Jefferson Lab Hall C Logbook for November 07 - runstarts omitted
Main INDEX
Friday
146029 11/30/07 23:17 saw HMS HV suggestion
146027 11/30/07 22:54 J Mulholland HMS High Voltage ok
146026 11/30/07 22:53 abdellah Target: target update 2
146025 11/30/07 22:45 J Mulholland HMS HV alarm
146024 11/30/07 22:23 abdellah target update
146023 11/30/07 21:55 Ramesh Asked for controlled access
146022 11/30/07 21:55 abdellah Target: Target problems - Heater power supply needs to be replaced
146021 11/30/07 21:19 frw FYI, shift crew
146020 11/30/07 20:53 Ramesh First run today on LH2 after beam study
146018 11/30/07 20:05 saw MVME 6100 failures
146017 11/30/07 19:31 horn/gaskell Moller Summary
146016 11/30/07 19:24 gaskell Moller backout
146013 11/30/07 19:04 Moffit Runplan for Friday Swing/Saturday Owl
146007 11/30/07 18:46 gaskell Moller runs 66907 and 66908 junk
146003 11/30/07 18:09 gaskell/horn Moller setup
146002 11/30/07 17:46 frw FPP: summary of changes during today's access
146001 11/30/07 17:28 saw Sweeping error messages under the rug
145991 11/30/07 16:02 cdaq Beam Time Accounting
145987 11/30/07 15:35 Moffit Gas Shed Key returned.
145985 11/30/07 13:31 M Jones Added roc14 (vmefpp2) back to COIN config
145983 11/30/07 13:28 mack Probably just the lower beam energy
145982 11/30/07 13:20 gilman calo channel L5.6 tripped
145981 11/30/07 13:14 Moffit BigCal HV channel trip
145980 11/30/07 12:13 puckett could the high failure rate of FPP crates have something to do with this?
145979 11/30/07 11:52 L.Pentchev left BigCal thresholds changed from 175mV to 165mV
145978 11/30/07 11:52 lassiter turn on alarm sounf for HMS controls
145977 11/30/07 11:28 gilman Hall radiation levels - Everyone should stay away from the dump
145976 11/30/07 11:02 gilman roc 14 cpu replaced
145975 11/30/07 10:12 Moffit DAH! It's Friday's plan... not Monday.
145974 11/30/07 09:52 LouisB Target: Parking the target during beam studies
145973 11/30/07 09:06 Moffit End of run sound enabled.
145971 11/30/07 08:35 Moffit Plan for Monday Day/Swing
145969 11/30/07 08:00 cdaq Beam Time Accounting
145968 11/30/07 07:56 A. Marsh Shift Summary
145967 11/30/07 07:44 A. Marsh Roc 13 crashed again
145962 11/30/07 06:01 A. Marsh Roc 13 crashed again
145960 11/30/07 05:59 hcf target: correction to comment
145959 11/30/07 05:55 hcf target: more followup
145958 11/30/07 05:50 jmaxwell BPM, BCM Screengrabs
145957 11/30/07 05:44 hcf PID fault followup
145955 11/30/07 05:27 hcf target: PID failed for a while!
145953 11/30/07 04:49 A. Marsh Roc 13 crash
145951 11/30/07 04:12 hcf target screens
145948 11/30/07 03:21 hcf target: transient alarm and alh hung
145947 11/30/07 03:09 A. Marsh Running without Roc 14 for rest of night
145946 11/30/07 03:08 M Jones Problems with ROC14, took it out of DAQ
145943 11/30/07 02:30 A. Marsh Roc 14 crash
145941 11/30/07 02:00 A. Marsh Trip on HD01 HMS shower counter
145940 11/30/07 01:43 A. Marsh beam back up
145939 11/30/07 00:01 cdaq Beam Time Accounting
Thursday
145938 11/29/07 23:45 Ramesh Shift Summary
145937 11/29/07 23:09 Margaziotis Target: Strip charts
145936 11/29/07 23:06 Margaziotis Target: IOC reboot, etc.
145935 11/29/07 23:00 Ramesh Beam down due to Beam loss monitor HV problem
145934 11/29/07 22:55 Ramesh ROC13, ROC14 and Event builder problem
145927 11/29/07 21:44 Moffit Oops. Runplan is for Thursday Swing/Friday Owl.
145922 11/29/07 20:45 J Mulholland bpm screenshots
145921 11/29/07 20:44 Moffit Runplan for Wednesday Swing/Thursday Owl
145917 11/29/07 18:59 Margaziotis Target: Transient alarm
145914 11/29/07 18:32 L.Pentchev left/right BigCal thresholds are now set to different values: 175mV/150mV
145907 11/29/07 17:18 L.Pentchev DAQ dead time chnaged from 55% tp 15%
145905 11/29/07 17:12 Margaziotis Target: Transient alarms
145904 11/29/07 16:52 L.Pentchev S0 HV increased only for run 66847
145901 11/29/07 16:28 Margaziotis Target: Screen shot
145897 11/29/07 16:01 cdaq Beam Time Accounting
145896 11/29/07 15:44 LouisB Target: Transient Alarm on Loop1 CernoX_3_R
145894 11/29/07 15:28 gilman runs crashing
145893 11/29/07 15:06 frullani Roc 14
145891 11/29/07 14:49 M.M FPP: The CH2 doors of both polarimeters are now closed
145890 11/29/07 14:46 gilman run 66843 unbuffered
145889 11/29/07 14:43 Moffit 3H00 Harp is fine.
145886 11/29/07 13:55 frullani computer dead time
145885 11/29/07 13:52 puckett BigCal threshold may be too high
145884 11/29/07 13:34 LouisB Target: Transient Alarm
145883 11/29/07 13:17 puckett turned on eloss calculation in engine, then turned back off
145881 11/29/07 12:38 gilman rebooting roc13
145880 11/29/07 12:32 M Jones Hall Access to replace roc14 cpu
145879 11/29/07 12:15 LouisB Target: Put Target cooling back to tuning for 80uA
145877 11/29/07 11:17 Perdrisat The CH2 doors of both polarimeters are now open
145876 11/29/07 10:44 LouisB Target: Reduced JT Valve to 20%
145875 11/29/07 10:17 puckett updated beam energy in KINEMATICS.db after beam energy measurement
145874 11/29/07 10:14 puckett more Analysis updates
145873 11/29/07 10:05 puckett updated BigCal ADC thresholds
145871 11/29/07 09:27 frullani run 66838 Roc13
145869 11/29/07 08:55 gilman re-power cycle roc13
145868 11/29/07 08:54 frullani ROC13 warning messages
145866 11/29/07 08:49 S. Frullani ROC13 warning messages
145865 11/29/07 08:31 LouisBSnapsh Target: Snapshot of target status at start of shift
145864 11/29/07 08:28 gilman rebooted roc 13
145862 11/29/07 08:16 cdaq Beam Time Accounting
145860 11/29/07 07:45 ccbutu Rest of the Shift Summary!
145856 11/29/07 06:19 jmaxwell BPM, BCM Screens
145855 11/29/07 06:04 ccbutu FPP1 problem solved!
145853 11/29/07 05:53 jmaxwell FPP 1 Trouble
145852 11/29/07 05:53 ccbutu FPP1 gaps!
145850 11/29/07 05:21 hcf target alarm: fan frequency transient alarm
145848 11/29/07 04:55 shift crew NO COFFEE!! Running on emergency supply.
145847 11/29/07 04:53 M Jones Forgot to modify ts2.crl when removing roc14
145844 11/29/07 04:40 hcf hcHe_supply_1_R transient HIHI alarm
145838 11/29/07 03:52 M Jones Eliminate ROC14 from coin config
145836 11/29/07 03:45 M.M FPP: Noise on chamber C layer 2
145835 11/29/07 03:44 frw ROC14 dead
145834 11/29/07 03:03 ccbutu Roc14 problem!
