Jefferson Lab Hall C Logbook for January 07 - runstarts omitted
Main INDEX
Wednesday
132292 01/31/07 23:20 Louis-tgt Analysis: analysis checklist of swing operators (entry 132291) covers runs 33730 to 33737
132291 01/31/07 23:05 Louis-tgt Analysis: Analysis checklist of the swing shift : 31-01-2007
132286 01/31/07 21:09 Louis-tgt Target: Snapshots of the Swing shift
132284 01/31/07 20:31 Fatiha Asymmetry versus yield scan for a francheoctant
132282 01/31/07 19:51 amicherd Modulation Coil OFF, Charge Feedback OFF
132281 01/31/07 19:43 amicherd since the run 33734 we started beam study for a Wells plot
132280 01/31/07 19:42 amicherd since the run 33734 we started beam study for a Wells plot
132276 01/31/07 18:20 Fatiha RCS problem solved by miodifiying the NA Chips
132272 01/31/07 16:12 swells Adjustments for New Altera Chip installation
132271 01/31/07 16:11 jschaub Day Shift Summary
132270 01/31/07 16:10 cdaq Beam Time Accounting
132269 01/31/07 16:02 Louis-tgt Target: Target snapshots for reference
132266 01/31/07 15:19 M Jones Analysis: Analysis checklist for runs 33720-33729
132261 01/31/07 13:33 Alex Analysis: Prelimary Yield cuts study on NA octants (rcs issue analysis).
132260 01/31/07 13:22 Larry NA "pion/random" latches switched from "pion" mode back to "random" mode
132259 01/31/07 13:17 Larry/S.Well Timing check/tweak for NA "Pion" Coincidence matrix
132258 01/31/07 13:06 jschaub Analysis: Oct 1 NA Octants Pion Collection Test
132255 01/31/07 12:59 jschaub Realtime Analyzer and CODA Crashed
132253 01/31/07 12:36 M Jones SMS: shift checklist snapshots
132246 01/31/07 11:11 Fatiha Yield versus helicity for different qrt phases.
132243 01/31/07 10:19 jschaub Beam: G0 Cavity Signals from Run 33722
132242 01/31/07 10:17 jschaub Beam: Charge Asymmtery and Position Differences from Run 33722 - OUT
132241 01/31/07 10:03 jschaub Beam: Had MCC Change the Beam Position
132238 01/31/07 09:45 jschaub Beam: Coil Modulation Cycle from Run 33720
132237 01/31/07 09:22 jmammei cerenkov single pe pulseheights
132236 01/31/07 09:19 Williamson Beam: Charge Asymmetry Width Larger than Usual
132233 01/31/07 08:26 Darko Owl shift summary
132232 01/31/07 08:03 cdaq Beam Time Accounting
132231 01/31/07 07:36 vardan Analysis: analysis checklist for runs 33713-19
132226 01/31/07 06:17 vardan hv tripped, stopped run 33721
132223 01/31/07 05:42 vardan shift checklist snapshots
132211 01/31/07 00:31 Louis Analysis: Only the run 33711 was a good for production
132210 01/31/07 00:28 Louis-tgt Analysis: many Out of Range values for the analysis of recent runs
132209 01/31/07 00:21 Louis-tgt Analysis: Analysis checklist
132208 01/31/07 00:11 cdaq Beam Time Accounting
Tuesday
132207 01/30/07 23:57 amicherd swing shift summary
132204 01/30/07 23:11 Larry Digital Scope Parameters for Cerenkov Analog signals
132203 01/30/07 23:04 Louis-tgt Target: Snapshots for Checklist
132202 01/30/07 22:45 amicherd good production run 33711; 33712 - not
132197 01/30/07 21:38 Williamson Target: Some more instructions for rebooting the "optilogic box"
132194 01/30/07 21:28 swells Cerenkov BPO relative timing
132191 01/30/07 20:40 Williamson RC Summary Monday 01-29-2007 Swing through Tuesday 01-30-2007 Day
132190 01/30/07 20:15 Doug Beck Analysis: 1st attempt at possible analysis algorithm for NA octants
132188 01/30/07 18:56 pking Analysis: Alternate analysis of the RCS problem during the beam current scans.
132187 01/30/07 18:54 Williamson Beam: Mott Polarization Measurement (earlier today)
132186 01/30/07 18:38 Louis Target: Scan of Checklist
132185 01/30/07 17:05 Williamson Analysis: Changed a few more runs from "not all good" to "good"
132184 01/30/07 16:48 Fatiha More studies on the rcs issue: Distribututions versus the qrt phase
132183 01/30/07 16:45 amicherd HV on SMS
132182 01/30/07 16:22 Williamson SMS: Overfill (pilot error) recovery and ramp up of SMS
132181 01/30/07 16:14 cdaq Beam Time Accounting
132180 01/30/07 16:13 gaskell Day shift summary
132179 01/30/07 16:02 Louis-tgt Tgt screens at shift start
132178 01/30/07 14:42 gaskell Moller cooldown complete
132177 01/30/07 14:42 swells/pking Recabling of NA logic
132176 01/30/07 13:35 kenyon Moller cryolines
132175 01/30/07 11:31 gaskell Starting Moller cooldown
132174 01/30/07 10:18 Williamson MCC Beam Report for Week of Jan 23 to Jan 30 (00:00 Tues to 00:00 Tues)
132173 01/30/07 09:42 Williamson SMS: UPS Self-tests Passed
132172 01/30/07 09:39 Williamson SMS: Back-up magnet computer status
132171 01/30/07 09:12 Williamson SMS: Ramped magnet down for UPS self-tests and Moller Cooling
132170 01/30/07 08:54 horn SMS: ramping down
132169 01/30/07 08:36 gaskell call for Controlled Access
132167 01/30/07 08:07 cdaq Beam Time Accounting
132166 01/30/07 07:52 Alex Owl Shift summary
132165 01/30/07 07:44 alex run 33708 is at 30uA of beam current
132160 01/30/07 06:11 vardan shift checklist snapshots
132158 01/30/07 00:38 Alex HV off since more than 20 minutes
132154 01/30/07 00:02 cdaq Beam Time Accounting
132153 01/30/07 00:02 ppillot swing shift summary
Monday
132152 01/29/07 23:53 pate Analysis: checklist for runs 33696-33703
132150 01/29/07 22:52 pate Target: rebooted the IOC
132148 01/29/07 22:08 Williamson RC Summary Sunday 01-28-2007 Swing through Monday 01-29-2007 Day
132145 01/29/07 21:30 Breuer Instructions for change from Random to Pion matrices
132144 01/29/07 21:30 pate shift checklist snapshots
132143 01/29/07 21:22 Breuer Instructions for change from Random to Pion matrices
132141 01/29/07 20:18 pate Beam: no good beam for some time now...
132140 01/29/07 19:50 pate Analysis: change of many recent runs from "not all good" to "good"
132133 01/29/07 17:10 pate reboot of vmec15
132131 01/29/07 16:03 cdaq Beam Time Accounting
132130 01/29/07 16:02 jschaub Day Shift Summary
132129 01/29/07 16:00 jschaub Day Shift Summary
132124 01/29/07 15:41 amicherd
132123 01/29/07 15:36 amicherd/jsc Analysis check for runs 33688 - 33695
132122 01/29/07 15:03 amicherd Target: more info about rebooting IOC
132121 01/29/07 14:45 amicherd IOC target was rebooted
132116 01/29/07 13:09 jmammei cerenkov single pe pulseheights
132113 01/29/07 11:40 jschaub Beam: G0 Cavity Signals from Run 33689
132112 01/29/07 11:38 jschaub Beam: Charge Asymmtery and Position Differences from Run 33689 - OUT
132111 01/29/07 11:36 amicherd JT valve opened by 2 steps, so now reserved heat is ~ 170W
132102 01/29/07 08:14 vardan Analysis: analysis checklist for runs 33674, 76-81,87
132101 01/29/07 08:04 cdaq Beam Time Accounting
132100 01/29/07 07:52 Alex Owl shift summary
132097 01/29/07 06:53 vardan shift checklist snapshots
132096 01/29/07 06:25 Alex Beam: the beam current just increased back to 35uA
132094 01/29/07 05:39 Alex Analysis: Analysis of the RCS test runs taken tonight (beam current scan)
132088 01/29/07 02:07 vardan shift checklist scan
132083 01/29/07 00:18 cdaq Beam Time Accounting
132082 01/29/07 00:18 ppillot swing shift summary
Sunday
132079 01/28/07 23:50 pate current scan: 30, 25, ...
132078 01/28/07 23:49 Williamson RC Summary Saturday 01-27-2007 Swing through Sunday 01-28-2007 Day
132075 01/28/07 23:17 pate shift checklist snapshots
132073 01/28/07 22:08 ppillot run at 30 uA with the same conditions for octant 1 as in the previous runs
132070 01/28/07 21:53 pate switched water pump motors for the diffuser
132069 01/28/07 21:18 pking/swells Analysis: Comparing Octant 1 and Octant 3 after the latch timing changes: no apparent effect
132067 01/28/07 19:39 swells NA Octant 1 electron Latcch timing adjustments
132065 01/28/07 19:09 pate Beam: beam is back; still at 30 uA
132060 01/28/07 18:01 pate Beam: software problem at MCC
132058 01/28/07 17:23 pate no really useful beam during this run
132054 01/28/07 16:48 pate Target: closed JT valve a touch, to reduce total heat load
132052 01/28/07 16:16 jmammei Beam: G0 Cavity signals from Run 33662
132051 01/28/07 16:04 cdaq Beam Time Accounting
132050 01/28/07 16:03 jmammei day shift summary
132048 01/28/07 15:38 Carissa Target: Shift Checklist...
