Jefferson Lab Hall C Logbook for October 10 - Target
Main INDEX
Sunday
Saturday
Friday
202953 10/29/10 16:27 smithg Target: new turbo controller location
202944 10/29/10 10:34 smithg Target: Flag target installed. Protocol explained.
Thursday
Wednesday
202857 10/27/10 22:40 smithg Target: z-position tape measure measurements: final result
202851 10/27/10 21:08 smithg Target: Status update
202818 10/27/10 11:40 covrig Target: target's Halloween
Tuesday
Monday
202567 10/25/10 12:26 smithg Target: status, pump autopsy results with pics, & repair plan
Sunday
Saturday
202317 10/23/10 17:13 covrig Target: 2 pictures
Friday
202120 10/22/10 17:19 covrig Target: status
202103 10/22/10 10:09 covrig Target: limit switches
202102 10/22/10 09:06 Davis, C. Target: Silence!
202097 10/22/10 07:45 Davis, C. Target: Target status
Thursday
202093 10/21/10 23:48 narayan Target: end of swing shift target screenshot
202081 10/21/10 19:45 Davis, C. Target: Moved target out of beam
202063 10/21/10 18:49 Davis, C. Target: Hydrogen Cell (w/ He gas) is in position
202049 10/21/10 18:30 Davis, C. Target: Changed encoder value for DS 2% Al Tgt., then moved there
202016 10/21/10 17:13 Davis, C. Target: Target moved to DS 4% Al
201992 10/21/10 15:06 covrig Target: "new" encoder values for some targets
201965 10/21/10 13:25 smithg Target: evacuated target loop
201916 10/21/10 11:20 covrig Target: reset h-motion calibration
201899 10/21/10 09:13 narayan Target: Target moved from expert GUI
201874 10/21/10 07:46 silwal Target: x target not moving to the encoder values specified???
201872 10/21/10 07:36 silwal Target: Target Out of Beam (HOME)
201868 10/21/10 07:17 silwal Target: moved to DS 4% Al target
201866 10/21/10 07:06 silwal Target: horizontal motion control YELLOW alarm
201859 10/21/10 06:06 silwal Target: scattering chamber vacuum fluctuations
201847 10/21/10 04:43 silwal Target: scattering chamber vacuum fluctuations
201842 10/21/10 03:44 silwal Target: scattering chamber vacuum improves with NO beam
201836 10/21/10 02:48 silwal Target: scattering chamber vacuum gradually getting bad, RED alarm
201829 10/21/10 01:39 silwal Target: vacuum upstream of target
201828 10/21/10 01:39 silwal Target: target to US 4% Al
201820 10/21/10 01:09 silwal Target: Target Out of Beam (HOME)
201809 10/21/10 00:19 silwal Target: to DS 4% Al
Wednesday
201803 10/20/10 23:47 Davis, C. Target: Target status at End of Swing Shift (almost)
201764 10/20/10 21:25 Davis, C. Target: Target status with 5 uA on US 4% Al
201737 10/20/10 19:56 Davis, C. Target: [15 min. ago] went to 4% Al US
201717 10/20/10 18:06 Davis, C. Target: Density changes
201706 10/20/10 17:02 Davis, C. Target: Target Out of Beam (HOME)
201700 10/20/10 15:48 Adesh Target: Target Status
201674 10/20/10 11:05 covrig Target: one more try on the pump
201654 10/20/10 08:19 Adesh Target: Moved to US 1% Al target
201643 10/20/10 06:35 silwal Target: scattering chamber vacuum fine now
201642 10/20/10 06:25 silwal Target: scattering chamber vacuum RED alarm
201632 10/20/10 05:29 silwal Target: H2 pressure alarms
201631 10/20/10 05:21 silwal Target: vacuum/dump gui snapshot
201615 10/20/10 04:00 silwal Target: scattering chamber vacuum fine now
201614 10/20/10 03:51 silwal Target: scattering chamber vacuum RED alarm
201603 10/20/10 03:20 covrig Target: resets
201597 10/20/10 02:50 covrig Target: status - warming up....
Tuesday
201577 10/19/10 23:40 spage & davi Target: Pump Belly Up
201573 10/19/10 23:23 spage / davi Target: LH2 target fan failure - screen shots
201571 10/19/10 22:25 W. Deconinck Target: Controlled access for target reset
201570 10/19/10 22:23 spage Target: LH2 pump trip, won't reset
201549 10/19/10 20:16 spage Target: brief fan frequency excursion
201511 10/19/10 18:16 Davis, C. Target: New Target Encoder values are restored.
