Jefferson Lab Hall C Logbook for February 08 - runstarts omitted

  • Main INDEX

    Friday

  • 151026 02/29/08 17:16 M JOnes Moved S0 adc cables
  • 151020 02/29/08 13:44 M Jones Turned on HV to FPP Chamber B for cosmic test
  • Thursday

  • 151019 02/28/08 17:07 hcf DC gas was pure argon -- restored to 50/50 mixture
  • Wednesday

    
    

    Tuesday

  • 151003 02/26/08 14:52 beaufait moeller
  • 150977 02/26/08 10:48 beaufait M test
  • Monday

    
    

    Saturday

  • 150940 02/23/08 17:25 M.M Gas alarm
  • Friday

    
    

    Thursday

    
    

    Wednesday

  • 150918 02/20/08 17:11 beaufait SOS quad LCW hoses
  • 150917 02/20/08 15:36
  • Tuesday

    
    

    Monday

  • 150885 02/18/08 18:37 puckett Gas alarm now cleared for ~10 minutes
  • 150884 02/18/08 18:01 puckett GasMaster Alarm cleared for 1-2 minutes, then goes off again...
  • 150883 02/18/08 17:59 hcf Gas
  • 150882 02/18/08 17:48 puckett ethane valve on manifold was closed...
  • 150881 02/18/08 17:33 puckett also, ethane bottle is valved all the way ON...
  • 150880 02/18/08 17:24 puckett GasMaster Alarm -- ethane pressure zero even though bottle at full weight...
  • 150879 02/18/08 15:48 frw helium empty
  • 150878 02/18/08 15:47 frw gas alarm: ethane empty
  • Friday

  • 150877 02/15/08 16:41 W. Luo Swap (22,03) (22,04) on BigCal plateform
  • 150876 02/15/08 16:41 W. Luo Swap (22,03) (22,04) on BigCal plateform
  • Thursday

  • 150875 02/14/08 17:52 W. Luo BigCal cable bad connection: (42,18), (42,20), (42,22)
  • 150874 02/14/08 17:31 W. Luo Turn off BigCal HV, booster and generator off
  • 150873 02/14/08 16:02 W . Luo Load BigCal HV hv_70019.new
  • 150870 02/14/08 15:31 W. Luo Run 68755, HV file hv_70003.new
  • 150853 02/14/08 12:28 W. Luo Decrease BigCal HV
  • 150852 02/14/08 11:47 W. Luo Run 68747 with HV increased 30v
  • 150849 02/14/08 11:11 W. Luo updated BigCal threshold for led run
  • 150842 02/14/08 10:31 W. Luo Turn on BigCal HV, booster and generator
  • Wednesday

  • 150827 02/13/08 18:38 W. Luo Turn off BigCal HV and booster, generator off
  • 150824 02/13/08 18:06 W. Luo Turn on BigCal HV and booster, restore HV settings at kine5 and do LED run
  • 150823 02/13/08 17:44 puckett BigCal calibration constants updated for all kin. 5 data from 2007 and Analyzer updates
  • Tuesday

  • 150822 02/12/08 17:44 frw HMS drift chamber gas flow reduced
  • Monday

  • 150821 02/11/08 11:20 L.Pentchev BigCal HV off
  • 150820 02/11/08 10:44 Fowler Dipole Off
  • 150819 02/11/08 10:28 vulcan Power supply (Big Bite)
  • 150818 02/11/08 09:58 cdaq Beam Time Accounting
  • 150817 02/11/08 09:28 smithg Target: Finished warmup
  • 150816 02/11/08 08:46 smithg Target: Beginning warmup
  • 150815 02/11/08 06:30 W. Luo Leave BigCal HV on
  • 150814 02/11/08 06:24 M.M HMS, FPP HV OFF, magnets currents set to 0amp
  • 150813 02/11/08 06:18 M.M Owl Shift summary
  • 150812 02/11/08 06:18 M.M Reboot HMS control system
  • 150811 02/11/08 06:13 W. Luo Helium bottle is empty
  • 150809 02/11/08 06:00 Lovelace Target: Owl Shift 6:00
  • 150808 02/11/08 05:58 W. Luo BCM&BPM
  • 150806 02/11/08 05:04 horn HMS set for 1.9 GeV kinematics
  • 150804 02/11/08 04:37 horn HMS magnet controls back
  • 150802 02/11/08 04:22 Lovelace Target: Owl Shift 4:00
  • 150801 02/11/08 04:09 W. Luo Optics study: momentum, 2150mev/c; Theta_hms, 26; 15cm dummy
  • 150800 02/11/08 04:00 M.M HMS control system crashed
  • 150799 02/11/08 03:13 W. Luo HMS control GUI crashed
  • 150798 02/11/08 03:05 Lovelace Target: Owl Shift 1:22
  • 150794 02/11/08 01:48 L.Pentchev don't see the downstream wall of the 20cm dummy
  • 150792 02/11/08 01:31 Lovelace Target: Owl Shift 1:22
  • 150786 02/11/08 00:16 Lovelace Target: Owl Shift Dummy Target 20cm
  • 150784 02/11/08 00:07 jmaxwell Target: Moved to 20cm Dummy
  • 150782 02/11/08 00:04 cdaq Beam Time Accounting
  • 150781 02/11/08 00:01 ejensen Swing shift summary
  • Sunday