132047 01/28/07 15:37 jmammei Beam: MCC sending ~10 uA
132046 01/28/07 14:54 jmammei, car RCS SUMMARY since 1-10-07
132045 01/28/07 13:50 jmammei Beam: MCC sending low I beam
132044 01/28/07 12:46 jmammei Beam: MCC update
132043 01/28/07 08:50 jmammei VESDA "blinking"
132040 01/28/07 08:24 jmammei beam status update
132039 01/28/07 08:02 cdaq Beam Time Accounting
132038 01/28/07 07:36 Alex Owl Shift summary
132037 01/28/07 00:12 cdaq Beam Time Accounting
132036 01/28/07 00:11 ppillot swing shif summary
Saturday
132035 01/27/07 23:40 pate Beam: there's been no beam since about 19:15
132034 01/27/07 23:17 pking Turned off the Grey Noise Box and restored Octant 1 electronics
132033 01/27/07 23:17 Williamson RC Summary Friday 01-26-2007 Swing through Saturday 01-27-2007 Day
132031 01/27/07 22:40 pking Summary of the RCS studies for today and this evening.
132030 01/27/07 22:17 pate Analysis: analysis checklist for runs 33644 - 33666 (continued after premature submission...)
132025 01/27/07 21:01 pking GNB rate in run 33669 was about 50 kHz
132022 01/27/07 20:47 pking Analysis: The RCS problem seems to be as present with "BPO only" latches as with the pion latch.
132021 01/27/07 20:31 pking No beam in run 33667.
132018 01/27/07 20:20 pate Analysis: analysis checklist for runs 33644 - 33666
132015 01/27/07 19:44 Breuer/King Analysis: Details of nice scaler MISbehaving with random pulser
131998 01/27/07 16:02 jmammei day shift summary
131997 01/27/07 16:01 cdaq Beam Time Accounting
131994 01/27/07 15:43 jmammei Beam: had low currents for several minutes
131993 01/27/07 15:41 Carissa Target: Shift checklist screenshots
131990 01/27/07 15:38 jmammei plot of cerenkov single pe pulseheights
131987 01/27/07 15:16 Breuer values for SPE of Cerenkovs today at 15:00, formatted
131986 01/27/07 15:13 Breuer values for SPE of Cerenkovs today at 15:00
131983 01/27/07 14:45 jmammei Beam: current increased to 35 uA
131980 01/27/07 14:23 jmammei CODA funniness
131975 01/27/07 13:41 pking Moved the GNB signals during this run.
131968 01/27/07 11:36 jmammei Beam: IHWP and charge asymmetry
131964 01/27/07 11:14 jmammei Beam: changed IHWP to OUT
131962 01/27/07 10:20 jmammei cerenkov pulseheights since 1-13-2007
131959 01/27/07 10:04 Carissa Analysis: Checklist: Runs 33614-33643
131957 01/27/07 09:10 jmammei turned coil modulation on
131953 01/27/07 08:07 cdaq Beam Time Accounting
131952 01/27/07 08:05 amicherd Owl shift summary
131951 01/27/07 07:30 Gericke Owl Shift Screen Shots
131940 01/27/07 02:22 Breuer special runs before and after Cernkov HV change.
131939 01/27/07 02:13 Breuer Analysis: pion matrix runs before and after HV change on Cerenkovs
131938 01/27/07 02:04 Breuer New Cerenkov HVs and gains before and after HV change; anode currents
131934 01/27/07 00:45 Gericke HV Settings File
131932 01/27/07 00:41 Gericke/Breu New High Voltge File
131926 01/27/07 00:20 cdaq Beam Time Accounting
131925 01/27/07 00:20 ppillot swing shift summary
Friday
131905 01/26/07 20:41 Williamson RC Summary Thursday 01-25-2007 Swing through Friday 01-26-2007 Day
131904 01/26/07 20:19 King/Breuer Analysis: Results for NA Encoder latch/clear delay studies (runs 33618-33624)
131899 01/26/07 19:36 pking Looking at NA electronics LATCH and CLEAR for Oct1 module 2
131896 01/26/07 18:31 Breuer Latch scalers only have INcreased rates!; plot
131895 01/26/07 18:29 Williamson Beam: Today's Mott Measurement
131894 01/26/07 18:29 Williamson Beam: Today's Mott Measurement
131893 01/26/07 18:29 Williamson Beam: Today's Mott Measurement
131892 01/26/07 18:22 Breuer Analysis: Scaler problem feature: frequency of bit dropping
131891 01/26/07 17:50 pking Disconnected scaler input cable for Oct1, cable 2C during run 33621
131885 01/26/07 16:32 pate Shift Checklist Screen Snapshots
131883 01/26/07 16:13 jschaub Beam: Target Computer Restart
131882 01/26/07 16:02 cdaq Beam Time Accounting
131881 01/26/07 16:00 jmammei Day shift summary
131875 01/26/07 14:12 jmammei VESDA "blinking" again
131874 01/26/07 13:49 jschaub Analysis: Checklist for Runs 33575-33613
131873 01/26/07 13:40 jmammei MCC magnet problem
131868 01/26/07 12:54 jschaub/beck Analysis: CD and NCD Plots for a Recent Run and for a 362MeV LH2 Run (Runs 33551 and 30778)
131867 01/26/07 12:54 jschaub/beck Analysis: CD and NCD Plots for a Recent Run and for a 362MeV LH2 Run (Runs 33551 and 30778)
131860 01/26/07 11:45 jmammei coil modulation turned off for rcs tests
131854 01/26/07 11:00 mack switching transients?
131852 01/26/07 10:12 Williamson/B Scope picture of input to scaler with regenerated BPO
131849 01/26/07 08:18 jmammei VESDA "blinking"
131848 01/26/07 08:11 amicherd Owl shift summary
131847 01/26/07 08:10 cdaq Beam Time Accounting
131846 01/26/07 08:09 amicherd Owl shift summary
131843 01/26/07 08:02 Gericke Owl Shift Screen Shots
131834 01/26/07 03:09 Breuer/King/ Summary of results for low-yield peak studies 01/25/07
131833 01/26/07 03:04
131832 01/26/07 03:03
131829 01/26/07 02:22 Breuer Details of hardware changes to test retriggered BPO
131828 01/26/07 02:18 Breuer 33601 has oct 1 returned to normal running, but with pion matrix
131825 01/26/07 01:50 Breuer/Beck tests for run 33599, 33600 and results
131824 01/26/07 01:43 Breuer Analysis: confirm: all real signals in test scalers show reduced rate-problem
131823 01/26/07 01:28 Breuer Analysis: pocket pulser with min widths scaler input: no problem
131818 01/26/07 00:09 cdaq Beam Time Accounting
131817 01/26/07 00:09 ppillot swing shift summary
Thursday
131816 01/25/07 22:49 pate comment on RC report
131813 01/25/07 22:15 Williamson RC Summary Tuesday 01-23-2007 Swing through Thursday 01-25-2007 Day
131812 01/25/07 22:08 pate Shift Checklist Screen Snapshots
131805 01/25/07 19:39 Breuer Run 33593 tests with pocket pulser into oct 1; other octants ok.
131804 01/25/07 19:34 Breuer No oct 7 or oct 1 in RUN 33594 (except for test data in octant 1), input description
131803 01/25/07 19:33 Breuer No oct 7 or oct 1 in this run (except for test data in octant 1), input description
131800 01/25/07 18:45 pking Managed to get the "bad RCS distributions" with a test pulser.
131793 01/25/07 17:56 Williamson SMS: Dump Switch Problem
131782 01/25/07 16:51 Williamson SMS: Replacement of UPS Batteries
131781 01/25/07 16:50
131778 01/25/07 16:27 jschaub Analysis: MH Plots to Investigate the "RCS Effect" in Earlier Running Periods
131775 01/25/07 16:07 jmammei Day shift summary
131774 01/25/07 16:06 cdaq Beam Time Accounting
131773 01/25/07 16:06 jschaub Analysis: Shift Checklist for Runs 33570-33574
131772 01/25/07 16:05 jschaub Analysis: Shift Checklist for Runs 33570-33574
131771 01/25/07 16:03 suleiman Beam: Position Feedback using the helicity magnets in the Injector
131763 01/25/07 15:04 jmammei controlled access to correct SMS
131757 01/25/07 12:52 swells BPO and relative timing
131753 01/25/07 12:03 Williamson SMS: Post Mortum and Lessons Learned from Fast Dump
131750 01/25/07 10:49 jmammei Hall C controlled access from 9am
131749 01/25/07 09:12 jschaub Target: Screen Snapshots
131745 01/25/07 08:23 Alex Analysis: Asymmetry vs absolute Halo rate
131744 01/25/07 08:16 cdaq Beam Time Accounting
131743 01/25/07 08:16 pking Looked at Octant 1 splitter/trigger settings between runs 33572 and 33573
131742 01/25/07 08:12 amicherd Owl shift summary
131739 01/25/07 07:09 Alex Analysis: update on the analysis checklist
131736 01/25/07 06:26 Alex Analysis: Analysis checklist (run 33561-33569), goat++ seems to have problems
131735 01/25/07 05:46 amicherd Shift Checklist Screen Snapshots
131734 01/25/07 05:38 Alex/Anna cdaql5 reboot
131731 01/25/07 03:47 amicherd run 33569, octant 1 was disconected for a moment, do not use for analysis.
