Jefferson Lab Hall C Logbook for February 08 - Full Listing
Main INDEX
Friday
151026 02/29/08 17:16 M JOnes Moved S0 adc cables
151025 02/29/08 17:02 cdaq Run 68852: Cosmic run
151024 02/29/08 17:02 cdaq End of Run 68851:
151023 02/29/08 15:49 cdaq Run 68851: Cosmic run
151022 02/29/08 15:48 cdaq End of Run 68850:
151021 02/29/08 13:46 cdaq Run 68850: Cosmic run
151020 02/29/08 13:44 M Jones Turned on HV to FPP Chamber B for cosmic test
Thursday
151019 02/28/08 17:07 hcf DC gas was pure argon -- restored to 50/50 mixture
151018 02/28/08 16:20 cdaq Run 68849: Cosmic run
151017 02/28/08 15:48 cdaq Run 68848: Cosmic run
151016 02/28/08 15:45 cdaq End of Run 68847:
151015 02/28/08 11:58 cdaq Run 68847: Cosmic run
151014 02/28/08 11:58 cdaq End of Run 68846:
151013 02/28/08 10:05 cdaq Run 68846: Cosmic run
Wednesday
151012 02/27/08 12:07 cdaq Run 68845: Cosmic run
151011 02/27/08 12:01 cdaq Run 68844: Cosmic run
151010 02/27/08 11:32 cdaq Run 68843: Cosmic run
151009 02/27/08 11:01 cdaq Run 68842: Cosmic run
151008 02/27/08 10:58 cdaq Run 68841: Cosmic run
Tuesday
151007 02/26/08 17:51 cdaq Run 68840: Cosmic run
151006 02/26/08 17:33 cdaq Run 68839: Cosmic run
151005 02/26/08 17:28 cdaq Run 68838: Cosmic run
151004 02/26/08 17:24 cdaq Run 68837: Cosmic run
151003 02/26/08 14:52 beaufait moeller
151002 02/26/08 12:06 cdaq Run 68836: test
151001 02/26/08 11:58 cdaq End of Run 68835:
151000 02/26/08 11:57 cdaq Run 68835: test
150999 02/26/08 11:54 cdaq End of Run 68834:
150998 02/26/08 11:53 cdaq Run 68834: test
150997 02/26/08 11:43 cdaq End of Run 68833:
150996 02/26/08 11:43 cdaq Run 68833: test
150995 02/26/08 11:40 cdaq End of Run 68832:
150994 02/26/08 11:40 cdaq Run 68832: test
150993 02/26/08 11:36 cdaq End of Run 68831:
150992 02/26/08 11:36 cdaq Run 68831: test
150991 02/26/08 11:32 cdaq End of Run 68830:
150990 02/26/08 11:32 cdaq Run 68830: test
150989 02/26/08 11:28 cdaq End of Run 68829:
150988 02/26/08 11:28 cdaq Run 68829: test
150987 02/26/08 11:23 cdaq End of Run 68828:
150986 02/26/08 11:23 cdaq Run 68828: test
150985 02/26/08 11:22 cdaq End of Run 68827:
150984 02/26/08 11:22 cdaq Run 68827: test
150983 02/26/08 11:19 cdaq End of Run 68826:
150982 02/26/08 11:19 cdaq Run 68826: test
150981 02/26/08 11:11 cdaq End of Run 68825:
150980 02/26/08 11:11 cdaq Run 68825: test
150979 02/26/08 11:04 cdaq End of Run 68824:
150978 02/26/08 11:04 cdaq Run 68824: test
150977 02/26/08 10:48 beaufait M test
Monday
150976 02/25/08 17:58 cdaq End of Run 68823:
150975 02/25/08 17:58 cdaq Run 68823: test
150974 02/25/08 17:56 cdaq End of Run 68822:
150973 02/25/08 17:56 cdaq Run 68822: test
150972 02/25/08 17:53 cdaq End of Run 68821:
150971 02/25/08 17:52 cdaq Run 68821: test
150970 02/25/08 17:50 cdaq End of Run 68820:
150969 02/25/08 17:50 cdaq Run 68820: test
150968 02/25/08 17:44 cdaq End of Run 68819:
150967 02/25/08 17:43 cdaq Run 68819: test
150966 02/25/08 17:42 cdaq End of Run 68818:
150965 02/25/08 17:42 cdaq Run 68818: test
150964 02/25/08 17:40 cdaq End of Run 68816:
150963 02/25/08 17:40 cdaq Run 68816: test
150962 02/25/08 17:37 cdaq End of Run 68815:
150961 02/25/08 17:37 cdaq Run 68815: test
150960 02/25/08 17:35 cdaq End of Run 68814:
150959 02/25/08 17:35 cdaq Run 68814: test
150958 02/25/08 17:31 cdaq End of Run 68813:
150957 02/25/08 17:30 cdaq Run 68813: test
150956 02/25/08 17:25 cdaq End of Run 68812:
150955 02/25/08 17:25 cdaq Run 68812: test
150954 02/25/08 17:24 cdaq End of Run 68811:
150953 02/25/08 17:23 cdaq Run 68811: test
150952 02/25/08 17:22 cdaq End of Run 68810:
150951 02/25/08 17:21 cdaq Run 68810: test
150950 02/25/08 17:20 cdaq End of Run 68809:
150949 02/25/08 17:20 cdaq Run 68809: test
150948 02/25/08 17:11 cdaq End of Run 68808:
150947 02/25/08 17:07 cdaq Run 68808: test
150946 02/25/08 16:48 cdaq End of Run 68807:
150945 02/25/08 16:45 cdaq Run 68807: test
150944 02/25/08 16:45 cdaq End of Run 68806:
150943 02/25/08 16:38 cdaq Run 68806: test
150942 02/25/08 14:50 cdaq End of Run 68805:
150941 02/25/08 14:50 cdaq Run 68805: test
Saturday
150940 02/23/08 17:25 M.M Gas alarm
Friday
150939 02/22/08 15:26 cdaq End of Run 68803:
150938 02/22/08 15:26 cdaq Run 68803: test
150937 02/22/08 15:07 cdaq End of Run 68802:
150936 02/22/08 15:06 cdaq Run 68802: test
150935 02/22/08 10:34 cdaq End of Run 68801:
150934 02/22/08 10:34 cdaq Run 68801: test
Thursday
150933 02/21/08 16:58 cdaq Run 68800: test
150932 02/21/08 16:33 cdaq Run 68799: test
150931 02/21/08 16:31 cdaq Run 68798: test
150930 02/21/08 16:29 cdaq End of Run 68797:
150929 02/21/08 16:28 cdaq Run 68797: test
150928 02/21/08 16:22 cdaq Run 68796: test
150927 02/21/08 16:18 cdaq Run 68795: test
150926 02/21/08 16:12 cdaq Run 68793: test
150925 02/21/08 16:08 cdaq Run 68792: test
150924 02/21/08 15:59 cdaq Run 68791: test
150923 02/21/08 14:28 cdaq Run 68790: test
150922 02/21/08 11:07 cdaq Run 68787: test
150921 02/21/08 11:00 cdaq Run 68786: test
150920 02/21/08 10:45 cdaq End of Run 68784:
150919 02/21/08 10:20 cdaq Run 68784: test
Wednesday
150918 02/20/08 17:11 beaufait SOS quad LCW hoses
150917 02/20/08 15:36
150916 02/20/08 13:07 cdaq Run 68781: test
