Difference between revisions of "Main Page"

From HallCWiki
Jump to navigationJump to search
Line 4: Line 4:
 
*[[Information for Shift Takers]]
 
*[[Information for Shift Takers]]
 
*[[KPP Run Plan]]
 
*[[KPP Run Plan]]
 +
** [https://hallcweb.jlab.org/DocDB/0008/000847/001/Hall_C_KPP_Demonstration-Mar2017-v8-final.pdf Hall C KPP Slides (final) [pdf]]
 
*[[Spring 2017 Commissioning Plan]]  
 
*[[Spring 2017 Commissioning Plan]]  
 
*[[RC daily meetings and daily runplan]]
 
*[[RC daily meetings and daily runplan]]

Revision as of 16:27, 23 March 2017

Hallcheader.jpg

Spring 2017 Commissioning Plans

Hall C Links

Hall C

Hall C is one of four experimental halls at JLab.

Hall C Computing.

Hall C in the Press.

Basic Equipment in Hall C

Beamline

HMS Detectors

SHMS Detectors

DAQ

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)
  • HMS and SHMS Collimator Control document.

Online Replay

Data Analysis

Monte Carlo

Hall C at 12 GeV