131728 01/25/07 03:29 Breuer/Beck Analysis: We surrounded the missing rate problem - we think. (with all figures, edited).
131727 01/25/07 03:15 Breuer/Beck Analysis: We surrounded the missing rate problem - we think.
131724 01/25/07 02:12 amicherd Starts from run 33568 -> HV ON, on all octants and normal runing condition for production run.
131723 01/25/07 01:45 amicherd
131722 01/25/07 01:38 Doug Beck Regenerated BPO
131720 01/25/07 01:30 Doug Beck Regenerated BPO
131718 01/25/07 01:11 Breuer/Beck run 33565 and 33566 details, changes in between
131714 01/25/07 00:41 Doug Beck Corrected mapping for O1, CED6 test
131711 01/25/07 00:16 Doug Beck Run 33564 is junk for NA (power for coinc crates turned off near end of run)
131708 01/25/07 00:09 voutier Target: Target IOC reboot
131707 01/25/07 00:09 cdaq Beam Time Accounting
131706 01/25/07 00:09 ppillot swing shift summary
Wednesday
131703 01/24/07 23:36 Doug Beck Signals in O1 CED 6
131702 01/24/07 23:25 voutier Analysis: Amalysis checlist (up to 33560)
131699 01/24/07 22:47 voutier Shift checklist
131696 01/24/07 22:18 Breuer/Beck Analysis: turning off fans does not affect the data in any positive way
131695 01/24/07 22:16 Breuer/Beck run 33560 octant 1 one matrix ribbon cable (mostly CED6,oct1) "reconditioned"
131693 01/24/07 22:12 pking Analysis: MySQL server on wmg0 shut down for tonight; use g0dbserver for now.
131691 01/24/07 21:55 Doug Beck Run 33560 has regenerated set of CED6 coincidence signals to scalers
131690 01/24/07 21:53 Doug Beck Run 33559 ended early
131683 01/24/07 20:16 Breuer/King Analysis: Paul's plots with strong indications of digital effect of yield problem
131682 01/24/07 19:34 ppillot beam charge asymetry width close to limits
131679 01/24/07 19:22 jmammei cerenkov single pe pulseheights
131678 01/24/07 19:09 Breuer/Beck run 33556: turned off 5 fans.
131675 01/24/07 18:20 muether SMS: SMS Paging is turned off...is it like that on purpose?
131670 01/24/07 16:37 Breuer/King details for run 33553, NA scaler CLR delay features
131669 01/24/07 16:27 Breuer run 33552 bad NA data due to electronics un/in-plugging
131664 01/24/07 16:04 jmammei day shift summary
131663 01/24/07 16:01 cdaq Beam Time Accounting
131662 01/24/07 15:59 jmammei cavity monitor behavior during beam trip
131661 01/24/07 15:50 jschaub Target: Screen Snapshots
131660 01/24/07 15:32 jschaub Beam: G0 Cavity Signals from Run 33548
131659 01/24/07 15:29 jschaub Beam: Charge Asymmtery and Position Differences from Run 33548 - IN
131658 01/24/07 15:25 jschaub Beam: Coil Modulation Cycle from Run 33528
131655 01/24/07 14:51 suleiman Beam: Helicity Magnets Slopes in the Injector
131653 01/24/07 14:44 jschaub Analysis: Checklist for Runs (33505-33546)
131647 01/24/07 13:02 suleiman Beam: Helicity Magnets Calibration in the Injector
131645 01/24/07 12:48 pking Analysis: Plots for the referred entry
131644 01/24/07 12:32 pking Analysis: Comparing structures in runs 33525 and 33527
131642 01/24/07 12:27 jmammei restart CODA after injector tests
131641 01/24/07 12:21 jschaub Analysis: Changed Almost All Condition Files
131635 01/24/07 11:17 jschaub/pkin Analysis: Condition Files
131633 01/24/07 11:13 jmammei Analysis: good_for values for rcs test runs
131609 01/24/07 08:43 suleiman We are going to Calibrate the Helicity Magnets in the Injector - Changes are done to the DAQ
131608 01/24/07 08:30 cdaq Beam Time Accounting
131607 01/24/07 08:17 amicherd Owl shift summary
131606 01/24/07 05:13 Breuer First run with fully restored normal octant 1 running conditions.
131605 01/24/07 05:03 Alex SMS: SMS Fast Dump
131603 01/24/07 04:46 Breuer Analysis: Plots for run 33525 and 33527 (increased CFD threshold)
131601 01/24/07 04:29 Breuer Summary of test runs 01/24/07 into 01/25/07
131597 01/24/07 03:08 Breuer What "all" signals?
131594 01/24/07 02:23 Williamson RC Summary Monday 01-22-2007 Swing through Wednesday 01-23-2007 Day
131593 01/24/07 02:11 amicherd
131592 01/24/07 02:05 amicherd
131587 01/24/07 00:13 cdaq Beam Time Accounting
131586 01/24/07 00:12 ppillot swing shift summary
Tuesday
131585 01/23/07 23:56 Breuer Run 33524 at end of run CED 6 and 7 counting; run 33525, 33526
131582 01/23/07 23:22 voutier Analysis: Analysis Checklist
131579 01/23/07 22:28 voutier Shift Checklist
131577 01/23/07 21:55 Breuer/Willi checked power supply ripple on Fastbus and MT crates
131576 01/23/07 21:51 Breuer run 22523 change in test setup for octant 1
131574 01/23/07 21:28 jschaub Beam: Changing XStage
131571 01/23/07 21:14 jschaub Analysis: Latch and Trigger Plots for Runs 33405 and 33410
131567 01/23/07 20:06 Breuer run 33520: 20 ns wide pulser into oct 1 FPD 12 and one CED; run 33521: 10 ns
131564 01/23/07 19:46 voutier Beam: Beam energy
131559 01/23/07 18:27 Williamson Beam: Channel Access Now Granted for Pockel's Cell X Position (when changing IHWP)
131557 01/23/07 17:51 Breuer run 33516 HV off, mostly no beam, pulser octant 1, specifics
131555 01/23/07 17:09 Breuer Pulser in Cerenkov of oct 5 for part of time
131552 01/23/07 16:18 jmammei cavity monitor plots after calibration
131551 01/23/07 16:10 jmammei shift summary
131550 01/23/07 16:06 cdaq Beam Time Accounting
131549 01/23/07 16:04 ppillot Analysis: problem seen on MH using the pulser
131548 01/23/07 15:57 Breuer changes for run 33515 and following
131547 01/23/07 15:52 jschaub Analysis: Shift Checklist for Runs 33505-33513
131546 01/23/07 15:47 smithg Target: D2 gas analysis
131543 01/23/07 15:13 jmammei run 33515 is NOT a production run
131541 01/23/07 15:08 muether Analysis: Elastic Electron Asymmetry and Yield distributions for run 33490 Octant 3
131540 01/23/07 15:08 muether Analysis: Elastic Electron Asymmetry and Yield distributions for run 33490 Octant 3
131536 01/23/07 14:05 jschaub Analysis: Individual Cell RCS Values, Various Runs
131535 01/23/07 14:05
131534 01/23/07 14:04
131533 01/23/07 13:24 jmammei Beam: Mott measurement results
131530 01/23/07 12:41 Fatiha More studies on the Trigger and Latches
131529 01/23/07 12:20 jschaub Analysis: Individual Cell RCS Values, Run 33490
131526 01/23/07 12:00 jschaub Analysis: Individual Cell RCS Values, Run 33490 (Better Format, Hopefully)
131525 01/23/07 11:57 jschaub Analysis: Individual Cell RCS Values, Run 33490
131524 01/23/07 11:42 jschaub Analysis: Individual Cell RCS Values, Run 33490
131523 01/23/07 11:42 jschaub Analysis: Individual Cell RCS Values, Run 33490
131521 01/23/07 11:16 jmammei plot of cerenkov single pe pulseheights over time
131520 01/23/07 10:47 jmammei MCC doing Mott measurements
131519 01/23/07 10:43 jschaub Target: Screen Snapshots and Shift Checklist Scan
131518 01/23/07 10:35 jmammei IHWP changed to IN before run 33510
131516 01/23/07 10:16 jmammei new calibrations in DB
131514 01/23/07 09:23 Armstrong Cerenkov single PE pulseheights (measured with beam)
131512 01/23/07 08:52 Armstrong Please post results of tests in logbook
131509 01/23/07 08:03 cdaq Beam Time Accounting
131508 01/23/07 08:03 amicherd Owl shift summary
131505 01/23/07 06:23 Alex Analysis: oops
131504 01/23/07 06:20 Alex Analysis: What s going on with the rcs again ? O_o
131503 01/23/07 06:17 Alex Analysis: Analysis Checklist (33494-33504)
131498 01/23/07 04:59 Alex Beam: Shift Checklist Screen Snapshots
131489 01/23/07 00:49 cdaq Beam Time Accounting
131488 01/23/07 00:49 ppillot swing shift summary
Monday
131487 01/22/07 23:55 voutier Beam: Beam energy
131486 01/22/07 23:53 swells BPO issues
131485 01/22/07 23:51 voutier Beam: Beam energy
131484 01/22/07 23:42 Fatiha Finally!
