Jefferson Lab Hall C Logbook for February 07 - Full Listing
Main INDEX
Wednesday
134212 02/28/07 20:58 muether SMS: Recieved PLC Heartbeat and Temp Mon alarms
134211 02/28/07 18:42 gzero Run 34297: Fastbus run FASTCLEAR enabled PS4=0 no TED
134210 02/28/07 18:39 gzero End of Run 34296:
134209 02/28/07 18:39 gzero Run 34296: JUNK
134208 02/28/07 18:38 gzero End of Run 34295:
134207 02/28/07 18:37 gzero Run 34295: JUNK
134206 02/28/07 18:11 suleiman Beam: Helicity Electrical Pickup
134205 02/28/07 17:56 gzero End of Run 34294:
134204 02/28/07 17:44 gzero Run 34294: Pockels Cell OFF - 35 uA to inline dump, normal setup
134203 02/28/07 17:40 gzero End of Run 34293:
134202 02/28/07 17:28 gzero Run 34293: Pockels Cell OFF - 35 uA to inline dump, Helicity cable unplugged to HV switch, Helicity signal unplugged to helicity magnets
134201 02/28/07 17:24 gzero End of Run 34292:
134200 02/28/07 17:14 gzero Run 34292: Pockels Cell OFF - 35 uA to inline dump, Helicity cable unplugged to HV switch
134199 02/28/07 17:04 gzero End of Run 34291:
134198 02/28/07 16:53 gzero Run 34291: Pockels Cell OFF - 35 uA to inline dump, Helicity cable unplugged to HV switch
134197 02/28/07 16:45 gzero End of Run 34290:
134196 02/28/07 16:35 gzero Run 34290: Pockels Cell OFF - 35 uA to inline dump
134195 02/28/07 12:18 gzero End of Run 34289:
134194 02/28/07 12:16 gzero Run 34289: Test of normal G0 run type after yesterdays work on g0inj
134193 02/28/07 11:18 gzero End of Run 34288:
134192 02/28/07 11:12 gzero Run 34288: Test of normal G0 run type after yesterdays work on g0inj
Tuesday
134191 02/27/07 19:49 gzero End of Run 34287:
134190 02/27/07 19:27 gzero Run 34287: Parity Quality Test, OUT, Flip Rate = 250 Hz, Pockels Cell ON
134189 02/27/07 19:26 gzero End of Run 34286:
134188 02/27/07 19:25 suleiman Beam: Commissioning of the new pockels cell HV switch
134187 02/27/07 19:08 gzero Run 34286: Parity Quality Test, OUT, Flip Rate = 250 Hz, Pockels Cell OFF
134186 02/27/07 19:08 gzero End of Run 34285:
134185 02/27/07 18:55 gzero Run 34285: Parity Quality Test, OUT, Flip Rate = 30 Hz, Pockels Cell OFF
134184 02/27/07 18:54 gzero End of Run 34284:
134183 02/27/07 18:34 gzero Run 34284: Parity Quality Test, OUT, Flip Rate = 30 Hz
134182 02/27/07 18:29 gzero End of Run 34283:
134181 02/27/07 18:12 gzero Run 34283: Parity Quality Test, OUT, Flip Rate = 30 Hz
134180 02/27/07 17:58 gzero End of Run 34282:
134179 02/27/07 17:42 gzero Run 34282: Parity Quality Test, IN, Flip Rate = 250 Hz
134178 02/27/07 17:38 gzero End of Run 34281:
134177 02/27/07 17:23 gzero Run 34281: Parity Quality Test, IN
134176 02/27/07 17:00 gzero End of Run 34280:
134175 02/27/07 16:53 gzero Run 34280: Pedestal Run, Helicity Rate = 30 Hz
134174 02/27/07 16:47 gzero End of Run 34279:
134173 02/27/07 16:40 gzero Run 34279: Pedestal Run, Helicity Rate = 250 Hz
134172 02/27/07 16:38 pking Changed kernel for g0inj; 250 Hz acquisition works now.
134171 02/27/07 16:36 gzero End of Run 34278:
134170 02/27/07 16:31 gzero Run 34278: Pedestal Run, Helicity Rate = 250 Hz
134169 02/27/07 15:28 gzero End of Run 34276:
134168 02/27/07 15:22 gzero Run 34276: Pedestal Run, Helicity Rate = 250 Hz
134167 02/27/07 15:17 gzero End of Run 34275:
134166 02/27/07 15:12 gzero Run 34275: Pedestal Run, Helicity Rate = 250 Hz
134165 02/27/07 15:10 gzero End of Run 34274:
134164 02/27/07 15:10 gzero Run 34274: Pedestal Run, Helicity Rate = 250 Hz
134163 02/27/07 14:52 gzero Run 34273: Pedestal Run, Helicity Rate = 250 Hz
134162 02/27/07 14:48 gzero End of Run 34272:
134161 02/27/07 14:47 gzero Run 34272: Pedestal Run, Helicity Rate = 250 Hz
134160 02/27/07 14:42 gzero End of Run 34271:
134159 02/27/07 14:41 gzero Run 34271: Pedestal Run, Helicity Rate = 250 Hz
134158 02/27/07 14:38 gzero End of Run 34270:
134157 02/27/07 14:34 gzero Run 34270: Pedestal Run, Helicity Rate = 250 Hz
134156 02/27/07 14:32 gzero End of Run 34269:
134155 02/27/07 14:28 gzero Run 34269: Pedestal Run, Helicity Rate = 250 Hz
134154 02/27/07 14:27 gzero End of Run 34268:
134153 02/27/07 14:15 gzero Run 34268: Pedestal Run, Helicity Rate = 250 Hz
134152 02/27/07 14:13 gzero End of Run 34266:
134151 02/27/07 13:59 gzero End of Run 34266:
134150 02/27/07 13:56 gzero Run 34266: Pedestal Run, Helicity Rate = 250 Hz
134149 02/27/07 13:44 gzero End of Run 34265:
134148 02/27/07 13:27 gzero Run 34265: Pedestal Run, Helicity Rate = 250 Hz
134147 02/27/07 13:26 gzero End of Run 34264:
134146 02/27/07 13:22 gzero Run 34264: Pedestal Run, Helicity Rate = 250 Hz
134145 02/27/07 13:22 gzero End of Run 34263:
134144 02/27/07 13:11 gzero Run 34263: Pedestal Run, Helicity Rate = 250 Hz
134143 02/27/07 12:26 gzero End of Run 34262:
134142 02/27/07 12:25 gzero Run 34262: Test of Logbook
0 02/27/07 09:04 no_name no_key
0 02/27/07 08:53 no_name no_key
0 02/27/07 08:41 no_name no_key
0 02/27/07 08:38 no_name no_key
0 02/27/07 08:34 no_name no_key
0 02/27/07 08:33 no_name no_key
0 02/27/07 08:18 no_name no_key
134134 02/27/07 00:10 saw Test
Monday
0 02/26/07 17:41 no_name no_key
0 02/26/07 17:36 no_name no_key
0 02/26/07 17:35 no_name no_key
0 02/26/07 17:31 no_name no_key
134129 02/26/07 17:29 gzero End of Run 34255:
134128 02/26/07 17:19 gzero Run 34255: Pedestal run, Helicity Flip = 250 Hz
134127 02/26/07 17:14 gzero End of Run 34254:
134126 02/26/07 17:10 gzero Run 34254: Pedestal run, Helicity Flip = 250 Hz
134125 02/26/07 17:07 gzero End of Run 34253:
134124 02/26/07 16:53 gzero Run 34253: Pedestal run, Helicity Flip = 250 Hz
134123 02/26/07 16:49 gzero End of Run 34252:
134122 02/26/07 16:43 gzero Run 34252: Pedestal run, Helicity Flip = 30 Hz
134121 02/26/07 09:31 ludwig Beam Time Accounting
Saturday
134120 02/24/07 21:52 benesch turned on halo detectors to allow beam line setup
134119 02/24/07 18:10 smithg Target: Moved tgt out of beam
Friday
134118 02/23/07 09:14 suleiman Beam: Position Feedback is Ready
134117 02/23/07 08:55 smithg Target: completed target warmup procedure
134116 02/23/07 08:17 smithg Target: rebooted ioc to fix tach readout
134115 02/23/07 07:47 seva hall c in restricted
134114 02/23/07 07:45 seva turned HV off
134113 02/23/07 07:44 seva magnet off
134112 02/23/07 07:13 seva owl shift summary
134111 02/23/07 07:13 seva beam off; asked mcc to put hall c in restricted access
134110 02/23/07 07:05 vardan Target: analysis shift checklist for runs 34243-50
134109 02/23/07 06:59 gzero End of Run 34251:
134108 02/23/07 06:51 M Jones Swing shift summary
134107 02/23/07 06:51 M Jones Swing shift summary
134106 02/23/07 05:48 tadevosn Target: shift checklist snapshots
134105 02/23/07 05:44 gzero Run 34251: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134104 02/23/07 05:42 gzero End of Run 34250:
134103 02/23/07 04:35 gzero Run 34250: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134102 02/23/07 04:33 gzero End of Run 34249:
134101 02/23/07 04:08 jianglai RC cell phone
134100 02/23/07 03:33 gzero Run 34249: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134099 02/23/07 03:31 gzero End of Run 34248:
134098 02/23/07 02:34 gzero Run 34248: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134097 02/23/07 02:31 gzero End of Run 34247:
134096 02/23/07 01:28 gzero Run 34247: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134095 02/23/07 01:28 gzero End of Run 34246:
134094 02/23/07 00:28 gzero Run 34246: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134093 02/23/07 00:27 cdaq Beam Time Accounting
134092 02/23/07 00:27 gzero End of Run 34245:
Thursday
134091 02/22/07 23:46 Carissa Target: Shift Checklist screenshots
134090 02/22/07 23:41 M Jones Swing shift summary
134089 02/22/07 23:27 gzero Run 34245: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134088 02/22/07 23:26 gzero End of Run 34244:
134087 02/22/07 22:41 Carissa Analysis: Checklist for runs 34238-34242
134086 02/22/07 22:26 gzero Run 34244: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134085 02/22/07 22:25 gzero End of Run 34243:
134084 02/22/07 21:24 gzero Run 34243: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134083 02/22/07 21:22 gzero End of Run 34242:
134082 02/22/07 20:19 gzero Run 34242: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134081 02/22/07 20:18 gzero End of Run 34241:
134080 02/22/07 19:18 gzero Run 34241: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134079 02/22/07 19:17 gzero End of Run 34240:
134078 02/22/07 18:28 suleiman Beam: The Injector Charge Asymmtery as measured by HAPPEX DAQ compared to G0 DAQ
134077 02/22/07 18:17 gzero Run 34240: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134076 02/22/07 18:16 gzero End of Run 34239:
134075 02/22/07 17:53 suleiman Beam: Feedback Screens (Charge and Position)
134074 02/22/07 17:16 gzero Run 34239: LD2 prod random,35 uA,362 MeV,Ps4=4000,IHWP=IN,Pos Fb ON
134073 02/22/07 17:13 gzero End of Run 34238:
134072 02/22/07 16:12 gzero Run 34238: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134071 02/22/07 16:10 gzero End of Run 34237:
134070 02/22/07 16:08 cdaq Beam Time Accounting
134069 02/22/07 16:06 amicherd Day shift summary
134068 02/22/07 15:52 maud Analysis: chaclist from r34226 to r34237
134067 02/22/07 15:24 suleiman Beam: Beam RealTime Screens during run 34237 - Position Feedback OFF.
134066 02/22/07 15:24 maud Target: target snapshots
134065 02/22/07 15:10 gzero Run 34237: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134064 02/22/07 15:08 gzero End of Run 34236:
134063 02/22/07 15:05 gzero Run 34236: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134062 02/22/07 15:03 gzero End of Run 34235:
134061 02/22/07 15:03 suleiman Beam: Beam RealTime Screens during run 34235 - Position Feedback ON.
134060 02/22/07 14:54 suleiman Beam: Feedback Screens (Charge and Position)
134059 02/22/07 14:21 Fatiha Follow-up on the halo
134058 02/22/07 14:01 suleiman Beam: Charge Asymmetry and Position Differences from run 34233 - IN - Position Feedback ON
134057 02/22/07 14:00 gzero Run 34235: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134056 02/22/07 13:59 gzero End of Run 34234:
134055 02/22/07 13:44 jschaub/fati Analysis: Preliminary Look at Halo Effects on Yield
134054 02/22/07 12:58 gzero Run 34234: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134053 02/22/07 12:56 gzero End of Run 34233:
134052 02/22/07 11:55 gzero Run 34233: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=IN
134051 02/22/07 11:54 amicherd I inserted HWP in
134050 02/22/07 11:50 gzero End of Run 34232:
134049 02/22/07 10:47 amicherd 35uA beam is back in normal, we started run
134048 02/22/07 10:45 gzero Run 34232: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134047 02/22/07 10:37 amicherd I stoped run, since nooticed thart we still have someting in coincidence yiels
134046 02/22/07 10:34 gzero End of Run 34231:
134045 02/22/07 10:31 amicherd MCC sending trune beam, this should not take more than couple of minutes
134044 02/22/07 10:06 jianglai RC Report: Feb. 21 Swing to Feb. 22 Day
134043 02/22/07 10:05 gzero Run 34231: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134042 02/22/07 10:04 gzero End of Run 34230:
134041 02/22/07 09:59 jianglai Analysis: owl shift analysis shift check list
134040 02/22/07 09:47 jschaub Beam: G0 Cavity Monitor Signals for Run 34209
134039 02/22/07 09:27 suleiman Beam: Position Feedback is now ON
134038 02/22/07 09:03 gzero Run 34230: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134037 02/22/07 09:00 gzero End of Run 34229:
134036 02/22/07 08:59 gzero Run 34229: junk
134035 02/22/07 08:57 gzero End of Run 34228:
134034 02/22/07 08:04 cdaq Beam Time Accounting
134033 02/22/07 08:03 seva owl shift summary
134032 02/22/07 07:59 gzero Run 34228: LD2 production random (position feedback ON), 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134031 02/22/07 07:56 gzero End of Run 34227:
134030 02/22/07 07:51 gzero Run 34227: Check Helicity Magnets Slope, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134029 02/22/07 07:48 gzero End of Run 34226:
134028 02/22/07 07:22 beaufait end of shift snapshots
134027 02/22/07 07:10 gzero Run 34226: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134026 02/22/07 07:08 gzero End of Run 34225:
134025 02/22/07 06:27 gzero Run 34225: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134024 02/22/07 06:08 gzero End of Run 34224:
134023 02/22/07 05:07 seva changed cerenkov multiplicity to 2/4
134022 02/22/07 05:07 gzero Run 34224: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134021 02/22/07 05:03 gzero End of Run 34223:
134020 02/22/07 04:57 gzero Run 34223: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT,Cerenkov 3/4
134019 02/22/07 04:56 gzero End of Run 34222:
134018 02/22/07 04:55 gzero Run 34222: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT,Cerenkov 3/4
134017 02/22/07 04:55 beaufait target ioc locked up
134016 02/22/07 04:54 seva changed cerenkov multiplicity to 3/4
134015 02/22/07 04:45 gzero End of Run 34221:
134014 02/22/07 03:45 gzero Run 34221: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134013 02/22/07 03:43 gzero End of Run 34220:
134012 02/22/07 02:41 gzero Run 34220: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134011 02/22/07 01:54 gzero End of Run 34219:
134010 02/22/07 00:41 gzero Run 34219: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134009 02/22/07 00:40 gzero End of Run 34218:
134008 02/22/07 00:03 cdaq Beam Time Accounting
Wednesday
134007 02/21/07 23:55 M Jones Swing shift summary
134006 02/21/07 23:41 gzero Run 34218: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
134005 02/21/07 23:39 gzero End of Run 34217:
134004 02/21/07 23:25 jianglai Run plan: Feb 21 Swing - Feb. 23 Owl
134003 02/21/07 23:13 Carissa Target: Shift Checklist scan
134002 02/21/07 23:06 Carissa Target: Shift Checklist Screenshots
134001 02/21/07 22:56 jianglai Scope measurement of Cerenkov HVs
134000 02/21/07 22:38 gzero Run 34217: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133999 02/21/07 22:37 gzero End of Run 34216:
133998 02/21/07 22:07 Carissa Analysis: Checklist for runs 34208-34214
133997 02/21/07 21:37 gzero Run 34216: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133996 02/21/07 21:35 gzero End of Run 34215:
133995 02/21/07 20:35 gzero Run 34215: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133994 02/21/07 20:34 gzero End of Run 34214:
133993 02/21/07 19:33 gzero Run 34214: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133992 02/21/07 19:32 gzero End of Run 34213:
133991 02/21/07 18:35 gzero Run 34213: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133990 02/21/07 18:33 gzero End of Run 34212:
133989 02/21/07 17:33 gzero Run 34212: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133988 02/21/07 17:32 gzero End of Run 34211:
133987 02/21/07 17:09 jschaub Beam: Coil Modulation Cycle from Run 34209
133986 02/21/07 16:43 Breuer Analysis: list of Cerenkov efficiency/gain/HV related entries
133985 02/21/07 16:32 gzero Run 34211: LD2 production random, 35 uA, 362 MeV, Ps4=4000, IHWP=OUT
133984 02/21/07 16:30 gzero End of Run 34210:
133983 02/21/07 16:16 suleiman Beam: Charge Asymmetry and Position Differences from run 34209 - OUT
133982 02/21/07 16:13 jianglai Friday shutdown time
133981 02/21/07 16:09 cdaq Beam Time Accounting
133980 02/21/07 16:06 amicherdz my day shift summary, was send too early :-), as update for my entry we completed run 34210, with the same cond. as 34209
133979 02/21/07 15:46 jianglai RC report: Feb. 20 Day - Feb. 21 Day
133978 02/21/07 15:30 gzero Run 34210: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133977 02/21/07 15:29 gzero End of Run 34209:
133976 02/21/07 15:04 amicherdz Day shift summary
133975 02/21/07 14:35 amicherd We changed fastbus prescaling for triger (increase) to 3500, now rates are good.