145833 11/29/07 02:32 hcf target: transient HIHI alarm on He supply temp
145832 11/29/07 02:30 ccbutu Shift Summary
145831 11/29/07 02:10 W. Luo Calibration done
145828 11/29/07 01:36 W. Luo Load HV for BigCal
145826 11/29/07 00:41 .hcf target: correction- cernox 3 alarm was LOLO
145825 11/29/07 00:40 hcf cernox 3 transient red alarm HIHI
145823 11/29/07 00:16 W. Luo After increasing threshold
145822 11/29/07 00:15 hcf target screens
145821 11/29/07 00:13 hcf target: moved to LH2 (late entry)
145819 11/29/07 00:01 cdaq Beam Time Accounting
Wednesday
145818 11/28/07 23:49 Ramesh Shift Summary
145817 11/28/07 23:11 L.Pentchev buffering mode
145816 11/28/07 22:56 L.Pentchev BigCal threshold set to 175mV
145815 11/28/07 22:51 Margaziotis Target: Moved to Empty
145814 11/28/07 22:34 Margaziotis Beam W/uA on 20 cm LH2
145813 11/28/07 22:23 Ramesh Beam trip due to second Moller quad
145812 11/28/07 22:16 Margaziotis Aux HPH pot setting
145811 11/28/07 22:13 W. Luo (4,32) noisy after calibration
145810 11/28/07 22:05 Margaziotis Target: Rebooted IOC
145808 11/28/07 21:41 W. Luo Set BigCal threshold to 150mv
145807 11/28/07 21:34 W. Luo Load new HV for BigCal
145806 11/28/07 21:33 W. Luo During load new HV, hctsv12:2005 off, restarted GUI
145804 11/28/07 21:17 JMulholland BPM BCM Screenshot
145802 11/28/07 21:02 Margaziotis Target: Strip Charts
145801 11/28/07 20:53 Margaziotis Target: Screen shot at 80 uA
145800 11/28/07 20:48 Ramesh ROC13 and ROC14 remotely power cycled
145798 11/28/07 20:45 Margaziotis Target: Raised limits on 3_R
145796 11/28/07 20:19 W. Luo BigCal after loading new HV
145795 11/28/07 20:15 Margaziotis Target: Alarm
145793 11/28/07 20:12 Margaziotis Target: Opened JT for 80 uA
145792 11/28/07 20:06 W. Luo Fpp Chamber problems
145790 11/28/07 19:44 Ramesh First production run this shift
145788 11/28/07 19:33 horn Beam energy measurement results
145787 11/28/07 19:11 Margaziotis Target: Screen shot
145785 11/28/07 18:33 M.M HMS/FPP: Drift maps
145784 11/28/07 18:32 W. Luo Load new HV for BigCal
145783 11/28/07 17:43 horn start beam energy measurement
145782 11/28/07 17:35 Margaziotis Target: Alarm
145781 11/28/07 17:26 gaskell Moller target is out
145780 11/28/07 17:23 Margaziotis Target: Opened JT valve
145779 11/28/07 17:23 gaskell/horn Moller backout
145778 11/28/07 17:22 horn/gaskell Moller Summary
145777 11/28/07 17:20 gaskell/horn collimator scan plots
145776 11/28/07 17:15 Margaziotis Target: Move to LH2 20 cm
145775 11/28/07 17:08 horn/gaskell Moller tuned
145774 11/28/07 16:58 Margaziotis Target: IOC reboot
145767 11/28/07 16:02 cdaq Beam Time Accounting
145762 11/28/07 15:19 LouisB Target: Global snapshot
145761 11/28/07 15:08 gaskell/horn Moller target and collimators in
145760 11/28/07 14:59 LouisB Target status--Pictures
145759 11/28/07 14:55 LouisB target: JT Valve reduced
145758 11/28/07 14:43 LouisB Target: Move to Empty Target
145757 11/28/07 14:36 gaskell Solenoid ramping to 3 T
145756 11/28/07 14:35 gaskell Moller setup
145754 11/28/07 13:58 gilman hms dipole comm error and crash
145752 11/28/07 13:04 gilman beam returns
145751 11/28/07 12:14 gilman asked to go from controlled to beam permit
145750 11/28/07 11:02 Moffit Status
145749 11/28/07 10:52 LB Target
145748 11/28/07 10:49 LB Target
145747 11/28/07 10:18 smithg Target: changed HPH resistance
145746 11/28/07 09:59 beaufait moeler down
145745 11/28/07 09:51 L.pentchev BigCal thresholds set to 125mV
145744 11/28/07 08:04 cdaq Beam Time Accounting
145743 11/28/07 07:58 A. Marsh Shift Summary
145742 11/28/07 07:41 A. Marsh Controlled access to fix moller quad, full survey
145741 11/28/07 06:14 hcf target screens
145740 11/28/07 06:09 W. Luo Load HV for BigCal
145739 11/28/07 06:05 hcf target- reduce coolant flow - beam off for a while
145738 11/28/07 05:44 A. Marsh update on beam status from MCC- probably no beam for rest of owl shift
145737 11/28/07 05:36 M.M HMS drift map
145736 11/28/07 05:12 puckett more preparation for BigCal kin5 analysis: shower reconstruction params from monte carlo
145735 11/28/07 04:06 A. Marsh beam down due to cryo problems
145734 11/28/07 03:51 puckett BigCal photodiode raw ADC, with and without LED
145733 11/28/07 03:49 M.M FPP: Trip current set at 28 micro amps
145731 11/28/07 03:34 M Jones Access for trigger
145729 11/28/07 03:09 A. Marsh return to beam permit
145727 11/28/07 02:53 L.Pentchev added 30ns to two groups of 8
145726 11/28/07 02:27 A. Marsh request for hall access (again)
145725 11/28/07 02:24 M.M FPP: Card swap chamber C layer 2 pos 6
145724 11/28/07 02:23 A. Marsh return to beam permit
145723 11/28/07 01:50 A. Marsh request for hall access
145722 11/28/07 01:39 puckett BigCal ADC ped histos in ROOT gui fixed
145721 11/28/07 01:37 hcf target: Loop-1 Screen Shot
145717 11/28/07 01:18 hcf TARGET - CHANGED ALARM SETPOINT
145715 11/28/07 01:13 hcf target- hc_L1-Cernox_3_R yellow alarm
145714 11/28/07 01:05 puckett also updated HMS thresholds from same run
145712 11/28/07 00:59 hcf target- JT opened for high current
145711 11/28/07 00:57 puckett updated BigCal ADC thresholds from run 66784
145709 11/28/07 00:06 cdaq Beam Time Accounting
Tuesday
145707 11/27/07 23:55 Ramesh Shift Summary
145706 11/27/07 23:54 M Jones Added 32ns delay to TDC stop to ROC12
145705 11/27/07 23:05 Ramesh Controlled access to put delays in the BigCal TDCs
145704 11/27/07 23:01 Margaziotis Target: Strip charts
145703 11/27/07 22:53 Margaziotis Target: Checklist
145702 11/27/07 22:48 horn Moller Q2
145699 11/27/07 22:08 Ramesh HMS angle 14.495 deg
145697 11/27/07 21:53 Margaziotis Target: Moved to 20 cm LH2
145696 11/27/07 21:52 Margaziotis Target: Alarm
145695 11/27/07 21:14 Ramesh Harp Scan
145694 11/27/07 19:57 Margaziotis Target: gui screen
145693 11/27/07 19:42 Margaziotis Target: Alarm
145692 11/27/07 19:25 horn Restarted the BETABRITE display
145691 11/27/07 19:21 saw Restarted betabrite
145690 11/27/07 18:40 Moffit Neat LED status display not updating. Tune beam coming.
145689 11/27/07 18:34 Moffit Runplan for Tuesday Swing/Wednesday Owl
145688 11/27/07 18:13 M Jones Changes to HMS timing
145687 11/27/07 18:06 M Jones HMS door would not open
145686 11/27/07 17:26 frw FPP: scope indicates high noise level (continued)
145685 11/27/07 17:14 frw FPP: scope indicates high noise level
145684 11/27/07 17:12 Margaziotis Target: Alarm
145680 11/27/07 16:27 Moffit Readiness Checklist completed, Hall will be swept at 5pm
145677 11/27/07 16:17 M Jones Moved HMS to 14.95 deg
145675 11/27/07 16:01 puckett updated angle/momentum/distance settings in KINEMATICS.db
145674 11/27/07 15:34 smithg Target: Cool down complete. Target ready.
145670 11/27/07 15:12 Lassiter HMS checkout --- Restrict Rotation to within Hall
145667 11/27/07 14:16 smithg Target: moved to empty
145666 11/27/07 13:17 smithg Target: Moved temp DVM to 2nd Cernox
145660 11/27/07 11:00 smithg Target: Cooldown started
145657 11/27/07 09:08 Moffit Status
Monday
145656 11/26/07 18:40 M.M FPP: Cards swap, back to the original configuration (Wiki)
145652 11/26/07 17:42 L.Pentchev changes in BigCal
145648 11/26/07 16:02 Perdrisat Disci signals from the HMS trigger circuitry
145642 11/26/07 14:27 Perdrisat S0 integrators
145640 11/26/07 14:11 W. Luo Changed BigCal HV
145630 11/26/07 12:58 smithg Target: update on tgt schedule
145629 11/26/07 11:11
Sunday
145627 11/25/07 15:17 M.M Gas
Friday
145626 11/23/07 14:24 M.M Gas
Wednesday
145624 11/21/07 15:56 M.M FPP: Cosmics test , cards test
Tuesday
145622 11/20/07 16:52 Perdrisat chnages on witdht and timing of S0 and S1
145620 11/20/07 13:09 mack New TLD locations
145619 11/20/07 12:27 L.Pentchev timing peaks explained
145618 11/20/07 12:18 W. Luo Roc1 keep crashing
145616 11/20/07 12:04 W. Luo run 66731: LED run
145614 11/20/07 12:01 gaskell/meek Moller target work
145613 11/20/07 11:48 mack drift maps
145612 11/20/07 11:02 frw FPP: gas flow
145611 11/20/07 11:00 L.Pentchev double timing peak in S0
145610 11/20/07 10:30 L.Pentchev structure in the HMS drift chambers
145609 11/20/07 10:28 frw hall in restricted access since 8am
145607 11/20/07 08:42 ccbutu Shift Summary
145606 11/20/07 07:53 frw re: performance of FPP AND HMS DC
145605 11/20/07 06:58 puckett performance of FPP AND HMS DC has slightly deteriorated over past few days
145604 11/20/07 06:40 frw Re: FPP 'nhits' spectra deteriorating
145602 11/20/07 06:15 puckett Set all BigCal calibration constants to 1 MeV/channel
145601 11/20/07 06:10 puckett FPP 'nhits' spectra deteriorating slightly
145600 11/20/07 06:03 puckett Summary of HMS delay study
145599 11/20/07 06:00 puckett BPM and BCM snapshots
145595 11/20/07 04:03 puckett BPM and BCM medm screens NOT WORKING
145584 11/20/07 00:48 cdaq Beam Time Accounting
Monday
145582 11/19/07 23:57 ent swing shift summary
145580 11/19/07 22:42 ent increased C1,C2 rates after HV change
145579 11/19/07 22:41 horn Shift checklist figures
145575 11/19/07 21:14 gaskell Target: target screen grabs
145573 11/19/07 19:41 W. Luo Online histograms changed after loading new HV for BigCal
145571 11/19/07 19:26 W. Luo Elastic peak after Loading new HV
145570 11/19/07 19:01 horn Energy measurement result
145569 11/19/07 18:59 W. Luo run 66707 with new HV for BigCal
145567 11/19/07 18:51 W. Luo Stopped the run, and reload HV
145564 11/19/07 18:18 johna Drive Velocity vs. Barometric Pressure
145563 11/19/07 17:56 W. Luo Load new HV for BigCal
145562 11/19/07 17:15 hcf Drive Velocity vs. Barometric Pressure
145561 11/19/07 17:13 ent beam instability
145560 11/19/07 16:54 brash Updated results for kin3
145559 11/19/07 16:20 gaskell do not run target gui on cdaql6
145558 11/19/07 16:15 gaskell target ioc reboot
145556 11/19/07 16:03 cdaq Beam Time Accounting
145555 11/19/07 16:02 X. Zheng day shift summary
145553 11/19/07 15:31 Reimer Target Screens
145552 11/19/07 15:29 X. Zheng BCM and BPM screens
145549 11/19/07 14:06 Reimer bpm and bcm screens
145548 11/19/07 13:59 Reimer He Bottle Changed
145545 11/19/07 12:36 ludwig Beam Time Accounting
145544 11/19/07 12:15 Reimer BigCal HV trip
145541 11/19/07 10:23 Reimer EB1 problem
145539 11/19/07 09:44 Reimer ROC14
145537 11/19/07 09:27 Phil Carter HDC12 drift distance and drift time are off
145535 11/19/07 08:08 cdaq Beam Time Accounting
145534 11/19/07 08:03 puckett replay for owl shift runs
145533 11/19/07 07:50 puckett Owl shift summary...
145532 11/19/07 07:46 X. Zhang Target: end the owl shift
145529 11/19/07 05:41 puckett BPM,BCM snapshot
145526 11/19/07 04:25 puckett failed to start run 66687 - hang on connect to TS/reboot TS and everything OK
145524 11/19/07 04:14 puckett ended 66686 - beam off for several minutes
145523 11/19/07 04:00 puckett ROC13 failure... ended 66685
145520 11/19/07 03:28 puckett runs 66681,66682 are JUNK
145518 11/19/07 02:22 puckett CODA problems again upon ending run 66680 - power-cycle ROC14 again to fix
145514 11/19/07 01:28 M Jones coda problem : had to power cycle vmefpp2 (roc14)
145513 11/19/07 01:27 puckett DAQ fixed... Thanks, Mark!