131483 01/22/07 23:40 voutier Analysis: Analysis Checklist
131481 01/22/07 23:30 swells RCS issue
131478 01/22/07 23:01 voutier Shift checlist
131474 01/22/07 21:49 Fatiha
131473 01/22/07 21:21 pking Analysis: Correct units of the latch/trigger ntuple variables are counts/nC
131470 01/22/07 19:40 Fatiha Zoomed trigger plot
131469 01/22/07 19:27 Fatiha How to get the Latches and Trigger variables in the mps_ntuple
131467 01/22/07 18:59 Fatiha The Trigger variable exhibits a 60 Hz component !!!
131466 01/22/07 18:39 Fatiha Latch versus otehr variables
131465 01/22/07 18:17 Fatiha Latches hisotgrams exhibit secondary peaks.
131464 01/22/07 18:01 Armstrong ramp up rate after beam trip
131463 01/22/07 17:53 smithg Target: ghtot alarms
131459 01/22/07 16:10 jschaub Analysis: Shift Checklist, Runs 33483-33493
131458 01/22/07 16:02 jmammei day shift summary
131457 01/22/07 16:01 cdaq Beam Time Accounting
131456 01/22/07 15:50 jschaub Target: Beam Trip ghtot Alarm
131453 01/22/07 15:34 jschaub Target: Shift Checklist Screen Snapshots
131452 01/22/07 15:01 jschaub Target: Beam Trip ghtot Alarm
131451 01/22/07 14:56 jschaub Beam: Charge Asymmtery and Position Differences from Run 33490 - OUT
131450 01/22/07 14:52 jschaub Beam: G0 Cavity Signals from Run 33490
131449 01/22/07 14:49 smithg Target: Tuning heater pid
131448 01/22/07 14:49 jschaub Beam: Coil Modulation Cycle from Run 33486
131447 01/22/07 14:46 jschaub Target: Beam Trip ghtot Alarm
131444 01/22/07 14:23 jschaub/sule Beam: Parity Quality Plots for the Various Backward-Angle Running Periods
131443 01/22/07 14:14 Armstrong BPO regeneration does not fix the problem
131440 01/22/07 13:03 jmammei octant 3 during run 33490
131439 01/22/07 12:43 Armstrong a BPO test: runs 33491, 33492 will be bad for Octant 1
131437 01/22/07 12:24 jschaub Analysis: Cell by Cell Asymmetry for a Spring LH2 687MeV Run--28826, Octant 5
131436 01/22/07 12:23 jmammei see if THIS works...
131435 01/22/07 12:23 jschaub Analysis: Cell by Cell Asymmetry for a Spring LH2 687MeV Run--28826
131433 01/22/07 12:22 jschaub Beam: Beam Trip ghtot Alarm
131432 01/22/07 12:17 muether SMS: Some noise from the the DQP
131431 01/22/07 12:11 jmammei see if this works...
131430 01/22/07 12:10 muether SMS: Summary of yesterday's SMS difficulties
131429 01/22/07 12:10 muether SMS: Summary of yesterday's SMS difficulties
131428 01/22/07 12:06 jmammei Cerenkov single pe pulse heights (measured with beam)
131427 01/22/07 12:06 jmammei Cerenkov single pe pulse heights (measured with beam)
131424 01/22/07 11:58 jschaub Target: Beam Trip ghtot Alarm
131421 01/22/07 10:56 Fatiha I agree
131420 01/22/07 10:21 jschaub Target: Beam Trip ghtot Alarms
131419 01/22/07 10:05 Armstrong comment on history of RCS effect...
131416 01/22/07 10:01 jmammei VESDA "beep"
131415 01/22/07 09:47 Armstrong more info on the "RCS" issue
131410 01/22/07 08:01 cdaq Beam Time Accounting
131409 01/22/07 07:54 amicherd Owl shift summary
131404 01/22/07 05:43 Alex Analysis: analsysis checklist (run 33473 to 33482)
131403 01/22/07 05:10 Alex/Anna Beam: shift checklist
131393 01/22/07 00:28 pking Analysis: Figures to go with my log entry 131378.
131391 01/22/07 00:15 cdaq Beam Time Accounting
131390 01/22/07 00:15 ppillot swing shift summary
Sunday
131389 01/21/07 23:56 voutier Target: Total heat alram
131388 01/21/07 23:23 voutier Checlist Scan
131386 01/21/07 22:35 Fatiha Asymmetry quality cell by cell during starting from
131379 01/21/07 18:38 pking Analysis: Location of my rootfiles from beam current dependence study
131378 01/21/07 18:34 pking Analysis: Looking for correlations in the "RCS problem" in one scaler
131377 01/21/07 18:17 ppillot test of the NA scalers (FPD direct counters and MH)
131376 01/21/07 18:13 pking Analysis: A look at the "RCS problem" at varying beam currents
131375 01/21/07 17:55 Fatiha CD yields versus mps for summer (low energy) and Fall ( high energy) runs
131373 01/21/07 17:16 Armstrong Brief RC report
131368 01/21/07 16:35 cdaq Beam Time Accounting
131366 01/21/07 16:09 amicherd Day shift summary
131365 01/21/07 15:55 Carissa Target: Shift Checklist -- no beam.
131364 01/21/07 14:12 gaskell Moller offline
131363 01/21/07 13:01 Armstrong SMS: another Fast Dump
131362 01/21/07 11:47 Carissa Analysis: Checklist (runs 33456-33472)
131361 01/21/07 09:54 Armstrong status report
131360 01/21/07 08:45 muether SMS: Started to ramp but then the control hardware died
131359 01/21/07 08:04 cdaq Beam Time Accounting
131358 01/21/07 08:02 Gericke Owl shift summary
131357 01/21/07 06:44 muether SMS: SMS Fastdump - EBC/405EX Failure
131345 01/21/07 00:24 cdaq Beam Time Accounting
131344 01/21/07 00:23 ppillot swing shift summary
Saturday
131341 01/20/07 23:10 ppillot erratum
131340 01/20/07 22:52 voutier Shift Checklist
131337 01/20/07 21:01 ppillot test of the NA scalers failled but should be redo properly ?
131330 01/20/07 18:27 Fatiha Yields with Cerenkov HVs OFF
131323 01/20/07 16:51 Fatiha Yield Variables from the 31 Mhz run
131322 01/20/07 16:35 Anna/Carissa Target: Shift check list
131320 01/20/07 16:31 Armstrong run 33458 may be suspect
131318 01/20/07 16:08 Anna/Carissa Analysis: Checklist (33449-33455)
131317 01/20/07 16:07 cdaq Beam Time Accounting
131316 01/20/07 16:02 amicherd Day shift summary
131313 01/20/07 14:55 Carissa Target: ghtot yellow alarm....
131308 01/20/07 12:30 Carissa Target: red alarm this time...
131305 01/20/07 11:55 Carissa Target: second yellow alarm....
131304 01/20/07 11:46 Carissa Target: ghtot yellow alarm
131301 01/20/07 10:46 Carissa Target: Another ghtot alarm....
131296 01/20/07 08:59 Fatiha Summary of the Affected electronics.
131293 01/20/07 08:02 cdaq Beam Time Accounting
131292 01/20/07 07:59 Gericke Qwl Shift Summary
131291 01/20/07 07:51 muether Analysis: Analysis Checklist (33420-33448)
131290 01/20/07 07:24 muether Shift Check list screen grabs and shift checklist scan
131287 01/20/07 06:52 muether Analysis: Some preliminary field scan results
131261 01/20/07 01:45 jroche Analysis: NA rcs: comfirming random effect in time
131255 01/20/07 00:50 muether Target: some information about ghtot alarms
131254 01/20/07 00:04 jroche swing shift summary
131251 01/20/07 00:01 cdaq Beam Time Accounting
Friday
131250 01/19/07 22:49 voutier Shift checklist
131245 01/19/07 21:53 Breuer electron detection efficiencies for all FPDs from multiplicity yield ratio
131240 01/19/07 19:30 Armstrong Cerenkov single PE pulseheights (measured with beam)
131237 01/19/07 17:13 jroche Beam: feedback screen for HWP OUT
131236 01/19/07 16:58 Armstrong Change IHWP to OUT
131233 01/19/07 16:18 jschaub Beam: Another Beam Trip Transient ghtot Alarm
131232 01/19/07 16:08 jschaub Target: Screen Snapshots
131231 01/19/07 16:04 cdaq Beam Time Accounting
131230 01/19/07 16:04 ppillot day shift summary
131227 01/19/07 15:13 jschaub Target: Another Beam Trip Transient ghtot Alarm
131226 01/19/07 15:02 jschaub Target: Another Beam Trip Transient ghtot Alarm
131223 01/19/07 14:01 Fatiha Switched off the coincidence crates for 10 minutes
131220 01/19/07 13:09 jschaub Beam: Charge Asymmtery and Position Differences from run 33419 - IN
131219 01/19/07 13:08 jschaub Beam: G0 Cavity Signals from run 33419
131218 01/19/07 12:52 Fatiha Plots from (MH to Direct) and (Direct to MH)
131215 01/19/07 12:25 jschaub Analysis: Another Beam Trip Transient ghtot Alarm
131214 01/19/07 12:18 jschaub Analysis: Another Transient ghtot Alarm
131213 01/19/07 12:05 Fatiha Back to normal running
131210 01/19/07 11:44 Fatiha Small changes in the electronics for investigation.