133974 02/21/07 14:34 jianglai 35 uA beam back
133973 02/21/07 14:32 amicherd We have 35uA beam with good hallo
133972 02/21/07 14:27 gzero Run 34209: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133971 02/21/07 14:26 gzero End of Run 34208:
133970 02/21/07 14:23 gzero Run 34208: LD2 production random, 35 uA, 362 MeV, Ps4=3000, IHWP=OUT
133969 02/21/07 14:22 gzero End of Run 34207:
133968 02/21/07 13:42 jmammei/amic Analysis: shift task list for runs 34197-34207
133967 02/21/07 13:41 jmammei/amic Analysis: shift task list for runs 34197-34207
133966 02/21/07 12:24 Target: fixed tachometer readout
133965 02/21/07 09:50 jmammei Target: HP heater reserve power
133964 02/21/07 09:43 jmammei Beam: turned halo monitors back on
133963 02/21/07 09:43 jianglai beam status
133962 02/21/07 09:33 jianglai Analysis: Cerenkov electron efficiency extracted from M2/M3 after we adjusted the high voltage
133961 02/21/07 09:29 gzero Run 34207: beam tuning, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133960 02/21/07 09:15 amicherd MCC will try to fix the beam over next ~.5 h.
133959 02/21/07 09:13 amicherd HV was sniped due to a momentarly huge hallo and beam trip
133958 02/21/07 09:12 gzero End of Run 34206:
133957 02/21/07 09:07 gzero Run 34206: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133956 02/21/07 09:02 jmammei Target: tachometer readout
133955 02/21/07 09:00 gzero End of Run 34205:
133954 02/21/07 08:36 jianglai beam status
133953 02/21/07 08:33 jmammei Target: tachometer
133952 02/21/07 08:06 seva owl shift summary
133951 02/21/07 08:05 gzero Run 34205: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133950 02/21/07 08:04 cdaq Beam Time Accounting
133949 02/21/07 08:04 gzero End of Run 34204:
133948 02/21/07 07:15 shift snapshots
133947 02/21/07 07:01 gzero Run 34204: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133946 02/21/07 06:58 seva problem solved; asked for beam
133945 02/21/07 06:54 seva rebooted G0 target IOC, again
133944 02/21/07 06:54 gzero End of Run 34203:
133943 02/21/07 06:41 seva rebooted G0 target IOC
133942 02/21/07 06:01 gzero Run 34203: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133941 02/21/07 05:59 gzero End of Run 34202:
133940 02/21/07 04:59 gzero Run 34202: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133939 02/21/07 04:58 gzero End of Run 34201:
133938 02/21/07 04:01 gzero Run 34201: LD2 production random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133937 02/21/07 04:00 seva change cerenkov multiplicity to 2/4
133936 02/21/07 03:58 gzero End of Run 34200:
133935 02/21/07 03:47 seva change cerenkov multiplicity to 3/4
133934 02/21/07 03:46 gzero Run 34200: LD2 production - random, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT, Cerenkov 3/4
133933 02/21/07 03:45 gzero End of Run 34199:
133932 02/21/07 02:51 jianglai beam back (sort of), we set up for data taking
133931 02/21/07 02:44 gzero Run 34199: LD2 production, 20 uA, 362 MeV, Ps4=3000, IHWP=OUT
133930 02/21/07 02:42 gzero End of Run 34198:
133929 02/21/07 02:32 gzero Run 34198: junk
133928 02/21/07 02:31 gzero End of Run 34197:
133927 02/21/07 02:26 gzero Run 34197: junk
133926 02/21/07 02:14 beaufait change to ld2 target
133925 02/21/07 00:12 maud Target: red alarm on gpOk4beam - greg was called.
133924 02/21/07 00:11 maud Target: LD2 target moved out of beam
133923 02/21/07 00:11 maud Target: IOC reboot
133922 02/21/07 00:02 cdaq Beam Time Accounting
Tuesday
133921 02/20/07 23:55 M JOnes Swing shift summary : NO BEAM
133920 02/20/07 23:32 maud No beam since this morning, so no snapshots and Analysis Checklist already up-to-date
133919 02/20/07 23:30 jianglai beam status
133918 02/20/07 19:53 jianglai Run plan: Feb 20 Swing to Feb 22 Owl
133917 02/20/07 19:27 pking Analysis: Discovered that "run_fill_start.pl" and "run_fill_end.pl" were still writing to 687MeV database
133916 02/20/07 17:13 jianglai Mott measurement after laser spot change
133915 02/20/07 16:08 cdaq Beam Time Accounting
133914 02/20/07 16:07 amicherd day shift summary
133913 02/20/07 13:37 jmammei He bottle (better format)
133912 02/20/07 13:37 jmammei He bottle
133911 02/20/07 13:17 jmammei Analysis: shift check list for runs 34175-34196
133910 02/20/07 12:43 jmammei shift checklist
133909 02/20/07 12:27 jianglai update cerenkov HVs for standard running
133908 02/20/07 12:01 jianglai Analysis: summary of matrix rates for electron, pion, and randoms for 362 MeV
133907 02/20/07 11:54 jmammei/muet SMS: ramping up to 2650A
133906 02/20/07 11:26 muether Reversed Polarity Field Scan
133905 02/20/07 10:48 Fatiha Ratio of coincidence matrices rates between Regular and reversed polarity
133904 02/20/07 09:45 gzero End of Run 34196:
133903 02/20/07 09:33 jmammei Target: Hall A 15K flowrate
133902 02/20/07 09:25 muether Drift Chamber LV on signal cable 241
133901 02/20/07 09:17 jianglai RC Report: Feb. 19 Day - Feb. 20 Day
133900 02/20/07 08:14 seva owl shift summary
133899 02/20/07 08:13 cdaq Beam Time Accounting
133898 02/20/07 08:12 beaufait end of shift report
133897 02/20/07 07:59 gzero Run 34196: run during Hall A BPM calibration
133896 02/20/07 07:27 jianglai control access to set the magnet polarity back
133895 02/20/07 07:00 beaufait shift snapshots
133894 02/20/07 06:50 gzero End of Run 34195:
133893 02/20/07 06:45 gzero Run 34195: Reverse polarity 1600A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133892 02/20/07 06:32 gzero End of Run 34194:
133891 02/20/07 06:22 gzero Run 34194: Reverse polarity 2000A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133890 02/20/07 06:19 beaufait magnet ramp down to 2000
133889 02/20/07 06:17 gzero End of Run 34193:
133888 02/20/07 06:07 gzero Run 34193: Reverse polarity 2400A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133887 02/20/07 06:01 gzero End of Run 34192:
133886 02/20/07 06:01 beaufait ramp[ down
133885 02/20/07 05:46 gzero Run 34192: Reverse polarity 3000A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133884 02/20/07 05:36 beaufait target motion and magnet change
133883 02/20/07 05:36 gzero End of Run 34191:
133882 02/20/07 05:30 beaufait target change
133881 02/20/07 05:07 gzero Run 34191: Reverse polarity 2650A, C, 362 MeV, 10uA, Ps4=4000, IHWP=OUT
133880 02/20/07 05:00 gzero End of Run 34190:
133879 02/20/07 04:34 gzero Run 34190: Reverse polarity 2650A, C, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133878 02/20/07 04:20 gzero End of Run 34189:
133877 02/20/07 03:51 gzero Run 34189: Reverse polarity 2650A, Al, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133876 02/20/07 03:48 gzero End of Run 34188:
133875 02/20/07 03:19 gzero Run 34188: Reverse polarity 2650uA, Al, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133874 02/20/07 03:17 beaufait target change
133873 02/20/07 03:04 gzero End of Run 34187:
133872 02/20/07 02:35 gzero Run 34187: Reverse polarity 2650uA, LD2, 362 MeV, 10uA, Ps4=4000, IHWP=OUT
133871 02/20/07 02:33 gzero End of Run 34186:
133870 02/20/07 02:23 seva reverse polarity: cerenkov and coin screen snapshot
133869 02/20/07 02:12 muether New Cerenkov HV Settings (for Reversed polarity and Standard field)
133868 02/20/07 02:11 jianglai reversed polarity run plan till end of OWL
133867 02/20/07 02:02 gzero Run 34186: Reverse polarity 2650uA, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133866 02/20/07 01:52 gzero Run 34185: Reverse polarity 2650uA, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133865 02/20/07 01:48 gzero End of Run 34184:
133864 02/20/07 01:27 gzero Run 34184: junk
133863 02/20/07 01:25 gzero End of Run 34183:
133862 02/20/07 01:10 gzero Run 34183: junk
133861 02/20/07 01:09 seva magnet ramped up; ready to take beam
133860 02/20/07 00:56 muether/beau SMS: SMS Polarity Reversed
133859 02/20/07 00:09 jianglai control access to switch the SMS polarity
133858 02/20/07 00:01 cdaq Beam Time Accounting
Monday
133857 02/19/07 23:56 M Jones Swing shift summary
133856 02/19/07 23:53 gzero End of Run 34182:
133855 02/19/07 23:44 M Jones SMS I=1600 Cerenkov and Coinc plots
133854 02/19/07 23:42 gzero Run 34182: field scan I=1600A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133853 02/19/07 23:35 Carissa Target: Shift Checklist screenshots
133852 02/19/07 23:31 gzero End of Run 34181:
133851 02/19/07 23:23 M Jones SMS I=2000 Cerenkov and Coinc plots
133850 02/19/07 23:20 gzero Run 34181: field scan I=2000A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133849 02/19/07 23:16 gzero End of Run 34180:
133848 02/19/07 23:09 M Jones SMS I=2400 Cerenkov and Coinc plots
133847 02/19/07 23:05 gzero Run 34180: field scan I=2400A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133846 02/19/07 23:01 gzero End of Run 34179:
133845 02/19/07 22:53 M Jones SMS I=2800 Cerenkov and Coinc plots
133844 02/19/07 22:49 gzero Run 34179: field scan I=2800A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133843 02/19/07 22:45 gzero End of Run 34178:
133842 02/19/07 22:43 Carissa Analysis: Checklist for runs 34166-34174
133841 02/19/07 22:38 M Jones SMS I=3200 Cerenkov and Coinc plots
133840 02/19/07 22:34 gzero Run 34178: field scan I=3200A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133839 02/19/07 22:28 gzero End of Run 34177:
133838 02/19/07 22:23 M Jones SMS I=3800 Cerenkov and Coinc plots
133837 02/19/07 22:17 gzero Run 34177: field scan I=3800A, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133836 02/19/07 22:05 gzero End of Run 34176:
133835 02/19/07 21:18 gzero Run 34176: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133834 02/19/07 21:18 Carissa Analysis: goodfor post -- neater
133833 02/19/07 21:17 gzero End of Run 34175:
133832 02/19/07 21:10 Carissa/Fati Analysis: Problem with good_for GUI -- Solved
133831 02/19/07 20:17 gzero Run 34175: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133830 02/19/07 20:15 gzero End of Run 34174:
133829 02/19/07 19:26 gzero Run 34174: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133828 02/19/07 19:24 gzero End of Run 34173:
133827 02/19/07 18:37 Carissa Checked on He level...
133826 02/19/07 18:26 M Jones IWHP changed to OUT before run 34172
133825 02/19/07 18:20 gzero Run 34173: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133824 02/19/07 18:19 gzero End of Run 34172:
133823 02/19/07 18:14 gzero Run 34172: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133822 02/19/07 18:10 gzero End of Run 34171:
133821 02/19/07 17:31 gzero Run 34171: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133820 02/19/07 17:29 gzero End of Run 34170:
133819 02/19/07 16:31 gzero Run 34170: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133818 02/19/07 16:29 gzero End of Run 34169:
133817 02/19/07 16:17 amicherd Day shift summary
133816 02/19/07 16:05 cdaq Beam Time Accounting
133815 02/19/07 16:00 jianglai RC report: Feb. 18 Day to Feb. 19 Day
133814 02/19/07 15:39 jianglai for Feb. 18 Swing shift summary
133813 02/19/07 15:26 gzero Run 34169: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133812 02/19/07 15:24 gzero End of Run 34168:
133811 02/19/07 14:17 gzero Run 34168: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133810 02/19/07 14:16 gzero End of Run 34167:
133809 02/19/07 13:55 jmammei He bottle
133808 02/19/07 13:39 jmammei Analysis: Shift Checklist, runs 34154-34165
133807 02/19/07 13:06 jmammei Shift Check List Screen Grabs
133806 02/19/07 12:58 amicherd at the end of run 34166 beam tripped and HV sniped
133805 02/19/07 12:54 gzero Run 34167: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133804 02/19/07 12:53 gzero End of Run 34166:
133803 02/19/07 12:08 jschaub Beam: Charge Asymmtery and Position Differences from Run 34161 - IN
133802 02/19/07 12:05 jschaub Beam: Correction: G0 Cavity Monitor Signals from Run 34161
133801 02/19/07 11:59 jschaub Beam: Coil Modulation Cycle from Run 34161
133800 02/19/07 11:54 jschaub Beam: Coil Modulation Cycle from Run 34158
133799 02/19/07 11:48 gzero Run 34166: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133798 02/19/07 11:47 gzero End of Run 34165:
133797 02/19/07 10:44 amicherd We started new run 34164 but HV was sniped.
133796 02/19/07 10:40 amicherd MCC fixed the problem with beam
133795 02/19/07 10:37 gzero Run 34165: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133794 02/19/07 10:35 gzero End of Run 34164:
133793 02/19/07 10:20 gzero Run 34164: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133792 02/19/07 10:16 gzero End of Run 34163:
133791 02/19/07 10:10 amicherd problem with a beam, MCC is workig on fixing.
133790 02/19/07 09:14 gzero Run 34163: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133789 02/19/07 09:13 gzero End of Run 34162:
133788 02/19/07 09:12 amicherd MCC fixed the problem, we have good beam again
133787 02/19/07 09:04 amicherd MCC is sending tune beam
133786 02/19/07 08:09 gzero Run 34162: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133785 02/19/07 08:08 gzero End of Run 34161:
133784 02/19/07 08:05 seva
133783 02/19/07 08:05 cdaq Beam Time Accounting
133782 02/19/07 07:17 beaufait Shift Check List Screen Grabs
133781 02/19/07 07:08 gzero Run 34161: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133780 02/19/07 07:07 gzero End of Run 34160:
133779 02/19/07 06:32
133778 02/19/07 06:07 gzero Run 34160: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133777 02/19/07 06:06 gzero End of Run 34159:
133776 02/19/07 05:07 gzero Run 34159: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133775 02/19/07 05:06 gzero End of Run 34158:
133774 02/19/07 04:02 gzero Run 34158: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133773 02/19/07 04:01 gzero End of Run 34157:
133772 02/19/07 03:00 gzero Run 34157: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133771 02/19/07 02:59 gzero End of Run 34156:
133770 02/19/07 01:36 gzero Run 34156: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133769 02/19/07 01:33 gzero End of Run 34155:
133768 02/19/07 00:22 gzero Run 34155: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133767 02/19/07 00:19 gzero End of Run 34154:
133766 02/19/07 00:18 beaufait Diffuser malfuntion
133765 02/19/07 00:04 cdaq Beam Time Accounting
Sunday
133764 02/18/07 23:46 maud Analysis: checklist until run 34153
133763 02/18/07 22:59 maud Target: checklist : No snapshots because no beam.
133762 02/18/07 22:37 gzero Run 34154: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133761 02/18/07 22:36 gzero End of Run 34153:
133760 02/18/07 21:30 jianglai Run plan: Feb. 19 OWL - Feb 20 OWL
133759 02/18/07 21:12 jianglai octant 8 problem again
133758 02/18/07 20:56 gzero Run 34153: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133757 02/18/07 20:55 gzero End of Run 34152:
133756 02/18/07 20:48 gzero Run 34152: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133755 02/18/07 20:48 gzero End of Run 34151:
133754 02/18/07 20:40 gzero Run 34151: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133753 02/18/07 20:39 gzero End of Run 34150:
133752 02/18/07 20:39 gzero Run 34150: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133751 02/18/07 20:35 gzero End of Run 34149:
133750 02/18/07 20:27 gzero Run 34149: production running random, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133749 02/18/07 20:26 gzero End of Run 34148:
133748 02/18/07 20:18 gzero Run 34148: production running random, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133747 02/18/07 20:11 gzero End of Run 34147:
133746 02/18/07 19:11 gzero Run 34147: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133745 02/18/07 19:09 gzero End of Run 34146:
133744 02/18/07 18:13 jianglai Please watch the charge asymmetry feedback this weekend
133743 02/18/07 18:13 gzero Run 34146: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133742 02/18/07 18:11 gzero End of Run 34145:
133741 02/18/07 17:11 gzero Run 34145: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133740 02/18/07 17:09 gzero End of Run 34144:
133739 02/18/07 17:08 suleiman Beam: MCC adjusted Hall C IA picomotor: The Slope is now -200 ppmV.
