Aug 14 2024
From HallCWiki
Jump to navigationJump to searchBack to Main Page >> Weekly meetings
Agenda
- Around table updates
- LAD DAQ hardware -- Hanjie [1]
Notes
- hcvme06: should be able to swap next week with Simona's one
- V1495: NPS crate 3 has one V1495. Need to check if ECAL needs it or not. Bob has one V2495
- Need to check if there are two long QSFP cables, and 12 NIM cables running between LAD DAQ bunker and GEM bunker
- Need to check when Hall C will install the DAQ bunker that we can move crates into Hall C, so trigger timing can be tested.