145506 11/19/07 00:45 puckett DAQ problems, start of owl shift
145504 11/19/07 00:28 X. Zhang Target: start the owl shift
145503 11/19/07 00:27 Reimer Swing Shift Summary 18 Nov 07
145501 11/19/07 00:21 puckett DAQ problems at beginning of owl shift...
145498 11/19/07 00:05 cdaq Beam Time Accounting
Sunday
145496 11/18/07 23:56 Reimer HV trip
145494 11/18/07 23:54 Reimer HV trip
145491 11/18/07 22:46 Reimer HV trip
145490 11/18/07 22:07 Bosted Target screen shots
145489 11/18/07 22:03 Bosted Target: reboot IOC
145486 11/18/07 21:26 Reimer DAQ ROC13 reboot
145484 11/18/07 20:32 Reimer TS1 and DAQ problems
145482 11/18/07 20:18 L.Pentchev BigCal HV crate table
145481 11/18/07 20:08 Reimer reboot of vmefpp1
145480 11/18/07 20:00 reimer
145478 11/18/07 19:51 wendy FPP wires
145476 11/18/07 18:57 Bosted Target: major glitch
145474 11/18/07 18:04 puckett updated calibration coefficients for BigCal
145473 11/18/07 16:36 puckett more bug fixes...
145472 11/18/07 16:26 puckett pictures...
145470 11/18/07 16:24 puckett bug fixed, but...
145469 11/18/07 16:16 wendy BPM and BCM screens
145468 11/18/07 16:10 puckett online GUI bugs and BigCal HV problems earlier
145467 11/18/07 16:02 ent day shift summary
145466 11/18/07 16:01 cdaq Beam Time Accounting
145465 11/18/07 15:55 W. Luo Target: Target Screenshot at the end of day shift
145463 11/18/07 15:16 W. Luo Target: target temp moved shaked during beam unstable
145462 11/18/07 14:50 brash job submission
145461 11/18/07 14:50 brash job submission
145458 11/18/07 14:10 ent trim rack problem
145457 11/18/07 14:07 albayrak BPM and BCM screenshots
145455 11/18/07 13:07 brash Analysis of kin4 data
145453 11/18/07 12:28 ent HV trip
145450 11/18/07 11:23 M Jones Problems with root gui, need to be fixed!
145449 11/18/07 11:16 M Jones Problems with root gui
145448 11/18/07 11:13 ent runs 66648-66650
145447 11/18/07 11:05 M Jones BigCal HV problems
145443 11/18/07 08:28 ent meant 66647/66648
145442 11/18/07 08:24 ent BigCal HV???
145440 11/18/07 08:08 Bitao Hu Target: start the day shift
145439 11/18/07 08:03 cdaq Beam Time Accounting
145437 11/18/07 08:01 Reimer Owl Summary 18 Nov 2007
145436 11/18/07 08:00 X.Zhang Target: end the owl shift
145434 11/18/07 06:50 Reimer Target
145433 11/18/07 06:38 Reimer Low current being restored
145432 11/18/07 02:16 Reimer beam energy change for hall a
145431 11/18/07 02:15 X.Zhang Target: Move the target to empty
145430 11/18/07 01:57 Reimer DAQ end/start run problem
145426 11/18/07 01:31 Seema BigCal trigger ADC problem with histogram.
145424 11/18/07 00:16 X. Zhang Target:
145423 11/18/07 00:01 cdaq Beam Time Accounting
Saturday
145422 11/17/07 23:59 Bitao Target: end swing shift
145421 11/17/07 23:55 ent swing shift summary
145418 11/17/07 21:57 ent ROC14 rebooted
145416 11/17/07 21:49 ent ROC14 died - end run 66638
145415 11/17/07 21:22 Wendy BPM and BCM screen
145414 11/17/07 21:19 ent pink screen missing
145411 11/17/07 19:15 ent BigCal HV trip, stopped run 66635
145409 11/17/07 18:57 ent beam back at 18:52
145407 11/17/07 18:34 ent another Hall B move. no beam
145406 11/17/07 18:10 ent 85 muA, down few minutes
145404 11/17/07 18:03 ent 80 muA
145403 11/17/07 17:49 ent trigger rate ok again
145402 11/17/07 17:22 M.M FPP: Chamber C trouble fixed
145400 11/17/07 17:04 M.M FPP: Chamber C trouble
145399 11/17/07 17:02 Wendy HMS S0
145398 11/17/07 16:51 Perdrisat updating of run inventory
145397 11/17/07 16:27 Bitao- Target: start the shift
145395 11/17/07 16:07 Bosted Target screen shots
145394 11/17/07 16:06 cdaq Beam Time Accounting
145393 11/17/07 16:05 X. Zheng day shift summary
145392 11/17/07 16:05 X. Zheng day shift summary
145391 11/17/07 15:57 M.M FPP: Chamber C trouble
145390 11/17/07 15:43 frw FPP: chamber C trouble
145389 11/17/07 15:33 Perdrisat HV too large on S1Y6-, S1Y7+
145388 11/17/07 15:33 Phil Carter reduced HV by 100 V
145387 11/17/07 15:28 X. Zheng hall back to beam permit (14:26)
145386 11/17/07 15:27 Perdrisat Change of S0x1 and S0x2 threshold
145385 11/17/07 15:26 X. Zheng Reboot Roc 13 and 14 (14:45)
145384 11/17/07 15:20 X. Zheng Beam off for 15min
145383 11/17/07 15:14 X. Zheng BPM and BCM screen shot
145382 11/17/07 15:08 M.M FPP: chamber C problem fixed BUT anomaly on another layer
145381 11/17/07 14:56 M Jones S0 eff from run 66613
145379 11/17/07 14:31 Bosted Target moved to 15 cm LH2
145378 11/17/07 14:30 L.Pentchev S0 thresholds changed from 50mV to 25mV
145377 11/17/07 14:29 cdaq Beam Time Accounting
145376 11/17/07 14:26 M.M FPP: Card swapping and vmefpp2 power cycling
145375 11/17/07 13:54 X. Zheng Hall in controlled access
145374 11/17/07 12:57 X. Zheng Update on hall status
145373 11/17/07 12:48 Xiaochao Zhe Plan for controlled access
145372 11/17/07 11:16 frw FPP fixed delayed due to no access
145371 11/17/07 10:37 Xiaochao Zhe Hall A pass change in progress
145370 11/17/07 10:21 puckett shifts in the hits histograms
145369 11/17/07 09:26 Bosted Target moved to Empty
145368 11/17/07 09:22 Phil Carter BigCal trigger ADC problem with histogram
145367 11/17/07 09:16 Bosted Target: termperature glitch on beam off
145365 11/17/07 08:16 M Jones FPP problem in s2c1x
145364 11/17/07 08:14 X. Zheng hfpp s2c1x hit pattern funny, need to be fixed
145363 11/17/07 07:54 Reimer Owl Summary
145361 11/17/07 07:51 X. Zhang Target: End of owl shift
145359 11/17/07 06:06 Reimer Beam is back
145357 11/17/07 05:05 Reimer RF problem
145352 11/17/07 00:02 X. Zhang Target: Begin the owl shift
145351 11/17/07 00:01 cdaq Beam Time Accounting
Friday
145347 11/16/07 21:46 horn Target: shift checklist
145344 11/16/07 20:14 puckett example of an interesting BigCal event...
145343 11/16/07 20:12 horn Beam off - rebooted tsgep3
145342 11/16/07 19:42 saw Updated bigcal.tcl
145340 11/16/07 19:24 Ramesh Correction to hclog of controlled access
145339 11/16/07 19:08 Ramesh Controlled access for restoring S0
145338 11/16/07 18:19 Wendy FPP Wire Hit
145335 11/16/07 17:35 Ramesh Data with S1 trigger (S0 unplugged)
145334 11/16/07 17:35 horn Rebooted ROC13 before run 66612
145328 11/16/07 17:14 horn Moller summary
145327 11/16/07 17:03 Ramesh Controlled access for S1 trigger setup
145326 11/16/07 16:54 horn Target: Moved back to hydrogen
145325 11/16/07 16:34 horn Moller done
145324 11/16/07 16:24 M.M FPP: Analysers 1 and 2 OUT.
145321 11/16/07 16:01 cdaq Beam Time Accounting
145320 11/16/07 16:01 ccbutu Target Status
145319 11/16/07 16:00 ccbutu@jlab. Traget status!
145317 11/16/07 15:53 puckett New calibration constants with >200,000 events
145314 11/16/07 15:32 horn Moller setup
145313 11/16/07 15:13 smithg Target: HPH current readback
145312 11/16/07 15:07 Hafidi FPP analyzer
145311 11/16/07 14:59 Hafidi Update on Moeller Q2
145310 11/16/07 14:25 Hafidi Moeller Q2
145305 11/16/07 10:19 gilman target changed to thin carbon
145304 11/16/07 10:14 Hafidi update
145303 11/16/07 09:40 Hafidi Beam is off
145302 11/16/07 09:26 Hafidi Pass change for hall A
145299 11/16/07 08:37 E. Christy HMS hotwire still present in 66595
145297 11/16/07 08:02 cdaq Beam Time Accounting
145296 11/16/07 07:56 Reimer Shift Summary
145295 11/16/07 07:40 X. Zhang Target: End the owl shift
145289 11/16/07 04:16 Reimer ./bigcal.tcl
145288 11/16/07 03:41 Reimer ROC 13 reboot
145285 11/16/07 02:19 Reimer HMS communication error
145281 11/16/07 00:12 X. Zhang Target: Begin the owl shift
145280 11/16/07 00:07 X. Zhang Target: Begin the owl shift
145279 11/16/07 00:06 X. Zhang Target: Begin Owl shift
145278 11/16/07 00:01 cdaq Beam Time Accounting
145277 11/16/07 00:00 Fatiha Shift Summary
Thursday
145276 11/15/07 23:54 Fatiha Beam screens at the end of the shift
145274 11/15/07 23:20 Fatiha Beam is back
145272 11/15/07 23:04 hcf target: red alarm on heater power
145270 11/15/07 22:47 Fatiha Beam off, RF trip
145269 11/15/07 22:39 hcf target screens -- note heater overshoot when beam goes off
145267 11/15/07 22:11 hcf target: fan frequency yellow alarm
145265 11/15/07 20:55 Fatiha Updates
145261 11/15/07 19:03 hcf target: yellow alarm
145260 11/15/07 18:54 puckett drift distances and residuals with new new drift map
145258 11/15/07 18:15 puckett updated goldrun file
145257 11/15/07 17:42 hcf hot wire in hdc1v1
145255 11/15/07 17:11 puckett more events in elastic peak...