133738 02/18/07 16:58 suleiman Beam: Charge Asymmetry and Position Differences from run 34140 - IN
133737 02/18/07 16:56 suleiman Beam: Charge Asymmetry and Position Differences from run 34118 - OUT
133736 02/18/07 16:19 suleiman Beam: G0 IA Slope has changed from -800 ppm/ V to -100 ppm/V
133735 02/18/07 16:07 gzero Run 34144: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133734 02/18/07 16:05 jianglai Day shift summary, Feb. 18
133733 02/18/07 16:04 gzero End of Run 34143:
133732 02/18/07 16:04 cdaq Beam Time Accounting
133731 02/18/07 15:00 gzero Run 34143: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133730 02/18/07 14:59 gzero End of Run 34142:
133729 02/18/07 14:20 Shift Checklist Scanned Pages
133728 02/18/07 14:11 jmammei Shift Check List Screen Grabs
133727 02/18/07 14:07 jianglai halo spikes during laser phase adjustment
133726 02/18/07 14:00 gzero Run 34142: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133725 02/18/07 13:58 gzero End of Run 34141:
133724 02/18/07 13:57 jmammei Analysis: Shift Checklist, runs 34132-34139
133723 02/18/07 12:54 gzero Run 34141: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133722 02/18/07 12:53 gzero End of Run 34140:
133721 02/18/07 11:52 gzero Run 34140: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133720 02/18/07 11:51 gzero End of Run 34139:
133719 02/18/07 10:52 gzero Run 34139: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133718 02/18/07 10:50 gzero End of Run 34138:
133717 02/18/07 09:50 gzero Run 34138: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133716 02/18/07 09:49 gzero End of Run 34137:
133715 02/18/07 09:19 jianglai RC report: Feb. 17 Day - Feb. 18 Day (very smooth running)
133714 02/18/07 09:12 jmammei Target: coolant flow rate fluctuating
133713 02/18/07 08:53 jianglai change of plan: please take "random" run only once a day
133712 02/18/07 08:49 gzero Run 34137: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133711 02/18/07 08:48 gzero End of Run 34136:
133710 02/18/07 08:30 cdaq Beam Time Accounting
133709 02/18/07 08:02 seva owl shift summary
133708 02/18/07 07:54 gzero Run 34136: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133707 02/18/07 07:47 gzero End of Run 34135:
133706 02/18/07 07:44 Darko Target: Shift Check Screen Shots
133705 02/18/07 06:52 gzero Run 34135: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133704 02/18/07 06:47 gzero End of Run 34134:
133703 02/18/07 06:46 Darko Analysis: Shift Task List Summary RUN# 34124-34132
133702 02/18/07 05:46 gzero Run 34134: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133701 02/18/07 05:44 gzero End of Run 34133:
133700 02/18/07 04:44 gzero Run 34133: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133699 02/18/07 04:43 gzero End of Run 34132:
133698 02/18/07 04:24 Darko Shift Check List Screen Grabs
133697 02/18/07 03:44 gzero Run 34132: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133696 02/18/07 03:43 gzero End of Run 34131:
133695 02/18/07 02:42 gzero Run 34131: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133694 02/18/07 02:39 gzero End of Run 34130:
133693 02/18/07 01:29 gzero Run 34130: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133692 02/18/07 01:28 gzero End of Run 34129:
133691 02/18/07 00:28 gzero Run 34129: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133690 02/18/07 00:26 gzero End of Run 34128:
133689 02/18/07 00:09 cdaq Beam Time Accounting
133688 02/18/07 00:09 J.W. Martin Feb. 17 Swing Shift Summary
Saturday
133687 02/17/07 23:50 J.W. Martin the locus I used
133686 02/17/07 23:44 J.W. Martin Analysis: pion data - we pretty much made my goal
133685 02/17/07 23:41 muether Analysis checklist for 34114-34123
133684 02/17/07 23:28 J.W. Martin Yep, octant 8 ... again.
133683 02/17/07 23:26 gzero Run 34128: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133682 02/17/07 23:25 gzero End of Run 34127:
133681 02/17/07 23:22 gzero Run 34127: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133680 02/17/07 23:18 gzero End of Run 34126:
133679 02/17/07 23:06 J.W. Martin Octant 8 problems again
133678 02/17/07 22:54 gzero Run 34126: production running randoms, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133677 02/17/07 22:54 gzero End of Run 34125:
133676 02/17/07 22:46 gzero Run 34125: production running randoms, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133675 02/17/07 22:43 gzero End of Run 34124:
133674 02/17/07 22:17 muether Shift Checklist screen grabs
133673 02/17/07 21:40 gzero Run 34124: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133672 02/17/07 21:38 gzero End of Run 34123:
133671 02/17/07 20:39 gzero Run 34123: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133670 02/17/07 20:38 gzero End of Run 34122:
133669 02/17/07 20:27 muether helicity correlated beam parameter vs run (for Riad)
133668 02/17/07 20:24 J.W. Martin Beam: realtime beam pictures for Riad
133667 02/17/07 20:09 gzero Run 34122: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133666 02/17/07 20:06 gzero End of Run 34121:
133665 02/17/07 19:51 gzero Run 34121: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133664 02/17/07 19:51 J.W. Martin Beam: IHWP = IN
133663 02/17/07 19:48 gzero End of Run 34120:
133662 02/17/07 18:46 gzero Run 34120: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133661 02/17/07 18:45 gzero End of Run 34119:
133660 02/17/07 17:41 gzero Run 34119: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133659 02/17/07 17:39 gzero End of Run 34118:
133658 02/17/07 16:36 gzero Run 34118: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133657 02/17/07 16:34 gzero End of Run 34117:
133656 02/17/07 16:09 Carissa Day Shift Summary -- Feb. 17
133655 02/17/07 16:04 cdaq Beam Time Accounting
133654 02/17/07 15:35 gzero Run 34117: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133653 02/17/07 15:33 gzero End of Run 34116:
133652 02/17/07 14:34 gzero Run 34116: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133651 02/17/07 14:32 gzero End of Run 34115:
133650 02/17/07 14:16 jmammei Analysis: shift task list for runs 34107-34113
133649 02/17/07 13:42 jmammei shift checklist screen shots
133648 02/17/07 13:42 jianglai Analysis: Cerenkov electron efficiency comparison: Jan. 27 and Feb. 15
133647 02/17/07 13:32 gzero Run 34115: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133646 02/17/07 13:30 gzero End of Run 34114:
133645 02/17/07 13:29 jianglai Analysis: stability of the random rate since transverse run
133644 02/17/07 12:28 gzero Run 34114: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133643 02/17/07 12:26 gzero End of Run 34113:
133642 02/17/07 12:03 jianglai RC report: Feb. 16 Day - Feb. 17 Day
133641 02/17/07 11:28 gzero Run 34113: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133640 02/17/07 11:26 gzero End of Run 34112:
133639 02/17/07 10:46 Carissa This is actually the end of run 34111
133638 02/17/07 10:26 gzero End of Run 34112:
133637 02/17/07 10:26 gzero Run 34112: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133636 02/17/07 09:31 Carissa Switched back to pions
133635 02/17/07 09:26 gzero Run 34111: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133634 02/17/07 09:21 gzero End of Run 34110:
133633 02/17/07 09:06 Carissa switched to randoms for 20min run
133632 02/17/07 08:58 gzero Run 34110: production running randoms, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133631 02/17/07 08:55 gzero End of Run 34109:
133630 02/17/07 08:16 cdaq Beam Time Accounting
133629 02/17/07 08:11 maud no random run performed during owl shift as the last one was done during last swing shift
133628 02/17/07 08:04 maud Owl shift summary
133627 02/17/07 08:03 maud Beam: high charge assymetry review
133626 02/17/07 07:55 gzero Run 34109: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133625 02/17/07 07:54 gzero End of Run 34108:
133624 02/17/07 07:48 Darko Target: Shift Summary Screen Shots
133623 02/17/07 07:29 Darko Analysis: Shift check summary for RUN# 34096-34106
133622 02/17/07 06:54 gzero Run 34108: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133621 02/17/07 06:25 gzero End of Run 34107:
133620 02/17/07 05:39 gzero Run 34107: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133619 02/17/07 05:37 gzero End of Run 34106:
133618 02/17/07 05:11 DArko Shift Check List Screen Grabs
133617 02/17/07 04:36 gzero Run 34106: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133616 02/17/07 04:31 gzero End of Run 34105:
133615 02/17/07 03:54 gzero Run 34105: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133614 02/17/07 03:54 gzero End of Run 34104:
133613 02/17/07 02:53 gzero Run 34104: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133612 02/17/07 02:51 gzero End of Run 34103:
133611 02/17/07 01:30 gzero Run 34103: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133610 02/17/07 01:29 gzero End of Run 34102:
133609 02/17/07 00:25 gzero Run 34102: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133608 02/17/07 00:23 gzero End of Run 34101:
133607 02/17/07 00:01 cdaq Beam Time Accounting
133606 02/17/07 00:00 J.W. Martin Feb. 16 Swing Shift Summary
Friday
133605 02/16/07 23:44 muether Analysis Check List Runs 34087-34095
133604 02/16/07 23:27 J.W. Martin/ weird low octant 8 rates again
133603 02/16/07 23:17 gzero Run 34101: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133602 02/16/07 23:15 gzero End of Run 34100:
133601 02/16/07 23:07 gzero Run 34100: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133600 02/16/07 23:06 gzero End of Run 34099:
133599 02/16/07 23:06 gzero Run 34099: junk
133598 02/16/07 23:02 gzero End of Run 34098:
133597 02/16/07 23:02 J.W. Martin REAL reference histos for mult3 running
133596 02/16/07 22:52 gzero Run 34098: randoms, mult3 NA and FR, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133595 02/16/07 22:50 gzero End of Run 34097:
133594 02/16/07 22:46 J.W. Martin reference coincidence matrices for mult3 study
133593 02/16/07 22:37 gzero Run 34097: randoms, mult3 NA and FR, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133592 02/16/07 22:35 gzero End of Run 34096:
133591 02/16/07 22:35 gzero Run 34096: randoms, mult3 NA, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133590 02/16/07 22:30 gzero End of Run 34095:
133589 02/16/07 22:25 muether Shift Check List Screen Grabs
133588 02/16/07 21:51 J.W. Martin randoms not pions
133587 02/16/07 21:41 jianglai Run Plan: Long weekend Feb. 16 Swing - Feb. 19 Swing
133586 02/16/07 21:33 jianglai Tentative reversed field run plan on Feb. 20
133585 02/16/07 21:27 gzero Run 34095: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133584 02/16/07 21:23 gzero End of Run 34094:
133583 02/16/07 21:10 gzero Run 34094: pions, NA Cherenkovs on Mult3, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133582 02/16/07 21:09 gzero End of Run 34093:
133581 02/16/07 20:42 gzero Run 34093: production running randoms, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133580 02/16/07 20:38 gzero End of Run 34092:
133579 02/16/07 20:07 jschaub Beam: G0 CavitySignals from Run 34089
133578 02/16/07 20:03 jschaub Beam: Charge Asymmetries and Position Differencesm Run 34089 - OUT
133577 02/16/07 19:41 gzero Run 34092: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133576 02/16/07 19:37 gzero End of Run 34091:
133575 02/16/07 19:35 jschaub Beam: Coil Modulation Cycle from Run 34089
133574 02/16/07 18:31 gzero Run 34091: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133573 02/16/07 18:30 gzero End of Run 34090:
133572 02/16/07 17:30 gzero Run 34090: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133571 02/16/07 17:29 gzero End of Run 34089:
133570 02/16/07 17:05 jschaub Analysis: Checklist for Runs 34079-34086
133569 02/16/07 16:23 gzero Run 34089: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133568 02/16/07 16:23 gzero End of Run 34088:
133567 02/16/07 16:06 jmammei Day shift summary
133566 02/16/07 16:06 cdaq Beam Time Accounting
133565 02/16/07 16:03 jmammei Beam: coil modulation turned on
133564 02/16/07 15:22 gzero Run 34088: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133563 02/16/07 15:21 gzero End of Run 34087:
133562 02/16/07 14:25 pking Possibly missing some of the silo data files of run 34084.
133561 02/16/07 14:17 jschaub Target: Shift Check List Screen Grabs
133560 02/16/07 14:06 gzero Run 34087: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133559 02/16/07 14:03 gzero End of Run 34086:
133558 02/16/07 13:52 pking Analysis: Initial concern for Cerenkovs in reversed polarity is due to uneven rates
133557 02/16/07 13:14 jianglai computer center staging disk
133556 02/16/07 13:04 jmammei Beam: charge asymmetry after IHWP change
133555 02/16/07 12:56 gzero Run 34086: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133554 02/16/07 12:55 gzero End of Run 34085:
133553 02/16/07 12:39 maud Analysis: Follow up to Cerenkov ADC spectra before and after polarity reversal.
133552 02/16/07 12:03 gzero Run 34085: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=OUT
133551 02/16/07 12:00 jmammei Beam: change IHWP to OUT
133550 02/16/07 11:58 gzero End of Run 34084:
133549 02/16/07 10:55 gzero Run 34084: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133548 02/16/07 10:53 gzero End of Run 34083:
133547 02/16/07 10:10 jianglai RC Report: Feb. 15 Day - Feb. 16 Day
133546 02/16/07 09:58 gzero Run 34083: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133545 02/16/07 09:56 gzero End of Run 34082:
133544 02/16/07 08:56 gzero Run 34082: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133543 02/16/07 08:56 gzero End of Run 34081:
133542 02/16/07 08:17 cdaq Beam Time Accounting
133541 02/16/07 07:59 maud Owl shift summary
133540 02/16/07 07:58 gzero Run 34081: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133539 02/16/07 07:56 gzero End of Run 34080:
133538 02/16/07 07:45 Darko Target: Owl shift summary screens
133537 02/16/07 07:20 Darko Analysis: Shift check list
133536 02/16/07 06:55 gzero Run 34080: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133535 02/16/07 06:53 gzero End of Run 34079:
133534 02/16/07 05:53 gzero Run 34079: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133533 02/16/07 05:52 gzero End of Run 34078:
133532 02/16/07 05:03 Darko Shift Check List Screen Grabs
133531 02/16/07 04:52 gzero Run 34078: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133530 02/16/07 04:51 gzero End of Run 34077:
133529 02/16/07 04:46 maud&darko oct 8 low rate FIXED
133528 02/16/07 03:49 gzero Run 34077: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133527 02/16/07 03:48 gzero End of Run 34076:
133526 02/16/07 03:35 maud snapshot of coinc mtrix for randoms mode : LOW RATES FOR OCT 8
133525 02/16/07 03:25 gzero Run 34076: production running Randoms, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133524 02/16/07 03:21 gzero End of Run 34075:
133523 02/16/07 02:23 gzero Run 34075: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133522 02/16/07 02:22 gzero End of Run 34074:
133521 02/16/07 01:19 gzero Run 34074: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133520 02/16/07 01:18 gzero End of Run 34073:
133519 02/16/07 00:13 J.W. Martin Feb. 15 Swing Shift Summary
133518 02/16/07 00:13 gzero Run 34073: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133517 02/16/07 00:12 gzero End of Run 34072:
133516 02/16/07 00:10 cdaq Beam Time Accounting
133515 02/16/07 00:00 muether Shift Check Scren Grabs
Thursday
133514 02/15/07 23:14 muether Analysis: Analysis Checklist
133513 02/15/07 23:12 gzero Run 34072: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133512 02/15/07 23:10 gzero End of Run 34071:
133511 02/15/07 22:46 J.W. Martin Beam: charge asymmetry width on BCM 1 borderline
133510 02/15/07 22:16 jschaub Beam: Coil Modulation Cycle from Run 34029
133509 02/15/07 22:09 gzero Run 34071: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133508 02/15/07 22:06 J.W. Martin Beam: CW to Hall
133507 02/15/07 22:05 J.W. Martin Beam: tune beam to Hall
133506 02/15/07 21:49 J.W. Martin Beam: IOC problems
133505 02/15/07 20:48 J.W. Martin Beam: IOC issues
133504 02/15/07 20:17 J.W. Martin Beam: RF problems
133503 02/15/07 20:16 gzero End of Run 34070:
133502 02/15/07 20:04 J.W. Martin snapshot of Cherenkov rates for run 34070
133501 02/15/07 19:56 muether Which runs?
133500 02/15/07 19:40 muether Cerenkov ADC spectra before and after polarity reversal
133499 02/15/07 19:34 gzero Run 34070: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133498 02/15/07 19:33 gzero End of Run 34069:
133497 02/15/07 18:41 jianglai Run plan: Feb. 15 Swing to Feb. 16
133496 02/15/07 18:41 muether Target Movement Summary
133495 02/15/07 18:34 gzero Run 34069: production running pions, LD2, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133494 02/15/07 18:21 gzero End of Run 34068:
133493 02/15/07 18:04 gzero Run 34068: Al frame, pion matrix, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133492 02/15/07 17:52 gzero End of Run 34067:
133491 02/15/07 17:37 gzero Run 34067: Radiator only, pion matrix, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133490 02/15/07 17:16 J.W. Martin Beam: beam off for access to remove flyswatter.
