Difference between revisions of "Information for Shift Takers"

From HallCWiki
Jump to navigationJump to search
(→‎Target Operator: Added info on where the "correct" PS factors can actually be found.)
Line 51: Line 51:
 
** Compare 50k replay histograms with the sample ones and report to shift leader any unexplained differences. Hclog them.
 
** Compare 50k replay histograms with the sample ones and report to shift leader any unexplained differences. Hclog them.
 
** For the Pion Electroproduction experiment analysis instructions see [https://hallcweb.jlab.org/wiki/index.php/Pion-LT_analysis_instructions here].
 
** For the Pion Electroproduction experiment analysis instructions see [https://hallcweb.jlab.org/wiki/index.php/Pion-LT_analysis_instructions here].
 +
** For the VCS experiment, analysis instructions can be found [https://hallcweb.jlab.org/wiki/index.php/VCS_Instructions_for_Shift_Takers here].
 
* Fill [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm?shiftChecklistTypeId=2 shift checklist] once per shift.  
 
* Fill [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm?shiftChecklistTypeId=2 shift checklist] once per shift.  
 
** '''An older Shift Checklist file, which also includes help for locating items, should be available [https://hallcweb.jlab.org/document/Checklist/CurrentChecklist.pdf here].'''
 
** '''An older Shift Checklist file, which also includes help for locating items, should be available [https://hallcweb.jlab.org/document/Checklist/CurrentChecklist.pdf here].'''

Revision as of 13:45, 12 June 2019

Counting house: 6000(*), 5503, 6666 | Run coordinator: 757-270-8916 | MCC: 7047(*), 7046, 7048 | Crew chief: 7045 | Guard house: 8522

Before the start of your shift: read and understand the Safety Documentation for this experiment.

  • You must then sign in the Yellow Binder in the Hall C Counting House!

Detailed instructions for Shift Takers are available on the How-to page. If you encounter problems, look first at those instructions for assistance.

Current Run Plans

Your Responsibilities

Shift Leader

  • Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the HCLOG
  • Follow the run plan and co-ordinate switching to the next experimental configuration with other shift workers and the MCC as required.
  • Maintain and update the Shift Summary detailing the events which occur while on shift
    • This is done by starting the summary as a log entry titled "X Shift Summary" where X = Day, Swing, Owl
    • Save & edit the summary after ANY event of interest occurs, including accesses
    • This provides the readers with an up-to-date play by play of the current shift
    • See example: https://logbooks.jlab.org/entry/3402742
  • Record the purpose for every single run in the "Run list" binders. Blank forms for Fall 2018 can be found here.
  • Keep track of beam time accounting
  • Consult the daily run plans and communicate with the RC whenever problems happen that cannot be solved by shift workers.
  • Maintain data taking quality and an efficient use of beam time.

Target Operator

  • Watch the target, see Target Info
  • Start and stop the DAQ. Ensure the correct PS factors are being used.
    • Consult the run plan for estimated PS factors to be used for a given setting, adjust these up or down as needed
  • Assist the shift leader and third person with their duties

Third person

  • Make certain that the Hall-C Alarm Handler process is running. See Hall_C_Alarm_Handler.
    • If there are any alarms being ignored or silenced, find out why and enter this in the logbook.
    • Log any alarms when they occur.
  • Carry out online analysis of the data, including 50k replays for the HMS and SHMS
    • Compare 50k replay histograms with the sample ones and report to shift leader any unexplained differences. Hclog them.
    • For the Pion Electroproduction experiment analysis instructions see here.
    • For the VCS experiment, analysis instructions can be found here.
  • Fill shift checklist once per shift.
    • An older Shift Checklist file, which also includes help for locating items, should be available here.

How To's: Instructions and How-to's for common problems

GMP How To's: You may find useful procedural information here since Hall A and C are similar.

Read-only Shift Schedule

Summer 2019 Shift Signup