Difference between revisions of "Information for Shift Takers"
From HallCWiki
Jump to navigationJump to search (→Shift Leader: Removed redundant info) |
(→Target Operator: Added info on where the "correct" PS factors can actually be found.) |
||
Line 40: | Line 40: | ||
* Watch the target, see [https://userweb.jlab.org/~smithg/target/Qweak/#_12_GeV_Era Target Info] | * Watch the target, see [https://userweb.jlab.org/~smithg/target/Qweak/#_12_GeV_Era Target Info] | ||
* Start and stop the DAQ. Ensure the correct PS factors are being used. | * Start and stop the DAQ. Ensure the correct PS factors are being used. | ||
+ | ** Consult the run plan for '''estimated''' PS factors to be used for a given setting, adjust these up or down as needed | ||
* Assist the shift leader and third person with their duties | * Assist the shift leader and third person with their duties | ||
Revision as of 13:44, 12 June 2019
Counting house: 6000(*), 5503, 6666 | Run coordinator: 757-270-8916 | MCC: 7047(*), 7046, 7048 | Crew chief: 7045 | Guard house: 8522
Before the start of your shift: read and understand the Safety Documentation for this experiment.
- You must then sign in the Yellow Binder in the Hall C Counting House!
Detailed instructions for Shift Takers are available on the How-to page. If you encounter problems, look first at those instructions for assistance.
Current Run Plans
- RC daily meetings and daily run plan for Summer 2019
- Run plans for all energies on Redmine
- Experts on call
- Beam Time Accounting quick link
- Shift Checklist quick link
Your Responsibilities
Shift Leader
- Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the HCLOG
- Follow the run plan and co-ordinate switching to the next experimental configuration with other shift workers and the MCC as required.
- Maintain and update the Shift Summary detailing the events which occur while on shift
- This is done by starting the summary as a log entry titled "X Shift Summary" where X = Day, Swing, Owl
- Save & edit the summary after ANY event of interest occurs, including accesses
- This provides the readers with an up-to-date play by play of the current shift
- See example: https://logbooks.jlab.org/entry/3402742
- Record the purpose for every single run in the "Run list" binders. Blank forms for Fall 2018 can be found here.
- Keep track of beam time accounting
- More information how to work the Beam Time Accounting (BTA) web app
- Consult the daily run plans and communicate with the RC whenever problems happen that cannot be solved by shift workers.
- Maintain data taking quality and an efficient use of beam time.
- Follow the directives in the COO and associated Safety Documentation.
Target Operator
- Watch the target, see Target Info
- Start and stop the DAQ. Ensure the correct PS factors are being used.
- Consult the run plan for estimated PS factors to be used for a given setting, adjust these up or down as needed
- Assist the shift leader and third person with their duties
Third person
- Make certain that the Hall-C Alarm Handler process is running. See Hall_C_Alarm_Handler.
- If there are any alarms being ignored or silenced, find out why and enter this in the logbook.
- Log any alarms when they occur.
- Carry out online analysis of the data, including 50k replays for the HMS and SHMS
- Compare 50k replay histograms with the sample ones and report to shift leader any unexplained differences. Hclog them.
- For the Pion Electroproduction experiment analysis instructions see here.
- Fill shift checklist once per shift.
- An older Shift Checklist file, which also includes help for locating items, should be available here.