133489 02/15/07 17:15 gzero End of Run 34066:
133488 02/15/07 16:53 gzero Run 34066: Flyswatter with radiator, pion matrix, 362 MeV, 35uA, Ps4=4000, IHWP=IN
133487 02/15/07 16:42 gzero End of Run 34065:
133486 02/15/07 16:29 jianglai changed NA Cerenkov HV
133485 02/15/07 16:22 J.W. Martin Cherenkov HV's changed during run 36064
133484 02/15/07 16:22 gzero Run 34065: Flyswatter only, pion matrix, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133483 02/15/07 16:17 gzero End of Run 34064:
133482 02/15/07 16:03 cdaq Beam Time Accounting
133481 02/15/07 16:02 jmammei Day Shift summary February 15th
133480 02/15/07 15:54 gzero Run 34064: Flyswatter only, pion matrix, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133479 02/15/07 13:03 jianglai Plan for aluminum target study
133478 02/15/07 12:24 jianglai Beam: Today's Mott results
133477 02/15/07 12:21 jianglai RC Report: Feb. 14 Day to Feb. 15 Day
133476 02/15/07 12:06 jianglai for thoughts on reversed field running
133475 02/15/07 12:02 jmammei Jeff's swing summary from last night
133474 02/15/07 11:15 jianglai Analysis: NA electron efficency
133473 02/15/07 11:05 smithg Target: LD2 out of beam. FLyswatter in.
133472 02/15/07 09:25 jmammei restored settings
133471 02/15/07 09:11 gzero End of Run 34063:
133470 02/15/07 09:05 gzero Run 34063: production, randoms, NA cer thresh 27mV, mult3, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133469 02/15/07 09:02 gzero End of Run 34062:
133468 02/15/07 08:52 jmammei Beam: cavity monitor x,y calibration
133467 02/15/07 08:50 gzero Run 34062: production, randoms, cer thresh 27mV, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133466 02/15/07 08:44 gzero End of Run 34061:
133465 02/15/07 08:26 maud Analysis: checklist until run 34059
133464 02/15/07 08:20 gzero Run 34061: production, randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133463 02/15/07 08:17 jmammei changing to randoms for Herbert's tests
133462 02/15/07 08:15 gzero End of Run 34060:
133461 02/15/07 08:02 cdaq Beam Time Accounting
133460 02/15/07 08:01 Darko Cherenkov rate increased in last 2 hours for cca 15%
133459 02/15/07 07:45 Darko Owl shift summary
133458 02/15/07 07:42 gzero Run 34060: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133457 02/15/07 07:40 gzero End of Run 34059:
133456 02/15/07 07:26 breuer mult 3 running comment
133455 02/15/07 07:19 breuer HV change for Cerenkov recommendation
133454 02/15/07 06:45 maud Target: checklist snpashots - shift without anything special
133453 02/15/07 06:38 gzero Run 34059: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133452 02/15/07 06:36 gzero End of Run 34058:
133451 02/15/07 05:39 gzero Run 34058: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133450 02/15/07 05:37 gzero End of Run 34057:
133449 02/15/07 04:38 gzero Run 34057: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133448 02/15/07 04:36 gzero End of Run 34056:
133447 02/15/07 03:40 gzero Run 34056: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133446 02/15/07 03:38 gzero End of Run 34055:
133445 02/15/07 02:37 gzero Run 34055: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133444 02/15/07 02:34 gzero End of Run 34054:
133443 02/15/07 01:33 gzero Run 34054: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133442 02/15/07 01:29 gzero End of Run 34053:
133441 02/15/07 00:35 jianglai plan for Owl shift
133440 02/15/07 00:27 gzero Run 34053: production, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133439 02/15/07 00:22 gzero End of Run 34052:
133438 02/15/07 00:09 cdaq Beam Time Accounting
Wednesday
133437 02/14/07 23:53 J.W. Martin coincidence matrix empty for octant 7 again
133436 02/14/07 23:52 gzero Run 34052: Herbert's Randoms for Pion Mode, CED delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133435 02/14/07 23:50 gzero End of Run 34051:
133434 02/14/07 23:49 gzero Run 34051: Herbert's Randoms for Pion Mode, CED delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133433 02/14/07 23:42 gzero End of Run 34050:
133432 02/14/07 23:38 Carissa Analysis: Checklist for runs 34031-34045 -- no plots
133431 02/14/07 23:22 Carissa Target: Checklist scans...
133430 02/14/07 23:21 Carissa Target: Shift Checklist screenshots
133429 02/14/07 23:15 gzero Run 34050: Herbert's Randoms for Pion Mode, FPD delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133428 02/14/07 23:11 jianglai/jwm measurement of cerenkov SPEs
133427 02/14/07 23:05 gzero End of Run 34049:
133426 02/14/07 22:45 J.W. Martin/ Oh my God! The coincidence matrices for octant seven are empty!
133425 02/14/07 22:35 gzero Run 34049: Herbert's Randoms, FPD delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133424 02/14/07 22:34 gzero End of Run 34048:
133423 02/14/07 22:26 gzero Run 34048: junk to debug octant 7
133422 02/14/07 22:23 Fatiha Please use g0dbserver when running the goat ( until sometimes tomorrow)
133421 02/14/07 22:18 gzero End of Run 34047:
133420 02/14/07 21:45 gzero Run 34047: Herbert's Randoms, FPD delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133419 02/14/07 21:44 gzero End of Run 34046:
133418 02/14/07 20:29 gzero Run 34046: Herbert's Randoms, CED delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133417 02/14/07 20:15 J.W. Martin Beam: ended run because no beam
133416 02/14/07 20:15 gzero End of Run 34045:
133415 02/14/07 20:00 J.W. Martin Beam: magnet trip / recycle
133414 02/14/07 19:49 J.W. Martin/ CED delayed matrices - randoms on the lower plots
133413 02/14/07 19:42 gzero Run 34045: Herbert's Randoms, CED delayed, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133412 02/14/07 19:30 gzero End of Run 34044:
133411 02/14/07 18:59 gzero Run 34044: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133410 02/14/07 18:58 gzero End of Run 34043:
133409 02/14/07 18:52 gzero Run 34043: junk run for beam checkout, Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133408 02/14/07 18:21 jianglai beam status
133407 02/14/07 16:03 cdaq Beam Time Accounting
133406 02/14/07 16:00 C. Davis Target: 14 Feb., 2007 Day shift
133405 02/14/07 15:54 gaskell Day shift summary
133404 02/14/07 14:30 suleiman Beam: Pockels Cell Translational Stage Scans
133403 02/14/07 14:20 gzero End of Run 34042:
133402 02/14/07 14:08 gaskell Refined polarization value
133401 02/14/07 14:00 gzero Run 34042: PC y-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133400 02/14/07 13:57 gzero End of Run 34041:
133399 02/14/07 13:37 gzero Run 34041: PC y-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133398 02/14/07 13:31 gzero End of Run 34040:
133397 02/14/07 13:10 gaskell Refined spin dance analysis and "lumi dance" results
133396 02/14/07 13:07 gzero Run 34040: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133395 02/14/07 13:05 gzero End of Run 34039:
133394 02/14/07 12:40 gzero Run 34039: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133393 02/14/07 12:30 gzero End of Run 34038:
133392 02/14/07 12:27 C. Davis Analysis: 14 Feb., 2007 Day shift --- analysis task list
133391 02/14/07 12:09 gzero Run 34038: PC y-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133390 02/14/07 12:06 gzero End of Run 34037:
133389 02/14/07 12:05 jianglai RC Report: Feb. 13 Day - Feb. 14 Day
133388 02/14/07 11:52 gzero Run 34037: PC y-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133387 02/14/07 11:47 gzero End of Run 34036:
133386 02/14/07 11:24 gzero Run 34036: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133385 02/14/07 11:19 gzero Run 34035: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133384 02/14/07 11:15 gzero Run 34034: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133383 02/14/07 11:12 gzero End of Run 34033:
133382 02/14/07 10:52 gzero Run 34033: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133381 02/14/07 10:51 gzero End of Run 34032:
133380 02/14/07 10:49 gzero Run 34032: PC x-stage Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133379 02/14/07 10:43 gaskell beam tuning done - going to controlled access
133378 02/14/07 10:37 gzero End of Run 34031:
133377 02/14/07 10:36 suleiman Beam: "Parity Quality" of G0 Beam after fixing the orbit - x-pos diff is now about 11 um
133376 02/14/07 09:48 suleiman HV tripped with pulsed beam in Hall C
133375 02/14/07 09:29 maud Analysis: Validation of Christophe's new timing for Cerenkov Trigger gate
133374 02/14/07 09:24 gzero Run 34031: Running during beam studies Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133373 02/14/07 09:09 gaskell beam gone for tuning and beam studies
133372 02/14/07 09:07 gzero End of Run 34030:
133371 02/14/07 08:22 gzero Run 34030: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133370 02/14/07 08:22 maud Analysis: checklist until run 34029
133369 02/14/07 08:21 gaskell Halo looks good - turning on HV
133368 02/14/07 08:02 cdaq Beam Time Accounting
133367 02/14/07 07:56 maud Analysis : bad halo effect on the random matrix
133366 02/14/07 07:54 Darko Owl shift summary
133365 02/14/07 07:25 maud Target: checklist snapshots ... run without incident
133364 02/14/07 07:17 maud Cerenkov SPE measurement
133363 02/14/07 06:01 gzero End of Run 34029:
133362 02/14/07 05:44 gzero Run 34029: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133361 02/14/07 05:44 gzero End of Run 34028:
133360 02/14/07 04:28 gzero Run 34028: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133359 02/14/07 04:26 gzero End of Run 34027:
133358 02/14/07 03:21 gzero Run 34027: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133357 02/14/07 03:20 gzero End of Run 34026:
133356 02/14/07 02:46 gzero Run 34026: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133355 02/14/07 02:32 gzero End of Run 34025:
133354 02/14/07 01:19 gzero Run 34025: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133353 02/14/07 01:18 gzero End of Run 34024:
133352 02/14/07 00:30 jianglai Run plan: Feb 14 Owl to Feb. 15 Owl
133351 02/14/07 00:21 gzero Run 34024: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133350 02/14/07 00:19 gzero End of Run 34023:
133349 02/14/07 00:12 J.W. Martin Feb. 13 Swing Shift Summary
133348 02/14/07 00:06 cdaq Beam Time Accounting
133347 02/14/07 00:00 C. Davis Target: 13 Feb., 2007 swing shift
Tuesday
133346 02/13/07 23:10 gzero Run 34023: junk run - bad halo - Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133345 02/13/07 22:58 J.W. Martin Analysis: Pion randoms - not sure I fully get it, but it looks close.
133344 02/13/07 22:54 gzero End of Run 34022:
133343 02/13/07 22:32 gzero Run 34022: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133342 02/13/07 22:04 J.W. Martin Beam: Wien setting
133341 02/13/07 21:59 J.W. Martin Beam: Wien changed to longitudinal, tune beam in Hall
133340 02/13/07 21:30 gzero End of Run 34021:
133339 02/13/07 20:26 gzero Run 34021: 45 degree Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133338 02/13/07 20:25 J.W. Martin Beam: IHWP = IN
133337 02/13/07 20:24 gzero End of Run 34020:
133336 02/13/07 20:08 C. Davis 13 Feb., 2007 swing shift -- screen captures
133335 02/13/07 19:23 gzero Run 34020: 45 degree Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133334 02/13/07 19:22 gzero End of Run 34019:
133333 02/13/07 19:17 gzero Run 34019: junk run, 45 deg transverse during tuneup
133332 02/13/07 19:16 J.W. Martin pion -> random
133331 02/13/07 19:02 J.W. Martin Beam: transverse running done - time to change to "45 degree" running
133330 02/13/07 19:00 gzero End of Run 34018:
133329 02/13/07 18:27 gzero Run 34018: Transverse Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133328 02/13/07 18:22 J.W. Martin Beam: beam off for rebooting IOCSE20
133327 02/13/07 18:21 gzero End of Run 34017:
133326 02/13/07 17:58 gzero Run 34017: Transverse Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133325 02/13/07 17:56 gzero End of Run 34016:
133324 02/13/07 17:12 gzero Run 34016: Transverse Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133323 02/13/07 17:11 J.W. Martin Beam: IHWP is OUT
133322 02/13/07 17:09 gzero End of Run 34015:
133321 02/13/07 16:20 gzero Run 34015: Transverse Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133320 02/13/07 16:17 gzero End of Run 34014:
133319 02/13/07 16:04 gaskell Day shift summary
133318 02/13/07 16:01 cdaq Beam Time Accounting
133317 02/13/07 15:31 gzero Run 34014: Transverse Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133316 02/13/07 15:31 horn Target: check list
133315 02/13/07 15:28 gaskell changed coincidence matrices from "random" to "pion"
133314 02/13/07 15:26 gzero End of Run 34013:
133313 02/13/07 15:25 horn Target: Moving from Al frame back to LD2 target
133312 02/13/07 15:25 horn Analysis shift checklist for runs 34004 to 34008
133311 02/13/07 14:32 gzero Run 34013: Transverse Running Randoms, 362 MeV, 35uA Al frame, Ps4=4000, IHWP=IN
133310 02/13/07 14:31 gzero End of Run 34012:
133309 02/13/07 13:42 gzero Run 34012: Transverse Running Randoms, 362 MeV, 35uA Al frame, Ps4=4000, IHWP=IN
133308 02/13/07 13:40 gzero End of Run 34011:
133307 02/13/07 13:34 gzero Run 34011: Junk for charge feedback
133306 02/13/07 13:33 gaskell changed half wave plate from OUT to IN
133305 02/13/07 13:31 gzero End of Run 34010:
133304 02/13/07 12:54 jianglai Additional 2 hour transverse program before we back out to longitudinal data taking
133303 02/13/07 12:44 gzero Run 34010: Transverse Running Randoms, 362 MeV, 35uA Al frame, Ps4=4000, IHWP=OUT
133302 02/13/07 12:43 gzero End of Run 34009:
133301 02/13/07 12:30 Armstrong Caution: let's keep this quiet
133300 02/13/07 12:27 jianglai RC report: Feb. 12 Swing to Feb. 13 day
133299 02/13/07 12:11 horn Shift Check List Figures
133298 02/13/07 12:06 pking Analysis: Random matrix asymmetries with transverse beam
133297 02/13/07 11:59 jschaub Beam: Charge Asymmtery and Position Differences from Run 33984 - OUT
133296 02/13/07 11:55 gzero Run 34009: Transverse Running Randoms, 362 MeV, 35uA Al frame, Ps4=4000, IHWP=OUT
133295 02/13/07 11:44 horn Target: Moving to Al frame target
133294 02/13/07 11:42 gzero End of Run 34008:
133293 02/13/07 11:40 jmammei Analysis: linear and sin fits for elastic locus and LUMIs
133292 02/13/07 10:56 gzero Run 34008: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133291 02/13/07 10:50 gzero End of Run 34007:
133290 02/13/07 10:38 horn Octant 8 electron rate issues - resolved
133289 02/13/07 10:21 Fatiha Sorry FPDs not CEDs
133288 02/13/07 10:05 Fatiha MT Oct1 CEDs
133287 02/13/07 09:51 gzero Run 34007: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133286 02/13/07 09:49 gzero End of Run 34006:
133285 02/13/07 09:35 gaskell octant 8 rate issues
133284 02/13/07 08:52 jianglai Beam: fixed Injector BCM calibration in the DB by hand
133283 02/13/07 08:48 gzero Run 34006: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133282 02/13/07 08:46 gzero End of Run 34005:
133281 02/13/07 08:44 horn Updated BCM threshold for Hall A charge feedback
133280 02/13/07 08:01 cdaq Beam Time Accounting
133279 02/13/07 08:01 seva Owl shift summary
133278 02/13/07 07:48 gzero Run 34005: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133277 02/13/07 07:45 gzero End of Run 34004:
133276 02/13/07 07:25 ppillot Analysis: Effective Cherenkov trigger width from CED/FPD/Cer random study
133275 02/13/07 06:56 maud Analysis: Peeking on how assymetries vs octant look (transverse data)
133274 02/13/07 06:48 maud Analysis: chacklist until run 34004
133273 02/13/07 06:46 gzero Run 34004: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133272 02/13/07 06:41 gzero End of Run 34003:
133271 02/13/07 06:17 maud Target: checklist snapshots + checklist scan
133270 02/13/07 05:39 gzero Run 34003: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133269 02/13/07 05:35 gzero End of Run 34002:
133268 02/13/07 05:35 maud FPD MT channels missing in Fastbus data
133267 02/13/07 04:37 gzero Run 34002: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133266 02/13/07 04:35 gzero End of Run 34001:
133265 02/13/07 03:36 seva changed status of IHWP from IN to OUT
133264 02/13/07 03:35 gzero Run 34001: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133263 02/13/07 03:34 gzero End of Run 34000:
133262 02/13/07 03:23 gzero Run 34000: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133261 02/13/07 03:17 gzero End of Run 33999:
133260 02/13/07 02:39 muether Cerenkov Singles Rates for all 362 LD2
133259 02/13/07 02:17 gzero Run 33999: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133258 02/13/07 02:16 gzero End of Run 33998:
133257 02/13/07 01:13 gzero Run 33998: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133256 02/13/07 01:11 gzero End of Run 33997:
133255 02/13/07 00:45 J.W. Martin Feb. 12 Swing Shift Summary
133254 02/13/07 00:42 J.W. Martin Analysis: Pion asymmetries in what we have for loci
133253 02/13/07 00:12 gzero Run 33997: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133252 02/13/07 00:10 gzero End of Run 33996:
133251 02/13/07 00:09 cdaq Beam Time Accounting
133250 02/13/07 00:00 C. Davis Target: 12 Feb., 2007 Swing shift -- Target status
Monday
133249 02/12/07 23:44 J.W. Martin Analysis: Pion estimated statistical uncertainty.