150915 02/20/08 11:32 cdaq Run 68777: test
Tuesday
150914 02/19/08 15:57 cdaq Run 68776: test
150913 02/19/08 15:52 cdaq Run 68775: test
150912 02/19/08 15:42 cdaq Run 68774: test
150911 02/19/08 15:41 cdaq End of Run 68773:
150910 02/19/08 15:40 cdaq Run 68773: test
150909 02/19/08 15:40 cdaq End of Run 68772:
150908 02/19/08 15:31 cdaq Run 68772: test
150907 02/19/08 15:30 cdaq End of Run 68771:
150906 02/19/08 15:26 cdaq Run 68771: test
150905 02/19/08 15:21 cdaq End of Run 68770:
150904 02/19/08 15:20 cdaq Run 68770: test
150903 02/19/08 15:19 cdaq End of Run 68769:
150902 02/19/08 15:18 cdaq Run 68769: test
150901 02/19/08 15:17 cdaq End of Run 68768:
150900 02/19/08 15:10 cdaq Run 68768: test
150899 02/19/08 15:10 cdaq End of Run 68767:
150898 02/19/08 15:05 cdaq Run 68767: test
150897 02/19/08 15:04 cdaq End of Run 68766:
150896 02/19/08 14:57 cdaq Run 68766: test
150895 02/19/08 14:56 cdaq End of Run 68765:
150894 02/19/08 14:55 cdaq Run 68765: test
150893 02/19/08 14:53 cdaq End of Run 68764:
150892 02/19/08 14:53 cdaq Run 68764: test
150891 02/19/08 14:41 cdaq Run 68763: test
150890 02/19/08 12:33 cdaq Run 68762: test
150889 02/19/08 12:14 cdaq Run 68761: test
150888 02/19/08 12:10 cdaq Run 68760: test
150887 02/19/08 12:09 cdaq End of Run 68759:
150886 02/19/08 12:09 cdaq Run 68759: BigCal LED run
Monday
150885 02/18/08 18:37 puckett Gas alarm now cleared for ~10 minutes
150884 02/18/08 18:01 puckett GasMaster Alarm cleared for 1-2 minutes, then goes off again...
150883 02/18/08 17:59 hcf Gas
150882 02/18/08 17:48 puckett ethane valve on manifold was closed...
150881 02/18/08 17:33 puckett also, ethane bottle is valved all the way ON...
150880 02/18/08 17:24 puckett GasMaster Alarm -- ethane pressure zero even though bottle at full weight...
150879 02/18/08 15:48 frw helium empty
150878 02/18/08 15:47 frw gas alarm: ethane empty
Friday
150877 02/15/08 16:41 W. Luo Swap (22,03) (22,04) on BigCal plateform
150876 02/15/08 16:41 W. Luo Swap (22,03) (22,04) on BigCal plateform
Thursday
150875 02/14/08 17:52 W. Luo BigCal cable bad connection: (42,18), (42,20), (42,22)
150874 02/14/08 17:31 W. Luo Turn off BigCal HV, booster and generator off
150873 02/14/08 16:02 W . Luo Load BigCal HV hv_70019.new
150872 02/14/08 15:41 cdaq End of Run 68756:
150871 02/14/08 15:38 cdaq Run 68756: BigCal LED run with HV of calibration in DEC 2007
150870 02/14/08 15:31 W. Luo Run 68755, HV file hv_70003.new
150869 02/14/08 15:27 cdaq End of Run 68755:
150868 02/14/08 15:24 cdaq Run 68755: BigCal LED run with HV of 1st calibration in Oct 2007
150867 02/14/08 15:14 cdaq End of Run 68754:
150866 02/14/08 15:11 cdaq Run 68754: BigCal LED run
150865 02/14/08 15:03 cdaq End of Run 68753:
150864 02/14/08 15:00 cdaq Run 68753: BigCal LED run
150863 02/14/08 14:52 cdaq End of Run 68752:
150862 02/14/08 14:49 cdaq Run 68752: BigCal LED run
150861 02/14/08 14:41 cdaq End of Run 68751:
150860 02/14/08 14:37 cdaq Run 68751: BigCal LED run
150859 02/14/08 14:29 cdaq End of Run 68750:
150858 02/14/08 14:26 cdaq Run 68750: BigCal LED run
150857 02/14/08 14:17 cdaq End of Run 68749:
150856 02/14/08 14:16 cdaq Run 68749: BigCal LED run
150855 02/14/08 13:58 cdaq End of Run 68748:
150854 02/14/08 13:55 cdaq Run 68748: BigCal LED run
150853 02/14/08 12:28 W. Luo Decrease BigCal HV
150852 02/14/08 11:47 W. Luo Run 68747 with HV increased 30v
150851 02/14/08 11:44 cdaq End of Run 68747:
150850 02/14/08 11:39 cdaq Run 68747: BigCal LED run
150849 02/14/08 11:11 W. Luo updated BigCal threshold for led run
150848 02/14/08 10:57 cdaq End of Run 68746:
150847 02/14/08 10:54 cdaq Run 68746: BigCal LED run
150846 02/14/08 10:43 cdaq End of Run 68745:
150845 02/14/08 10:41 cdaq Run 68745: BigCal LED run
150844 02/14/08 10:35 cdaq End of Run 68744:
150843 02/14/08 10:32 cdaq Run 68744: BigCal LED run
150842 02/14/08 10:31 W. Luo Turn on BigCal HV, booster and generator
Wednesday
150827 02/13/08 18:38 W. Luo Turn off BigCal HV and booster, generator off
150826 02/13/08 18:13 cdaq End of Run 68743:
150825 02/13/08 18:11 cdaq Run 68743: BigCal LED run
150824 02/13/08 18:06 W. Luo Turn on BigCal HV and booster, restore HV settings at kine5 and do LED run
150823 02/13/08 17:44 puckett BigCal calibration constants updated for all kin. 5 data from 2007 and Analyzer updates
Tuesday
150822 02/12/08 17:44 frw HMS drift chamber gas flow reduced
Monday
150821 02/11/08 11:20 L.Pentchev BigCal HV off
150820 02/11/08 10:44 Fowler Dipole Off
150819 02/11/08 10:28 vulcan Power supply (Big Bite)
150818 02/11/08 09:58 cdaq Beam Time Accounting
150817 02/11/08 09:28 smithg Target: Finished warmup
150816 02/11/08 08:46 smithg Target: Beginning warmup
150815 02/11/08 06:30 W. Luo Leave BigCal HV on
150814 02/11/08 06:24 M.M HMS, FPP HV OFF, magnets currents set to 0amp
150813 02/11/08 06:18 M.M Owl Shift summary
150812 02/11/08 06:18 M.M Reboot HMS control system
150811 02/11/08 06:13 W. Luo Helium bottle is empty
150810 02/11/08 06:01 cdaq End of Run 68742:
150809 02/11/08 06:00 Lovelace Target: Owl Shift 6:00
150808 02/11/08 05:58 W. Luo BCM&BPM
150807 02/11/08 05:05 cdaq Run 68742: Optics calibration.
