Hall C Document 1181-v1
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
Special BCM Calibration Procedure Down to 1 muA
Document #:
HallC-doc-1181-v1
Document type:
Documentation
Submitted by:
Dave Mack
Updated by:
Dave Mack
Document Created:
21 Aug 2022, 13:39
Contents Revised:
21 Aug 2022, 13:39
Metadata Revised:
21 Aug 2022, 13:39
Viewable by:
Public document
Modifiable by:
JLab
admin
Quick Links:
Latest Version
Abstract:
Run Coordinator should make 3 copies: for the MCC, for the Hall C CH, and for themselves.
No need to close the slit for zeroes since the only other hall running this week will be Hall B, and leakage is normally only of order 1E-4.
Files in Document:
BCMCalibrationProcedureAug2022_special.pdf
(125.7 kB)
Other Files:
BCMCalibrationProcedureAug2022_special.docx
(16.4 kB)
Topics:
Beamline
Authors:
Dave Mack
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
DocDB
Version 8.8.6, contact
Document Database Administrators