131208 01/19/07 11:39 Armstrong Mott measurement: 82.2%
131203 01/19/07 11:11 jschaub Analysis: Checklist for Runs 33397-33418
131202 01/19/07 10:40 Fatiha My last try on solving this
131200 01/19/07 10:05 Fatiha Correction to JSR about the pion matrices
131199 01/19/07 10:05 jschaub Target: Another Transient ghtot Alarm
131198 01/19/07 09:50 Fatiha Old data analysed wit h the New analyser
131195 01/19/07 08:29 Armstrong Plan for today
131194 01/19/07 08:25 cdaq Beam Time Accounting
131193 01/19/07 08:20 jschaub Target: Alarm
131192 01/19/07 08:16 amicherd Owl shift summary
131191 01/19/07 07:59 real NA rcs : erratum pion are also concern by the wings
131188 01/19/07 07:29 real Analysis: NA rcs.
131185 01/19/07 05:46 real checklist
131182 01/19/07 04:38 real run 33414 is electronic test. not production.
131181 01/19/07 04:37 real Latch signal Adaptation to 50 ohm
131172 01/19/07 02:24 jroche Analysis: NA rcs: more check for readout issues: found bit of interrest?
131167 01/19/07 00:20 cdaq Beam Time Accounting
131166 01/19/07 00:19 jroche swing shift summary
Thursday
131165 01/18/07 23:45 voutier Analysis: Analysis checklist snapshots
131164 01/18/07 23:45 voutier Analysis: Analysis checklist for 33405
131161 01/18/07 22:53 Fatiha/Mat/A Traced back the date when the tails started to appear in the yields
131160 01/18/07 22:47 voutier Shift checklist
131159 01/18/07 22:46 jroche Beam: noisy charge asymmerty: realtime analysis snapshot
131158 01/18/07 22:35 Fatiha Rebooted an Other NIM crate
131153 01/18/07 21:48 jroche Beam: noisy charge asymmetry width?
131152 01/18/07 21:36 jroche NA rcs : onto the mps ntuple
131151 01/18/07 21:28 Fatiha Upadate: Tracing when the tails started
131148 01/18/07 19:45 Fatiha Yield versus mps plot
131147 01/18/07 19:44 Fatiha Yield versus mps plot
131142 01/18/07 17:27 jroche run 33403 is production not 31 MHz
131136 01/18/07 16:10 cdaq Beam Time Accounting
131135 01/18/07 16:08 ppillot Day shift summary
131134 01/18/07 15:48 Armstrong status
131133 01/18/07 14:30 jschaub Target: Screen Snapshots and Shift Checklist Scan
131132 01/18/07 14:10 Armstrong Cerenkov single PE pulseheights measured (beam off values)
131130 01/18/07 14:03 Breuer Cerenkov timing change may be due to different HV settings
131129 01/18/07 13:46 Fatiha Start and end run windows
131126 01/18/07 12:48 gaskell Moller cooldown complete
131125 01/18/07 12:30 Fatiha Power cycled 2 NIM crates
131121 01/18/07 11:30 Fatiha Yields for the previous variables
131120 01/18/07 10:59 Armstrong RC summary January 18
131119 01/18/07 10:51 Fatiha The Plot (Diret, NCD and CD asymemtries)
131118 01/18/07 10:47 jschaub SMS: Ramped Down SMS
131117 01/18/07 10:44 Armstrong Borated poly part of Octant 5 shielding reinstalled
131116 01/18/07 10:31 Fatiha RCS status for the NA
131115 01/18/07 10:03 jschaub Analysis: Checklist for Runs 33355-33396
131114 01/18/07 09:20 ppillot Timing between individual Cerenkov PMTs
131112 01/18/07 08:58 Armstrong run plan for today
131111 01/18/07 08:51 Armstrong Cerenkov single PE pulseheights measured
131110 01/18/07 08:12 C. Furget FR Cerenkov timing changed
131109 01/18/07 08:11 C. Furget Owl shift summary
131108 01/18/07 08:08 cdaq Beam Time Accounting
131105 01/18/07 07:42 gaskell Moller and slow dump
131104 01/18/07 07:05 cdaq Beam Time Accounting
131096 01/18/07 06:02 real checklist snapshot
131092 01/18/07 05:47 C. Furget Run 33390 is junk
131083 01/18/07 03:24 C. Furget Disappearance (and reappearance) of Pink Window
131076 01/18/07 01:15 jroche Analysis: NA rcs: something to explore
131075 01/18/07 00:23 C. Furget Wrong tittle : pedestal run
131074 01/18/07 00:22 Alex Analysis:
131073 01/18/07 00:21 C. Furget PS4 = 10 instead of 50
131071 01/18/07 00:16 Alex Analysis: Preliminary Results of Efficiencies for 31MHZ running based on ARS analysis
Wednesday
131069 01/17/07 23:58 muether SMS: Ramped back to 2650A and more on the slow dump
131068 01/17/07 23:57 jroche swing shift summary
131067 01/17/07 22:56 jroche SMS: slow dump (lhe level low)
131064 01/17/07 22:02 voutier Target: gpt8 sensor
131062 01/17/07 21:57 jroche new beam position
131061 01/17/07 21:45 muether SMS: Back to 2650A
131060 01/17/07 21:44 jroche disable 30Hz, turn on HV
131058 01/17/07 21:12 jroche requested beam permit
131057 01/17/07 21:08 gaskell Moller full and on cold return
131055 01/17/07 21:04 jroche enable 30Hz
131053 01/17/07 20:54 Breuer Analysis: Corrected table for efficiencies.
131052 01/17/07 20:46 Armstrong in case you get locked out of the counting house...
131051 01/17/07 20:35 Breuer Analysis: electron efficiencies from multiplicities for today's 31 MHz data runs 33374 ff.
131050 01/17/07 20:10 Breuer Analysis: Corrected extraction of electron efficiencies from yields for different multiplicities
131049 01/17/07 19:59 Armstrong Additional short runs requested for 31 MHz
131048 01/17/07 19:33 voutier Target: gpt3 and gpt5 alarms
131047 01/17/07 19:24 jroche SMS full, onto the moeller soleinoid
131045 01/17/07 19:11 voutier Target: pt3, pt5 alarms
131044 01/17/07 18:37 muether SMS: SMS Fastdump
131043 01/17/07 16:52 jroche magnet fast-dump: going to controlled access
131041 01/17/07 16:39 Armstrong short term run plan
131040 01/17/07 16:23 kenyon SMS: Reinstalled Pb at bottom octant
131039 01/17/07 16:16 jschaub Target: Shift Summary and Beam Screen Captures
131038 01/17/07 16:02 cdaq Beam Time Accounting
131037 01/17/07 16:01 ppillot Day shift summary
131034 01/17/07 15:21 Fatiha Cleaned the work disk /p/hallc-gzeroback
131031 01/17/07 14:15 Armstrong adjusted beam threshold on BTA
131030 01/17/07 13:58 pking Reformed the link from g0backward/coda25/gzero.flags to g0backward/coda25/crl/g0vmets.flags
131029 01/17/07 13:47 jschaub Analysis: Preliminary 31MHz Analysis, Run 33373, Octant 2
131026 01/17/07 13:34 Fatiha Coda rates
130991 01/17/07 11:52 Fatiha/Caris Summary of the recorded production data during the experiment
130987 01/17/07 09:43 jschaub Analysis: Shift Checklist for Runs 33335-33354
130986 01/17/07 09:43 jschaub Analysis: Shift Checklist for Runs 33335-33354
130983 01/17/07 08:07 cdaq Beam Time Accounting
130982 01/17/07 08:07 C. Furget Owl shift summary
130981 01/17/07 08:04 Fatiha Aware of
130976 01/17/07 06:35 real checklist snapshot
130975 01/17/07 06:25 C. Furget Errors on the asymmetry in LD2 at 360 MeV
130974 01/17/07 05:54 real threshold scan result. CER 8-1 HV changed was not effective. solve before run 33354
130968 01/17/07 04:23 real/furget New set of HV for all cerenkov (+30V for all)
130957 01/17/07 01:16 real cerenkov gain, threshold scan results
130953 01/17/07 00:11 cdaq Beam Time Accounting
130952 01/17/07 00:11 jroche swing shift summary
130951 01/17/07 00:07 jroche Analysis: octant 1 OUT: strange asymmetry or satistic playing trick on me?
Tuesday
130950 01/16/07 23:42 voutier shift checklist scan
130947 01/16/07 23:24 voutier Shift check list snapshots
130943 01/16/07 20:46 Breuer Analysis: result of partial (Pb only) restoration of wall downstream of octant 5
130942 01/16/07 20:44 jroche iocse20: died again
130937 01/16/07 18:55 jroche ioc 20 rebooted
130935 01/16/07 18:38 Breuer Analysis: for 31 MHz runnig rates at 360 vs 690 MeV beam
130934 01/16/07 18:23 cdaq Beam Time Accounting
130933 01/16/07 18:22 jroche FPD-CED HV backup
130930 01/16/07 17:41 Breuer Analysis: Average Cerenkov pulse hight loss with/without beam
130927 01/16/07 16:38 Alex Analysis: Summary of Aluminium Background Data
130926 01/16/07 16:05 jschaub Day Shift Summary
130923 01/16/07 15:23 pate shift checklist snapshots
130920 01/16/07 13:57 suleiman Beam: G0 Cavity Signals from run 33333 - still bad.