150806 02/11/08 05:04 horn HMS set for 1.9 GeV kinematics
150805 02/11/08 04:46 cdaq End of Run 68741:
150804 02/11/08 04:37 horn HMS magnet controls back
150803 02/11/08 04:33 cdaq Run 68741: Optics calibration.
150802 02/11/08 04:22 Lovelace Target: Owl Shift 4:00
150801 02/11/08 04:09 W. Luo Optics study: momentum, 2150mev/c; Theta_hms, 26; 15cm dummy
150800 02/11/08 04:00 M.M HMS control system crashed
150799 02/11/08 03:13 W. Luo HMS control GUI crashed
150798 02/11/08 03:05 Lovelace Target: Owl Shift 1:22
150797 02/11/08 02:17 cdaq End of Run 68740:
150796 02/11/08 01:56 cdaq Run 68740: Optics calibration.
150795 02/11/08 01:49 cdaq End of Run 68739:
150794 02/11/08 01:48 L.Pentchev don't see the downstream wall of the 20cm dummy
150793 02/11/08 01:33 cdaq Run 68739: Optics calibration.
150792 02/11/08 01:31 Lovelace Target: Owl Shift 1:22
150791 02/11/08 01:26 cdaq End of Run 68738:
150790 02/11/08 01:15 cdaq Run 68738: Optics calibration.
150789 02/11/08 01:11 cdaq End of Run 68737:
150788 02/11/08 00:55 cdaq Run 68737: Optics calibration.
150787 02/11/08 00:46 cdaq End of Run 68736:
150786 02/11/08 00:16 Lovelace Target: Owl Shift Dummy Target 20cm
150785 02/11/08 00:13 cdaq Run 68736: Optics calibration.
150784 02/11/08 00:07 jmaxwell Target: Moved to 20cm Dummy
150783 02/11/08 00:04 cdaq End of Run 68735:
150782 02/11/08 00:04 cdaq Beam Time Accounting
150781 02/11/08 00:01 ejensen Swing shift summary
Sunday
150780 02/10/08 23:44 cdaq Run 68735: Optics calibration.
150779 02/10/08 23:41 jmaxwell Target: screenshot
150778 02/10/08 23:40 ejensen helium pressure
150777 02/10/08 23:39 jmaxwell Target: Moved target to 3 foil Al
150776 02/10/08 23:37 cdaq End of Run 68734:
150775 02/10/08 23:26 ejensen bcm/bpm
150774 02/10/08 23:16 L.Pentchev changes for the optical studies
150773 02/10/08 23:12 cdaq Run 68734: Optics calibration.
150772 02/10/08 23:07 ejensen optics
150771 02/10/08 22:21 jmaxwell Target: Moved target to 2 foil Al
150770 02/10/08 21:40 cdaq End of Run 68733:
150769 02/10/08 21:36 cdaq Run 68733: EP6 calibration, WACS.
150768 02/10/08 21:34 cdaq End of Run 68732:
150767 02/10/08 21:20 cdaq Run 68732: EP1 calibration, WACS.
150766 02/10/08 21:17 cdaq End of Run 68731:
150765 02/10/08 21:05 cdaq Run 68731: EP2 calibration, WACS.
150764 02/10/08 21:02 cdaq End of Run 68730:
150763 02/10/08 20:49 cdaq Run 68730: EP3 calibration, WACS.
150762 02/10/08 20:46 cdaq End of Run 68729:
150761 02/10/08 20:27 cdaq Run 68729: EP4 calibration, WACS.
150760 02/10/08 20:24 cdaq End of Run 68728:
150759 02/10/08 20:10 ejensen EP Scan
150758 02/10/08 20:10 jmaxwell Target: Target moved to 20cm LH2
150757 02/10/08 20:07 cdaq Run 68728: EP5 calibration, WACS.
150756 02/10/08 19:26 cdaq End of Run 68727:
150755 02/10/08 19:20 cdaq Run 68727: EPG2 calibration, WACS.
150754 02/10/08 19:15 cdaq End of Run 68726:
150753 02/10/08 18:50 cdaq Run 68726: EPG3 calibration, WACS.
150752 02/10/08 18:49 cdaq End of Run 68725:
150751 02/10/08 18:31 ejensen target change
150750 02/10/08 18:26 cdaq Run 68725: EPG3 calibration, WACS.
150749 02/10/08 18:13 jmaxwell Target: Target Moved to 15 cm LH2+Radiator
150748 02/10/08 18:09 cdaq End of Run 68724:
150747 02/10/08 17:59 cdaq Run 68724: EPG2, WACS.
150746 02/10/08 17:35 cdaq End of Run 68723:
150745 02/10/08 17:24 ejensen mcc problem
150744 02/10/08 17:22 cdaq Run 68723: EPG2, WACS.
150743 02/10/08 17:08 cdaq End of Run 68722:
150742 02/10/08 16:56 ejensen taking data again
150741 02/10/08 16:45 cdaq Run 68722: Production LH2, WACS.
150740 02/10/08 16:35 gaskell Moller cooldown aborted
150739 02/10/08 16:31 horn/fowler HMS dipole and Q2 tripped
150738 02/10/08 16:17 jmaxwell Target: snapshot
150737 02/10/08 16:09 cdaq Beam Time Accounting
150736 02/10/08 16:05 X. Zheng day shift summary
150735 02/10/08 16:03 cdaq End of Run 68721:
150734 02/10/08 16:02 X. Zheng target for this run
150733 02/10/08 16:00 cdaq Run 68721: WACS, EPG2, BigBite 150A.
150732 02/10/08 16:00 horn HMS dipole back
150731 02/10/08 15:56 cdaq End of Run 68720:
150730 02/10/08 15:34 cdaq Run 68720: WACS, EPG2, BigBite 150A.