145254 11/15/07 17:04 hcf HMS DC Threshold lowered to nominal value
145252 11/15/07 16:54 puckett HMS drift chamber residuals after new driftmap
145251 11/15/07 16:40 puckett hot wire in hdc1v1
145250 11/15/07 16:39 puckett New HMS driftmap calculated from run 66569
145249 11/15/07 16:30 Fatiha Beam Screens
145248 11/15/07 16:26 Fatiha Roc14 is back
145246 11/15/07 16:12 Fatiha Roc 13 &14 crash
145245 11/15/07 16:05 hcf target screens - end of day shift
145244 11/15/07 16:02 smithg Target: New target alarms on beam current & raster
145242 11/15/07 16:00 cdaq Beam Time Accounting
145241 11/15/07 15:49 smithg Target: IOC startup script fixed
145240 11/15/07 15:43 puckett Analysis: Changed htof_tolerance and updated BigCal thresholds
145239 11/15/07 15:16 Hafidi TS1 not responding
145236 11/15/07 14:16 horn Moller solenoid problems - resolved
145234 11/15/07 14:02 Hafidi Ethane bottle
145233 11/15/07 14:01 Hafidi Beam off for many minutes
145232 11/15/07 13:39 Hafidi Ethane gauge reads zero
145230 11/15/07 13:04 gaskell performed "restore" on Moller ioc
145229 11/15/07 12:36 Hafidi BPM & BCM at the begining of the shift
145227 11/15/07 12:04 horn Moller postponed until swing shift
145226 11/15/07 11:35 horn Moller setup
145225 11/15/07 11:02 Bosted Target: beam current alarm reset
145224 11/15/07 10:42 Bosted Target moved to Empty. Some alarms not working correctly.
145223 11/15/07 10:27 Hafidi Beam tuning and target not moving
145222 11/15/07 10:01 Hafidi Gasmaster alarm (2)
145221 11/15/07 09:52 Hafidi Alarm in "Gasmaster box"
145220 11/15/07 09:50 Hafidi SMS: DC1&2 and FPP HV trips
145217 11/15/07 08:50 Bosted Target IOC rebooted
145216 11/15/07 08:12 Hafidi Beam away
145215 11/15/07 08:07 Hafidi Pass change for HallA
145213 11/15/07 08:02 cdaq Beam Time Accounting
145212 11/15/07 07:57 Reimer Owl shift summary
145211 11/15/07 07:42 m commisso d Target: end of shift screen shot
145208 11/15/07 06:51 m commisso d Target: Current and raster alarms not set!
145207 11/15/07 06:51 Reimer ROC13 disconnected
145206 11/15/07 06:34 m commisso d Target: IOC software issues
145204 11/15/07 04:56 m commisso d Target: IOC reboot not working
145203 11/15/07 04:17 puckett BigCal event display
145202 11/15/07 03:38 Reimer ROC14 and 13
145200 11/15/07 03:00 Reimer ROC14 reboot
145196 11/15/07 02:01 Reimer roc11 reboot
145194 11/15/07 01:42 m commisso d Target: Target: JT opened 1 step
145193 11/15/07 01:13 m commisso d Target: JT valve adjustment
145192 11/15/07 00:51 Reimer Vacuum problems fixed
145190 11/15/07 00:35 Reimer Beam to hall
145189 11/15/07 00:10 m commisso d Target: start of shift screen shot
145188 11/15/07 00:07 cdaq Beam Time Accounting
145187 11/15/07 00:06 Fatiha Swing Shift Summary
Wednesday
145185 11/14/07 23:23 mahbub hctsv12:2005 tripped
145184 11/14/07 23:15 Fatiha Update
145183 11/14/07 23:09 hcf target screens
145182 11/14/07 22:45 Fatiha Status
145181 11/14/07 22:20 hcf target power?
145180 11/14/07 21:59 Fatiha Beam off for a while
145176 11/14/07 19:34 puckett BigCal plots are fine
145175 11/14/07 19:19 mahbub BigCal TDC and Cluster plots do not look right
145174 11/14/07 19:11 hcf target JT to 35%
145173 11/14/07 18:59 mahbub HV hctsv12:2005 trip
145172 11/14/07 18:59 hcf target screens showing beam turn-on
145170 11/14/07 18:55 Fatiha Start production mode
145169 11/14/07 18:49 Beam positio Beam positions at starting of the shift
145168 11/14/07 18:49 hcf Greg's alarm tested vs. BCM
145167 11/14/07 18:46 hcf Target JT valve opened for 80uA beam
145166 11/14/07 18:44 Fatiha BCM screen (fluctuations in BCM1)
145165 11/14/07 18:38 Fatiha Set ps3 to 99999
145163 11/14/07 18:33 Fatiha HMS screen after the hall access
145159 11/14/07 18:19 Fatiha MCC wil lsend tuned beam
145158 11/14/07 18:18 horn HMS back at 17.96 degrees
145157 11/14/07 18:00 Fatiha Sweeping the hall
145156 11/14/07 18:00 lassiter New HMS lower limit on Rotation Angle 12.25 deg
145155 11/14/07 17:44 smithg Target: Cooldown complete
145154 11/14/07 16:45 cdaq Beam Time Accounting
145153 11/14/07 16:34 smithg Target: On cold return. Condensing now.
145152 11/14/07 16:32 M Jones Set Bigcal thresholds to -300mV ( readback -325)
145151 11/14/07 15:49 mack TLD locations for equipment dosimetry
145150 11/14/07 15:41 L.Pentchev swapped two trigger group pairs for testing
145149 11/14/07 14:03 ccbutu Swing Shifts on Nov 14 2007
145148 11/14/07 13:47 smithg Target: cooldown started
145147 11/14/07 13:19 saw Moved tsgep3 to different switch
145145 11/14/07 12:07 horn Beam time accounting back on cdaqs3
145144 11/14/07 11:09 puckett replay on kirby
145143 11/14/07 09:26 gaskell Moller on cold return
Tuesday
145142 11/13/07 19:35 gaskell 4 K down again
145141 11/13/07 16:52 smithg Target: next steps
145140 11/13/07 16:45 ccbutu Cancel of Swing and Owl shifts!
145134 11/13/07 13:24 M JOnes Set bigcal threshold to 25
145133 11/13/07 13:03 smithg Target: Target saga
145132 11/13/07 12:56 L.Pentchev estimation of the uncertainty due to main precession
145131 11/13/07 12:51 mack Shielding installation plans
145130 11/13/07 12:28 mack Hall survey results
145129 11/13/07 12:23 ccbutu Target: Lost of target!
145128 11/13/07 11:54 puckett BPM003C X and Y switched in detmap?
145127 11/13/07 09:07 gilman roc 14 crash
145125 11/13/07 08:50 vahe Target: Start of shift, target screen snapshot
145123 11/13/07 08:08 cdaq Beam Time Accounting
145121 11/13/07 07:54 Hafidi Target
145120 11/13/07 07:50 Hafidi Connection lost
145119 11/13/07 05:49 Hafidi ROC14
145117 11/13/07 05:33 Seema BPM/BCM scan for checklist
145116 11/13/07 05:11 Hafidi ROC13
145114 11/13/07 04:41 Hafidi ROC13
145112 11/13/07 04:08 Hafidi BigCal HV trip
145109 11/13/07 03:05 Hafidi ROC13 once more
145106 11/13/07 02:54 Hafidi ROC13
145103 11/13/07 02:01 Hafidi ROC13
145100 11/13/07 01:15 puckett changes to bigcal_shower.param and ideas for BigCal analysis:
145098 11/13/07 00:16 X. Zhang Target: Begin the Owl shift
145097 11/13/07 00:12 Hafidi BPM & BCM
145096 11/13/07 00:03 Hafidi DC1&2&FPP HV trip
145094 11/13/07 00:01 cdaq Beam Time Accounting
Monday
145093 11/12/07 23:41 m commisso d Target: end of shift screen shot
145090 11/12/07 22:49 mahbub HV trip on hctsv12
145089 11/12/07 22:26 Ramesh BPM/BCM snap shot
145085 11/12/07 20:21 m commisso d TargetL JT valve closed
145083 11/12/07 19:53 Ramesh TS1 failure
145082 11/12/07 19:44 m commisso d Target: JT valve openned, vac. pressure spike
145080 11/12/07 18:57 Subedi HMS screen
145078 11/12/07 18:08 Ramesh Run End (66512) failed
145074 11/12/07 16:29 M.M FPP: Power cycling of the HMS door and Chamber A card air spray
145073 11/12/07 16:05 m commisso d Target: start of shift screen shot, heater power
145072 11/12/07 16:04 cdaq Beam Time Accounting
145071 11/12/07 15:57 ccbutu HMS Hut Door !
145070 11/12/07 15:54 gilman controlled access
145069 11/12/07 15:53 vahe Target: End of shift, target screen snapshot
145066 11/12/07 15:14 vahe Target: Target IOC reboot
145065 11/12/07 15:08 gilman beam off to reboot cryotarget ioc
145061 11/12/07 12:09 M Jones Change "T-Settle" time from 500us to 100us
145058 11/12/07 11:56 M Jones Analysis: DAQ and "1 extra event in TDc slot" Warnings
145055 11/12/07 10:53 ludwig Beam Time Accounting
145054 11/12/07 10:46 ludwig Beam Time Accounting
145052 11/12/07 10:37 vahe Target: Target cryoflow graph problem fixed
145050 11/12/07 10:05 puckett modified ratio.C to fix scale of FPP efficiency plots
145049 11/12/07 09:24 vahe Target: Target screen snapshot
145045 11/12/07 08:38 ccbutu Analysis: Account of Hall C problems
145043 11/12/07 08:03 Hafidi TS1
145042 11/12/07 08:01 cdaq Beam Time Accounting
145039 11/12/07 07:36 ccbutu@jlab. Gas pressure
145038 11/12/07 07:35 X. Zhang Target: End of shift
145035 11/12/07 07:15 Hafidi ROC13
145032 11/12/07 05:36 Hafidi ROC14
145030 11/12/07 05:09 Hafidi ROC13
145027 11/12/07 04:09 Hafidi BPMs & BCMs scans for Checklist
145026 11/12/07 04:04 Hafidi Magnets settings snapshots for monday mornig checks
145023 11/12/07 03:01 Hafidi ROC 11 not responding
145022 11/12/07 02:52 Hafidi HMS DC1&2 and FPP HV trip
145017 11/12/07 01:07 Hafidi ROC14 not responding
145016 11/12/07 00:34 X. Zhang Target: Begin shift. Everything is OK!