130919 01/16/07 13:56 suleiman Beam: Charge Asymmtery and Position Differences from run 33333 - OUT -
130918 01/16/07 13:53 Armstrong RC summary January 14
130916 01/16/07 13:36 pate magnet back to full current, beam back on, HV being turned on...
130915 01/16/07 13:27 suleiman Beam: coil Modulation Cycle from run 33327
130914 01/16/07 12:55 Armstrong Hall C closed back up
130913 01/16/07 12:47 Armstrong Cerenkov pulse-heights measured with beam off
130912 01/16/07 11:44 pate Analysis: analysis shift check list for runs 33316-33334
130910 01/16/07 11:11 Fatiha .cnd files for production runs of all the experiment
130908 01/16/07 10:57 Armstrong cdaqfs interruption; now back
130906 01/16/07 10:49 muether SMS: Rebooted PC-104/ Restored RoxTempE readback
130905 01/16/07 10:24 pate Target: rebooted target IOC in order to recover correct motor frequency readout
130904 01/16/07 10:15 Armstrong Beam: Helicity-correlated beam properties
130900 01/16/07 09:13 Armstrong Plan for access today, etc.
130898 01/16/07 08:08 C. Furget Owl shift summary
130897 01/16/07 08:03 cdaq Beam Time Accounting
130896 01/16/07 07:48 real snapshot checklist (a short one as mcc tune the beam)
130892 01/16/07 05:37 C. Furget Gain measurement of Cerenkov PMTs
130891 01/16/07 05:28 C. Furget Gain measurement of Cerenkov PMTs
130880 01/16/07 00:13 jroche swing shift summary
130879 01/16/07 00:12 cdaq Beam Time Accounting
Monday
130878 01/15/07 23:46 voutier shift checklist
130862 01/15/07 16:02 cdaq Beam Time Accounting
130861 01/15/07 16:00 neven Day Shift Summary
130860 01/15/07 15:45 pate shift checklist snapshots
130858 01/15/07 15:04 neven Run 33318 ended short because of RF cavity problem
130854 01/15/07 14:43 pate Analysis: analysis shift check list for runs 33299-33315
130853 01/15/07 14:09 pate Beam: G0bpm.adl display went white --- reboot of vmec15 needed to get it started again
130840 01/15/07 08:10 pate tags for gas bottles
130839 01/15/07 08:01 cdaq Beam Time Accounting
130838 01/15/07 08:01 C. Furget Owl shift summary
130836 01/15/07 07:40 real Helium bottle changed. NO TAG ON IT!
130834 01/15/07 07:36 real checklist scan
130831 01/15/07 05:29 real checklist snapshot
130818 01/15/07 01:27 real target pump speed goes down to 4 Hz. Greg was paged. Just a readout PB to be fixed with IOC reboot.
130815 01/15/07 00:30 real target fan speed is bad
130814 01/15/07 00:12 cdaq Beam Time Accounting
130813 01/15/07 00:11 ppillot swing shift summary
Sunday
130812 01/14/07 23:46 vardan analysis shift check list for runs 33290 - 33298
130805 01/14/07 21:11 vardan shift checklist snapshots
130794 01/14/07 16:15 ppillot Analysis: Values of effective trigger width from CED/FPD random study
130793 01/14/07 16:08 ppillot Analysis: Effective trigger width from CED/FPD random study
130792 01/14/07 16:06 cdaq Beam Time Accounting
130791 01/14/07 16:02 neven Day Shift Summary
130790 01/14/07 15:57 Armstrong change IHWP from IN to OUT
130789 01/14/07 15:52 pate Beam: IHWP now OUT
130784 01/14/07 14:42 pate Analysis: analysis shift checklist for runs 33274 to 33289
130783 01/14/07 14:30 Armstrong RC summary and run plan
130782 01/14/07 14:27 Carissa Analysis: Checklist Runs 33275-33289
130779 01/14/07 13:41 pate shift check list snapshots
130768 01/14/07 09:09 neven Cerenkov rate problem solved!
130767 01/14/07 08:56 neven Are those Cerenkov rates normal?
130764 01/14/07 08:03 C. Furget Owl shift summary
130763 01/14/07 08:02 cdaq Beam Time Accounting
130760 01/14/07 06:36 real shift checklist snapshot
130759 01/14/07 06:35 realshift ch
130756 01/14/07 04:18 C. Furget Run 33282 lasted with target IOC (~20 min)
130755 01/14/07 04:17 C. Furget Lasted with target IOC (~20 min)
130754 01/14/07 04:16 real Target: had to reboot IOC again.
130747 01/14/07 00:11 cdaq Beam Time Accounting
130746 01/14/07 00:10 ppillot swing shift summary
Saturday
130741 01/13/07 21:31 vardan shift checklist snapshots
130738 01/13/07 20:38 Alex Analysis: Analysis Checklist
130733 01/13/07 18:17 muether Updated golden values
130728 01/13/07 16:04 cdaq Beam Time Accounting
130727 01/13/07 16:04 neven Day Shift Report
130724 01/13/07 14:54 pate shift check list snapshots
130717 01/13/07 12:17 muether Analysis checklist (33247-33268)
130716 01/13/07 11:39 pate Target: had to reboot target IOC
130707 01/13/07 08:49 muether SMS: Coil E ROX Temp not updating.
130706 01/13/07 08:11 cdaq Beam Time Accounting
130705 01/13/07 08:10 C. Furget Owl shift summary
130701 01/13/07 07:49 horn Items for next week
130697 01/13/07 06:55 real checklist snapshot
130696 01/13/07 06:17 real high temperature for coil E (8.72) of SMS
130684 01/13/07 01:54 Breuer electron detection efficiency from multiplicity rates ratio
130681 01/13/07 00:53 Breuer New gain matching for all Cerenkovs/ new HV
130673 01/13/07 00:11 cdaq Beam Time Accounting
130672 01/13/07 00:09 Breuer HV on Cerenkov oct 6-4 was off during run
130671 01/13/07 00:09 ppillot swing shift summary
Friday
130666 01/12/07 23:50 Carissa Target: Shift Checklist screenshots...
130663 01/12/07 23:25 Carissa Analysis: Checklist: Runs 33239-33246
130662 01/12/07 23:24 horn addition to run plan
130659 01/12/07 21:42 Carissa re: pushed in ribbon cables in roc4
130654 01/12/07 19:04 Carissa/Fati pushed in ribbon cables in roc4...
130651 01/12/07 17:40 jschaub Analysis: RCS Issues
130644 01/12/07 16:31 horn Run plan for tonight/tomorrow
130643 01/12/07 16:07 A. Lung Day shift summary
130641 01/12/07 16:04 cdaq Beam Time Accounting
130639 01/12/07 15:56 pate Analysis: analysis shift checklist for runs 33192-33238
130638 01/12/07 15:09 pate shift check list snapshots
130631 01/12/07 11:45 Lung Runs are elec random matrix, NOT pion matrix
130627 01/12/07 10:09 horn Loaded new BCM calibration into EPICS
130625 01/12/07 09:54 horn PC xstage needed to be changed by hand
130622 01/12/07 09:10 horn IHWP state changed to IN
130619 01/12/07 08:13 C. Furget Owl shift summary
130618 01/12/07 08:04 cdaq Beam Time Accounting
130615 01/12/07 07:27 horn halo window problem fixed
130608 01/12/07 03:15 real shft check list screenshots
130605 01/12/07 02:41 C. Furget Halo rates window is frozen
130604 01/12/07 02:26 C. Furget Checklists from previous shifts
130601 01/12/07 01:30 Breuer rate monitor: oct 7 CED 5to8 ncd-electron scalers acting up again in run 33226
130598 01/12/07 00:53 C. Furget Random test
130597 01/12/07 00:35 real SMS PLC heart Beat alarm.
130592 01/12/07 00:04 Carissa Target: Checklist scan -- not done
130591 01/12/07 00:03 cdaq Beam Time Accounting
130590 01/12/07 00:02 Franklin Swing Shift Summary
130589 01/12/07 00:02 Fatiha ET_mesasages
Thursday
130587 01/11/07 23:58 Carissa Target: Shift Checklist...
130583 01/11/07 23:45 Franklin DAQ errors et_command_loop
130582 01/11/07 23:39 Franklin Electron + Pion Matrix Snapshot
130580 01/11/07 23:21 Carissa Analysis: Checklist for runs 33213-33219
130578 01/11/07 22:37 horn addition to tonight's run plan
130571 01/11/07 19:46 Carissa/Mat Analysis: Coincidence matrices with randoms subtracted
130570 01/11/07 19:25 Breuer Settings and change for HV interlock ("sniper", "snipper")
130565 01/11/07 18:12 pking Analysis: The first offline analysis run with the minor corrections to calibration_id=15 will be run 33216.
130564 01/11/07 18:07 Franklin Beam: Restart Beam Feedback
130563 01/11/07 18:01 pking Analysis: I have fixed the older calibration entries in gzero_362MeV_comm2; also added IPM0I07 calibrations to calibration_id=15.