150729 02/10/08 15:32 cdaq End of Run 68719:
150728 02/10/08 15:31 cdaq Run 68719: EPG1 endpoint {500A;}
150727 02/10/08 15:30 dhamilton BigCal thresholds reduced for low current epgamma run
150726 02/10/08 15:30 bogdanw BigBite current set to 150A
150725 02/10/08 15:05 X. Zheng HMS communication problem (again), and going to controlled access now
150724 02/10/08 14:46 X. Zheng HMS dipole tripped
150723 02/10/08 14:44 cdaq End of Run 68718:
150722 02/10/08 14:23 Yi Zhang loop1 JT valve
150721 02/10/08 14:19 cdaq Run 68718: EPG1 endpoint 500A;
150720 02/10/08 13:08 gaskell Starting Moller cooldown
150719 02/10/08 10:52 smithg Target: started to open JT
150718 02/10/08 09:44 smithg Target: alarm handler was not running
150717 02/10/08 09:33 smithg Target: hats off to cryo
150716 02/10/08 08:58 smithg Target: bullshit
150715 02/10/08 08:07 Danagoulian Shift summary
150714 02/10/08 08:04 cdaq Beam Time Accounting
150713 02/10/08 07:31 Danagoulian Hall C status
150712 02/10/08 05:21 Danagoulian ESR is up and running
150711 02/10/08 03:51 Danagoulian ESR crash
150710 02/10/08 03:50 W. Luo BCM&BPM
150709 02/10/08 03:14 Lovelace Target: 2:27 Owl
150708 02/10/08 02:58 gaskell ESR crashed
150707 02/10/08 02:04 cdaq End of Run 68717:
150706 02/10/08 01:50 W. Luo Stop run 68716, power cycled Roc13, 14&hallc switch
150705 02/10/08 01:47 cdaq Run 68717: Production LH2, WACS.
150704 02/10/08 01:42 cdaq End of Run 68716:
150703 02/10/08 01:35 cdaq Run 68716: Production LH2, WACS.
150702 02/10/08 01:34 cdaq End of Run 68715:
150701 02/10/08 01:18 Lovelace Target: 1:17 Owl
150700 02/10/08 01:07 cdaq Run 68715: Production LH2, WACS.
150699 02/10/08 01:06 cdaq End of Run 68714:
150698 02/10/08 00:49 Lovelace Target: Start Owl
150697 02/10/08 00:38 cdaq Run 68714: Production LH2, WACS.
150696 02/10/08 00:37 cdaq End of Run 68713:
150695 02/10/08 00:10 Lovelace Target: Start Owl
150694 02/10/08 00:08 cdaq Run 68713: Production LH2, WACS.
150693 02/10/08 00:07 cdaq End of Run 68712:
150692 02/10/08 00:02 cdaq Beam Time Accounting
150691 02/10/08 00:01 hamlet Swing Shift Summary, 09 Febr 08
Saturday
150690 02/09/08 23:41 cdaq Run 68712: Production LH2, WACS.
150689 02/09/08 23:40 cdaq End of Run 68711:
150688 02/09/08 23:12 cdaq Run 68711: Production LH2, WACS.
150687 02/09/08 23:11 cdaq End of Run 68710:
150686 02/09/08 22:43 cdaq Run 68710: Production LH2, WACS.
150685 02/09/08 22:42 cdaq End of Run 68709:
150684 02/09/08 22:17 cdaq Run 68709: Production LH2, WACS.
150683 02/09/08 22:14 cdaq End of Run 68708:
150682 02/09/08 21:46 cdaq Run 68708: Production LH2, WACS.
150681 02/09/08 21:45 cdaq End of Run 68707:
150680 02/09/08 21:18 cdaq Run 68707: Production LH2, WACS.
150679 02/09/08 21:17 cdaq End of Run 68706:
150678 02/09/08 20:51 cdaq Run 68706: Production LH2, WACS.
150677 02/09/08 20:50 cdaq End of Run 68705:
150676 02/09/08 20:23 cdaq Run 68705: Production LH2, WACS.
150675 02/09/08 20:22 cdaq End of Run 68704:
150674 02/09/08 19:56 cdaq Run 68704: Production LH2, WACS.
150673 02/09/08 19:55 cdaq End of Run 68703:
150672 02/09/08 19:29 cdaq Run 68703: Production LH2, WACS.
150671 02/09/08 19:27 cdaq End of Run 68702:
150670 02/09/08 19:19 Jonathan Mil Target Screens
150669 02/09/08 19:00 cdaq Run 68702: Production LH2, WACS.
150668 02/09/08 18:59 cdaq End of Run 68701:
150667 02/09/08 18:32 cdaq Run 68701: Production LH2, WACS.
150666 02/09/08 18:31 cdaq End of Run 68700:
150665 02/09/08 18:05 cdaq Run 68700: Production LH2, WACS.
150664 02/09/08 18:04 cdaq End of Run 68699:
150663 02/09/08 18:03 dhamilton ROC2 reboot was not needed - mistake in online analysis
150662 02/09/08 17:38 cdaq Run Query:MSQL server has gone away: Production LH2, WACS.
150661 02/09/08 17:35 cdaq End of Run 68698:
150660 02/09/08 17:17 hamlet Have DAQ problem after run 68696
150659 02/09/08 17:10 cdaq Run 68698: Production LH2, WACS.
150658 02/09/08 17:03 cdaq End of Run 68696:
150657 02/09/08 16:47 hamlet Runs with number 68694 and 68695 are junk
150656 02/09/08 16:36 cdaq Run 68696: Production LH2, WACS.
150655 02/09/08 16:30 cdaq End of Run 68693:
150654 02/09/08 16:02 cdaq Run 68693: Production LH2, WACS.
150653 02/09/08 16:01 cdaq End of Run 68692:
150652 02/09/08 16:01 cdaq Beam Time Accounting
150651 02/09/08 15:59 X. Zheng day shift summary
150650 02/09/08 15:35 cdaq Run 68692: Production LH2, WACS.
150649 02/09/08 15:34 cdaq End of Run 68691:
150648 02/09/08 15:08 cdaq Run 68691: Production LH2, WACS.
150647 02/09/08 14:54 kelleher target screens for Feb 9, Day
150646 02/09/08 14:44 cdaq End of Run 68690:
150645 02/09/08 14:43 cdaq Run 68690: Production LH2, WACS.
150644 02/09/08 14:43 X. Zheng ROC13&14 power cycled
150643 02/09/08 14:41 ejensen fpp hot wire
150642 02/09/08 14:36 cdaq End of Run 68689:
150641 02/09/08 14:25 cdaq Run 68689: Production LH2, WACS.
150640 02/09/08 14:25 cdaq End of Run 68688:
150639 02/09/08 13:59 cdaq Run 68688: Production LH2, WACS.
150638 02/09/08 13:58 X. Zheng BPM & BCM capture
150637 02/09/08 12:42 puckett ROC2 is HMS drift chambers, ROC1 is scintillators and beamline stuff
150636 02/09/08 12:17 W. Luo Power cycled HV crate 34
150635 02/09/08 12:06 X. Zheng beam update
150634 02/09/08 11:19 X. Zheng beam delivery problem
150633 02/09/08 10:42 cdaq End of Run 68687:
150632 02/09/08 10:33 M JOnes I do not see the reason for reboot of roc2
150631 02/09/08 10:18 cdaq Run 68687: Production LH2, WACS.