133248 02/12/07 23:40 Larry How-To for Switching from "Pion" to "Randoms" mode (and vice versa)
133247 02/12/07 23:37 C. Davis Analysis: 12 Feb., 2007 swing shift --- analysis check list
133246 02/12/07 23:17 breuer increased Cerenkov rate
133245 02/12/07 23:08 gzero Run 33996: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133244 02/12/07 23:06 gzero End of Run 33995:
133243 02/12/07 22:10 J.W. Martin HV trip
133242 02/12/07 22:08 gzero Run 33995: Transverse Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133241 02/12/07 22:06 gzero End of Run 33994:
133240 02/12/07 21:50 J.W. Martin Yes, we are taking transverse data: 33992, 33993, 33994
133239 02/12/07 21:46 C. Davis 12 Feb., 2007 swing shift --- screen captures
133238 02/12/07 21:33 J.W. Martin Beam: positions tweaked
133237 02/12/07 21:32 jmammei Beam: BPM calibration for run 33955
133236 02/12/07 21:10 gzero Run 33994: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133235 02/12/07 20:57 J.W. Martin Beam: positions tweaked a bit, then lost beam
133234 02/12/07 20:56 gzero End of Run 33993:
133233 02/12/07 20:24 gzero Run 33993: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133232 02/12/07 20:21 gzero End of Run 33992:
133231 02/12/07 20:18 J.W. Martin Beam: positions better (slopes different from last night) - halo still high
133230 02/12/07 19:45 J.W. Martin Beam: halo rates high and beam position off
133229 02/12/07 19:20 gzero Run 33992: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133228 02/12/07 19:19 gzero End of Run 33991:
133227 02/12/07 19:16 J.W. Martin Beam: CW beam is back
133226 02/12/07 19:13 C. Davis Target: Target moved into position
133225 02/12/07 19:12 gzero Run 33991: junk run for charge feedback
133224 02/12/07 17:45 gaskell BCM 2 gain back to normal
133223 02/12/07 17:43 horn/gaskell Moller Summary
133222 02/12/07 17:08 horn Moller backout
133221 02/12/07 16:55 gaskell Moller update part 2
133220 02/12/07 16:55 cdaq Moller Run 62163: Moller run - solenoid at 2.5T, Wien -21.0 degrees
133219 02/12/07 16:55 jianglai Run plan: Feb. 12 Swing to Feb. 14 Day
133218 02/12/07 16:49 cdaq Moller Run 62162: Moller run - solenoid at 2.5T
133217 02/12/07 16:46 cdaq Beam Time Accounting
133216 02/12/07 16:44 gaskell Day shift summary
133215 02/12/07 16:43 cdaq Moller Run 62161: Moller run - solenoid at 2.5T
133214 02/12/07 16:26 cdaq Moller Run 62160: Moller run - solenoid at 2.5T
133213 02/12/07 16:19 cdaq Moller Run 62159: Moller run - solenoid at 2.5T
133212 02/12/07 16:15 cdaq Moller Run 62158: Moller run - solenoid at 2.5T
133211 02/12/07 15:54 cdaq Moller Run 62157: Moller run - solenoid at 2.5T
133210 02/12/07 15:49 cdaq Moller Run 62156: Moller run - solenoid at 2.5T
133209 02/12/07 15:45 cdaq Moller Run 62155: Moller run - solenoid at 2.5T
133208 02/12/07 15:14 cdaq Moller Run 62154: Moller run - solenoid at 2.5T
133207 02/12/07 15:05 cdaq Moller Run 62153: Moller run - solenoid at 2.5T
133206 02/12/07 15:02 cdaq Moller Run 62152: Moller run - solenoid at 2.5T
133205 02/12/07 14:38 cdaq Moller Run 62151: Moller run - solenoid at 2.0T
133204 02/12/07 14:31 cdaq Moller Run 62150: Moller run - solenoid at 2.0T
133203 02/12/07 13:16 gaskell Moller update
133202 02/12/07 13:04 cdaq Moller Run 62149: Moller run - solenoid at 2.0T
133201 02/12/07 12:29 Armstrong repeat, corrected a link
133200 02/12/07 12:25 Armstrong comments on coil modulation
133199 02/12/07 12:12 cdaq Moller Run 62148: Moller run - solenoid at 1.0T
133198 02/12/07 12:01 cdaq Moller Run 62147: Moller run - solenoid at 0.5T
133197 02/12/07 11:53 jschaub Beam: Coil Modulation Cycle for Run 33984
133196 02/12/07 11:44 cdaq Moller Run 62146: Moller run - zero field
133195 02/12/07 11:41 cdaq Moller Run 62145: Moller tuneup - after ROC reboot
133194 02/12/07 11:34 cdaq Moller Run 62143: Moller tuneup
133193 02/12/07 11:21 cdaq Moller Run 62142: Moller tuneup
133192 02/12/07 11:17 cdaq Moller Run 62141: Moller tuneup
133191 02/12/07 11:14 cdaq Moller Run 62140: Moller tuneup
133190 02/12/07 11:12 cdaq Moller Run 62139: Moller tuneup
133189 02/12/07 11:08 cdaq Moller Run 62138: Moller tuneup
133188 02/12/07 10:55 cdaq Moller Run 62137: Moller tuneup
133187 02/12/07 10:20 Larry RC Summary, Sunday Feb.11 Swing through Monday Feb.12 Owl
133186 02/12/07 09:34 cdaq Moller Run 62136: Junk
133185 02/12/07 09:14 horn halo target is retracted now
133184 02/12/07 09:10 horn Moller setup
133183 02/12/07 09:00 horn Target: moving target out of beam
133182 02/12/07 08:58 gzero End of Run 33990:
133181 02/12/07 08:40 cdaq Beam Time Accounting
133180 02/12/07 08:31 gzero Run 33990: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133179 02/12/07 08:26 gzero End of Run 33989:
133178 02/12/07 07:58 maud Owl shift summary
133177 02/12/07 07:34 Darko Target: No problem ... + 08:30 screenshots
133176 02/12/07 07:28 Darko Analysis: Shift Check List
133175 02/12/07 07:25 gzero Run 33989: Production Running Randoms, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133174 02/12/07 07:24 gzero End of Run 33988:
133173 02/12/07 07:24 gzero Run 33988: Junk
133172 02/12/07 06:31 maud Switched Pion Matrix to Randoms
133171 02/12/07 06:11 gzero End of Run 33987:
133170 02/12/07 06:03 gzero Run 33987: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133169 02/12/07 06:01 gzero End of Run 33986:
133168 02/12/07 05:11 Darko Owl Shift Screen Shots
133167 02/12/07 05:00 gzero Run 33986: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133166 02/12/07 04:58 gzero End of Run 33985:
133165 02/12/07 03:56 gzero Run 33985: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133164 02/12/07 03:56 gzero End of Run 33984:
133163 02/12/07 02:54 gzero Run 33984: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133162 02/12/07 02:53 gzero End of Run 33983:
133161 02/12/07 01:52 gzero Run 33983: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133160 02/12/07 01:50 gzero End of Run 33982:
133159 02/12/07 00:45 gzero Run 33982: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133158 02/12/07 00:43 gzero End of Run 33981:
133157 02/12/07 00:35 J.W. Martin Feb. 11 Swing Shift Summary
133156 02/12/07 00:33 cdaq Beam Time Accounting
Sunday
133155 02/11/07 23:59 C. Davis Target: 11 Feb., 2007 swing shift
133154 02/11/07 23:40 gzero Run 33981: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133153 02/11/07 23:39 gzero End of Run 33980:
133152 02/11/07 23:05 C. Davis Analysis: 11 Feb., 2007 swing shift --- Analysis shift task list {Preformatted On}
133151 02/11/07 23:04 C. Davis Analysis: 11 Feb., 2007 swing shift --- Analysis shift task list
133150 02/11/07 22:59 J.W. Martin Analysis: pulsed beam and pion purity
133149 02/11/07 22:39 gzero Run 33980: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133148 02/11/07 22:38 gzero End of Run 33979:
133147 02/11/07 21:41 gzero Run 33979: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133146 02/11/07 21:38 gzero End of Run 33978:
133145 02/11/07 20:38 gzero Run 33978: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133144 02/11/07 20:37 gzero End of Run 33977:
133143 02/11/07 20:07 C. Davis 11 Feb., 2007 swing shift --- screen captures
133142 02/11/07 19:37 gzero Run 33977: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133141 02/11/07 19:36 gzero End of Run 33976:
133140 02/11/07 19:11 J.W. Martin Beam: charge asymmetry looking good
133139 02/11/07 19:09 C. Davis Target: 11 Feb., 2007 swing shift --- Target snapshot as beam returnes
133138 02/11/07 18:46 J.W. Martin Beam: halo good - charge asym width bad
133137 02/11/07 18:34 J.W. Martin Beam: halo rates too high
133136 02/11/07 18:32 gzero Run 33976: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133135 02/11/07 18:26 J.W. Martin Beam: more beam is coming
133134 02/11/07 18:15 J.W. Martin Beam: Beam is coming
133133 02/11/07 16:19 Larry RC Summary, Saturday Feb.10 Swing through Sunday Feb.11 Day
133132 02/11/07 16:02 jschaub Day Shift Summary
133131 02/11/07 16:01 cdaq Beam Time Accounting
133130 02/11/07 14:45 horn Shift checklist - figures
133129 02/11/07 14:40 horn Analysis shift checklist for runs 33962-33974
133128 02/11/07 13:30 jschaub Beam: No Beam in Sight...
133127 02/11/07 13:01 horn Target: checklist
133126 02/11/07 12:34 gzero End of Run 33975:
133125 02/11/07 11:59 gzero Run 33975: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133124 02/11/07 11:57 gzero End of Run 33974:
133123 02/11/07 10:42 gzero Run 33974: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133122 02/11/07 10:41 gzero End of Run 33973:
133121 02/11/07 09:42 gzero Run 33973: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133120 02/11/07 09:40 gzero End of Run 33972:
133119 02/11/07 08:36 gzero Run 33972: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133118 02/11/07 08:34 gzero End of Run 33971:
133117 02/11/07 08:10 cdaq Beam Time Accounting
133116 02/11/07 08:08 maud Owl shift summary
133115 02/11/07 07:58 Darko Target: Owl Shift summary
133114 02/11/07 07:58 Darko Target: Owl Shift summary
133113 02/11/07 07:31 gzero Run 33971: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133112 02/11/07 07:29 gzero End of Run 33970:
133111 02/11/07 07:26 Darko Analysis: Shift Check Summary for run# 33961-33967
133110 02/11/07 06:28 gzero Run 33970: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133109 02/11/07 06:25 gzero End of Run 33969:
133108 02/11/07 05:31 Darko Scan of the shift checklist
133107 02/11/07 05:24 gzero Run 33969: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133106 02/11/07 05:22 gzero End of Run 33968:
133105 02/11/07 04:21 gzero Run 33968: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133104 02/11/07 04:18 gzero End of Run 33967:
133103 02/11/07 04:16 Darko Owl Shift Screen Shots
133102 02/11/07 03:17 maud HV tripped because of IOC FE 20 crashed in MCC
133101 02/11/07 03:14 gzero Run 33967: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133100 02/11/07 03:09 gzero End of Run 33966:
133099 02/11/07 02:54 maud erratum on title of runs 33964 and 33965
133098 02/11/07 02:49 gzero Run 33966: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
133097 02/11/07 02:48 gzero End of Run 33965:
133096 02/11/07 01:45 gzero Run 33965: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133095 02/11/07 01:43 gzero End of Run 33964:
133094 02/11/07 00:57 maud IHWP status changed to OUT
133093 02/11/07 00:56 gzero Run 33964: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133092 02/11/07 00:55 gzero End of Run 33963:
133091 02/11/07 00:06 cdaq Beam Time Accounting
133090 02/11/07 00:04 J.W. Martin Feb. 10 Swing Shift Summary
133089 02/11/07 00:00 C. Davis Target: 10 Feb., 2007 swing shift -- EoS report for the LD2 target
Saturday
133088 02/10/07 23:54 gzero Run 33963: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133087 02/10/07 23:52 gzero End of Run 33962:
133086 02/10/07 23:34 C. Davis Analysis: Ooops.
133085 02/10/07 23:27 C. Davis Analysis: 10 Feb., 2007 Swing shift --- Analysis check list
133084 02/10/07 22:53 gzero Run 33962: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133083 02/10/07 22:51 gzero End of Run 33961:
133082 02/10/07 22:02 J.W. Martin Beam: IOCSE20 reboot
133081 02/10/07 21:51 gzero Run 33961: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133080 02/10/07 21:50 gzero End of Run 33960:
133079 02/10/07 20:53 gzero Run 33960: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133078 02/10/07 20:49 gzero End of Run 33959:
133077 02/10/07 19:50 gzero Run 33959: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133076 02/10/07 19:49 gzero End of Run 33958:
133075 02/10/07 19:47 C. Davis 10 Feb., 2007 Swing shift --- screen captures
133074 02/10/07 18:49 jmammei Beam: IOCSE14 BPMs during calibration run 33955
133073 02/10/07 18:33 gzero Run 33958: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133072 02/10/07 18:32 gzero End of Run 33957:
133071 02/10/07 17:33 gzero Run 33957: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133070 02/10/07 17:31 gzero End of Run 33956:
133069 02/10/07 16:55 Larry RC Summary, Friday Feb.9 Swing through Saturday Feb.10 Day
133068 02/10/07 16:35 J.W. Martin Beam: BPM calibration complete
133067 02/10/07 16:29 gzero Run 33956: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133066 02/10/07 16:25 gzero End of Run 33955:
133065 02/10/07 16:01 horn Day shift summary
133064 02/10/07 16:01 cdaq Beam Time Accounting
133063 02/10/07 15:02 horn Conditions for BCM/BPM calibration - run 33955
133062 02/10/07 14:24 gzero Run 33955: BCM/BPM calibration
133061 02/10/07 14:18 gzero End of Run 33954:
133060 02/10/07 14:05 gaskell Target: target snapshot
133059 02/10/07 13:59 gzero Run 33954: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133058 02/10/07 13:57 gzero End of Run 33953:
133057 02/10/07 13:51 gaskell Analysis shift checklist for runs 33943-33950
133056 02/10/07 13:07 Larry Which High rates (?)
133055 02/10/07 12:59 gzero Run 33953: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133054 02/10/07 12:59 gzero End of Run 33952:
133053 02/10/07 12:29 gaskell screen shots for shift checklist
133052 02/10/07 12:18 horn realtime restarted - late entry
133051 02/10/07 12:08 Fatiha It is not the realtime
133050 02/10/07 11:58 gzero Run 33952: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133049 02/10/07 11:56 gzero End of Run 33951:
133048 02/10/07 11:56 Fatiha Realtime (more)
133047 02/10/07 11:54 Fatiha Cerenkov rates in the realtime
133046 02/10/07 11:17 horn Moller electronics checkout
133045 02/10/07 11:15 cdaq Moller Run 62135: LED flasher
133044 02/10/07 11:13 Larry Herbert's draft runplan for "Special Randoms" measurement
133043 02/10/07 11:13 cdaq Moller Run 62134: LED flasher
133042 02/10/07 11:11 cdaq Moller Run 62133: LED flasher
133041 02/10/07 11:09 cdaq Moller Run 62132: LED flasher
133040 02/10/07 10:59 cdaq Moller Run 62131: LED flasher
133039 02/10/07 10:56 gzero Run 33951: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133038 02/10/07 10:53 cdaq Moller Run 62130: LED flasher
133037 02/10/07 10:51 gzero End of Run 33950:
133036 02/10/07 10:49 cdaq Moller Run 62129: LED flasher
133035 02/10/07 10:37 gzero Run 33950: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133034 02/10/07 10:36 gzero End of Run 33949:
133033 02/10/07 10:34 horn Hall A charge feedback threshold modified
133032 02/10/07 09:36 gzero Run 33949: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133031 02/10/07 09:35 gzero End of Run 33948:
133030 02/10/07 08:41 gzero Run 33948: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133029 02/10/07 08:39 gzero End of Run 33947:
133028 02/10/07 08:10 cdaq Beam Time Accounting
133027 02/10/07 07:59 maud Owl shift summary
133026 02/10/07 07:57 DArko Target: Target Monitor Screen Shots
133025 02/10/07 07:52 maud Cerenkov rate of PMT 2 oct 1 high
133024 02/10/07 07:46 Darko Analysis: Shift check tasks
133023 02/10/07 07:40 gzero Run 33947: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133022 02/10/07 07:39 gzero End of Run 33946:
133021 02/10/07 06:38 gzero Run 33946: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133020 02/10/07 06:37 gzero End of Run 33945:
133019 02/10/07 05:35 gzero Run 33945: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133018 02/10/07 05:33 gzero End of Run 33944:
133017 02/10/07 04:42 Darko Owl shift check list snapshots
133016 02/10/07 04:32 gzero Run 33944: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133015 02/10/07 04:31 gzero End of Run 33943:
133014 02/10/07 03:30 gzero Run 33943: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133013 02/10/07 03:29 gzero End of Run 33942:
133012 02/10/07 02:30 gzero Run 33942: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133011 02/10/07 02:28 gzero End of Run 33941:
133010 02/10/07 01:28 gzero Run 33941: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133009 02/10/07 01:27 gzero End of Run 33940:
133008 02/10/07 01:00 Larry RC Summary, Thursday Feb.8 Swing through Friday Feb.8 Day
133007 02/10/07 00:28 gzero Run 33940: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133006 02/10/07 00:26 Larry Paul King's draft Runplan for Transverse Data
133005 02/10/07 00:26 gzero End of Run 33939:
133004 02/10/07 00:02 cdaq Beam Time Accounting
133003 02/10/07 00:01 J.W. Martin Feb. 9 Swing Shift Summary
133002 02/10/07 00:00 C. Davis Target: 9 Feb., 2007 swing shift report
Friday
133001 02/09/07 23:25 gzero Run 33939: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
133000 02/09/07 23:24 gzero End of Run 33938:
132999 02/09/07 23:24 C. Davis Analysis: 9 Feb., 2007 Swing shift --- Check List
132998 02/09/07 22:23 gzero Run 33938: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132997 02/09/07 22:21 gzero End of Run 33937:
132996 02/09/07 21:21 gzero Run 33937: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132995 02/09/07 21:20 gzero End of Run 33936:
132994 02/09/07 20:04 C. Davis 9 Feb., 2007 swing shift -- screen captues
132993 02/09/07 19:51 gzero Run 33936: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132992 02/09/07 19:49 gzero End of Run 33935:
132991 02/09/07 19:18 C. Davis Target: Adjustment to JT valve
132990 02/09/07 18:49 gzero Run 33935: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132989 02/09/07 18:45 gzero End of Run 33934:
132988 02/09/07 18:25 Breuer Analysis: new M2/M3 electron efficiencies based on runs 33931,32
132987 02/09/07 18:24 Larry/John Clarification on Switchover to "Pions" running
132986 02/09/07 18:06 Alex For shift leaders, "good_for" input when taking pion data
132985 02/09/07 17:49 jschaub Changed Second Matrix from Randoms to Pions
132984 02/09/07 17:45 gzero Run 33934: Production Running Pions, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132983 02/09/07 17:34 gzero End of Run 33933:
132982 02/09/07 17:24 suleiman Beam: New Hall A IA Slope (+1600 ppm/DACV) - Hall A Charge Feedback is now ON
132981 02/09/07 16:36 CD & JM HV ON!
