Difference between revisions of "Aug 14 2024"

From HallCWiki
Jump to navigationJump to search
 
Line 5: Line 5:
  
 
== Notes ==
 
== Notes ==
 +
* hcvme06: should be able to swap next week with Simona's one
 +
* V1495: NPS crate 3 has one V1495. Need to check if ECAL needs it or not. Bob has one V2495
 +
* Need to check if there are two long QSFP cables, and 12 NIM cables running between LAD DAQ bunker and GEM bunker
 +
* Need to check when Hall C will install the DAQ bunker that we can move crates into Hall C, so trigger timing can be tested.

Latest revision as of 14:44, 14 August 2024

Back to Main Page >> Weekly meetings

Agenda

  • Around table updates
  • LAD DAQ hardware -- Hanjie [1]

Notes

  • hcvme06: should be able to swap next week with Simona's one
  • V1495: NPS crate 3 has one V1495. Need to check if ECAL needs it or not. Bob has one V2495
  • Need to check if there are two long QSFP cables, and 12 NIM cables running between LAD DAQ bunker and GEM bunker
  • Need to check when Hall C will install the DAQ bunker that we can move crates into Hall C, so trigger timing can be tested.