Difference between revisions of "A1nd2n-ERR"
From HallCWiki
Jump to navigationJump to searchLine 47: | Line 47: | ||
|'''11:00''' || colspan="3"|Coffee Break | |'''11:00''' || colspan="3"|Coffee Break | ||
|- | |- | ||
− | |'''11:20''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/Pol._He3_target_installation_Hall_C_2019_ERR_power_point_Rev. | + | |'''11:20''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/Pol._He3_target_installation_Hall_C_2019_ERR_power_point_Rev._3-17Mar2018.pptx Installation Presentation] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.mpp [Schedule (MS Project)]] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.pdf [Schedule (PDF)]] (5) || Walter Kellner || 15+10 |
|- | |- | ||
|'''11:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/detector-systems_sawatzky_v1.pdf Spectrometer and detector system] (4) || Brad Sawatzky || 10+5 | |'''11:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/detector-systems_sawatzky_v1.pdf Spectrometer and detector system] (4) || Brad Sawatzky || 10+5 |
Revision as of 16:48, 17 March 2018
ERR Committee Members
- Pavel Degtiarenko
- Alexandre Deur
- Chris Keith (chair)
- Renuka Rajput-Ghoshal
- Bert Manzlak
- Michael Tiefenback
- Javier Gomez (observer)
- Ed Folts (observer)
Charge
Agenda • Monday March 19, 2018
Room: Cebaf Center L102
Bluejeans Connection Info
https://bluejeans.com/850126485
Phone Dial-in +1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) Global Numbers: http://bluejeans.com/numbers Meeting ID: 850 126 485
Program • Cebaf Center L102
Polarized He-3 Proposals
E12-06-110 (A1n)
Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C
- E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
- E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
- E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.
E12-06-121 (d2n-g2n)
- E12-06-121 (d2n-g2n) Proposal for PAC30
- E12-06-121 (d2n-g2n) Update for PAC36 (Grading PAC) - Approved for 29 PAC days. Updated to accommodate planned improvement in Target FoM.
E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)
- Pol_3He_Elastic_Measurement
- 3He Form Factor Double-Polarization Asymmetry Measurement Proposal