145015 11/12/07 00:33 Hafidi BPM and BCM
145014 11/12/07 00:31 Hafidi DAQ not responding
145011 11/12/07 00:04 bitao Target: end run snapshot
145010 11/12/07 00:02 cdaq Beam Time Accounting
145009 11/12/07 00:00 Fatiha Swing Shift Summray
Sunday
145008 11/11/07 23:54 Fatiha Beam screens at theend of the shift
145006 11/11/07 23:27 Fatiha Power cycled roc13
145005 11/11/07 23:26 Wendy FPP Hit rate
145002 11/11/07 23:15 Fatiha ROC14 crash after many warnings
145001 11/11/07 23:13 puckett Analysis: bigcal timing
144999 11/11/07 22:42 Fatiha Rocs13&14
144997 11/11/07 22:21 Fatiha Very stable beam at 70 uA
144995 11/11/07 22:02 Fatiha MCC is taking the beam again for tuning
144993 11/11/07 21:28 mack FPP card threshold
144992 11/11/07 21:04 Fatiha Magnet screens after Steve Lassiter's work
144990 11/11/07 20:48 Lassiter HMS NMR Communication Problems
144989 11/11/07 20:28 Fatiha Power cycled SKYLLA
144988 11/11/07 20:18 Wendy High Voltage Big Cal
144987 11/11/07 20:10 Fatiha HMS Dipole Power Supply Communication Error
144986 11/11/07 19:46 Fatiha Beam Back
144984 11/11/07 19:22 Bitao Target: Target: L1 Temps Graph didn't show anything from previous shift
144983 11/11/07 19:20 Fatiha a Lot of trips, MCC is going to send tuned beam and try to understand what is going on.
144981 11/11/07 18:46 M.M FPP: Hit rate spectra chamber A
144979 11/11/07 18:06 puckett BigCal HV after access, beam at 60 uA
144977 11/11/07 18:05 puckett Activities during access
144976 11/11/07 17:56 Fatiha Ask for beam back
144974 11/11/07 17:44 saw Rebooted Hall C switch
144973 11/11/07 17:44 Fatiha Network problems sloved.
144972 11/11/07 17:27 M Jones Analysis: Fixed problem with test in gepelastic.test which gives wrong "elastic counts per unit charge"
144971 11/11/07 17:07 Fatiha Hall going to a controlled access for all the Network problems.
144970 11/11/07 16:52 Fatiha Big cal messages, impossibility to restart the software
144969 11/11/07 16:48 Fatiha All the BigCal HVs tripped
144968 11/11/07 16:46 bitao supervisor rebooted
144967 11/11/07 16:33 Fatiha FPP and HMS HV trips
144966 11/11/07 16:31 Fatiha Beam screens
144963 11/11/07 16:23 frw HWP is OUT
144961 11/11/07 16:11 Fatiha Quad fields not read in EPICS
144960 11/11/07 16:11 saw HMS Quad Hall Probes restored
144959 11/11/07 16:06 E. Christy beam screens
144958 11/11/07 16:05 bitao Target: start of shift, target snapshot
144957 11/11/07 16:01 bogdanw shift summary
144956 11/11/07 16:00 cdaq Beam Time Accounting
144955 11/11/07 15:58 vahe Target: End of shift, target snapshot
144954 11/11/07 15:49 E. Christy HMS Q3 readback field unstable
144953 11/11/07 15:30 puckett changed "golden" run to 66452
144951 11/11/07 15:18 E. Christy run 66454 stopped to reset hctsv12:2005 HV
144950 11/11/07 15:01 puckett updated KINEMATICS.db
144949 11/11/07 14:32 E. Christy FPP WC thresholds in shift checklist
144948 11/11/07 14:29 bogdanw BigCal HV trips
144947 11/11/07 14:25 M Jones Predicted SIMC rates at this kinematic
144942 11/11/07 12:31 bogdanw polarization - wave plate
144940 11/11/07 12:27 bogdanw ROC14 warning
144939 11/11/07 12:16 E. Christy All OK with run 66447
144936 11/11/07 10:33 E. Christy Strange BigCal row hit distribution for run 66446
144935 11/11/07 09:56 frw floor markings VS encoder
144934 11/11/07 09:46 E. Christy HMS angle is actually 17.94
144932 11/11/07 09:02 bogdanw BigCal HV
144931 11/11/07 09:01 bogdanw HMS HV screens
144929 11/11/07 08:26 bogdanw Beam and BPM
144928 11/11/07 08:23 vahe Target: Start of shift, target shapshoot
144927 11/11/07 08:05 Danagoulian Target: End shift summary
144925 11/11/07 08:04 cdaq Beam Time Accounting
144924 11/11/07 07:58 Hafidi Beam trips
144923 11/11/07 06:55 Danagoulian Analysis: ROC14
144920 11/11/07 05:36 Danagoulian Analysis: The plot does not change
144918 11/11/07 04:55 Hafidi ROC 14 rebooted
144917 11/11/07 04:51 K. Hafidi BigCal trip
144916 11/11/07 04:25 Danagoulian BPM/BCM
144914 11/11/07 03:17 brash Analyzer updates
144912 11/11/07 03:11 K. Hafidi ROC14 reboot
144910 11/11/07 02:43 Danagoulian Target: operational target
144909 11/11/07 02:08 K. Hafidi Beam trips
144907 11/11/07 01:26 W. Luo Run 66435 is ok
144906 11/11/07 01:14 W. Luo Peds and adc hits
144905 11/11/07 01:13 K. Hafidi HMS momentum settings and the red light in the Quad Ln2 Temps
144904 11/11/07 01:11 K. Hafidi HMS momentum settings
144903 11/11/07 00:57 K. Hafidi Big Cal HV trip
144900 11/11/07 00:06 Fatiha Shift Summary
144899 11/11/07 00:04 Fatiha Beam screen at the end of shift
144898 11/11/07 00:03 cdaq Beam Time Accounting
Saturday
144897 11/10/07 23:56 Danagoulian Target: Shift start
144896 11/10/07 23:44 Bitao Hu Target: Target:swing shift ends
144895 11/10/07 23:40 Fatiha BPM screen before the end of the shift
144894 11/10/07 23:36 bogdanw Day Shift summary
144893 11/10/07 23:12 Fatiha Roc13 crash
144890 11/10/07 22:15 W. Luo How to fix HV crate crash problems
144888 11/10/07 21:31 W. Luo hctsv12:2006 lost connection
144886 11/10/07 20:47 Fatiha Beam Current lowered to 85 uA
144883 11/10/07 20:19 Fatiha Roc 14 power cycled
144882 11/10/07 20:12 Fatiha Roc 14 crashes again
144881 11/10/07 20:10 Fatiha BigCal again (HV05)
144879 11/10/07 19:35 Fatiha roc14 crash
144878 11/10/07 19:28 W. Luo hctsv12:2005 lost connection
144876 11/10/07 19:08 kravtsov BigCal HV is OK
144875 11/10/07 19:07 Fatiha Put back buffer then took it back.
144873 11/10/07 18:46 kravtsov BigCal 3,4,7,8,11,12 rows do not working
144872 11/10/07 18:41 Fatiha Power cycled roc13
144869 11/10/07 17:19 Fatiha Beam postions are good and beam is stable
144868 11/10/07 17:04 puckett forgot to attach plot for calib. results
144867 11/10/07 16:59 Fatiha Removed the buffer mode from the flag file.
144866 11/10/07 16:54 puckett new BigCal calibration constants from run 66401
144864 11/10/07 16:39 Fatiha MCC lowering the beam current
144863 11/10/07 16:32 Fatiha Beam positions at the starting of the shift
144861 11/10/07 16:24 Fatiha Beam Current
144859 11/10/07 16:14 Bitao Hu Target: Target:swing shift start
144857 11/10/07 16:07 cdaq Beam Time Accounting
144856 11/10/07 16:06 puckett onlineGUI improvements
144855 11/10/07 15:53 vahe Target: End of shift, target screenshot
144854 11/10/07 15:49 Vahe Target: End of shift target snapshot
144853 11/10/07 15:20 brash FPP information added to the gep coincidence ntuple
144852 11/10/07 15:19 M Jones Updated the cfg files for the "gep_online" macro
144850 11/10/07 15:15 puckett nothing wrong with 37CD... onlineGUI problem instead!!!
144849 11/10/07 14:52 puckett elastic counts per unit charge added to greport.template, results:
144848 11/10/07 14:52 M.M FPP: Plateau curve -2.5V
144846 11/10/07 14:34 bogdanw BCM
144845 11/10/07 14:07 puckett updated ROC11, ROC12 ADC thresholds
144843 11/10/07 13:20 puckett trigger group 37CD stopped firing AGAIN!
144842 11/10/07 12:51 ejensen Analysis: Error message from analysis in run 66412
144840 11/10/07 11:38 M Jones Keeping an eye on scalers using " bigcal.tcl " script
144839 11/10/07 11:30 M Jones Comparing Mott and Moller
144837 11/10/07 09:57 bogdanw Hall C expert attention
144836 11/10/07 09:48 M Jones ROC1: "Not all modules converted" error
144834 11/10/07 09:39 frw TS1 crashed
144832 11/10/07 08:39 bogdanw FPP
144828 11/10/07 08:06 vahe Start of shift, Target status
144826 11/10/07 08:02 K. Hafidi OWL Shift summary
144825 11/10/07 08:01 cdaq Beam Time Accounting
144824 11/10/07 07:52 Danagoulian Target: End_of_shift snapshot
144822 11/10/07 07:05 Hafidi update
144820 11/10/07 06:48 Hafidi shift update
144819 11/10/07 06:46 Danagoulian ROC1 error message
144818 11/10/07 06:44 Danagoulian BPM
144816 11/10/07 04:26 Danagoulian Target: Heater power
144813 11/10/07 03:58 Danagoulian Target: Heater power 0?
144808 11/10/07 02:33 Danagoulian Target: Yellow alarm
144807 11/10/07 02:31 M.M FPP: configuration Thd=-2.5V HV 2350V
144803 11/10/07 01:38 M.M FPP: Screen Thd=-2.5 HV 2500
144802 11/10/07 01:32 M.M FPP Screen Thd=-2.5 HV 2450
144800 11/10/07 01:24 M.M FPP: Screen thd=-2.5 HV 2400
144798 11/10/07 01:16 M.M FPP Screen Thd=-2.5 HV 2350
144796 11/10/07 01:16 W. Luo New replay
144795 11/10/07 01:09 M.M FPP: Screen Thd=-2.5 HV 2200
144792 11/10/07 01:00 M.M FPP: Screen Thd=-2.5 HV 2250
144789 11/10/07 00:44 M.M FPP: Screen Thr=-2.5 HV 2300
144788 11/10/07 00:44 Danagoulian Target: Owl shift start snapshot
144786 11/10/07 00:42 L.Pentchev 4 layers missing becase NIM crate was off
144784 11/10/07 00:04 cdaq Beam Time Accounting
Friday
144783 11/09/07 23:58 Fatiha Shift Summary
144782 11/09/07 23:57 Fatiha Asked for Controlled access
144781 11/09/07 23:54 Bitao Hu Target: Target:endshift summary
144779 11/09/07 23:25 Fatiha Harp results
144778 11/09/07 23:21 brash moller measurement - oops
144777 11/09/07 23:16 brash moller measurement
144776 11/09/07 23:13 W. Luo ADC peds & scaler screen shot
144774 11/09/07 23:09 W. Luo 4 rows missing in BigCal
144773 11/09/07 22:59 Fatiha RF trips
144772 11/09/07 22:51 Fatiha FPP HVs look stable at 70 uA
144771 11/09/07 22:50 Fatiha FPP Screen at 70 uA
144769 11/09/07 22:45 Bitao Hu Target: target: target works well with beam on
144768 11/09/07 22:39 i. albayrak empty rows on BIGCAL
144767 11/09/07 22:37 i. albayrak ROC1 error
144766 11/09/07 22:29 i. albayrak bcm screenshot
144764 11/09/07 22:27 Fatiha FPP HV screen for beam current 60 uA
144763 11/09/07 22:24 Fatiha FPP HV screen for beam current 50 uA
144762 11/09/07 22:23 Fatiha FPP HV screen for beam current 40 uA
144760 11/09/07 22:20 Fatiha FPP HV screen at beam current 20 uA.
