1 | |
12:15, 19 June 2023 | NPS Background Dose.pdf (file) | 2.32 MB | Summary of previous MC estimates of DVCS background rates, and Hall A running experience | 1 | |
12:17, 19 June 2023 | NPS base irradiation resultsv2.pdf (file) | 1.83 MB | Note on irradiation tests of the NPS PMT bases. V. Berdnikov, D. Mack | 1 | |
08:34, 10 July 2023 | NPS ElasticCalibrations.pdf (file) | 515 KB | Update with 4 pass and 5 pass calorimeter calibration settings, both at 9 m | 2 | |
12:32, 22 August 2023 | C2082 NPS-Survey.pdf (file) | 435 KB | Survey Report on alignment of NPS Calo track with SHMS Carriage readback | 1 | |
10:07, 28 August 2023 | DVCS-kin-NPS-2023 v0.xlsx (file) | 158 KB | Added alternate kinematics KinC_x25_3' in Column AC to increase gap between NPS and HMS. Other minor tweaks, additions. | 9 | |
08:04, 7 September 2023 | Phoebus.png (file) | 29 KB | From cuawiki page on NPS Slow Controls | 1 | |
12:49, 11 September 2023 | NPS VTP DAQ.pdf (file) | 108 KB | Corrected Units of some variables. Added readout parameters | 3 | |
14:27, 21 September 2023 | NPS DVCS RunPlan.pdf (file) | 211 KB | Updated details on KinC_x50_2 Updated Elastic Kinematics with 9.5 m calo at 5-pass | 6 | |
08:26, 30 October 2023 | Runsheet dvcs NPS.pdf (file) | 580 KB | Changed layout | 7 | |
09:13, 4 April 2024 | C2097 NPS Survey02Apr2024.pdf (file) | 107 KB | April 2 Survey results of Calo relative to SHMS. Disagrees by 0.3 deg from previous? | 1 | |
11:44, 15 April 2024 | NPS Completion 2024.pdf (file) | 151 KB | Updated end of 3-pass and final 4-pass running | 9 |