150630 02/09/08 10:16 cdaq End of Run 68686:
150629 02/09/08 09:52 X. Zheng Run 68684-68686 have BigCal threshold -600mV
150628 02/09/08 09:48 cdaq Run 68686: Production LH2, WACS.
150627 02/09/08 09:48 cdaq End of Run 68685:
150626 02/09/08 09:21 cdaq Run 68685: Production LH2, WACS.
150625 02/09/08 09:20 cdaq End of Run 68684:
150624 02/09/08 08:53 cdaq Run 68684: Production LH2, WACS.
150623 02/09/08 08:51 cdaq End of Run 68683:
150622 02/09/08 08:31 dhamilton BigCal threshold change
150621 02/09/08 08:25 cdaq Run 68683: Production LH2, WACS.
150620 02/09/08 08:05 cdaq Beam Time Accounting
150619 02/09/08 08:05 Danagoulian Bigcal channel hv_34_15 dead
150618 02/09/08 08:04 Danagoulian Shift Summary
150617 02/09/08 07:58 cdaq Run 68682: Production LH2, WACS.
150616 02/09/08 07:55 cdaq End of Run 68681:
150615 02/09/08 07:23 cdaq Run 68681: Production LH2, WACS.
150614 02/09/08 07:21 cdaq End of Run 68680:
150613 02/09/08 06:48 cdaq Run 68680: Production LH2, WACS.
150612 02/09/08 06:47 cdaq End of Run 68679:
150611 02/09/08 06:14 cdaq Run 68679: Production LH2, WACS.
150610 02/09/08 06:05 cdaq End of Run 68676:
150609 02/09/08 05:33 cdaq Run 68676: Production LH2, WACS.
150608 02/09/08 05:32 cdaq End of Run 68675:
150607 02/09/08 04:59 cdaq Run 68675: Production LH2, WACS.
150606 02/09/08 04:58 cdaq End of Run 68674:
150605 02/09/08 04:39 dhamilton ROC2 reboot
150604 02/09/08 04:25 cdaq Run 68674: Production LH2, WACS.
150603 02/09/08 04:20 Phil Carter Target: screen shot
150602 02/09/08 04:19 cdaq End of Run 68673:
150601 02/09/08 04:08 cdaq Run 68673: Production LH2, WACS.
150600 02/09/08 04:06 cdaq End of Run 68672:
150599 02/09/08 03:52 cdaq Run 68672: Production LH2, WACS.
150598 02/09/08 03:51 cdaq End of Run 68671:
150597 02/09/08 03:18 cdaq Run 68671: Production LH2, WACS.
150596 02/09/08 03:17 cdaq End of Run 68670:
150595 02/09/08 02:43 cdaq Run 68670: Production LH2, WACS.
150594 02/09/08 02:42 cdaq End of Run 68669:
150593 02/09/08 02:09 cdaq Run 68669: Production LH2, WACS.
150592 02/09/08 02:08 cdaq End of Run 68668:
150591 02/09/08 01:36 cdaq Run 68668: Production LH2, WACS.
150590 02/09/08 01:35 cdaq End of Run 68667:
150589 02/09/08 01:17 Danagoulian BCM-BPM
150588 02/09/08 01:06 cdaq Run 68667: Production LH2, WACS.
150587 02/09/08 01:01 cdaq End of Run 68666:
150586 02/09/08 00:39 Phil Carter Target: lost communication, no reboot
150585 02/09/08 00:30 cdaq Run 68666: Production LH2, WACS.
150584 02/09/08 00:25 cdaq End of Run 68665:
150583 02/09/08 00:09 cdaq Run 68665: Production LH2, WACS.
150582 02/09/08 00:02 cdaq Beam Time Accounting
150581 02/09/08 00:01 hamlet Swing Shift Summary, 08 Febr 08
Friday
150580 02/08/08 23:55 cdaq End of Run 68664:
150579 02/08/08 23:41 cdaq Run 68664: Production LH2, WACS.
150578 02/08/08 23:40 cdaq End of Run 68663:
150577 02/08/08 23:03 cdaq Run 68663: Production LH2, WACS.
150576 02/08/08 23:02 cdaq End of Run 68662:
150575 02/08/08 22:29 cdaq Run 68662: Production LH2, WACS.
150574 02/08/08 22:28 cdaq End of Run 68661:
150573 02/08/08 21:56 cdaq Run 68661: Production LH2, WACS.
150572 02/08/08 21:55 cdaq End of Run 68660:
150571 02/08/08 21:43 puckett Got the betabrite working again.
150570 02/08/08 21:24 cdaq Run 68660: Production LH2, WACS.
150569 02/08/08 21:23 cdaq End of Run 68659:
150568 02/08/08 20:51 cdaq Run 68659: Production LH2, WACS.
150567 02/08/08 20:50 cdaq End of Run 68658:
150566 02/08/08 20:39 puckett BetaBrite display stuck
150565 02/08/08 20:16 cdaq Run 68658: Production LH2, WACS.
150564 02/08/08 20:15 cdaq End of Run 68657:
150563 02/08/08 19:44 puckett HMS and FPP HV trip
150562 02/08/08 19:43 cdaq Run 68657: Production LH2, WACS.
150561 02/08/08 19:38 cdaq End of Run 68656:
150560 02/08/08 19:11 cdaq Run 68656: Production LH2, WACS.
150559 02/08/08 19:10 cdaq End of Run 68655:
150558 02/08/08 18:55 shahinya Target status
150557 02/08/08 18:38 cdaq Run 68655: Production LH2, WACS.
150556 02/08/08 18:37 cdaq End of Run 68654:
150555 02/08/08 18:05 cdaq Run 68654: Production LH2, WACS.
150554 02/08/08 17:27 M.M Kinematic 5, Calibration: HMS Trigger Time Offsets, HMS hstart default value, HMS time offset, HMS driftmaps
150553 02/08/08 17:01 hamlet Beam OFF, magnet problem in ARC
150552 02/08/08 16:56 cdaq End of Run 68653:
150551 02/08/08 16:27 cdaq Run 68653: Production LH2, WACS.
150550 02/08/08 16:26 cdaq End of Run 68652:
150549 02/08/08 16:15 shahinya Target status
150548 02/08/08 16:02 cdaq Beam Time Accounting
150547 02/08/08 15:56 vahe Target: End of shift: Target screenshot
150546 02/08/08 15:55 cdaq Run 68652: Production LH2, WACS.
150545 02/08/08 15:54 cdaq End of Run 68651:
150544 02/08/08 15:40 ccbutu Shift Summary
150543 02/08/08 15:24 cdaq Run 68651: Production LH2, WACS.
150542 02/08/08 15:23 cdaq End of Run 68650:
150541 02/08/08 14:57 cdaq Run 68650: Production LH2, WACS.