144759 11/09/07 22:18 Bitao Hu Target: Target:15cm LH2 target is ON
144758 11/09/07 22:17 Fatiha FPP HVs at zero beam current
144757 11/09/07 21:55 frw Moller measurement and tune
144756 11/09/07 21:33 Fatiha MCC is doing harp scan
144755 11/09/07 21:28 W. Luo HV hctsv12:2005 crashed
144753 11/09/07 21:13 Fatiha MCC is tuning the beam
144752 11/09/07 20:55 gaskell Moller Q2
144751 11/09/07 20:55 W. Luo Checked BigCal 36B cables
144750 11/09/07 20:52 horn/gaskell Moller Summary
144749 11/09/07 20:22 gaskell Moller HV
144748 11/09/07 20:20 gaskell Moller backout
144747 11/09/07 20:17 gaskell going to Controlled access
144746 11/09/07 20:04 horn Moller Q2 tripped again - cannot ramp back to field
144744 11/09/07 19:44 Bitao Target: Target temperature was around 17.5K. No alarm.
144739 11/09/07 19:07 horn/gaskell Collimator scan results
144738 11/09/07 19:03 horn/gaskell Moller tuned
144729 11/09/07 17:19 frw FPP HV currents with 1uA beam, MT target
144728 11/09/07 16:57 frw DAQ in buffered mode
144727 11/09/07 16:11 Bitao Hu Target: Target
144726 11/09/07 16:02 cdaq Beam Time Accounting
144725 11/09/07 16:00 Jonathan Mil Shift Summary
144724 11/09/07 15:48 m commisso d Target: end of shift screen shot
144723 11/09/07 15:41 gaskell Moller progress
144722 11/09/07 15:34 L.Pentchev BigCal thresholds set to -300mV
144721 11/09/07 15:32 mack BCM calibration results
144720 11/09/07 15:32 horn Moller Q2 still at field
144719 11/09/07 15:32 mack BCM calibration results
144718 11/09/07 14:39 M Jones Turned off the booster power supplies
144717 11/09/07 13:53 gaskell Moller Q2 keeps tripping
144716 11/09/07 13:29 gaskell Ramping solenoid to 1 T
144715 11/09/07 13:28 gaskell Moller preparations
144714 11/09/07 13:04 cdaq Beam Time Accounting
144713 11/09/07 12:32 M Jones Analysis: Added analysis of bigcal scalers to engine
144712 11/09/07 12:01 m commisso d Target: Loop 1 alarm - temp spike?
144711 11/09/07 11:39 Jonathan Mil GEP HV turned off
144710 11/09/07 11:36 horn MCC setting up combined optics for Moller
144709 11/09/07 11:32 m.commisso d Target: moved to Empty for beam without raster
144708 11/09/07 11:22 m.commisso d Target: low current unrastered beam on LH2
144706 11/09/07 10:53 m.commisso d Target: 15K cryoflow fluctuations?
144703 11/09/07 09:16 frw plans for today
144702 11/09/07 09:15 A. Shahinyan Roc14
144700 11/09/07 08:19 m commisso d Target: start of shift screen shot
144699 11/09/07 08:04 M.M Owl shift Summary
144698 11/09/07 08:01 M.M Bpm Bcm screens
144697 11/09/07 08:00 Xiaodong Zha Target:
144695 11/09/07 07:52 M.M Beam is back
144694 11/09/07 07:43 Xiaodong Zha Target:
144693 11/09/07 07:38 M.M Access to hall
144692 11/09/07 07:19 puckett Check thresholds on rows 31 and 32
144691 11/09/07 05:27 M.M Beam down
144690 11/09/07 04:42 M.M Roc 13 and 2 crashed
144688 11/09/07 03:53 M.M ROC 13 Crashed
144687 11/09/07 02:54 M.M hctsv 2005 crashed
144685 11/09/07 02:51 M.M FPP: Roc 14 crashed
144682 11/09/07 01:49 M.M FPP: New thd -2.9V
144681 11/09/07 01:28 M.M Beam current 70 muamps
144679 11/09/07 01:00 M.M FPP: NEW Cath HV @ 2300V
144677 11/09/07 00:48 Xiaodong Zha Target: Begin work
144676 11/09/07 00:35 M.M FPP: HV trip
144674 11/09/07 00:30 W. Luo Run:66348 figures
144671 11/09/07 00:07 Fatiha Shift Summary
144670 11/09/07 00:06 M.M FPP: HV trip
144669 11/09/07 00:03 cdaq Beam Time Accounting
Thursday
144668 11/08/07 23:57 Jonathan Mil Target:
144667 11/08/07 23:54 W. Luo Run sheets
144666 11/08/07 23:49 Fatiha Changed ps4 to 10
144663 11/08/07 23:27 Fatiha FPP HV trips
144661 11/08/07 23:05 L.Pentchev trigger group 37CD fixed
144660 11/08/07 22:58 Jonathan Mil Beam Position
144659 11/08/07 22:56 Fatiha Beam screen again
144658 11/08/07 22:07 Fatiha Tuned beam
144657 11/08/07 21:54 Fatiha Beam back
144654 11/08/07 21:14 Fatiha Status
144653 11/08/07 20:46 M Jones Access to hall
144652 11/08/07 20:44 Fatiha No beam for at least 1/2 h
144646 11/08/07 20:04 puckett gep.map.63006 committed to cvs
144645 11/08/07 19:59 puckett fixed detmap file for swapped cables in BigCal trigger ADC
144636 11/08/07 18:51 Fatiha Still in a controlled access
144624 11/08/07 17:29 cdaq Beam Time Accounting
144623 11/08/07 17:18 M.M FPP: Back to the original configuration
144622 11/08/07 17:13 Jonathan Mil Target Moved
144621 11/08/07 16:48 Fatiha Hall going to a controlled access
144619 11/08/07 16:17 Fatiha MCC is going to do a Harp Scan
144618 11/08/07 15:56 J Mulholland Shift Summary
144617 11/08/07 15:48 J Mulholland BPM and BCM Screenshots
144616 11/08/07 15:48 m commisso d target: end of shift screen shot
144615 11/08/07 15:44 J Mulholland Harp Scan
144614 11/08/07 15:36 J Mulholland Beam Studies Extended
144613 11/08/07 14:48 M Jones Compter deadtime and buffered mode
144609 11/08/07 13:41 J Mulholland LN2 Alert HMS Quad 2 broken probe
144608 11/08/07 13:22 J Mulholland Quad 2 LN2 alert
144607 11/08/07 13:06 m commisso d target: target gui updated
144606 11/08/07 11:42 M Jones Results of time of fastbus readout study
144601 11/08/07 10:28 smithg Target: loop 3 melted
144600 11/08/07 09:50 J Mulholland Beam Studies
144597 11/08/07 09:34 m commisso d target: moved to empty in prep. for beam test
144596 11/08/07 09:33 mack HMS DC behavior
144595 11/08/07 09:18 M Jones ROC13 crash at end of run
144594 11/08/07 09:10 M Jones HMS DC still improving look at run 66308
144593 11/08/07 09:09 M Jones HMS DC still improving look at run 66308
144592 11/08/07 08:57 J Mulholland Ion Chamber snapshot pre beam studies
144590 11/08/07 08:26 m commisso d target: start of shift screen shot
144589 11/08/07 07:59 A. Marsh Owl Shift Summary
144588 11/08/07 07:17 kohlm Target: target screen shot end owl 11-08-2007
144587 11/08/07 07:01 A. Marsh BPM and BCM screens
144585 11/08/07 06:37 A. Marsh Beam: Beam back at 6:35
144584 11/08/07 06:29 A. Marsh Beam: Beam down at 4:00
144583 11/08/07 03:26 puckett trigger group 37CD is missing again
144582 11/08/07 02:27 kohlm Target: Alarm hcL1_Cernox_2_R
144580 11/08/07 01:52 puckett HMS DC efficiency seems improved
144577 11/08/07 00:37 A. Marsh BPM and BCM screens
144576 11/08/07 00:24 kohlm Target: target screen shot begin owl 11-08-2007
144575 11/08/07 00:08 cdaq Beam Time Accounting
144574 11/08/07 00:04 Fatiha Hall A decided to do BCM calibrations now
144573 11/08/07 00:03 Fatiha Swing Shift Summary
Wednesday
144572 11/07/07 23:49 m commisso d target : end of shift screen shot
144570 11/07/07 23:42 puckett Target Positions, shift workers
144569 11/07/07 23:15 M.M FPP: Cable swap.
144568 11/07/07 23:07 M.M FPP: Gas flows.
144567 11/07/07 22:42 m commisso d target: moved to loop 1, 15cm
144566 11/07/07 22:41 Fatiha Controlled Access and Status
144565 11/07/07 22:29 puckett HMS-BigCal correlation after changing geometry params...
144563 11/07/07 22:16 puckett Offsets inHMS-BigCal position correlation
144561 11/07/07 22:03 Fatiha BCM calibration ended
144560 11/07/07 21:31 Fatiha Beam Current screen during the BCM calibration
144559 11/07/07 20:31 W. Luo one HV crate off run:66295
144558 11/07/07 20:28 Fatiha Starting hallC BCM calibrations
144556 11/07/07 20:20 M.M FPP: Low gas flow in the chamber
144554 11/07/07 20:10 M.M FPP: Card swapping
144552 11/07/07 20:02 M Jones Increased gas flow to HMS Dc1 and DC2
144551 11/07/07 19:58 m commisso d target: moved to LOOP 3, 4cm target
144549 11/07/07 19:47 Fatiha Hall going ot controlled access
144547 11/07/07 19:45 m commisso d typo: should read BDS postition, not BDB
144546 11/07/07 19:42 m commisso d target: moved to 4cm Dummy
144545 11/07/07 19:40 m commisso d target: movement stopped prematurely
144544 11/07/07 19:29 m commisso d target: getting ready to move to 4 cm dummy...
