Difference between revisions of "Main Page"

From HallCWiki
Jump to navigationJump to search
Line 1: Line 1:
 
[[Image:hallcheader.jpg]]
 
[[Image:hallcheader.jpg]]
  
== Spring 2017 Commissioning Plans ==
+
 
 +
== Fall 2017 Commissioning Plans ==
 
*[[Information for Shift Takers]]
 
*[[Information for Shift Takers]]
*[[KPP Run Plan]]
 
** [https://hallcweb.jlab.org/DocDB/0008/000847/001/Hall_C_KPP_Demonstration-Mar2017-v8-final.pdf Hall C KPP Slides (final) [pdf]]
 
 
*[[Spring 2017 Commissioning Plan]]  
 
*[[Spring 2017 Commissioning Plan]]  
*[[RC daily meetings and daily runplan]]
 
 
*[[Experts on call]]
 
*[[Experts on call]]
 
*[[How-to]]
 
*[[How-to]]
 +
 +
== Spring 2017 KPP run ==
 +
*[[KPP Run Plan]]
 +
** [https://hallcweb.jlab.org/DocDB/0008/000847/001/Hall_C_KPP_Demonstration-Mar2017-v8-final.pdf Hall C KPP Slides (final) [pdf]]
 +
*[[RC daily meetings and daily runplan]] for KPP
  
 
= Hall C Links =
 
= Hall C Links =

Revision as of 08:44, 5 April 2017

Hallcheader.jpg


Fall 2017 Commissioning Plans

Spring 2017 KPP run

Hall C Links

Hall C

Hall C is one of four experimental halls at JLab.

Hall C Computing.

Hall C in the Press.

Basic Equipment in Hall C

Beamline

HMS Detectors

SHMS Detectors

DAQ

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)
  • HMS and SHMS Collimator Control document.

Online Replay

Data Analysis

Monte Carlo

Hall C at 12 GeV