132980 02/09/07 16:30 jschaub Beam: G0 Cavity Signals from Run 33919
132979 02/09/07 16:30 gzero Run 33933: Hall A Charge Feedback Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132978 02/09/07 16:27 jschaub Beam: Charge Asymmtery and Position Differences from Run 33919 - IN
132977 02/09/07 16:07 jschaub Day Shift Summary
132976 02/09/07 16:05 cdaq Beam Time Accounting
132975 02/09/07 15:58 jschaub Beam: Coil Modulation Cycle from Run 33903
132974 02/09/07 15:37 Louis-tgt Analysis: Analysis checklist of the DAY shift 02-09-07 (not much new)
132973 02/09/07 15:37 gzero End of Run 33932:
132972 02/09/07 14:51 gzero Run 33932: Hall A Charge Feedback Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132971 02/09/07 14:41 gzero End of Run 33931:
132970 02/09/07 14:29 Louis-tgt Beam: Scans of Checklist 02-09-07
132969 02/09/07 14:12 gzero Run 33931: Herbert's Mult3 Test Run, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132968 02/09/07 14:03 gzero End of Run 33930:
132967 02/09/07 14:01 Louis-tgt Beam: Snapshots of the Checklist for DAY Shift 02-09-07
132966 02/09/07 13:41 gzero Run 33930: Hall A Charge Feedback Calibration, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132965 02/09/07 13:39 gzero End of Run 33929:
132964 02/09/07 13:22 gzero Run 33929: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132963 02/09/07 13:17 gzero End of Run 33928:
132962 02/09/07 12:40 gzero Run 33928: Production (Maybe) Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132961 02/09/07 12:28 gzero End of Run 33927:
132960 02/09/07 12:27 gzero Run 33927: Production (Maybe) Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132959 02/09/07 11:56 Doug Beck Analysis: Effect of scaler errors on asymmetry - please check!
132958 02/09/07 10:52 Larry Hall-C back in Beam Permit mode
132957 02/09/07 10:38 gzero End of Run 33926:
132956 02/09/07 10:10 gzero Run 33926: test realtime analyser
132955 02/09/07 09:55 saw In case of analysis difficulties
132954 02/09/07 09:49 Larry Opportunistic Access into Hall-C for Diffuser waterpump preventive maintenance
132953 02/09/07 09:31 Louis-tgt Target: References snap shots at start of DAY shift 02-09-07
132952 02/09/07 09:07 gzero End of Run 33925:
132951 02/09/07 08:59 Louis-tgt Target: JT valve adjustments
132950 02/09/07 08:09 Darko Owl Shift Summary
132949 02/09/07 08:05 cdaq Beam Time Accounting
132948 02/09/07 08:05 gzero Run 33925: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132947 02/09/07 08:02 gzero End of Run 33924:
132946 02/09/07 07:59 Darko Parity Quality with Hall A
132945 02/09/07 07:58 maud Analysis: checklist until run 33923
132944 02/09/07 07:54 Darko Snapshots during run 33922
132943 02/09/07 07:20 maud Target: checklist snapshots
132942 02/09/07 07:19 maud Target: target strips - smooth running
132941 02/09/07 06:44 gzero Run 33924: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132940 02/09/07 06:42 gzero End of Run 33923:
132939 02/09/07 06:16 Darko Snapshots during run 33922
132938 02/09/07 06:13 gzero Run 33923: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132937 02/09/07 06:12 gzero End of Run 33922:
132936 02/09/07 05:13 gzero Run 33922: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132935 02/09/07 05:03 gzero End of Run 33921:
132934 02/09/07 04:46 Darko Snapshots during run 33921
132933 02/09/07 04:41 gzero Run 33921: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132932 02/09/07 04:39 gzero End of Run 33920:
132931 02/09/07 03:41 gzero Run 33920: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132930 02/09/07 03:39 gzero End of Run 33919:
132929 02/09/07 02:42 gzero Run 33919: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132928 02/09/07 00:45 muether SMS: UPS Status Screens
132927 02/09/07 00:01 cdaq Beam Time Accounting
Thursday
132926 02/08/07 23:56 Roos Swing Shift Summary
132925 02/08/07 23:52 C. Davis Target: Shift Report for 8 Feb., 2007 swing shift
132924 02/08/07 23:11 roos MCC will try until midnight to provide 2 hall running
132923 02/08/07 22:19 roos struggling to get back to production
132922 02/08/07 22:15 gzero End of Run 33918:
132921 02/08/07 21:57 gzero Run 33918: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132920 02/08/07 20:49 Larry RC Summary, Wednesday Feb.7 Day through Thursday Feb.8 Day
132919 02/08/07 20:40 gzero End of Run 33917:
132918 02/08/07 19:58 Breuer Analysis: delay curve for NA Cerenkov gate
132917 02/08/07 19:51 gzero Run 33917: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132916 02/08/07 19:50 C. Davis 8 Feb., 2007 Swing shift --- screen captures
132915 02/08/07 19:39 gzero End of Run 33916:
132914 02/08/07 18:50 gzero Run 33916: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132913 02/08/07 18:47 roos How to turn on Hall A charge asymmetry feedback / better format
132912 02/08/07 18:46 roos How to turn on Hall A charge asymmetry feedback
132911 02/08/07 18:36 gzero End of Run 33915:
132910 02/08/07 18:07 suleiman Beam: Changed the cable coming from Hall A counting house from BCM2X3 to BCM2X10
132909 02/08/07 18:06 gzero Run 33915: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132908 02/08/07 18:03 gzero End of Run 33914:
132907 02/08/07 18:01 Larry Re-adjusted timing on NA Cerenkov signals to Latches
132906 02/08/07 17:41 gzero Run 33914: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132905 02/08/07 17:18 C. Davis Target: Move target back into position
132904 02/08/07 17:08 C. Davis Target: Move target back into position
132903 02/08/07 16:44 C. Davis Target: Moving Target to "out of beam" at MCC request
132902 02/08/07 16:30 jschaub Beam: IHWP Inserted
132901 02/08/07 16:28 jschaub Day Shift Summary
132900 02/08/07 16:08 cdaq Beam Time Accounting
132899 02/08/07 15:47 Larry Timing tweak performed on NA Cerenkov signals to Electron Latch
132898 02/08/07 15:03 suleiman Beam: Pockels Cell Stage Scan
132897 02/08/07 14:54 Louis-tgt Analysis: Analysis checklist for the day shift -- no beam - noy much to report - no plots
132896 02/08/07 14:04 Larry Opportunistic Mott Measurement
132895 02/08/07 13:51 kenyon Checked hall for helium leaks
132894 02/08/07 12:46 Louis-tgt Target: Here is the snapshot as summary of some cjange in target tuning
132893 02/08/07 12:41 Louis-tgt Target: JT Valve ajustment
132892 02/08/07 12:36 Louis-tgt Target: HallA start cold return
132891 02/08/07 11:54 gzero End of Run 33913:
132890 02/08/07 11:43 gzero Run 33913: PC x-stage Scan, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132889 02/08/07 11:42 gzero End of Run 33912:
132888 02/08/07 11:38 Louis-tgt Target: JT valve Open by 3 steps
132887 02/08/07 11:15 gzero Run 33912: PC x-stage Scan, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132886 02/08/07 11:03 gzero End of Run 33911:
132885 02/08/07 10:55 gzero Run 33911: PC x-stage Scan, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132884 02/08/07 10:53 gzero End of Run 33910:
132883 02/08/07 10:46 gzero Run 33910: PC x-stage Scan, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132882 02/08/07 10:45 gzero End of Run 33909:
132881 02/08/07 10:42 gzero Run 33909: PC x-stage Scan, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132880 02/08/07 09:55 Louis-tgt Target: Ioc reboot after powercycling the frequencemeter of Tachy -reading is fixed
132879 02/08/07 09:53 maud Analysis: analysis checklist ... with seeable pictures i hope
132878 02/08/07 09:35 maud Analysis: analysis checklist until run 33908
132877 02/08/07 08:46 Louis-tgt Target: Reference snapshot at Start of DAY shift 02-08-07
132876 02/08/07 08:31 gzero End of Run 33908:
132875 02/08/07 08:07 cdaq Beam Time Accounting
132874 02/08/07 08:06 Darko Owl shift summary
132873 02/08/07 07:52 maud Target: checklist snapshots
132872 02/08/07 07:47 gzero Run 33908: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132871 02/08/07 07:45 gzero End of Run 33907:
132870 02/08/07 06:41 gzero Run 33907: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132869 02/08/07 06:30 mike-maud Target: action on target tonight
132868 02/08/07 04:52 maud Target: target reboot + red pressure alarm
132867 02/08/07 04:14 gzero End of Run 33906:
132866 02/08/07 03:23 gzero Run 33906: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132865 02/08/07 03:21 gzero End of Run 33905:
132864 02/08/07 02:23 gzero Run 33905: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132863 02/08/07 02:21 gzero End of Run 33904:
132862 02/08/07 01:26 gzero Run 33904: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132861 02/08/07 01:23 gzero End of Run 33903:
132860 02/08/07 00:27 gzero Run 33903: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132859 02/08/07 00:25 gzero End of Run 33902:
132858 02/08/07 00:01 cdaq Beam Time Accounting
132857 02/08/07 00:00 C. Davis Target: 7 Feb., 2007 swing shift report
Wednesday
132856 02/07/07 23:59 P. Roos Swing Shift Summary
132855 02/07/07 23:28 gzero Run 33902: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132854 02/07/07 23:21 gzero End of Run 33901:
132853 02/07/07 23:10 roos Run 33899 is -12 ns NA cerenkov
132852 02/07/07 23:09 gzero Run 33901: Cerenkov {cable curve} -4ns for all NA Cerenkov
132851 02/07/07 23:05 gzero End of Run 33900:
132850 02/07/07 22:55 gzero Run 33900: Cerenkov {cable curve} -8ns for all NA Cerenkov
132849 02/07/07 22:50 gzero End of Run 33899:
132848 02/07/07 22:49 lee/roos delay curve for NA cerenkov detectors
132847 02/07/07 22:41 C. Davis Analysis: 7 Feb., 2007 Swing shift analysis check list --- II
132846 02/07/07 22:39 gzero Run 33899: Cerenkov cable
132845 02/07/07 22:29 gzero End of Run 33898:
132844 02/07/07 22:15 C. Davis Analysis: 7 Feb., 2007 swing shift analysis check-list -- I
132843 02/07/07 21:52 gzero Run 33898: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132842 02/07/07 21:51 gzero End of Run 33897:
132841 02/07/07 20:44 gzero Run 33897: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132840 02/07/07 20:42 gzero End of Run 33896:
132839 02/07/07 20:28 Breuer Analysis: Program to extract M2/M3 electron efficiencies and rate ratios between runs
132838 02/07/07 20:11 Breuer Analysis: increased NA electron rates with shifted Cerenkov gate
132837 02/07/07 19:42 gzero Run 33896: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132836 02/07/07 19:40 gzero End of Run 33895:
132835 02/07/07 19:37 C. Davis Shift Check List Scans 7 Feb., 2007 (swing shift)
132834 02/07/07 19:19 C. Davis 7 FEB., 2007 Swing Shift Screen Captures
132833 02/07/07 18:37 Larry Restored timing for Octant-1 and 3 Cerenkov signal going to "electron" latch
132832 02/07/07 18:33 gzero Run 33895: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132831 02/07/07 18:28 gzero End of Run 33894:
132830 02/07/07 18:25 Larry Here, "Pion matrix" means "Randoms matrix"
132829 02/07/07 18:20 Larry Adjusted timing for Octant-1 and 3 Cerenkov signal going to "electron" latch
132828 02/07/07 18:19 roos Run 33894 is test of Cerenkov timing
132827 02/07/07 18:14 gzero Run 33894: Production setup/ took out 8ns out of Cerenkov signal to latch for Oct. 1&3
132826 02/07/07 18:11 Fatiha/Larry Yield versus time on the pion matrix, and study of possible dependency with the beam current or quality.
132825 02/07/07 18:08 gzero End of Run 33893:
132824 02/07/07 18:05 Carissa Analysis: ratio of randoms rates again -- oops...