201509 10/19/10 17:55 Davis, C. Target: Target Temp. Oscillation examples
201505 10/19/10 17:09 Davis, C. Target: Fan at 34 Hz briefly but long enough to trip minor alarm
201485 10/19/10 13:56 narayan Target: pump trip
201479 10/19/10 13:07 narayan Target: Alert: pump temperature rising, though steady now
201469 10/19/10 11:18 narayan Target: pump alarm
201466 10/19/10 10:50 narayan Target: midshift Target status
201449 10/19/10 07:44 silwal Target: snapshot gui/stripcharts, everything normal
201448 10/19/10 07:26 silwal Target: 15K supply temp YELLOW alarm
201417 10/19/10 03:00 silwal Target: vacuum/dump gui snapshot
201415 10/19/10 02:26 silwal Target: upstream ion chamber YELLOW alarm, tune beam
Monday
201402 10/18/10 23:47 Davis, C. Target: Target status at End of Swing Shift (almost)
201398 10/18/10 22:42 Davis, C. Target: Target is HOME, out of beam
201384 10/18/10 20:24 Davis, C. Target: Drp in 4K coolant supply
201380 10/18/10 18:49 Davis, C. Target: No Alarm on QWT_poA
201368 10/18/10 17:04 covrig Target: lh2 pump fsd
201351 10/18/10 14:51 covrig Target: loop pressure
201337 10/18/10 13:27 covrig Target: status
201302 10/18/10 07:31 silwal Target: snapshot gui/stripcharts
201279 10/18/10 02:52 silwal Target: target pump temp back to ~ 84 K
201267 10/18/10 00:44 silwal Target: target pump temp ~ 86 K, used to be 84K, no alarms yet
Sunday
201263 10/17/10 23:44 Davis, C. Target: Target status at End of Swing Shift (almost)
201230 10/17/10 19:43 Davis, C. Target: 15Ki minor alarm (yellow)
201218 10/17/10 17:53 Davis, C. Target: QWL1fc_Voltage_R goes to 444
201217 10/17/10 17:41 Davis, C. Target: Target is now taking 50 uA
201192 10/17/10 16:21 Davis, C. Target: QWL1fc_voltage_r goes to 444
201147 10/17/10 11:33 R. Carlini Target: MD noise floor
201133 10/17/10 07:58 silwal Target: snapshot gui/stripcharts
201118 10/17/10 04:38 silwal Target: 15 K supply line YELLOW alarm
201107 10/17/10 02:44 silwa Target: alarm at 3x3mm raster, LH2 @ 50uA
Saturday
201094 10/16/10 23:47 Davis, C. Target: Target status at End of Swing Shift (almost)
201071 10/16/10 21:02 Davis, C. Target: Target status
201064 10/16/10 20:20 Davis, C. Target: I do hope that this works better as a table of the Pump Temperatures (see my previous message)
201061 10/16/10 20:13 Davis, C. Target: Tgt status, Pump temperature
201059 10/16/10 19:58 Davis, C. Target: Target status and Pump Temp.!
201044 10/16/10 16:59 smithg Target: Al runs prior to run 5913 are probably bad
201039 10/16/10 16:30 Davis, C. Target: Hydrogen cell IN, by permission of MCC
201038 10/16/10 16:22 Davis, C. Target: Target to HOMER pos'n.
201035 10/16/10 16:04 Davis, C. Target: Tgt Params at 16:00 Beginning of Swing shift
200965 10/16/10 05:34 silwal Target: x raster alarm
200959 10/16/10 04:15 silwal Target: dont close QWScatt_Chamber_Vacuum_R Alarm gui
200949 10/16/10 02:11 smithg Target: New encoder table for target positions
200946 10/16/10 01:34 smithg Target: surge tank turbo tripped
Friday
200934 10/15/10 23:44 Davis, C. Target: Almost End of Shift Screenshots (EoSS) for Friday Swing Shift
200932 10/15/10 22:59 Davis, C. Target: Move to LH2 target cell
200929 10/15/10 22:48 Davis, C Target: Moved to US 4% Al Tgt.
200922 10/15/10 22:04 Davis, C. Target: 10 pm situation with Cryo excursions
200913 10/15/10 21:00 Davis, Opper Target: up to 40 uA on the DS 4% Al Target
200903 10/15/10 20:20 AK Opper & C Target: moved to DS 4% Al target
200898 10/15/10 20:03 Davis, C, Ad Target: Moved US 6x6 hole 1mm
200894 10/15/10 19:48 Davis, C. Target: Move Tgt to US 6x6 square
200852 10/15/10 17:28 Davis, C Target: Target goes HOME
200847 10/15/10 16:47 Davis, C. Target: 444 Alarm
200806 10/15/10 12:22 Adesh Target: Target Motion issues
200805 10/15/10 12:15 Adesh Target: Target Motion issues
200796 10/15/10 10:36 covrig Target: ice on the LH2 pump motor radiator
200795 10/15/10 10:35 Armstrong Target: FSD for target motion tested, and is OK
200781 10/15/10 09:04 Armstrong Target: Target motion fun and games and FSD...