150540 02/08/08 14:51 cdaq End of Run 68649:
150539 02/08/08 14:36 Analysis: Replay Run 68647
150538 02/08/08 14:33 Hovhannes Replay 68647
150537 02/08/08 14:22 cdaq Run 68649: Production LH2, WACS.
150536 02/08/08 14:20 cdaq End of Run 68648:
150535 02/08/08 14:15 ccbutu BigCal & FPP rates
150534 02/08/08 14:13 ccbutu Hall C IOCs
150533 02/08/08 14:09 ccbutu HAll C Beam Position & IOCs
150532 02/08/08 13:50 cdaq Run 68648: Production LH2, WACS.
150531 02/08/08 13:49 cdaq End of Run 68647:
150530 02/08/08 13:19 cdaq Run 68647: Production LH2, WACS.
150529 02/08/08 13:18 cdaq End of Run 68646:
150528 02/08/08 12:50 ccbutu Back to production mode!
150527 02/08/08 12:47 cdaq Run 68646: Production LH2, WACS.
150526 02/08/08 12:44 gaskell Moller backout
150525 02/08/08 12:40 horn/gaskell Moller summary
150524 02/08/08 12:30 cdaq End of Run 68645:
150523 02/08/08 12:26 cdaq Moller Run 68645: IHWP=IN
150522 02/08/08 12:26 cdaq End of Run 68644:
150521 02/08/08 12:21 cdaq Moller Run 68644: IHWP=IN
150520 02/08/08 12:21 cdaq End of Run 68643:
150519 02/08/08 12:17 cdaq Moller Run 68643: IHWP=IN
150518 02/08/08 11:02 cdaq End of Run 68642:
150517 02/08/08 11:01 cdaq Moller Run 68642: IHWP=IN, tune run
150516 02/08/08 10:55 cdaq End of Run 68641:
150515 02/08/08 10:52 cdaq Moller Run 68641: IHWP=IN
150514 02/08/08 10:02 cdaq End of Run 68640:
150513 02/08/08 10:02 cdaq Moller Run 68640: daq test
150512 02/08/08 09:49 cdaq End of Run 68639:
150511 02/08/08 09:31 cdaq Run 68639: Production LH2, WACS.
150510 02/08/08 09:30 cdaq End of Run 68638:
150509 02/08/08 08:59 cdaq Run 68638: Production LH2, WACS.
150508 02/08/08 08:50 cdaq End of Run 68637:
150507 02/08/08 08:43 cdaq Run 68637: Production LH2, WACS.
150506 02/08/08 08:42 cdaq End of Run 68636:
150505 02/08/08 08:11 cdaq Run 68636: Production LH2, WACS.
150504 02/08/08 08:09 cdaq End of Run 68635:
150503 02/08/08 08:08 vahe Target: Start of shift: Target screenshot
150502 02/08/08 08:01 cdaq Beam Time Accounting
150501 02/08/08 07:57 Jonathan Mil Shift Summary
150500 02/08/08 07:55 Lovelace Target: Shift Owl 7:53 2/8/08
150499 02/08/08 07:39 cdaq Run 68635: Production LH2, WACS.
150498 02/08/08 07:38 cdaq End of Run 68634:
150497 02/08/08 07:36 Lovelace Target: Shift Owl 7:40 2/8/08
150496 02/08/08 07:31 Jonathan Mil Scalar Display & total Triggers/ABU
150495 02/08/08 07:28 Jonathan Mil Beam SS
150494 02/08/08 07:07 cdaq Run 68634: Production LH2, WACS.
150493 02/08/08 07:06 cdaq End of Run 68633:
150492 02/08/08 06:42 Lovelace Target: Shift Owl 6:40 2/8/08
150491 02/08/08 06:34 cdaq Run 68633: Production LH2, WACS.
150490 02/08/08 06:33 cdaq End of Run 68632:
150489 02/08/08 06:10 cdaq Run 68632: Production LH2, WACS.
150488 02/08/08 05:53 Lovelace Target: Shift Owl 5:40 2/8/08
150487 02/08/08 05:51 Lovelace Target: Shift Owl 5:40 2/8/08
150486 02/08/08 05:42 cdaq End of Run 68631:
150485 02/08/08 05:28 Lovelace Target: Shift Owl 4:50 2/8/08
150484 02/08/08 05:20 cdaq Run 68631: Production LH2, WACS.
150483 02/08/08 05:18 cdaq End of Run 68630:
150482 02/08/08 04:50 w. Luo bcm&bpm
150481 02/08/08 04:48 cdaq Run 68630: Production LH2, WACS.
150480 02/08/08 04:46 cdaq End of Run 68629:
150479 02/08/08 04:16 cdaq Run 68629: Production LH2, WACS.
150478 02/08/08 04:15 cdaq End of Run 68628:
150477 02/08/08 04:11 Lovelace Target: Shift Owl 4:00 2/8/08
150476 02/08/08 04:11 W. Luo Change BigCal online histogram
150475 02/08/08 04:08 Jonathan Mil 700mV threshold and HV change (from W. Luo Calibration)
150474 02/08/08 04:00 dhamilton New BigCal HV and discriminator threshold
150473 02/08/08 03:58 W. Luo End run 68626, increased BigCal Threshold to -700mv
150472 02/08/08 03:56 W. Luo Load new HV before run 68626
150471 02/08/08 03:47 W. Luo Roc 14 crashed, end run 68627
150470 02/08/08 03:46 cdaq Run 68628: Production LH2, WACS.
150469 02/08/08 03:41 cdaq End of Run 68627:
150468 02/08/08 03:34 cdaq Beam Time Accounting
150467 02/08/08 03:28 cdaq Run 68627: Production LH2, WACS.
150466 02/08/08 03:27 cdaq End of Run 68626:
150465 02/08/08 03:26 cdaq Run 68626: Production LH2, WACS.
150464 02/08/08 03:15 cdaq End of Run 68625:
150463 02/08/08 03:12 dhamilton Plan to change BigCal HV to compensate for drop in gain
150462 02/08/08 02:57 W. Luo Reboot BCM LED display
150461 02/08/08 02:52 dhamilton BigCal gains continue to drop
150460 02/08/08 02:42 cdaq Run 68625: Production LH2, WACS.
150459 02/08/08 02:41 cdaq End of Run 68624:
150458 02/08/08 02:08 cdaq Run 68624: Production LH2, WACS.
150457 02/08/08 02:08 cdaq End of Run 68623:
150456 02/08/08 01:46 dhamilton BigCal discrimator thresholds decreased to 1.3 GeV (650 mV)
150455 02/08/08 01:35 cdaq Run 68623: Production LH2, WACS.
150454 02/08/08 01:28 cdaq End of Run 68622:
150453 02/08/08 01:05 cdaq Run 68622: Production LH2, WACS.
150452 02/08/08 01:02 cdaq End of Run 68621:
150451 02/08/08 00:23 Lovelace Target: Start Shift Owl 2/8/08
150450 02/08/08 00:21 cdaq Run 68621: Production LH2, WACS.