132823 02/07/07 17:59 Carissa Analysis: Ratio of randoms counting rates over several days
132822 02/07/07 17:09 gzero Run 33893: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132821 02/07/07 17:07 gzero End of Run 33892:
132820 02/07/07 16:58 C. Davis Target: Coolant fluctuations
132819 02/07/07 16:07 gzero Run 33892: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132818 02/07/07 16:05 gzero End of Run 33891:
132817 02/07/07 16:02 cdaq Beam Time Accounting
132816 02/07/07 16:01 gaskell Day shift summary
132815 02/07/07 15:43 Louis-tgt Beam: Snapshot of the checklist for DAY shift 02-07-07 finally
132814 02/07/07 15:35 Louis-tgt Analysis: Analysis checlist covering Owl and Day run 33871 to 33888
132813 02/07/07 15:08 gzero Run 33891: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132812 02/07/07 15:06 gzero End of Run 33890:
132811 02/07/07 14:24 gaskell test entry with picture
132810 02/07/07 14:11 jschaub Beam: Coil Modulation Cycle from Run 33885
0 02/07/07 14:09 no_name no_key
132808 02/07/07 14:07 gaskell Beam trip - took HV with it
132807 02/07/07 14:03 gzero Run 33890: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132806 02/07/07 14:00 gzero End of Run 33889:
132805 02/07/07 13:54 gzero Run 33889: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132804 02/07/07 13:52 gzero End of Run 33888:
132803 02/07/07 13:42 Louis-tgt Beam: Just a try
132802 02/07/07 13:36 Louis-tgt Beam: Snapshots of Checklist DAY shift 02-07-07 good pictures
132801 02/07/07 13:27 Louis-tgt Beam: Snapshots of the Checklist for DAY shift 02-07-07
132800 02/07/07 13:22 Larry RC Summary, Monday Feb.5 Day through Wednesday Feb.7 Owl
132799 02/07/07 12:55 gzero Run 33888: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132798 02/07/07 12:49 gzero End of Run 33887:
132797 02/07/07 11:58 jschaub Removed File Transfer Errors for Runs 33715 & 33876
132796 02/07/07 11:49 gzero Run 33887: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132795 02/07/07 11:48 gzero End of Run 33886:
132794 02/07/07 10:48 gzero Run 33886: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132793 02/07/07 10:40 gzero End of Run 33885:
132792 02/07/07 09:47 gzero Run 33885: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132791 02/07/07 09:44 gzero End of Run 33884:
132790 02/07/07 08:52 gzero Run 33884: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132789 02/07/07 08:50 gzero End of Run 33883:
132788 02/07/07 08:47 Louis-tgt Target: Some transient alarm on pressures
132787 02/07/07 08:35 Louis-tgt Target: Reference snapshots for Alarm settings 02-07-07 cont'd
132786 02/07/07 08:25 Louyis-tgt Target: Reference snapshots for ALARMS settings at start od DAY shift 02-07-07
132785 02/07/07 08:14 Louis-tgt Target: Reference snapshots at start of DAY shift 02-07-07
132784 02/07/07 08:06 cdaq Beam Time Accounting
132783 02/07/07 07:47 Darko Owl shift summary
132782 02/07/07 07:44 gzero Run 33883: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132781 02/07/07 07:42 gzero End of Run 33882:
132780 02/07/07 07:24 maud Target: checklist snapshot - owl shift without any incident
132779 02/07/07 07:14 Darko Cerenkov rates during run 33882
132778 02/07/07 06:40 gzero Run 33882: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132777 02/07/07 06:39 gzero End of Run 33881:
132776 02/07/07 05:40 gzero Run 33881: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132775 02/07/07 05:39 gzero End of Run 33880:
132774 02/07/07 04:43 gzero Run 33880: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132773 02/07/07 04:40 gzero End of Run 33879:
132772 02/07/07 03:40 gzero Run 33879: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132771 02/07/07 03:38 gzero End of Run 33878:
132770 02/07/07 03:27 Darko Cerenkov RATES & HALO during run 33878
132769 02/07/07 03:25 Darko Cerenkov RATES & HALO during run 33878
132768 02/07/07 02:40 gzero Run 33878: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132767 02/07/07 02:38 gzero End of Run 33877:
132766 02/07/07 01:36 gzero Run 33877: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132765 02/07/07 01:12 gzero Run 33876: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132764 02/07/07 01:10 gzero End of Run 33875:
132763 02/07/07 00:27 Larry Loaded new HV's for NA Cerenkov PMTs
132762 02/07/07 00:14 Roos Swing Shift Summary
132761 02/07/07 00:12 gzero Run 33875: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132760 02/07/07 00:08 gzero End of Run 33874:
132759 02/07/07 00:06 cdaq Beam Time Accounting
132758 02/07/07 00:06 gzero Run 33874: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132757 02/07/07 00:01 gzero End of Run 33873:
Tuesday
132756 02/06/07 23:59 gzero Run 33873: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132755 02/06/07 23:58 C. Davis Target: 6 Feb., 2007 swing shift: end of shift (EOS) report
132754 02/06/07 23:57 gzero End of Run 33872:
132753 02/06/07 23:24 Larry New HV's for NA Cerenkov PMTs
132752 02/06/07 23:23 C. Davis Analysis: 6 Feb., 2007 Swing shift Analysis check list -- Part the Second
132751 02/06/07 23:13 Larry Comment regarding Cerenkov efficiency details
132750 02/06/07 23:00 C. Davis Target: IOC ReBoot
132749 02/06/07 22:54 gzero Run 33872: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132748 02/06/07 22:47 gzero End of Run 33871:
132747 02/06/07 22:37 C. Davis Analysis: 6 Feb., 2007 swing shift analysis check list -- Part the First
132746 02/06/07 21:58 gzero Run 33871: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132745 02/06/07 21:55 gzero End of Run 33870:
132744 02/06/07 21:46 Breuer Analysis: Rate change tables from threshold changes of Cerenkov detectors
132743 02/06/07 21:32 Breuer Analysis: Electron efficiency changes with discr. threshold change (run 33867,33868)
132742 02/06/07 20:52 gzero Run 33870: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132741 02/06/07 20:50 gzero End of Run 33869:
132740 02/06/07 20:22 C. Davis Shift Check List Screen Captures 06 Feb., 2007 swing
132739 02/06/07 20:01 C. Davis Shift Check List Screen Captures 06 Feb 2007 swing
132738 02/06/07 19:49 roos Multiplicity test/measurement for Cerenkov efficiencies
132737 02/06/07 19:49 gzero Run 33869: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132736 02/06/07 19:39 gzero End of Run 33868:
132735 02/06/07 19:24 gzero Run 33868: Herbert test Mult3 20 mv thresholds on CER
132734 02/06/07 19:19 gzero End of Run 33867:
132733 02/06/07 19:04 gzero Run 33867: Herbert test Mult2 20 mv thresholds on CER
132732 02/06/07 19:00 gzero End of Run 33866:
132731 02/06/07 17:59 gzero Run 33866: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132730 02/06/07 17:58 gzero End of Run 33865:
132729 02/06/07 17:33 suleiman Beam: Helicity Magnets Test with G0 Production Data
132728 02/06/07 16:57 gzero Run 33865: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132727 02/06/07 16:55 gzero End of Run 33864:
132726 02/06/07 16:11 Louis-tgt Analysis: Analysis checklist of the DAY shift )@-)^-(& run 33848 to 33861
132725 02/06/07 16:04 cdaq Beam Time Accounting
132724 02/06/07 16:02 gaskell Day shift summary
132723 02/06/07 15:57 Louis-tgt Target: Reboot IOC
132722 02/06/07 15:52 gzero Run 33864: Production Running, Helicity Magnets ON, Position Feedback ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132721 02/06/07 15:38 gzero End of Run 33863:
132720 02/06/07 15:06 gzero Run 33863: Production Running, Helicity Magnets ON, Position Feedback ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132719 02/06/07 15:05 gzero End of Run 33862:
132718 02/06/07 14:43 suleiman Beam: Helicity Magnets Electrical Pick-up
132717 02/06/07 14:08 gzero Run 33862: Production Running, Helicity Magnets ON, Position Feedback ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132716 02/06/07 14:07 gzero End of Run 33861:
132715 02/06/07 13:23 Louis-tgt Beam: Snapshots of the checklist for Day shift of 02-06-07
132714 02/06/07 13:09 gzero Run 33861: Production Running, Helicity Magnets ON, Position Feedback ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132713 02/06/07 13:07 gzero End of Run 33860:
132712 02/06/07 12:13 gaskell beam is back
132711 02/06/07 12:09 gzero Run 33860: Production Running, Helicity Magnets ON, Position Feedback ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132710 02/06/07 11:55 gzero End of Run 33859:
132709 02/06/07 11:52 suleiman This run was with PC OFF - not production.
132708 02/06/07 11:44 gzero Run 33859: Pockels Cell OFF, Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132707 02/06/07 11:42 gzero End of Run 33858:
132706 02/06/07 11:41 swells NA Cerenkov/trigger timing
132705 02/06/07 11:37 gzero Run 33858: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132704 02/06/07 11:36 gzero End of Run 33857:
132703 02/06/07 11:20 gzero Run 33857: Pockels Cell OFF, Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132702 02/06/07 11:16 gzero End of Run 33856:
132701 02/06/07 10:59 gzero Run 33856: Pockels Cell OFF, Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132700 02/06/07 10:57 gzero End of Run 33855:
132699 02/06/07 10:42 gzero Run 33855: Pockels Cell OFF, Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132698 02/06/07 10:32 gaskell ARC 4 box supply trouble
132697 02/06/07 10:29 gaskell beam off for 10 minutes - ended run
132696 02/06/07 10:28 gzero End of Run 33854:
132695 02/06/07 10:18 gaskell "production running" from run 33854
132694 02/06/07 10:04 gzero Run 33854: Production Running while Helicity Magnets ON, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132693 02/06/07 10:01 gzero End of Run 33853:
132692 02/06/07 09:48 Louis-tgt Target: Pressure gpt3 case
132691 02/06/07 09:20 gzero Run 33853: Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132690 02/06/07 09:18 gzero End of Run 33852:
132689 02/06/07 09:08 gzero Run 33852: Helicity Magnets Test, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132688 02/06/07 09:05 gaskell Beam studies starting
132687 02/06/07 09:00 gaskell trippy beam at end of run 33851
132686 02/06/07 08:59 gzero End of Run 33851:
132685 02/06/07 08:22 Louis-tgt Target: Reference snapshots at Start of DAY shift of 02/06/07
132684 02/06/07 08:19 horn Owl Shift Summary
132683 02/06/07 08:15 gzero Run 33851: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132682 02/06/07 08:10 cdaq Beam Time Accounting
132681 02/06/07 08:09 gzero End of Run 33850:
132680 02/06/07 07:36 gzero Run 33850: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132679 02/06/07 07:35 gzero End of Run 33849:
132678 02/06/07 06:35 gzero Run 33849: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132677 02/06/07 06:35 gzero End of Run 33848:
132676 02/06/07 06:32 muether Analysis: Checklist for Runs 33827-33847
132675 02/06/07 06:06 muether Monticello Menu and Shift check list screen grabs including checklist scans
132674 02/06/07 05:32 gzero Run 33848: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132673 02/06/07 05:31 gzero End of Run 33847:
132672 02/06/07 04:45 horn Run 33846 is not all good
132671 02/06/07 04:38 horn/muether Octant 5 pion coincidences - solved
132670 02/06/07 04:30 gzero Run 33847: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132669 02/06/07 04:28 gzero End of Run 33846:
132668 02/06/07 04:11 horn Rebooted octant 1 and octant 5 coincidence crates
132667 02/06/07 04:09 gzero Run 33846: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132666 02/06/07 04:06 gzero End of Run 33845:
132665 02/06/07 04:02 horn Octant 5 pion coincidences
132664 02/06/07 03:14 horn Run 33844 likely junk
132663 02/06/07 03:02 gzero Run 33845: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132662 02/06/07 03:00 gzero End of Run 33844:
132661 02/06/07 02:44 gzero Run 33844: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132660 02/06/07 02:43 gzero End of Run 33843:
132659 02/06/07 02:41 gzero Run 33843: DAQ test
132658 02/06/07 02:35 gzero End of Run 33842:
132657 02/06/07 01:38 gzero Run 33842: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132656 02/06/07 01:36 gzero End of Run 33841:
132655 02/06/07 01:30 Larry NA Cerenkov HV's checked
132654 02/06/07 00:37 gzero Run 33841: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132653 02/06/07 00:36 gzero End of Run 33840:
132652 02/06/07 00:02 roos Swing Shift Summary
132651 02/06/07 00:01 cdaq Beam Time Accounting
Monday
132650 02/05/07 23:53 C. Davis Target: 5 Feb., 2007 Swing shift Report
132649 02/05/07 23:35 gzero Run 33840: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132648 02/05/07 23:34 gzero End of Run 33839:
132647 02/05/07 22:31 gzero Run 33839: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132646 02/05/07 22:29 gzero End of Run 33838:
132645 02/05/07 21:29 C. Davis Target: Impossibly stable Target Vacuum
132644 02/05/07 21:24 gzero Run 33838: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132643 02/05/07 21:22 gzero End of Run 33837:
132642 02/05/07 21:17 Breuer Analysis: Electron efficiency loss from 01/27 to 02/05
132641 02/05/07 21:10 roos swing shift screen shots
132640 02/05/07 20:48 gzero Run 33837: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132639 02/05/07 20:34 roos beam trip rate
132638 02/05/07 20:30 gzero End of Run 33836:
132637 02/05/07 20:23 gzero Run 33836: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132636 02/05/07 20:17 rooa beam trip rate up
132635 02/05/07 20:15 gzero End of Run 33835:
132634 02/05/07 19:16 Larry Set NA and FR Cerenkovs back to Mult-2
132633 02/05/07 19:13 gzero Run 33835: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132632 02/05/07 19:09 gzero End of Run 33834:
132631 02/05/07 19:02 roos Had to reboot ROC7 and restart CODA
132630 02/05/07 19:01 Larry ROC 7 crashed after run 33832, rebooted
132629 02/05/07 18:52 gzero Run 33834: Short Run with Mult {3;} 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132628 02/05/07 18:33 gzero End of Run 33833:
132627 02/05/07 18:31 gzero End of Run 33833:
132626 02/05/07 18:30 Larry Adjusted NA and FR Cerenkovs to Mult-3 for a 10 minute test run
132625 02/05/07 18:27 gzero Run 33833: Short Run with Mult 3; 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132624 02/05/07 18:20 gzero End of Run 33832:
132623 02/05/07 17:19 gzero Run 33832: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132622 02/05/07 17:17 gzero End of Run 33831:
132621 02/05/07 16:10 gzero Run 33831: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132620 02/05/07 16:09 gzero End of Run 33830:
132619 02/05/07 16:02 gaskell Day shift summary
132618 02/05/07 16:01 cdaq Beam Time Accounting
132617 02/05/07 15:08 gzero Run 33830: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132616 02/05/07 15:06 gzero End of Run 33829:
132615 02/05/07 15:04 muether SMS: How to control "The Girl From Ipanema"
132614 02/05/07 14:55 gaskell No - sound is off
132613 02/05/07 14:46 Louis-tgt Analysis: The plots of previous entry got messed up here is the correct one, I hope!
132612 02/05/07 14:46 muether SMS: Recieved LHe level high alarm
132611 02/05/07 14:25 Louis-tgt Analysis: Analysis checklist for DAY shift of 02-05-07
132610 02/05/07 14:04 gzero Run 33829: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132609 02/05/07 14:01 gzero End of Run 33828:
132608 02/05/07 13:53 gaskell Screenshots for shift checklist
132607 02/05/07 13:05 gzero Run 33828: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132606 02/05/07 13:03 gzero End of Run 33827:
132605 02/05/07 12:32 Larry RC Summary, Sunday Feb.4 Day through Monday Feb.5 Owl
132604 02/05/07 12:01 gzero Run 33827: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132603 02/05/07 12:00 gzero End of Run 33826:
132602 02/05/07 11:57 gaskell stopped and started charge feedback
132601 02/05/07 11:55 gzero Run 33826: Junk run
132600 02/05/07 11:34 gaskell Mott measurement results
132599 02/05/07 11:26 gaskell IHWP changed to OUT
132598 02/05/07 11:17 gaskell tune beam on the way
132597 02/05/07 10:08 gaskell Beam gone for ARC 4 power supply fix
132596 02/05/07 10:06 gzero End of Run 33825:
132595 02/05/07 09:22 gzero Run 33825: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132594 02/05/07 09:20 gzero End of Run 33824:
132593 02/05/07 08:20 gzero Run 33824: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132592 02/05/07 08:16 gzero End of Run 33823:
132591 02/05/07 08:12 Louis-tgt Target: Reference snapshot at Day shift start
132590 02/05/07 08:01 cdaq Beam Time Accounting
132589 02/05/07 08:00 muether February 5th: Owl Shift Summary
132588 02/05/07 07:38 Darko Analysis: Shift check list Run# 33814-33820
132587 02/05/07 07:16 gzero Run 33823: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132586 02/05/07 07:14 gzero End of Run 33822:
132585 02/05/07 06:14 gzero Run 33822: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132584 02/05/07 06:12 gzero End of Run 33821:
132583 02/05/07 05:04 gzero Run 33821: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132582 02/05/07 05:03 gzero End of Run 33820:
132581 02/05/07 04:02 Darko Owl Shift Screen Shots
132580 02/05/07 03:56 gzero Run 33820: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132579 02/05/07 03:55 gzero End of Run 33819:
132578 02/05/07 02:49 gzero Run 33819: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132577 02/05/07 02:47 gzero End of Run 33818:
132576 02/05/07 01:42 gzero Run 33818: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132575 02/05/07 01:40 gzero End of Run 33817:
132574 02/05/07 00:33 gzero Run 33817: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132573 02/05/07 00:31 gzero End of Run 33816:
132572 02/05/07 00:05 cdaq Beam Time Accounting
132571 02/05/07 00:04 Bosted swing shift summary
Sunday
132570 02/04/07 23:25 gzero Run 33816: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132569 02/04/07 23:24 gzero End of Run 33815:
132568 02/04/07 22:55 Louis-tgt Analysis: Analysis checklist of the swing shift runs 33805 to 33813 included
132567 02/04/07 22:23 gzero Run 33815: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132566 02/04/07 22:22 gzero End of Run 33814:
132565 02/04/07 21:23 gzero Run 33814: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132564 02/04/07 21:21 Louis-tgt Beam: Snapshots of the Checklist for Swing shift
132562 02/04/07 20:21 gzero Run 33813: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132561 02/04/07 20:19 gzero End of Run 33812:
132560 02/04/07 19:12 gzero Run 33812: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132559 02/04/07 19:10 gzero End of Run 33811:
132558 02/04/07 18:10 gzero Run 33811: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132557 02/04/07 17:46 gzero End of Run 33810:
132556 02/04/07 17:28 gzero Run 33810: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132555 02/04/07 17:25 gzero End of Run 33809:
132554 02/04/07 16:53 gzero Run 33809: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132553 02/04/07 16:36 gzero End of Run 33808:
132552 02/04/07 16:32 gzero Run 33808: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132551 02/04/07 16:14 Larry Beam trip
132550 02/04/07 16:09 gzero End of Run 33807:
132549 02/04/07 16:03 Carissa Target: Shift Checklist Scan
132548 02/04/07 16:02 Louis-tgt Target: Reference snapshot at start of swing shift
132547 02/04/07 16:01 cdaq Beam Time Accounting
132546 02/04/07 15:54 Pitt Feb. 4 Day Shift Summary
132545 02/04/07 15:54 Carissa Target: Shift Checklist Screenshots
132544 02/04/07 15:21 gzero Run 33807: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132543 02/04/07 15:20 gzero End of Run 33806:
132542 02/04/07 15:14 Carissa Analysis: Checklist for runs 33796-33804
132541 02/04/07 14:18 gzero Run 33806: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132540 02/04/07 14:18 gzero End of Run 33805:
132539 02/04/07 13:18 gzero Run 33805: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132538 02/04/07 13:16 gzero End of Run 33804:
132537 02/04/07 13:05 Breuer Analysis: reference values of Cerenkov detectors
132536 02/04/07 12:53 Carissa Beam: Parity quality plots for current running period
132535 02/04/07 12:21 gzero Run 33804: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132534 02/04/07 12:19 gzero End of Run 33803:
132533 02/04/07 11:44 Pitt Beam: IOCSE20 reboot
132532 02/04/07 11:41 Larry Beam off for 3-4 minutes, IOCSE20 needs to be rebooted
132531 02/04/07 11:35 Larry RC Summary (typo corrected), Saturday Feb.3 Day through Sunday Feb.4 Owl
132530 02/04/07 11:27 Larry RC Summary, Saturday Feb.3 Day through Sunday Feb.4 Owl
132529 02/04/07 11:14 gzero Run 33803: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132528 02/04/07 11:12 gzero End of Run 33802:
132527 02/04/07 10:02 gzero Run 33802: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132526 02/04/07 10:01 gzero End of Run 33801:
132525 02/04/07 09:19 cdaq Beam Time Accounting
132524 02/04/07 09:01 gzero Run 33801: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132523 02/04/07 09:00 gzero End of Run 33800:
132522 02/04/07 08:01 gzero Run 33800: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132521 02/04/07 08:01 benesch shift summary
132520 02/04/07 08:00 gzero End of Run 33799:
132519 02/04/07 07:26 Darko Analysis: Shift check list Run# 33789-33795
132518 02/04/07 06:51 gzero Run 33799: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132517 02/04/07 06:50 gzero End of Run 33798:
132516 02/04/07 05:51 gzero End of Run 33798:
132515 02/04/07 05:42 gzero Run 33798: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132514 02/04/07 05:40 gzero End of Run 33797:
132513 02/04/07 05:06 Darko Owl Shift Screen Shots current-halo.strip corrction
132512 02/04/07 05:01 Darko Owl Shift Screen Shots
132511 02/04/07 04:51 gzero Run 33797: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132510 02/04/07 03:49 gzero Run 33796: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132509 02/04/07 03:48 gzero End of Run 33795:
132508 02/04/07 03:12 gzero Run 33795: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132507 02/04/07 03:10 gzero End of Run 33794:
132506 02/04/07 01:58 gzero Run 33794: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132505 02/04/07 01:57 gzero End of Run 33793:
132504 02/04/07 00:52 gzero Run 33793: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132503 02/04/07 00:51 gzero End of Run 33792:
132502 02/04/07 00:05 Bosted Swing Shift Summary
132501 02/04/07 00:00 cdaq Beam Time Accounting
Saturday
132500 02/03/07 23:43 gzero Run 33792: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132499 02/03/07 23:42 gzero End of Run 33791:
132498 02/03/07 22:43 gzero Run 33791: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132497 02/03/07 22:42 Louis-tgt Analysis: Correct text file for previous entry ( the other was messy !!!)