  • 150779 02/10/08 23:41 jmaxwell Target: screenshot
  • 150778 02/10/08 23:40 ejensen helium pressure
  • 150777 02/10/08 23:39 jmaxwell Target: Moved target to 3 foil Al
  • 150775 02/10/08 23:26 ejensen bcm/bpm
  • 150774 02/10/08 23:16 L.Pentchev changes for the optical studies
  • 150772 02/10/08 23:07 ejensen optics
  • 150771 02/10/08 22:21 jmaxwell Target: Moved target to 2 foil Al
  • 150759 02/10/08 20:10 ejensen EP Scan
  • 150758 02/10/08 20:10 jmaxwell Target: Target moved to 20cm LH2
  • 150751 02/10/08 18:31 ejensen target change
  • 150749 02/10/08 18:13 jmaxwell Target: Target Moved to 15 cm LH2+Radiator
  • 150745 02/10/08 17:24 ejensen mcc problem
  • 150742 02/10/08 16:56 ejensen taking data again
  • 150740 02/10/08 16:35 gaskell Moller cooldown aborted
  • 150739 02/10/08 16:31 horn/fowler HMS dipole and Q2 tripped
  • 150738 02/10/08 16:17 jmaxwell Target: snapshot
  • 150737 02/10/08 16:09 cdaq Beam Time Accounting
  • 150736 02/10/08 16:05 X. Zheng day shift summary
  • 150734 02/10/08 16:02 X. Zheng target for this run
  • 150732 02/10/08 16:00 horn HMS dipole back
  • 150727 02/10/08 15:30 dhamilton BigCal thresholds reduced for low current epgamma run
  • 150726 02/10/08 15:30 bogdanw BigBite current set to 150A
  • 150725 02/10/08 15:05 X. Zheng HMS communication problem (again), and going to controlled access now
  • 150724 02/10/08 14:46 X. Zheng HMS dipole tripped
  • 150722 02/10/08 14:23 Yi Zhang loop1 JT valve
  • 150720 02/10/08 13:08 gaskell Starting Moller cooldown
  • 150719 02/10/08 10:52 smithg Target: started to open JT
  • 150718 02/10/08 09:44 smithg Target: alarm handler was not running
  • 150717 02/10/08 09:33 smithg Target: hats off to cryo
  • 150716 02/10/08 08:58 smithg Target: bullshit
  • 150715 02/10/08 08:07 Danagoulian Shift summary
  • 150714 02/10/08 08:04 cdaq Beam Time Accounting
  • 150713 02/10/08 07:31 Danagoulian Hall C status
  • 150712 02/10/08 05:21 Danagoulian ESR is up and running
  • 150711 02/10/08 03:51 Danagoulian ESR crash
  • 150710 02/10/08 03:50 W. Luo BCM&BPM
  • 150709 02/10/08 03:14 Lovelace Target: 2:27 Owl
  • 150708 02/10/08 02:58 gaskell ESR crashed
  • 150706 02/10/08 01:50 W. Luo Stop run 68716, power cycled Roc13, 14&hallc switch
  • 150701 02/10/08 01:18 Lovelace Target: 1:17 Owl
  • 150698 02/10/08 00:49 Lovelace Target: Start Owl
  • 150695 02/10/08 00:10 Lovelace Target: Start Owl
  • 150692 02/10/08 00:02 cdaq Beam Time Accounting
  • 150691 02/10/08 00:01 hamlet Swing Shift Summary, 09 Febr 08
  • Saturday