144543 11/07/07 19:22 Fatiha MCC is taking beam for BCM calibrations
144541 11/07/07 18:19 Fatiha FPP Plateau data status
144539 11/07/07 18:11 M.M FPP: 50 000 events online replay with paw (fpp_plotmenu)
144537 11/07/07 17:44 puckett onlineGUI should be working now
144533 11/07/07 17:19 frw Run Plan until 9am tomorrow
144529 11/07/07 16:55 puckett Analysis -- changed standard COIN histograms
144527 11/07/07 16:41 m commisso d target: hcL3_Cernox_3_R transient alarm
144526 11/07/07 16:39 Fatiha Beam Screens
144525 11/07/07 16:21 M Commisso D Target: H2 pressure a little high
144523 11/07/07 16:02 cdaq Beam Time Accounting
144522 11/07/07 16:02 M. Commisso Target - start of shift screen shot
144521 11/07/07 15:59 gilman day shift summary
144520 11/07/07 14:59 M Jones New nominal beam positions
144519 11/07/07 14:19 puckett new BigCal shower reconstruction parameters
144518 11/07/07 14:14 J Mulholland Target: Alarm hcL1_Cernox_2_R
144516 11/07/07 13:57 brash New driftmap
144514 11/07/07 12:21 brash Scripts for full replay of runs
144513 11/07/07 11:51 J Mulholland Target: JT Valve Change
144511 11/07/07 11:45 J Mulholland Target: HPH warning
144510 11/07/07 11:11 gilman current back to 80 uA
144508 11/07/07 10:40 gilman beam current
144506 11/07/07 10:35 J Mulholland Target: IOC Reboot
144504 11/07/07 10:17 L.Pentchev Cosy spin transport files
144503 11/07/07 10:08 gilman BIGCAL threshold
144501 11/07/07 09:53 horn beam centering results
144500 11/07/07 09:38 gilman FPP HV back on
144497 11/07/07 09:28 J Mulholland Target: moved to H 15cm
144495 11/07/07 08:57 gilman beam returns
144494 11/07/07 08:44 frw limited access only tomorrow, need requests TODAY
144493 11/07/07 08:39 gilman BLM trips
144492 11/07/07 08:18 gilman FPP HV OFF
144491 11/07/07 08:13 cdaq Beam Time Accounting
144490 11/07/07 08:12 puckett updated KINEMATICS.db
144489 11/07/07 08:11 Punjabi Shift summary
144488 11/07/07 08:10 J Mulholland Target: Day Shift Screenshot
144487 11/07/07 07:47 mahbub Target screens
144486 11/07/07 07:32 kohlm BPM/BCM images
144483 11/07/07 06:19 Punjabi FPP chamber trip
144476 11/07/07 04:50 mahbub Target: Move to BeO to check beam spot
144475 11/07/07 04:46 mahbub Target: Move to Copper target as test
144471 11/07/07 04:05 Punjabi Harp scan
144470 11/07/07 04:04 Punjabi Harp scan
144469 11/07/07 03:41 mahbub Target: Move to 15 cm Dummy target
144468 11/07/07 01:44 Punjabi Harp scan
144467 11/07/07 00:02 cdaq Beam Time Accounting
144466 11/07/07 00:00 Fatiha Shift Summary
Tuesday
144465 11/06/07 23:54 Jonathan Mil CW Beam
144464 11/06/07 23:38 Fatiha Tuned beam ot the hall
144463 11/06/07 23:13 Jonathan Mil Beams
144462 11/06/07 23:06 Fatiha Beam Status
144461 11/06/07 22:53 Fatiha Accelerator Overview Screen
144460 11/06/07 21:47 Fatiha Megnet set for the new Kinematics after Energy change
144459 11/06/07 21:45 Jonathan Mil Target Moved
144458 11/06/07 21:42 Fatiha HMS moved to 17.96 deg
144457 11/06/07 20:27 Jonathan Mil Beam into Hall
144456 11/06/07 17:48 W. Luo Swapped two pairs of HV cables
144455 11/06/07 17:04 M Jones Proposed plan for centering beam on target
144454 11/06/07 16:18 Jonathan Mil Beam Permit
144453 11/06/07 16:17 cdaq Beam Time Accounting
144452 11/06/07 14:22 frw swing shift on stand-by
144451 11/06/07 14:16 M Jones Analysis: Modified ENGINE: h_physics.f
144450 11/06/07 14:05 M Jones Beam scans of solid targets
144449 11/06/07 12:01 frw vmefpp1mon remote access fixed
144448 11/06/07 10:25 M Jones Reduced HMS trigger width from 100ns to 50ns
144447 11/06/07 09:55 frw YES
144446 11/06/07 09:39 gilman Removing SANE detectors from platform
144445 11/06/07 09:27 frw energy change TODAY
144443 11/06/07 08:35 gilman controlled access
144442 11/06/07 08:31 J Mulholland Target: IOC Reboot
144441 11/06/07 08:29 frw controlled access
144440 11/06/07 08:10 J Mulholland Target: screenshot day
144439 11/06/07 08:02 cdaq Beam Time Accounting
144438 11/06/07 07:57 Marsh Analysis: shift summary
144437 11/06/07 07:55 A. Marsh BPM and BCM images
144436 11/06/07 07:52 A. Marsh BPM and BCM images
144435 11/06/07 07:42 kohlm Target: 11-06-2007 owl end
144428 11/06/07 05:05 puckett ROC13 alive and well after access, power-cycle
144427 11/06/07 04:35 puckett controlled access to power-cycle ROC13.
144426 11/06/07 04:21 puckett ROC13 down, tried all reboot procedures, may need to ask for an access.
144424 11/06/07 03:49 kohlm Target: target position changed to 15cm lq. hydrogen
144418 11/06/07 02:59 kohlm Target: target position changed from 2-foil C to 3-foil Al
144412 11/06/07 02:14 target position changed from 2-foil Al to 2-foil C
144407 11/06/07 01:40 kohlm Target: target position changed from 4cm dummy to 2-foil Al
144399 11/06/07 00:40 kohlm Target: target position changed from 15cm dummy to 4cm dummy
144398 11/06/07 00:35 kohlm Target: 11-06-2007 owl begin
144396 11/06/07 00:35 kohlm Target: 11-06-2007 owl begin
144394 11/06/07 00:16 cdaq Beam Time Accounting
144393 11/06/07 00:10 Fatiha Swing shift Summary
Monday
144387 11/05/07 22:57 Jonathan Mil Target Moved
144386 11/05/07 22:56 Fatiha Asked to Adjust beam position
144384 11/05/07 22:27 Fatiha Hall going to beam permit
144383 11/05/07 22:01 Fatiha hall going to Controlled access
144382 11/05/07 21:31 Fatiha How to grab the HMS screen
144380 11/05/07 21:10 mahbub HMS Screen
144379 11/05/07 21:02 test test
144378 11/05/07 20:33 Fatiha Beam screens
144372 11/05/07 18:37 Jonathan Mil Change of Target
144370 11/05/07 18:14 M Jones Lucite scalers
144369 11/05/07 17:56 M Jones Cable setup for Lucite detector
144368 11/05/07 17:54 Jonathan Mil Target Change
144367 11/05/07 17:47 Jonathan Mil Target Change
144366 11/05/07 17:34 Fatiha Going to beam permit
144364 11/05/07 17:16 L.Pentchev two summing modules (41cd and 42cd) replaced
144361 11/05/07 16:22 frw beam available
144359 11/05/07 16:14 cdaq Beam Time Accounting
144352 11/05/07 15:48 ludwig Beam Time Accounting
144348 11/05/07 15:09 W. Luo updated HMS online histograms
144346 11/05/07 14:54 hcf hdc2x1 weak wire group- fixed?
144344 11/05/07 14:24 W. Luo Turn off LED
144343 11/05/07 14:22 cdaq Beam Time Accounting
144342 11/05/07 14:22 frw RF seperator developments
144341 11/05/07 13:59 J Mulholland Target Alarm Threshold Change!
144340 11/05/07 13:52 J Mulholland Target alarm cryo return
144339 11/05/07 13:22 J Mulholland Target: Cryo Return transient
144337 11/05/07 12:56 J Mulholland Target: Transient Cryo Return Temp alarm. T above High (28K)
144336 11/05/07 12:17 J Mulholland Target: Cryo Return T above 28K Transient
144333 11/05/07 11:23 J Mulholland Target: return temp transient
144332 11/05/07 10:58 J Mulholland Target: Return T alarm
144331 11/05/07 10:46 J Mulholland Target: hcCryo_Return_T
144330 11/05/07 10:07 saw ROC14 secondary event list
144328 11/05/07 09:49 smithg Target: Horizontal offset
144324 11/05/07 09:18 frw status of RF seperator troubles
144322 11/05/07 09:00 M Jones For test set bigcal threshold for -25mV
144321 11/05/07 08:14 J Mulholland target gui screenshot
144320 11/05/07 05:47 mahbub Target: Alarm on Loop 1 Fan frequency
144319 11/05/07 04:48 mahbub Hall going to Controlled Access
144318 11/05/07 02:09 mahbub Target: Alarm on Loop 3
144317 11/05/07 02:00 mahbub Target: Alarm on hcL1_Cernox_3_R
144316 11/05/07 01:32 mahbub Target screens
144315 11/05/07 01:27 mahbub Target: Target alarm on hcCryo_Return_T
144314 11/05/07 00:25 Moffit Problems with 5th pass RF separator. No beam during Owl.