130560 01/11/07 17:01 suleiman Beam: G0 Cavity Signals from run 33214 - Still bad
130559 01/11/07 16:58 suleiman Beam: Charge Asymmetry and Position Differences from run 33214 - OUT - Looks good
130558 01/11/07 16:51 Breuer Cerenkov signal hights 36 hours later
130557 01/11/07 16:50 suleiman Beam: Coil Modulation Cycle from run 33213 - The dispersion in Hall C line has been fixed
130556 01/11/07 16:49 Franklin Beam: IOC rebooted
130555 01/11/07 16:45 jschaub Analysis: 1Hz Structure and RCS Issues
130554 01/11/07 16:45 horn Run plan for tonight/tomorrow
130552 01/11/07 16:15 Lung No beam
130551 01/11/07 16:10 cdaq Beam Time Accounting
130549 01/11/07 16:07 Lung Day Shift Summary
130548 01/11/07 16:05 jschaub Analysis: Shift Checklist for Runs 33193-33212
130547 01/11/07 15:52 Breuer possibly Cerenkov o2-1 not working since some time including run 33214
130544 01/11/07 15:18 pking Analysis: I have restored the mysql service on wmg0.
130543 01/11/07 15:10 jschaub Beam: Screen Captures
130542 01/11/07 14:53 Lung BPM IOC SE20 rebooted.
130541 01/11/07 14:39 suleiman Beam: After huge effort by Pete Francis (Thanks) - IPM0L03XM is now fixed
130540 01/11/07 14:23 pking Analysis: I am taking down the mysql database on wmg0 for a little while.
130539 01/11/07 14:19 horn Beam: feedback display updated
130538 01/11/07 14:16 jschaub HV Back Up
130536 01/11/07 14:13 jschaub SMS: Transfer Protocol Error
130535 01/11/07 14:13 horn Beam: halo and beam positions after tuning
130534 01/11/07 14:11 jschaub HV Trip
130533 01/11/07 14:08 horn Beam polarization - from Mott measurement
130530 01/11/07 13:38 Lung Restarted beamfeedback and realtime analyzer
130528 01/11/07 12:59 Lung Improved beam tune
130527 01/11/07 12:41 jmammei Beam: injector calibrations added to DB for last calibration
130524 01/11/07 12:09 ppillot Analysis: better estimation of deadtime using pion matrix
130522 01/11/07 11:56 jschaub Target: Weird (Hopefully) Transient Alarm
130521 01/11/07 11:47 Lung No raster beam prep
130520 01/11/07 11:41 suleiman Beam: The XM wire of the 0L03 BPM is bad
130519 01/11/07 11:40 suleiman Beam: Mike Spata was informed of the big dispersion in our line and he is going to fix it now.
130518 01/11/07 11:39 jschaub Target: Moving Target Out of Beamline
130516 01/11/07 11:25 Lung Restart beamfeedback and realtime
130515 01/11/07 11:09 jmammei Beam: BPM calibrations for run 33190
130514 01/11/07 10:58 suleiman Beam: Charge Asymmetry and Position Differences from run 33207 - OUT
130513 01/11/07 10:55 horn Beam update
130510 01/11/07 10:28 Lung/Suleima Beam: The Parity-Quality Screens from the RealTime Display
130509 01/11/07 10:17 suleiman Beam: Coil Modulation Cycle from run 33207
130506 01/11/07 08:01 cdaq Beam Time Accounting
130505 01/11/07 08:00 muether Owl shift summary
130502 01/11/07 06:56 muether/cari Total randoms coincidence matrix
130498 01/11/07 05:16 real shift check list snapshots
130488 01/11/07 02:11 Breuer Result of shielding change for octant 5.
130485 01/11/07 01:23 Breuer remarks on special random matrix runs
130484 01/11/07 01:06 muether Snapshot of Pion matrix at 35uA
130479 01/11/07 00:20 Carissa Target: shift checklist
130478 01/11/07 00:06 Franklin Swing Shift Summary
130477 01/11/07 00:04 cdaq Beam Time Accounting
Wednesday
130474 01/10/07 23:54 Franklin Beam: Parity QUality
130473 01/10/07 23:32 Franklin Beam: Halos erratic
130472 01/10/07 23:18 Franklin SMS: (CED, FPD) snapshots for special matrix
130471 01/10/07 23:06 Carissa Analysis: Checklist
130469 01/10/07 23:03 horn Run plan for tonight/tomorrow
130466 01/10/07 22:13 Franklin Beam: Halo problem
130465 01/10/07 21:44 horn HV trip - reset
130461 01/10/07 20:58 Franklin Beam: Beam off for awhile
130460 01/10/07 20:34 Franklin SMS: (CED,FPD) snapshots for special matrix
130453 01/10/07 17:51 suleiman Beam: Increase the limits (factor 2) on the first coil (y)
130452 01/10/07 17:47 suleiman Beam: Coil Modulation Cycle from run 33189 - will lower the limits on Coil 6 (y)
130451 01/10/07 17:36 suleiman Beam: The IOCs are in Gain OFF
130450 01/10/07 17:33 suleiman/Fra Beam: Start BCM/BPM Calibration run 33190
130447 01/10/07 16:50 cdaq Beam Time Accounting
130446 01/10/07 16:49 suleiman Beam: G0 Cavity Siganls from run 33185 - The signals are saturated since we are running at 35 uA now
130445 01/10/07 16:40 ppillot Analysis: deadtime in LD2 at 40 uA
130444 01/10/07 16:22 jschaub Target: Screen Captures
130443 01/10/07 16:21 jschaub Target: Screen Captures
130440 01/10/07 16:07 amicherd Day shift summary
130439 01/10/07 16:04 suleiman Beam: Charge Asymmetry and Position Differences from run 33185 - OUT - Looks good.
130438 01/10/07 15:36 suleiman Beam: How to change the Insertable Half-wave Plate (IHWP)
130437 01/10/07 15:27 jschaub Analysis: Checklist for Runs 33177-33185
130436 01/10/07 15:26 jschaub Analysis: Checklist for Runs 33177-33185
130433 01/10/07 14:32 amicherd stable 35uA beam back, we are in production mode
130431 01/10/07 14:15 amicherd no beam - MCC called that they needed to have access, there will not be a beam
130427 01/10/07 12:34 Anna Micherd run 33184 and 33185 status, now we are using ts_fullinj
130426 01/10/07 12:33 Anna Micherd run 33184 and 33185 status, now we are using ts_fullinj
130424 01/10/07 12:06 jschaub Target: Low Magnet Current Alarm
130422 01/10/07 11:59 muether SMS: VCL B Flow Controller Problem
130421 01/10/07 10:49 jschaub Target: Target and Magnet Alarms
130417 01/10/07 10:28 gaskell Octant 5 shielding removed
130416 01/10/07 10:12 saw More on DAQ problem
130415 01/10/07 09:46 Fatiha run ***82 is a test run
130414 01/10/07 09:40 Fatiha We will use ts_full for now
130410 01/10/07 09:01 Fatiha Lost the rsh connection ( gzerol3 to the crates)
130409 01/10/07 08:40 horn coil modulation turned on before run 33180
130408 01/10/07 08:18 real CRYO problem in south Linac. Beam is off for a while.
130407 01/10/07 08:16 real Owl shift summary
130406 01/10/07 08:04 cdaq Beam Time Accounting
130405 01/10/07 07:39 muether Checklist scan
130404 01/10/07 07:33 real Problem with CODA, we could not close the runs.
130396 01/10/07 06:29 muether Short Analysis Checklist
130395 01/10/07 05:56 muether Shift check list screen grabs
130394 01/10/07 05:49 Breuer Anode currents, SPE signalshight , HV change Oct 3, before run 33178
130393 01/10/07 05:26 Breuer Analysis: randoms as a function of beam current scan
130392 01/10/07 05:24 Breuer Analysis: Multiplicity ratios for electron detection efficiency
130391 01/10/07 05:17 muether Target: Close JT valve 2 click
130390 01/10/07 05:16 real roc31 does not come back
130389 01/10/07 05:13 real Inaccurate threshold for mutiplicity for french cerenkov
130387 01/10/07 05:02 real ROC 31 (goinj) crached when I did a start run. I reboot it.
130383 01/10/07 03:45 Breuer Analysis: Multiplicity ratios for electron detection efficiency
130378 01/10/07 03:01 real Very bad halo for run 33172, improved for run 33173
130374 01/10/07 02:43 real We are done with 5 uA beam study. waiting for higher current to continue the plan.
130370 01/10/07 02:07 real Cerenkov multiplicity check, while MCC works on beam
130361 01/10/07 00:58 muether Target: Downstream (CAV2) indicator blinking red during >45 uA running
130356 01/10/07 00:26 real low beam current
130353 01/10/07 00:13 Carissa Target: Shift checklist/summary...
130351 01/10/07 00:05 Franklin Swing Shift Summary
130350 01/10/07 00:02 cdaq Beam Time Accounting
Tuesday
130348 01/09/07 23:47 Carissa Target: Alarms: heat load and temperature.