  • 150670 02/09/08 19:19 Jonathan Mil Target Screens
  • 150663 02/09/08 18:03 dhamilton ROC2 reboot was not needed - mistake in online analysis
  • 150662 02/09/08 17:38 cdaq Run Query:MSQL server has gone away: Production LH2, WACS.
  • 150660 02/09/08 17:17 hamlet Have DAQ problem after run 68696
  • 150657 02/09/08 16:47 hamlet Runs with number 68694 and 68695 are junk
  • 150652 02/09/08 16:01 cdaq Beam Time Accounting
  • 150651 02/09/08 15:59 X. Zheng day shift summary
  • 150647 02/09/08 14:54 kelleher target screens for Feb 9, Day
  • 150644 02/09/08 14:43 X. Zheng ROC13&14 power cycled
  • 150643 02/09/08 14:41 ejensen fpp hot wire
  • 150638 02/09/08 13:58 X. Zheng BPM & BCM capture
  • 150637 02/09/08 12:42 puckett ROC2 is HMS drift chambers, ROC1 is scintillators and beamline stuff
  • 150636 02/09/08 12:17 W. Luo Power cycled HV crate 34
  • 150635 02/09/08 12:06 X. Zheng beam update
  • 150634 02/09/08 11:19 X. Zheng beam delivery problem
  • 150632 02/09/08 10:33 M JOnes I do not see the reason for reboot of roc2
  • 150629 02/09/08 09:52 X. Zheng Run 68684-68686 have BigCal threshold -600mV
  • 150622 02/09/08 08:31 dhamilton BigCal threshold change
  • 150620 02/09/08 08:05 cdaq Beam Time Accounting
  • 150619 02/09/08 08:05 Danagoulian Bigcal channel hv_34_15 dead
  • 150618 02/09/08 08:04 Danagoulian Shift Summary
  • 150605 02/09/08 04:39 dhamilton ROC2 reboot
  • 150603 02/09/08 04:20 Phil Carter Target: screen shot
  • 150589 02/09/08 01:17 Danagoulian BCM-BPM
  • 150586 02/09/08 00:39 Phil Carter Target: lost communication, no reboot
  • 150582 02/09/08 00:02 cdaq Beam Time Accounting
  • 150581 02/09/08 00:01 hamlet Swing Shift Summary, 08 Febr 08
  • Friday