150449 02/08/08 00:17 Jonathan Mil cdaql6
150448 02/08/08 00:08 vahe Target: End of shift: Target screenshot
150447 02/08/08 00:05 cdaq End of Run 68620:
Thursday
150446 02/07/08 23:54 hamlet Swing Shift Summary, 07 Febr 08
150445 02/07/08 23:53 cdaq Run 68620: Production LH2, WACS.
150444 02/07/08 23:52 dhamilton Drop in BigCal rate is due to drop in gain
150443 02/07/08 23:21 cdaq Run 68619: Production LH2, WACS.
150442 02/07/08 23:20 cdaq End of Run 68618:
150441 02/07/08 22:38 cdaq Run 68618: Production LH2, WACS.
150440 02/07/08 22:37 cdaq End of Run 68617:
150439 02/07/08 21:56 cdaq Run 68617: Production LH2, WACS.
150438 02/07/08 21:56 cdaq End of Run 68616:
150437 02/07/08 21:35 hamlet BigCal rate again slowly dropped down
150436 02/07/08 21:15 cdaq Run 68616: Production LH2, WACS.
150435 02/07/08 21:07 cdaq End of Run 68615:
150434 02/07/08 20:58 cdaq Run 68615: Production LH2, WACS.
150433 02/07/08 20:57 cdaq End of Run 68614:
150432 02/07/08 20:16 cdaq Run 68614: Production LH2, WACS.
150431 02/07/08 20:16 cdaq End of Run 68613:
150430 02/07/08 19:34 cdaq Run 68613: Production LH2, WACS.
150429 02/07/08 19:33 cdaq End of Run 68612:
150428 02/07/08 18:52 cdaq Run 68612: Production LH2, WACS.
150427 02/07/08 18:50 cdaq End of Run 68611:
150426 02/07/08 18:10 cdaq Run 68611: Production LH2, WACS.
150425 02/07/08 18:09 cdaq End of Run 68610:
150424 02/07/08 17:29 cdaq Run 68610: Production LH2, WACS.
150423 02/07/08 17:28 cdaq End of Run 68609:
150422 02/07/08 16:49 cdaq Run 68609: Production LH2, WACS.
150421 02/07/08 16:46 cdaq End of Run 68608:
150420 02/07/08 16:25 vahe Target: Start of shift: Target screenshot
150419 02/07/08 16:17 cdaq Run 68608: Production LH2, WACS.
150418 02/07/08 16:17 cdaq End of Run 68607:
150417 02/07/08 16:05 L.Pentchev old summary, just disregard it
150416 02/07/08 15:58 cdaq Beam Time Accounting
150415 02/07/08 15:57 hcf helium flow
150414 02/07/08 15:55 Keppel day shift summary
150413 02/07/08 15:40 Bosted Target: Target: had to reboot IOC
150412 02/07/08 15:37 cdaq Run 68607: Production LH2, WACS.
150411 02/07/08 15:30 cdaq End of Run 68606:
150410 02/07/08 15:29 R. Lindgren Shift Summary
150409 02/07/08 15:29 M.M Helium flow
150408 02/07/08 15:20 M.M bpm / bcm
150407 02/07/08 15:06 L.Pentchev CAMAC power supply replaced
150406 02/07/08 14:59 cdaq Run 68606: Production LH2, WACS.
150405 02/07/08 14:58 cdaq End of Run 68605:
150404 02/07/08 14:40 cdaq Run 68605: Production LH2, WACS.
150403 02/07/08 14:38 cdaq End of Run 68604:
150402 02/07/08 12:50 L.Pentchev Set ps2=999999
150401 02/07/08 12:20 L.Pentchev BigCal discriminator replaced
150400 02/07/08 11:32 M JOnes Fixed problem with S0 tdc signals in data
150399 02/07/08 11:29 M Jones Modified threshold to "S0x2p" from 25 to 50mV
150398 02/07/08 09:16 cdaq Run 68604: cosmics with ps2=1 to test s0 TDC
150397 02/07/08 08:56 L.Pentchev status
150396 02/07/08 08:23 cdaq End of Run 68603:
150395 02/07/08 08:07 jensen owl shift summary
150394 02/07/08 08:03 cdaq Beam Time Accounting
150393 02/07/08 07:55 cdaq Run 68603: Production LH2, WACS.
150392 02/07/08 07:48 cdaq End of Run 68602:
150391 02/07/08 07:47 jensen cold counters
150390 02/07/08 07:13 cdaq Run 68602: Production LH2, WACS.
150389 02/07/08 07:12 cdaq End of Run 68601:
150388 02/07/08 06:48 jensen bpm/bcm screens
150387 02/07/08 06:34 cdaq Run 68601: Production LH2, WACS.
150386 02/07/08 06:32 cdaq End of Run 68600:
150385 02/07/08 06:10 Phil Carter Target: transient alarm
150384 02/07/08 05:58 cdaq Run 68600: Production LH2, WACS.
150383 02/07/08 05:56 cdaq End of Run 68599:
150382 02/07/08 05:24 cdaq Run 68599: Production LH2, WACS.
150381 02/07/08 05:22 cdaq End of Run 68598:
150380 02/07/08 04:47 cdaq Run 68598: Production LH2, WACS.
150379 02/07/08 04:47 Phil Carter Target: IOC reboot; raster mask woes
150378 02/07/08 04:05 dhamilton RCS Event Rate
150377 02/07/08 04:01 cdaq End of Run 68597:
150376 02/07/08 03:27 cdaq Run 68597: Production LH2, WACS.
150375 02/07/08 03:25 cdaq End of Run 68596:
150374 02/07/08 02:53 dhamilton Increase to 40 microamps - BigCal pedestals
150373 02/07/08 02:52 cdaq Run 68596: Production LH2, WACS.
150372 02/07/08 02:50 cdaq End of Run 68595:
150371 02/07/08 02:31 dhamilton BigCal HV change
150370 02/07/08 02:17 cdaq Run 68595: Production LH2, WACS.
150369 02/07/08 02:17 W. Luo Decrease HV on (42,22) for 200v
150368 02/07/08 02:16 W. Luo restore the HV for (42,22)
150367 02/07/08 02:16 cdaq End of Run 68594:
150366 02/07/08 02:07 W. Luo Decrease HV on (42,22) for 200v
150365 02/07/08 02:06 cdaq Run 68594: Production LH2, WACS.
150364 02/07/08 02:05 cdaq End of Run 68593:
150363 02/07/08 02:02 W. Luo The GEP3 Wiki link on Hall C web site broken
150362 02/07/08 01:55 cdaq Run 68593: Production LH2, WACS.
150361 02/07/08 01:54 cdaq End of Run 68592:
150360 02/07/08 01:44 W. Luo "turn off" 6 columns of BigCal
150359 02/07/08 01:33 cdaq Run 68592: Production LH2, WACS.