130344 01/09/07 22:48 pking Analysis: Added new BCM calibration for the changed BCM gains
130342 01/09/07 22:38 suleiman Beam: The position diffeences for IN and OUT
130335 01/09/07 21:07 Breuer Anode Current Monitor (ACM) plot evaluation
130333 01/09/07 20:53 Breuer/Verst loaded new CED/FPD HV's and backed up before run 33157
130329 01/09/07 20:12 Carissa Target: LD2 target now in
130328 01/09/07 20:03 Carissa Target: Moving target into beam: LD2
130327 01/09/07 20:03 suleiman Beam: The Beam positions on target and on the pivot are good now
130325 01/09/07 19:27 Breuer HV with new Cerenkov settings backed up
130324 01/09/07 19:25 horn Wien angle setting for this run period
130323 01/09/07 19:12 Breuer HV with new Cerenkov settings backed up
130322 01/09/07 19:09 horn Updated BCM calibration in EPICS
130321 01/09/07 19:03 horn Run plan for tonight/tomorrow
130320 01/09/07 17:13 Franklin SMS: Oct 3 Cherenkov ADCs fixed
130319 01/09/07 17:02 cdaq Beam Time Accounting
130318 01/09/07 17:02 jschaub Analysis: DBPlotter Updated
130317 01/09/07 16:54 suleiman Beam: The BCM1 and BCM2 Gains were lowered from 4 to 3 - The epics gains should be adjusted to matc hthe new Gain settings
130316 01/09/07 16:16 Anna Micherd Day Shift summary
130315 01/09/07 15:17 Breuer et al adjusted HV for Cerenkovs again; some gain losses since yesterday, anode currents
130314 01/09/07 14:54 Fatiha Scratch disk is full, Moving the Fall root files.
130313 01/09/07 14:23 suleiman Beam: Coil Modulation Cycle from run 33153 - Change the modulation amplitude
130312 01/09/07 13:52 jschaub Analysis: DBPlotter Update
130311 01/09/07 11:57 suleiman Beam: G0 Cavity Signals from run 33153
130310 01/09/07 11:44 suleiman Beam: Parity Quality from run 33153 - Not that big improvement and still showing the same behavior in Hall C line - Chao is working on it now
130309 01/09/07 11:02 horn status update
130308 01/09/07 10:34 suleiman Beam: The Parity Quality of G0 beam has improved overnight
130307 01/09/07 10:24 jschaub Target: Moved Target Out of Beamline
130302 01/09/07 08:08 real Owl shift summary
130300 01/09/07 08:02 cdaq Beam Time Accounting
130299 01/09/07 07:37 real random rates, ration random/elastic in coincidence matrix
130298 01/09/07 07:26 muether Analysis Checklist 33143-33150
130297 01/09/07 06:42 real Fastbus prescale adjusted to 4000. Rates are 80 evt/s
130296 01/09/07 06:42 muether Shift Check list screen grabs
130287 01/09/07 03:40 real relaunch good_for gui, It was updating gzero_687MeV_com2 db instead of 362 one
130278 01/09/07 00:58 real current beam scan is delay to tomorrow morning, because of the ion chamber calibration
130276 01/09/07 00:30 cdaq Beam Time Accounting
130274 01/09/07 00:04 Franklin Swing Shift Summary
Monday
130269 01/08/07 23:35 Carissa Target: Shift Checklist
130268 01/08/07 23:34 Franklin SMS: Coincidence Matrix Plot
130267 01/08/07 23:16 Franklin Beam: LUMI HVs turned on.
130264 01/08/07 22:32 Franklin SMS: Current Snapshop display
130256 01/08/07 21:27 suleiman Beam: Parity Quality for IN - run 33136
130255 01/08/07 21:21 suleiman Beam: Hall C BPMs Widths during run 33136
130254 01/08/07 21:21 Carissa Target: LD2 target in...
130252 01/08/07 20:58 suleiman Beam: The RealTime plots showing parity-quality from run 33136
130251 01/08/07 20:54 suleiman Beam: Parity Quality for OUT - run 33135
130250 01/08/07 20:50 suleiman Beam: Hall C BPMs Widths during run 33135
130249 01/08/07 20:45 Franklin SMS: Detector rates with target out
130248 01/08/07 20:41 suleiman Target: Halo and beam position
130247 01/08/07 20:39 suleiman Beam: Parity Controls Screen - during run 33136
130244 01/08/07 20:18 suleiman Beam: The RealTime plots showing parity-qulaity from run 33135
130243 01/08/07 20:10 suleiman Beam: Charge Feedback is ON
130242 01/08/07 20:01 suleiman Beam: IA Scan. New Slope and the Charge Feedback is ON. New Slope = -1225 ppm/DAC V.
130241 01/08/07 19:59 Breuer turn on HV's at 20 uA, no target
130236 01/08/07 19:15 Franklin SMS: Improve Parity quality... start IA scan
130230 01/08/07 18:05 Franklin Beam: First Beam
130229 01/08/07 18:03 horn Short Run Plan
130228 01/08/07 17:09 Breuer reseated decoder board for octant 3
130227 01/08/07 17:03 Breuer/Real adjusted most Cerenkov HV's
130226 01/08/07 16:53 smithg & mse Target: LD2 condensed- cooldown completed
130225 01/08/07 16:37 muether SMS: Ramped magnet to 2650
130221 01/08/07 15:26 muether SMS: Local magnet expert pager re-enabled (587-5574)
130220 01/08/07 15:07 muether SMS: Responded to some alarms
130219 01/08/07 14:46 smithg Target: starting transition to cold return
130218 01/08/07 14:29 real G0 HV system Rebooted, and works
130217 01/08/07 14:22 smithg Target: cool down in progress
130216 01/08/07 14:19 saw High Voltage EPICS software change
130215 01/08/07 14:08 real Cerenkov HV ON
130214 01/08/07 13:30 Fatiha All works fien afetr the file system check
130209 01/08/07 12:12 Fatiha gzerol3. fiole system check
130208 01/08/07 12:06 jschaub Analysis: Updated G0DBPlotter
130207 01/08/07 11:22 smithg Target: Cooldown delayed till noonish
130206 01/08/07 09:36
Saturday
130205 01/06/07 19:14 pking Analysis: Fixed error in autoanalyzers; restarted autoanalyzers
130204 01/06/07 18:48 gzero ASCS summary for Fri Jan 05 2007
130203 01/06/07 18:43 pking Analysis: Finished updating the gzero_362MeV_comm2 database; this running period begins with run 33060.
Friday
130202 01/05/07 19:14 pking Analysis: Finished installing the new analyzer, still need some work for gzero_362MeV_comm2 database.
130201 01/05/07 18:26 Breuer Analysis: Extraction of electron efficiencies from comparing yields for different Cerenkov multiplicities
130200 01/05/07 16:36 breuer ignore this: it is just a test
130199 01/05/07 16:16 smithg Target: Changed target helium bottles
130198 01/05/07 15:12 kenyon SMS: Bottom octant shielding
130197 01/05/07 14:54 real cosmics ended, HV OFF for the weekend
130195 01/05/07 14:47 gaskell Halo HV on
130194 01/05/07 14:46 gaskell Call for sweep
130193 01/05/07 14:33 pking Analysis: I will be changing the G0Analysis version and switching to "gzero_362MeV_comm2" this afternoon.
130192 01/05/07 14:14 kenyon Moller vent line H2O box
130191 01/05/07 14:12 kenyon There are H2O leaks on SOS quad's cooling lines.
130190 01/05/07 14:10 kenyon/caruc SMS: A can pump swap
130189 01/05/07 14:08 real Summary of tests
130188 01/05/07 13:47 real HV change for cer Octant 6 PMT 1
130185 01/05/07 12:55 smithg Target: Moved target to out-of-beam position
130172 01/05/07 06:32 muether SMS: Another EBC error
Thursday
130171 01/04/07 16:31 muether SMS: Strange LHe Inlet Temperature High Alarm
130170 01/04/07 16:30 real Spare low voltage power supply
130167 01/04/07 16:23 real Low power supply problem, come from CER 6-4
130164 01/04/07 15:33 real Low power supply problem, come from CER 6-1
130161 01/04/07 12:05 real Low voltage power supply seem dead
130158 01/04/07 11:34 real Error in roc31, using ts_Fullinj, Not a problem said Riad
130154 01/04/07 11:25 real run 33113 was a daq test run, with 30Hz and config : ts_full
130151 01/04/07 10:48 real Electronic racks are power up
130150 01/04/07 08:58 kenyon SMS: LHe level problem
130149 01/04/07 08:50 kenyon/caruc Target: Pumped out target VJs
Wednesday
130148 01/03/07 21:16 suleiman Beam: The Injector beam studies are over for now - On sunday swing we will check the parity Quality in Hall C
130147 01/03/07 21:10 suleiman Beam: G0 Injector Beam Studies
130145 01/03/07 20:32 suleiman Beam: The status of the laser table at the end of beam studies
130134 01/03/07 18:29 suleiman Beam: PC Stages for OUT
130131 01/03/07 18:17 muether SMS: SMS Control System Failure
130127 01/03/07 17:17 suleiman Beam: Injector BPMs Pedestals from run 33103 (monitor_calibration_id=18)
130123 01/03/07 16:46 suleiman Beam: Laser setup at start of beam studies
130122 01/03/07 16:35 suleiman Beam: iocse11 is in Gains off
130115 01/03/07 16:24 suleiman Beam: Pc Status at the start of beam test (and iocse11)
Tuesday
130111 01/02/07 16:42 Bailey & Sul Beam: G0 PC Installation Summary
130071 01/02/07 12:37 muether SMS: Responding to LHe Alarm
Monday