  • 150571 02/08/08 21:43 puckett Got the betabrite working again.
  • 150566 02/08/08 20:39 puckett BetaBrite display stuck
  • 150563 02/08/08 19:44 puckett HMS and FPP HV trip
  • 150558 02/08/08 18:55 shahinya Target status
  • 150554 02/08/08 17:27 M.M Kinematic 5, Calibration: HMS Trigger Time Offsets, HMS hstart default value, HMS time offset, HMS driftmaps
  • 150553 02/08/08 17:01 hamlet Beam OFF, magnet problem in ARC
  • 150549 02/08/08 16:15 shahinya Target status
  • 150548 02/08/08 16:02 cdaq Beam Time Accounting
  • 150547 02/08/08 15:56 vahe Target: End of shift: Target screenshot
  • 150544 02/08/08 15:40 ccbutu Shift Summary
  • 150539 02/08/08 14:36 Analysis: Replay Run 68647
  • 150538 02/08/08 14:33 Hovhannes Replay 68647
  • 150535 02/08/08 14:15 ccbutu BigCal & FPP rates
  • 150534 02/08/08 14:13 ccbutu Hall C IOCs
  • 150533 02/08/08 14:09 ccbutu HAll C Beam Position & IOCs
  • 150528 02/08/08 12:50 ccbutu Back to production mode!
  • 150526 02/08/08 12:44 gaskell Moller backout
  • 150525 02/08/08 12:40 horn/gaskell Moller summary
  • 150503 02/08/08 08:08 vahe Target: Start of shift: Target screenshot
  • 150502 02/08/08 08:01 cdaq Beam Time Accounting
  • 150501 02/08/08 07:57 Jonathan Mil Shift Summary
  • 150500 02/08/08 07:55 Lovelace Target: Shift Owl 7:53 2/8/08
  • 150497 02/08/08 07:36 Lovelace Target: Shift Owl 7:40 2/8/08
  • 150496 02/08/08 07:31 Jonathan Mil Scalar Display & total Triggers/ABU
  • 150495 02/08/08 07:28 Jonathan Mil Beam SS
  • 150492 02/08/08 06:42 Lovelace Target: Shift Owl 6:40 2/8/08
  • 150488 02/08/08 05:53 Lovelace Target: Shift Owl 5:40 2/8/08
  • 150487 02/08/08 05:51 Lovelace Target: Shift Owl 5:40 2/8/08
  • 150485 02/08/08 05:28 Lovelace Target: Shift Owl 4:50 2/8/08
  • 150482 02/08/08 04:50 w. Luo bcm&bpm
  • 150477 02/08/08 04:11 Lovelace Target: Shift Owl 4:00 2/8/08
  • 150476 02/08/08 04:11 W. Luo Change BigCal online histogram
  • 150475 02/08/08 04:08 Jonathan Mil 700mV threshold and HV change (from W. Luo Calibration)
  • 150474 02/08/08 04:00 dhamilton New BigCal HV and discriminator threshold
  • 150473 02/08/08 03:58 W. Luo End run 68626, increased BigCal Threshold to -700mv
  • 150472 02/08/08 03:56 W. Luo Load new HV before run 68626
  • 150471 02/08/08 03:47 W. Luo Roc 14 crashed, end run 68627
  • 150468 02/08/08 03:34 cdaq Beam Time Accounting
  • 150463 02/08/08 03:12 dhamilton Plan to change BigCal HV to compensate for drop in gain
  • 150462 02/08/08 02:57 W. Luo Reboot BCM LED display
  • 150461 02/08/08 02:52 dhamilton BigCal gains continue to drop
  • 150456 02/08/08 01:46 dhamilton BigCal discrimator thresholds decreased to 1.3 GeV (650 mV)
  • 150451 02/08/08 00:23 Lovelace Target: Start Shift Owl 2/8/08
  • 150449 02/08/08 00:17 Jonathan Mil cdaql6
  • 150448 02/08/08 00:08 vahe Target: End of shift: Target screenshot
  • Thursday

  • 150446 02/07/08 23:54 hamlet Swing Shift Summary, 07 Febr 08
  • 150444 02/07/08 23:52 dhamilton Drop in BigCal rate is due to drop in gain
  • 150437 02/07/08 21:35 hamlet BigCal rate again slowly dropped down
  • 150420 02/07/08 16:25 vahe Target: Start of shift: Target screenshot
  • 150417 02/07/08 16:05 L.Pentchev old summary, just disregard it
  • 150416 02/07/08 15:58 cdaq Beam Time Accounting
  • 150415 02/07/08 15:57 hcf helium flow
  • 150414 02/07/08 15:55 Keppel day shift summary
  • 150413 02/07/08 15:40 Bosted Target: Target: had to reboot IOC
  • 150410 02/07/08 15:29 R. Lindgren Shift Summary
  • 150409 02/07/08 15:29 M.M Helium flow
  • 150408 02/07/08 15:20 M.M bpm / bcm
  • 150407 02/07/08 15:06 L.Pentchev CAMAC power supply replaced
  • 150402 02/07/08 12:50 L.Pentchev Set ps2=999999
  • 150401 02/07/08 12:20 L.Pentchev BigCal discriminator replaced
  • 150400 02/07/08 11:32 M JOnes Fixed problem with S0 tdc signals in data
  • 150399 02/07/08 11:29 M Jones Modified threshold to "S0x2p" from 25 to 50mV
  • 150397 02/07/08 08:56 L.Pentchev status
  • 150395 02/07/08 08:07 jensen owl shift summary
  • 150394 02/07/08 08:03 cdaq Beam Time Accounting
  • 150391 02/07/08 07:47 jensen cold counters
  • 150388 02/07/08 06:48 jensen bpm/bcm screens
  • 150385 02/07/08 06:10 Phil Carter Target: transient alarm
  • 150379 02/07/08 04:47 Phil Carter Target: IOC reboot; raster mask woes
  • 150378 02/07/08 04:05 dhamilton RCS Event Rate
  • 150374 02/07/08 02:53 dhamilton Increase to 40 microamps - BigCal pedestals
  • 150371 02/07/08 02:31 dhamilton BigCal HV change
  • 150369 02/07/08 02:17 W. Luo Decrease HV on (42,22) for 200v
  • 150368 02/07/08 02:16 W. Luo restore the HV for (42,22)
  • 150366 02/07/08 02:07 W. Luo Decrease HV on (42,22) for 200v
  • 150363 02/07/08 02:02 W. Luo The GEP3 Wiki link on Hall C web site broken
  • 150360 02/07/08 01:44 W. Luo "turn off" 6 columns of BigCal
  • 150357 02/07/08 01:07 jensen increased beam current
  • 150355 02/07/08 00:23 Phil Carter Target: screenshot
  • 150353 02/07/08 00:05 cdaq Beam Time Accounting
  • 150352 02/07/08 00:04 hamlet Swing Shift Summary, 06 Febr 08
  • Wednesday