150358 02/07/08 01:22 cdaq End of Run 68591:
150357 02/07/08 01:07 jensen increased beam current
150356 02/07/08 00:46 cdaq Run 68591: Production LH2, WACS.
150355 02/07/08 00:23 Phil Carter Target: screenshot
150354 02/07/08 00:17 cdaq End of Run 68590:
150353 02/07/08 00:05 cdaq Beam Time Accounting
150352 02/07/08 00:04 hamlet Swing Shift Summary, 06 Febr 08
Wednesday
150351 02/06/08 23:51 hamlet BigCal rate slowly dropped down
150350 02/06/08 23:39 cdaq Run 68590: Production LH2, WACS.
150349 02/06/08 23:34 cdaq End of Run 68589:
150348 02/06/08 23:17 cdaq Run 68589: Production LH2, WACS.
150347 02/06/08 23:08 cdaq End of Run 68588:
150346 02/06/08 22:31 cdaq Run 68588: Production LH2, WACS.
150345 02/06/08 22:30 cdaq End of Run 68587:
150344 02/06/08 21:53 cdaq Run 68587: Production LH2, WACS.
150343 02/06/08 21:52 cdaq End of Run 68586:
150342 02/06/08 21:15 cdaq Run 68586: Production LH2, WACS.
150341 02/06/08 21:14 cdaq End of Run 68585:
150340 02/06/08 20:38 cdaq Run 68585: Production LH2, WACS.
150339 02/06/08 20:37 cdaq End of Run 68584:
150338 02/06/08 19:58 cdaq End of Run 68583:
150337 02/06/08 19:22 cdaq Run 68583: Production LH2, WACS.
150336 02/06/08 19:21 cdaq End of Run 68582:
150335 02/06/08 18:45 cdaq Run 68582: Production LH2, WACS.
150334 02/06/08 18:44 cdaq End of Run 68581:
150333 02/06/08 18:43 M.M bpm / bcm
150332 02/06/08 18:10 vahe Target: Target IOC reboot
150331 02/06/08 18:10 cdaq Run 68581: Production LH2, WACS.
150330 02/06/08 17:59 cdaq End of Run 68580:
150329 02/06/08 17:39 cdaq Run 68580:
150328 02/06/08 17:37 cdaq End of Run 68579:
150327 02/06/08 17:02 cdaq Run 68579:
150326 02/06/08 17:00 cdaq End of Run 68578:
150325 02/06/08 16:26 cdaq Run 68578:
150324 02/06/08 16:23 cdaq End of Run 68577:
150323 02/06/08 16:06 vahe Target: Start of shift, target screenshot
150322 02/06/08 15:58 cdaq Beam Time Accounting
150321 02/06/08 15:56 gilman shift run summary
150320 02/06/08 15:38 cdaq Run 68577:
150319 02/06/08 15:31 cdaq End of Run 68576:
150318 02/06/08 15:27 gilman status
150317 02/06/08 15:00 cdaq Run 68576:
150316 02/06/08 14:46 ccbutu Target: Changed target!
150315 02/06/08 14:44 gilman ion chambers levels with BigBite on
150314 02/06/08 14:42 E. Christy Field readback not in epics - VMEC 18 rebooted
150313 02/06/08 14:13 gilman controlled access
150312 02/06/08 14:09 cdaq End of Run 68575:
150311 02/06/08 13:40 E. Christy Beam position correction - stop run 68574
150310 02/06/08 13:40 cdaq Run 68575:
150309 02/06/08 13:16 cdaq End of Run 68574:
150308 02/06/08 13:14 dhamilton BTA entry . ignore
150307 02/06/08 12:49 M Jones Reduced delay of HMS tdc and adc gate to ROC1 by 8ns
150306 02/06/08 12:20 cdaq Beam Time Accounting
150305 02/06/08 12:16 cdaq Run 68574:
150304 02/06/08 12:13 cdaq End of Run 68573:
150303 02/06/08 12:10 cdaq Run 68573:
150302 02/06/08 12:08 cdaq End of Run 68572:
150301 02/06/08 11:40 gilman more screen shots
150300 02/06/08 11:39 gilman screen shots
150299 02/06/08 11:28 ccbutu Target: Status of the target!
150298 02/06/08 11:09 gilman Hall C status - increasing beam current to 40 uA
150297 02/06/08 11:06 cdaq Run 68572:
150296 02/06/08 11:05 cdaq End of Run 68571:
150295 02/06/08 10:57 cdaq Run 68571:
150294 02/06/08 10:56 cdaq End of Run 68570:
150293 02/06/08 10:51 gilman Hall C status - beam back
150292 02/06/08 10:41 cdaq Run 68570:
150291 02/06/08 09:38 cdaq End of Run 68568:
150290 02/06/08 08:05 Jonathan Mil Target SS
150289 02/06/08 07:12 cdaq Run 68568: WACS production: LH2 15 cm + rad., 40 uA,
150288 02/06/08 06:55 cdaq End of Run 68567:
150287 02/06/08 01:09 bogdanw vacuum trip set adjustment
Tuesday
150286 02/05/08 22:34 kohlm Target: end of swing shift snap shot
150285 02/05/08 21:50 bogdanw run plan for RCS
150284 02/05/08 20:08 kohlm Target: mid of swing shift snap shot
150283 02/05/08 20:04 kohlm Increased JT value
150282 02/05/08 18:27 kohlm Target: Target: begin of swing shift snapshot
150281 02/05/08 17:28 M.M Cosmic run
150280 02/05/08 17:10 W. Luo Decrease BigCal threshold
150279 02/05/08 16:58 horn Moller status for experiment checklist
150278 02/05/08 16:31 lassiter HMS on at 2.02Gev/c
150277 02/05/08 16:27 big bite checkout
150276 02/05/08 16:12 Lassiter HMS Dipole JT5 swapped out
150275 02/05/08 16:08 smithg Target: New Beam Current Limits
150274 02/05/08 16:03 smithg Target: Cooldown Finished
150273 02/05/08 15:51 cdaq Run 68567: cosmic data
150272 02/05/08 15:48 M Jones Turned on HV to HMS and FPP chambers
150271 02/05/08 15:29 Lassiter HMS Angles set 21.00 to 42.00
150270 02/05/08 14:13 smithg Target: closed warm return
150269 02/05/08 12:40 cdaq End of Run 68566:
150268 02/05/08 12:37 cdaq Run 68566: BigCal LED test run
150267 02/05/08 12:36 cdaq End of Run 68565:
150266 02/05/08 12:35 cdaq Run 68565: BigCal LED test run
150265 02/05/08 12:31 W. Luo Turn on BigCal HV and also the booster
150264 02/05/08 12:30 smithg Target: started to open JT
150263 02/05/08 10:58 smithg Target: Began formal cooldown procedure
This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.12
If you have any comments or problems, please contact:
Stephen A. Wood
saw@jlab.org
(757) 269-7367