132496 02/03/07 22:41 gzero End of Run 33790:
132495 02/03/07 22:35 Louis-tgt Analysis: Analysis Checklist for Swing shift from RUN 33779 to 33788 included
132494 02/03/07 21:45 gzero Run 33790: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132493 02/03/07 21:42 gzero End of Run 33789:
132492 02/03/07 21:06 Louis-tgt Beam: Snapshots for Checklist of the Swing shift
132491 02/03/07 20:39 gzero Run 33789: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132490 02/03/07 20:38 gzero End of Run 33788:
132489 02/03/07 19:34 gzero Run 33788: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132488 02/03/07 19:32 gzero End of Run 33787:
132487 02/03/07 18:25 gzero Run 33787: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132486 02/03/07 18:23 gzero End of Run 33786:
132485 02/03/07 17:40 Larry BPM/BCM calibrations postponed
132484 02/03/07 17:13 gzero Run 33786: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132483 02/03/07 17:11 gzero End of Run 33785:
132482 02/03/07 17:11 gzero Run 33785: Junk, HV off
132481 02/03/07 16:50 gzero End of Run 33784:
132480 02/03/07 16:37 gzero Run 33784: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132479 02/03/07 16:35 gzero End of Run 33783:
132478 02/03/07 16:11 Louis-tgt Target: Reference snapshots at start of Swing shift
132477 02/03/07 16:01 cdaq Beam Time Accounting
132476 02/03/07 16:00 Pitt Day shift summary
132475 02/03/07 15:49 Carissa Analysis: Brief checklist (no plots except coulomb)
132474 02/03/07 15:29 gzero Run 33783: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132473 02/03/07 15:28 Carissa Target: Shift Checklist Screenshots
132472 02/03/07 15:28 gzero End of Run 33782:
132471 02/03/07 15:21 Pitt Coil modulation re-enabled
132470 02/03/07 14:29 gzero Run 33782: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132469 02/03/07 14:27 gzero End of Run 33781:
132468 02/03/07 14:16 Larry RC Summary, Friday Feb.2 Day through Saturday Feb.3 Owl
132467 02/03/07 14:00 Pitt Snapshots for Steve Wells
132466 02/03/07 13:58 Pitt Snapshots for Steve Wells
132465 02/03/07 13:43 Pitt Beam: Beam: snapshot of current beam conditions
132464 02/03/07 13:26 Pitt Sudden improvement in beam conditions
132463 02/03/07 13:25 gzero Run 33781: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132462 02/03/07 12:39 gzero End of Run 33780:
132461 02/03/07 12:39 Larry Beam off, Magnet power supply problem
132460 02/03/07 12:38 Pitt Beam: Beam conditions after restoration
132459 02/03/07 11:42 gzero Run 33780: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=IN
132458 02/03/07 11:40 Carissa Target: LD2 target ready
132457 02/03/07 11:39 gzero End of Run 33779:
132456 02/03/07 11:29 Carissa Target: Moing LD2 target into beam....
132455 02/03/07 11:20 gzero Run 33779: Test run, carbon target
132454 02/03/07 10:30 Carissa Target: Moving target to carbon....
132453 02/03/07 10:21 Carissa Target: Moving target out of beam...
132452 02/03/07 08:06 muether Owl Shift Summary
132451 02/03/07 08:06 cdaq Beam Time Accounting
132450 02/03/07 06:20 muether Cerenkov rates and the intergity file
132449 02/03/07 05:20 muether beam status update
132448 02/03/07 05:00 muether Well plot data in table format
132447 02/03/07 03:06 muether Beam status update
132446 02/03/07 01:47 muether SMS: LHe stable over the last ~17hrs
132445 02/03/07 00:09 seva Beam: Swing shift summary
132444 02/03/07 00:06 cdaq Beam Time Accounting
Friday
132443 02/02/07 23:47 Larry Summary of beam (& diffuser) problems during day and swing shift
132442 02/02/07 23:32 Louis-tgt Analysis: Analysis checklist for swing shift. run 33778-33778 because NO BEAM
132441 02/02/07 22:12 Louis-tgt Target: Scan of shift check list
132440 02/02/07 19:43 seva Beam: not POC, PLC problems
132439 02/02/07 19:36 seva Beam: POC problems, MCC called an expert
132438 02/02/07 19:11 seva Beam: South Linac dropped to restricted, sweap is in progress
132437 02/02/07 18:46 seva NO BEAM
132436 02/02/07 17:50 ALex Analysis: BIG mistake in the previous entry
132435 02/02/07 17:22 Alex Analysis: Ibeam scan for rcs studies, some results
132434 02/02/07 17:07 Breuer Warning about high Cerenkov rate/current with barely "acceptable" beam
132433 02/02/07 16:51 jschaub Analysis: Wells Plots
132432 02/02/07 16:23 Larry Beam Status
132431 02/02/07 16:04 jschaub Day Shift Summary
132430 02/02/07 16:03 cdaq Beam Time Accounting
132429 02/02/07 15:54 louis-tgt Target: Reference snapshots at start of swing shift
132428 02/02/07 15:36 horn Analysis: check list
132427 02/02/07 15:15 Fatiha Moved old rootfiles to the wrk disk
132426 02/02/07 15:01 muether Spare diffuser pump pin
132425 02/02/07 14:48 horn Diffuser problem - resolved
132424 02/02/07 14:12 horn Diffuser update
132423 02/02/07 14:07 swells swapped spare NA coincidence boards
132422 02/02/07 13:50 Larry C-line Diffuser fault
132421 02/02/07 13:25 Armstrong Mott measurement results:
132420 02/02/07 12:29 jschaub Beam: Beam Off Due to High Halos
132419 02/02/07 11:03 gzero End of Run 33778:
132418 02/02/07 10:50 gzero Run 33778: BCM/BPM Scan--Variable Currents, 362 MeV, LD2, Ps4=4000, IHWP=OUT
132417 02/02/07 10:47 gzero End of Run 33777:
132416 02/02/07 10:41 gzero Run 33777: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132415 02/02/07 10:34 jschaub Mott and Access Finished and IHWP Inserted
132414 02/02/07 10:10 Larry Short-term Runplan
132413 02/02/07 09:25 jschaub Mott Measurement and Hall Access
132412 02/02/07 09:03 gzero End of Run 33776:
132411 02/02/07 08:35 gzero Run 33776: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132410 02/02/07 08:32 gzero End of Run 33775:
132409 02/02/07 08:16 cdaq Beam Time Accounting
132408 02/02/07 07:33 Darko Owl shift summary
132407 02/02/07 07:31 gzero Run 33775: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132406 02/02/07 07:29 gzero End of Run 33774:
132405 02/02/07 06:44 vardan Analysys: analysis shift checklist for runs 33767-71
132404 02/02/07 06:33 gzero Run 33774: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132403 02/02/07 06:32 gzero End of Run 33773:
132402 02/02/07 05:48 vardan shift checklist snapshots
132401 02/02/07 05:26 gzero Run 33773: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132400 02/02/07 05:24 gzero End of Run 33772:
132399 02/02/07 04:25 gzero Run 33772: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132398 02/02/07 04:24 gzero End of Run 33771:
132397 02/02/07 03:26 gzero Run 33771: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132396 02/02/07 03:24 gzero End of Run 33770:
132395 02/02/07 02:25 gzero Run 33770: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132394 02/02/07 02:23 gzero End of Run 33769:
132393 02/02/07 01:41 cdaq Beam Time Accounting
132392 02/02/07 01:22 gzero Run 33769: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132391 02/02/07 01:20 gzero End of Run 33768:
132390 02/02/07 00:28 amicherd Swing shift summary
132389 02/02/07 00:25 gzero Run 33768: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132388 02/02/07 00:17 gzero End of Run 33767:
Thursday
132387 02/01/07 23:58 Williamson/M SMS: Yet another LHe-flow-drop incident
132386 02/01/07 23:19 Louis-tgt Analysis: Shift Analysis runs 33748 to 33764 (production for 33761 to 33764 only)- with more plots
132385 02/01/07 23:15 Louis-tgt Analysis: Shift Analysis runs 33748 to 33764 (production for 33761 to 33764 only)
132384 02/01/07 23:11 Williamson SMS: Another Slow Dump -- another 4K Helium interruption
132383 02/01/07 22:59 gzero Run 33767: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132382 02/01/07 22:58 gzero End of Run 33766:
132381 02/01/07 22:47 gzero Run 33766: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132380 02/01/07 22:45 gzero End of Run 33765:
132379 02/01/07 22:37 gzero Run 33765: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132378 02/01/07 21:57 gzero End of Run 33764:
132377 02/01/07 21:54 Louis-tgt Beam: Snapshots for the checklist of swing shift
132376 02/01/07 21:41 Breuer Analysis: Electron efficiency changes when changing Cerenkov HV (gain) [rotated pictures]
132375 02/01/07 21:34 Breuer Analysis: Electron efficiency changes when changing Cerenkov HV (gain) [rotated pictures]
132374 02/01/07 21:31 Breuer Analysis: Electron efficiency changes when changing Cerenkov HV (gain)
132373 02/01/07 20:18 Williamson Analysis: Simulation of RCS effect
132372 02/01/07 19:32 gzero Run 33764: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132371 02/01/07 19:31 gzero End of Run 33763:
132370 02/01/07 19:16 Williamson RC Summary Tuesday 01-30-2007 Swing through Thursday 02-01-2007 Owl
132369 02/01/07 18:35 pking Analysis: How I created my plots of bad/good ratios.
132368 02/01/07 18:31 gzero Run 33763: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132367 02/01/07 18:28 gzero End of Run 33762:
132366 02/01/07 18:01 swells more info on digital scope picture
132365 02/01/07 17:54 swells/swill Scope picture of new Altera chip scaler input (persistence mode)
132364 02/01/07 17:48 Williamson SMS: LHe Level during LHe flow drops
132363 02/01/07 17:34 horn Parity Quality
132362 02/01/07 17:19 gzero Run 33762: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132361 02/01/07 17:15 gzero End of Run 33761:
132360 02/01/07 17:14 suleiman Beam: Helicity Magnets Commissioning
132359 02/01/07 17:11 suleiman Beam: Changed Hall C IA slope from -1225 to -800 ppm/V
132358 02/01/07 17:04 gzero Run 33761: Production Running, 362 MeV, 35uA LD2, Ps4=1600, IHWP=OUT
132357 02/01/07 17:04 Carissa Analysis: Ratio of coincidence rates for pions vs randoms
132356 02/01/07 16:57 gzero End of Run 33760:
132355 02/01/07 16:49 Louis -tgt Target: Reference snapshots at shift start
132354 02/01/07 16:31 horn cryo events update
132353 02/01/07 16:23 gzero Run 33760: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132352 02/01/07 16:20 gzero End of Run 33759:
132351 02/01/07 16:13 jschaub Day Shift Summary
132350 02/01/07 16:11 cdaq Beam Time Accounting
132349 02/01/07 16:10 horn Analysis: check shiftlist
132348 02/01/07 15:43 horn Shift check list: figures
132347 02/01/07 15:36 gzero Run 33759: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132346 02/01/07 15:33 gzero End of Run 33758:
132345 02/01/07 14:52 gzero Run 33758: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132344 02/01/07 14:50 gzero End of Run 33757:
132343 02/01/07 14:20 gzero Run 33757: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132342 02/01/07 14:16 gzero End of Run 33756:
132341 02/01/07 13:42 gzero Run 33756: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132340 02/01/07 13:41 gzero End of Run 33755:
132339 02/01/07 13:28 Williamson Analysis: Plot of Paul's alternate analysis
132338 02/01/07 12:36 gzero Run 33755: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132337 02/01/07 12:33 gzero End of Run 33754:
132336 02/01/07 12:11 swells New Altera chips installed
132335 02/01/07 11:56 gzero Run 33754: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132334 02/01/07 11:54 gzero End of Run 33753:
132333 02/01/07 11:40 gzero Run 33753: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132332 02/01/07 11:39 gzero End of Run 33752:
132331 02/01/07 11:28 gzero Run 33752: Helicity Magnets Running, 362 MeV, 35uA LD2, Ps4=max, IHWP=OUT
132330 02/01/07 11:24 gzero End of Run 33751:
132329 02/01/07 11:22 Williamson SMS: SMS ramped up again
132328 02/01/07 10:36 gzero Run 33751: Test run
132327 02/01/07 10:36 gzero End of Run 33750:
132326 02/01/07 10:32 gzero Run 33750: Test run
132325 02/01/07 10:31 gzero End of Run 33749:
132324 02/01/07 10:29 horn Network communication problems - late entry
132323 02/01/07 10:17 Fatiha Asymmetry-Yield scan for a French Octant (the Plots)
132322 02/01/07 10:10 Williamson SMS: SMS Slow Due to LHe Level Low
132321 02/01/07 09:06 gzero Run 33749: Test run
132320 02/01/07 09:04 gzero End of Run 33748:
132319 02/01/07 08:33 gzero Run 33748: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132318 02/01/07 08:31 gzero End of Run 33747:
132317 02/01/07 08:07 cdaq Beam Time Accounting
132316 02/01/07 08:06 Darko Owl Shift Summary
132315 02/01/07 07:34 gzero Run 33747: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132314 02/01/07 07:32 gzero End of Run 33746:
132313 02/01/07 07:25 vardan Analysis: analysis shift checklist for runs 33738-44
132312 02/01/07 06:34 gzero Run 33746: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132311 02/01/07 06:31 gzero End of Run 33745:
132310 02/01/07 06:04 vardan shift checklist scan
132309 02/01/07 05:55 vardan shift checklist snapshots
132308 02/01/07 05:40 Darko Beam: RUN# 33743 & 33744; Pick Asymmetry +5000 figures
132307 02/01/07 05:31 gzero Run 33745: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132306 02/01/07 05:30 gzero End of Run 33744:
132305 02/01/07 04:34 gzero Run 33744: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132304 02/01/07 04:32 gzero End of Run 33743:
132303 02/01/07 03:59 Darko Beam: RUN# 33741 & 33742; Pick Asymmetry -5000 figures
132302 02/01/07 03:36 gzero Run 33743: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132301 02/01/07 03:34 gzero End of Run 33742:
132300 02/01/07 02:37 gzero Run 33742: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132299 02/01/07 02:34 gzero End of Run 33741:
132298 02/01/07 01:38 gzero Run 33741: Production Running, 362 MeV, 35uA LD2, Ps4=4000, IHWP=OUT
132297 02/01/07 01:36 gzero End of Run 33740:
132296 02/01/07 00:31 cdaq Beam Time Accounting
132295 02/01/07 00:31 amicherdz Swing shift summary
This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.12
If you have any comments or problems, please contact:
Stephen A. Wood
saw@jlab.org
(757) 269-7367