144313 11/05/07 00:00 cdaq Beam Time Accounting
Sunday
144312 11/04/07 23:57 S. Sirca Swing shift SUMMARY
144311 11/04/07 23:26 puckett added new capabilities to onlineGUI software (paw alias file handling)
144310 11/04/07 19:34 S. Sirca MCC loses RF separator, beam off
144308 11/04/07 18:34 Margaziotis Target: screen
144307 11/04/07 18:26 Margaziotis Target: screen
144305 11/04/07 17:44 Margaziotis Target: Alarm
144303 11/04/07 17:12 Margaziotis Target: screens
144302 11/04/07 16:59 S. Sirca BPM, BCM screens
144300 11/04/07 16:08 cdaq Beam Time Accounting
144299 11/04/07 16:08 mack Aluminum dummy target
144298 11/04/07 16:07 Danagoulian Shift summary
144297 11/04/07 15:54 Jonathan Mil Vac Pressure
144295 11/04/07 14:56 Danagoulian Empty target run
144292 11/04/07 14:44 Danagoulian Dummy and empty target run
144291 11/04/07 14:43 Jonathan Mil return to 15 cm H2 target
144289 11/04/07 14:04 Jonathan Mil Problem with return Temp
144286 11/04/07 13:48 Jonathan Mil Target Moved to Dummy
144285 11/04/07 13:30 Rondon Follow up on beam position and HMS pedestals
144284 11/04/07 13:19 Rondon Beam position and HMS pedestals
144283 11/04/07 13:19 Danagoulian BPM scale limits
144282 11/04/07 13:02 Danagoulian Roc 14 error in Run 66186
144280 11/04/07 12:38 Danagoulian Short runs 66177-66185
144275 11/04/07 11:20 Danagoulian BPM/BCM snapshot
144273 11/04/07 11:01 Jonathan Mil Target Reboot
144271 11/04/07 10:23 Danagoulian ROC 14 error did not show up in DAQ
144269 11/04/07 09:46 M Jones Commited files from the replay directory to cvs
144267 11/04/07 09:43 M Jones Commited files BTRACKING/b_find_clusters.f and HTRACKING/h_fpp_drift.f to cvs
144266 11/04/07 09:42 Danagoulian wrong beam current in the runlog
144263 11/04/07 08:40 frw rebooting ROC14 (or ROC13)
144261 11/04/07 08:07 brash Replaying of entire runs
144260 11/04/07 08:02 Markowitz owl shift summary
144259 11/04/07 08:01 cdaq Beam Time Accounting
144258 11/04/07 07:52 Kirillov target
144257 11/04/07 07:46 M Jones Replaying entire run
144256 11/04/07 07:19 cdaq Beam Time Accounting
144253 11/04/07 06:12 Markowitz beam gne for QIE measurement
144245 11/04/07 01:40 Kirillov target
144244 11/04/07 01:39 Markowitz2nd 2nd target ioc reboot
144242 11/04/07 01:02 kirillov target
144239 11/04/07 00:56 Markowitz roc 14 woes continue
144237 11/04/07 00:00 cdaq Beam Time Accounting
144236 11/04/07 00:00 S. Sirca Swing shift SUMMARY
Saturday
144235 11/03/07 23:56 S. Sirca All quiet on the ROC front
144234 11/03/07 23:53 kohlm Target: end of shift GUI
144232 11/03/07 22:25 brash roc14 location
144231 11/03/07 22:18 mack roc14
144230 11/03/07 22:17 S. Sirca TS and ROC reboots
144227 11/03/07 21:18 S. Sirca Location of ROC14
144226 11/03/07 21:04 S. Sirca BPM, BCM screens
144225 11/03/07 21:03 S. Sirca Golden run 66152 for kin 3
144224 11/03/07 20:57 mack where is roc14?
144222 11/03/07 20:32 S. Sirca Frequent ROC14 crashes
144217 11/03/07 17:13 S. Sirca BPM, BCM screens
144216 11/03/07 17:07 kohlm Target: start of shift screenshot
144214 11/03/07 16:25 M Jones Instructions for replaying online data for shift workers
144213 11/03/07 16:11 brash replaying full runs - NEW REPLAY SCRIPT
144212 11/03/07 16:10 cdaq Beam Time Accounting
144211 11/03/07 16:10 Danagoulian Shift summary
144210 11/03/07 15:55 Rondon Target:end of shift GUI
144208 11/03/07 15:33 perdrisa goldenrun redifined
144206 11/03/07 15:06 Danagoulian Bigcal HV problem
144205 11/03/07 15:04 Danagoulian Roc 14 fault
144204 11/03/07 15:00 Danagoulian BPM/BCM snapshot
144203 11/03/07 14:53 Rondon Target: Vacuum chamber pressure trend?
144201 11/03/07 13:58 M Jones Problem with hctsv12:2006 in Lecroy HV gui
144199 11/03/07 13:49 brash Updated drift map
144196 11/03/07 13:39 M Jones Lost HV connection to hctsv11:2005
144195 11/03/07 13:37 Rondon Target: even more reserve power needed
144193 11/03/07 13:21 Rondon Target: increase HPH power
144192 11/03/07 13:20 Danagoulian ROC 13 failure
144190 11/03/07 13:02 Rondon Target: Temperature alarm with 80 muA
144188 11/03/07 12:28 Rondon Target: beam up to 75 muA
144187 11/03/07 11:47 Danagoulian HMS dipole NMR communication fault
144186 11/03/07 10:04 Rondon Target: Vacuum chamber pressure
144185 11/03/07 10:01 Rondon Target: chart of HPH power vs Ibeam
144184 11/03/07 10:01 mack drift time spectra look promising!
144183 11/03/07 09:25 Rondon Target: asking for up to 80 uA
144182 11/03/07 08:28 W. Luo Save BigCal HV settings to database
144181 11/03/07 08:22 cdaq Beam Time Accounting
144180 11/03/07 08:18 Rondon Target: start of shift GUI
144179 11/03/07 06:12 puckett MCC takes beam away again.
144178 11/03/07 05:38 puckett MCC sends beam back, we're taking data
144175 11/03/07 04:25 Markowitz shift summary
144173 11/03/07 03:02 Markowitz Run 66139 looks good
144172 11/03/07 03:01 puckett run 66138 was bad because HMS dipole setting was incorrect.
144170 11/03/07 02:54 Markowitz run 66138 histograms look od
144169 11/03/07 02:02 puckett FPP Analyzer doors are in starting with run 66138
144167 11/03/07 01:37 M.M FPP: straight through runs summary.
144166 11/03/07 01:33 M.M FPP: Analysers IN!!!!
144165 11/03/07 01:32 M.M SO,S1: Trigger S0 AND S1, HV S0 ON
144164 11/03/07 01:24 Markowitz access to move in doors, simultaneously cycle quads
144162 11/03/07 00:17 M.M FPP: adjusted time window spectra
144161 11/03/07 00:02 S. Sirca Swing shift SUMMARY
Friday
144160 11/02/07 23:38 S. Sirca Beam will be off starting at 4am
144158 11/02/07 23:33 mahbub Target screens
144157 11/02/07 23:03 Moffit Prescales for 66134 and 66135
144155 11/02/07 22:10 S. Sirca BPM, BCM screens
144153 11/02/07 21:39 Moffit Runplan for Wednesday through Thursday Day (take 2)
144152 11/02/07 21:34 S. Sirca Harp scan results
144151 11/02/07 21:05 Moffit Correction to runplan
144150 11/02/07 20:20 Moffit Current Runplan for the weekend.
144149 11/02/07 18:39 M jones Analysis: Modified ENGINE
144148 11/02/07 17:54 frw FPP: adjusted time window of F1 TDCs
144147 11/02/07 16:03 horn Target: screen
144146 11/02/07 15:57 cdaq Beam Time Accounting
144145 11/02/07 15:57 Higinbotham Shift Summary
144144 11/02/07 14:38 Punjabi Fpp chambers C and D problems fixed
144141 11/02/07 14:01 horn Target: Changed to 15cm LH2
144140 11/02/07 13:14 frw FPP: bad data starting with run 66077
144138 11/02/07 12:18 horn Moller DAQ test done
144128 11/02/07 08:53 moffit Status: Controlled access.
144126 11/02/07 08:06 cdaq Beam Time Accounting
144125 11/02/07 08:05 Markowitz Shift Summary
144124 11/02/07 06:04 hcf target screens
144117 11/02/07 00:49 M Jones Time peak for tracker
144116 11/02/07 00:47 M Jones Lucite hodo
144115 11/02/07 00:04 S. Sirca Swing shift SUMMARY
144114 11/02/07 00:02 cdaq Beam Time Accounting
Thursday
144113 11/01/07 23:57 Shabestari Target: Vacuum pressure
144112 11/01/07 23:56 Shabestari Target screen
144109 11/01/07 23:21 Shabestari Target: BeO
144108 11/01/07 23:15 Shabestari Target: empty
144107 11/01/07 23:08 puckett online analysis GUI...
144106 11/01/07 23:07 S. Sirca BPM screenshot
144097 11/01/07 21:44 S. Sirca ROC12 problems
144092 11/01/07 20:10 frw HMS trigger set to OR, s0 HV off
144091 11/01/07 20:06 frw FPP: both analyzers retracted
144086 11/01/07 19:20 moffit Runplan for Thursday Swing through Friday Day
144084 11/01/07 18:44 Shabestari Target moved to LH2
144083 11/01/07 18:38 S. Sirca Harp scan results
144082 11/01/07 17:28 saw More networking
144081 11/01/07 16:21 cdaq Beam Time Accounting
144078 11/01/07 15:55 Margaziotis Target moved to Empty-in steps
144077 11/01/07 15:11 M.M FPP: ERRATUM!!!!!!!! Plateau curve
144076 11/01/07 13:29 gaskell Moller analyzer does not compile on cdaql6 or cdaql7
144075 11/01/07 13:26 brash FPP tracking/zclose study .. more
144074 11/01/07 13:25 brash Tracking/Zclose study
144073 11/01/07 11:51 puckett BigCal calibration constants and BigCal analysis:
144072 11/01/07 11:41 saw Network cabling changes
144070 11/01/07 11:31 gaskell Runs 66086-66088 Moller runs
144068 11/01/07 11:10 Margaziotis Archiver storing data
144067 11/01/07 10:59 W. Luo Turn on all HV for BigCal after the absorber back
144065 11/01/07 10:42 Margaziotis Archiver not storing data
144064 11/01/07 10:06 gaskell Plans for Controlled Access
144063 11/01/07 10:04 gaskell Big Cal HV off
144062 11/01/07 09:37 Margaziotis Target Screen
144061 11/01/07 09:24 moffit Status: Hall being swept for controlled access.
144060 11/01/07 09:00 Margaziotis Target reboot IOC
144059 11/01/07 08:51 gaskell target reboot and beam off
144057 11/01/07 08:19 gaskell ended run 66082 fro ROC 11 problems
144055 11/01/07 08:03 cdaq Beam Time Accounting
144054 11/01/07 07:55 W. Luo Shift summary
144052 11/01/07 07:30 W. Luo Beam current
144050 11/01/07 07:28 E. Frlez Target checklist screen
144049 11/01/07 07:14 W. Luo BPM
144048 11/01/07 07:13 W. Luo BCM picture
144044 11/01/07 06:06 brash Clean up main replay directory
144043 11/01/07 06:01 L.Pentchev calibration with 1" absorber: first iteration
144040 11/01/07 04:58 W. Luo Load new HV for BigCal
144035 11/01/07 01:49 mahbub BigCal scintillator HVs OFF
144034 11/01/07 01:43 M.M FFP Both doors closed
144032 11/01/07 01:42 M.M FPP plateau curve with equal voltage on field and cathode wires, thd=-3.0V
144019 11/01/07 00:16 E. Frlez Target Logger
144016 11/01/07 00:03 cdaq Beam Time Accounting
144015 11/01/07 00:00 S. Sirca Swing shift SUMMARY