  • 150351 02/06/08 23:51 hamlet BigCal rate slowly dropped down
  • 150333 02/06/08 18:43 M.M bpm / bcm
  • 150332 02/06/08 18:10 vahe Target: Target IOC reboot
  • 150323 02/06/08 16:06 vahe Target: Start of shift, target screenshot
  • 150322 02/06/08 15:58 cdaq Beam Time Accounting
  • 150321 02/06/08 15:56 gilman shift run summary
  • 150318 02/06/08 15:27 gilman status
  • 150316 02/06/08 14:46 ccbutu Target: Changed target!
  • 150315 02/06/08 14:44 gilman ion chambers levels with BigBite on
  • 150314 02/06/08 14:42 E. Christy Field readback not in epics - VMEC 18 rebooted
  • 150313 02/06/08 14:13 gilman controlled access
  • 150311 02/06/08 13:40 E. Christy Beam position correction - stop run 68574
  • 150308 02/06/08 13:14 dhamilton BTA entry . ignore
  • 150307 02/06/08 12:49 M Jones Reduced delay of HMS tdc and adc gate to ROC1 by 8ns
  • 150306 02/06/08 12:20 cdaq Beam Time Accounting
  • 150301 02/06/08 11:40 gilman more screen shots
  • 150300 02/06/08 11:39 gilman screen shots
  • 150299 02/06/08 11:28 ccbutu Target: Status of the target!
  • 150298 02/06/08 11:09 gilman Hall C status - increasing beam current to 40 uA
  • 150293 02/06/08 10:51 gilman Hall C status - beam back
  • 150290 02/06/08 08:05 Jonathan Mil Target SS
  • 150287 02/06/08 01:09 bogdanw vacuum trip set adjustment
  • Tuesday

  • 150286 02/05/08 22:34 kohlm Target: end of swing shift snap shot
  • 150285 02/05/08 21:50 bogdanw run plan for RCS
  • 150284 02/05/08 20:08 kohlm Target: mid of swing shift snap shot
  • 150283 02/05/08 20:04 kohlm Increased JT value
  • 150282 02/05/08 18:27 kohlm Target: Target: begin of swing shift snapshot
  • 150281 02/05/08 17:28 M.M Cosmic run
  • 150280 02/05/08 17:10 W. Luo Decrease BigCal threshold
  • 150279 02/05/08 16:58 horn Moller status for experiment checklist
  • 150278 02/05/08 16:31 lassiter HMS on at 2.02Gev/c
  • 150277 02/05/08 16:27 big bite checkout
  • 150276 02/05/08 16:12 Lassiter HMS Dipole JT5 swapped out
  • 150275 02/05/08 16:08 smithg Target: New Beam Current Limits
  • 150274 02/05/08 16:03 smithg Target: Cooldown Finished
  • 150272 02/05/08 15:48 M Jones Turned on HV to HMS and FPP chambers
  • 150271 02/05/08 15:29 Lassiter HMS Angles set 21.00 to 42.00
  • 150270 02/05/08 14:13 smithg Target: closed warm return
  • 150265 02/05/08 12:31 W. Luo Turn on BigCal HV and also the booster
  • 150264 02/05/08 12:30 smithg Target: started to open JT
  • 150263 02/05/08 10:58 smithg Target: Began formal cooldown procedure