200777 10/15/10 08:20 birchall Target: Target motion
200773 10/15/10 08:02 Armstrong Target: move hydrogen cell 4 mm horizontal
200767 10/15/10 07:37 Armstrong Target: move to hydrogen target
200763 10/15/10 07:23 Armstrong Target: move to upstream centering hole
200760 10/15/10 07:16 Armstrong Target: horiz. motion control screens
200757 10/15/10 07:07 Armstrong Target: moved to DS 4% Al target
200753 10/15/10 06:49 Armstrong Target: some target screens
200751 10/15/10 06:29 Armstrong Target: Note on upstream 6x6 Al target
200749 10/15/10 06:13 Armstrong Target: moved to Downstream Centering Hole
200707 10/15/10 01:04 silwal Target: US 2x2 BRSquare:: x changed by -0.25 mm to get to 74336 encoder pos, entry 200704 was moved by -2.5mm, not -0.25
200704 10/15/10 00:54 silwal Target: US 2x2 BRSquare:: x changed by -0.25 mm
200700 10/15/10 00:46 silwal Target: US 2x2 BRSquare:: x changed by +0.5 mm, Y changed by -0.5mm
200695 10/15/10 00:32 silwal Target: US 2x2 BRSquare:: x changed by +1.5 mm
200691 10/15/10 00:15 silwal Target: moved to US 2x2 BRSquare
200685 10/15/10 00:00 Davis, C Target: End of Swing Shift (EoSS) screen capture
Thursday
200684 10/14/10 23:58 Davis, C. & Target: Back to DS centering hole, but new encoder positions
200678 10/14/10 23:41 Davis, C. & Target: UP!
200666 10/14/10 23:13 Davis, C. & Target: Small Tgt. motion
200661 10/14/10 23:00 Davis C. Target: Encoder positions for US centering hole
200660 10/14/10 22:53 Davis, C. Target: Moved to US centering hole
200649 10/14/10 22:19 Davis, C. Target: Move target to DS centering hole
200637 10/14/10 21:22 covrig Target: cryo update - late entry
200635 10/14/10 21:05 Davis, C Target: Excursion in 15 K line
200629 10/14/10 20:47 smithg Target: Home button on main GUI broken
200628 10/14/10 20:47 Davis, C Target: Target HOME
200614 10/14/10 19:35 Davis, C Target: beam on solid target
200605 10/14/10 16:51 Davis, C Target: Effect of pump speed change (after a few minutes
200602 10/14/10 16:45 Davis, C. & Target: Pump at 30 Hz
200600 10/14/10 16:36 covrig Target: work update
200591 10/14/10 15:28 donjones Target: reduce 15 K flow
200583 10/14/10 14:45 donjones Target: new target alarm limits
200567 10/14/10 14:14 donjones Target: cryo warns of reduced temperature in 15K line asks for overal reduced flow rates in future
200526 10/14/10 08:36 donjones Target: target hp voltage alarm
200519 10/14/10 08:02 silwal Target: target to HOME; HOME button on the main target did not work, used horizontal/vertical motion control gui to HOME target
200518 10/14/10 07:45 silwal Target: yellow alarm on target high power heater voltage
200514 10/14/10 07:38 silwal Target: target to DS 4% Al
200511 10/14/10 07:15 Adesh Target: 143 uamps, 3X3 raster, 25 Hz
200484 10/14/10 04:50 silwal Target: pump at 25hz, LH2
200474 10/14/10 03:36 Adesh Target: Encoder X values updated
200472 10/14/10 03:25 Adesh Target: LH2 boiling studies status
200437 10/14/10 00:01 Adesh Target: Target status @ 150 uamps
Wednesday
200434 10/13/10 23:45 Davis, C Target: Tgt Status at 150 uA
200413 10/13/10 20:09 smithg Target: 150 uA initial stability looks good
200401 10/13/10 17:50 Davis, C & S Target: Damping after several minutes of 150 uA
200400 10/13/10 17:43 Spayde Target: 150 uA on LH2!
200398 10/13/10 17:33 Davis, C Target: 150 uA
200395 10/13/10 17:00 Spayde Target: Going for 150 uA on LH2!
200394 10/13/10 16:59 Davis, C Target: 120 uA on Tgt
200385 10/13/10 15:45 donjones Target: screenshot end of day shift
200378 10/13/10 13:27 covrig Target: hph beam compensation turned ON
200367 10/13/10 11:52 donjones Target: target IOC reboot
200346 10/13/10 09:30 donjones Target: cryo changes load from 4K to 15K line
200325 10/13/10 05:46 silwal Target: snapshot of bcm calibration (current upto ~93uA)
200321 10/13/10 04:52 silwal Target: ~93uA on LH2
200318 10/13/10 04:22 Adesh Target: High Power Heater Power reduction
200299 10/13/10 02:58 silwal Target: LH2 target:: y moved by -3mm
200297 10/13/10 02:53 silwal Target: LH2 target:: y moved by +7mm, issues with the BREAK OFF button on the vertical motion gui again, worked after pressing BREAK ON first
200294 10/13/10 02:41 silwal Target: LH2 target:: y moved by -4mm, issues with the BREAK OFF button on the vertical motion gui, worked after Controller Warm Reboot
200286 10/13/10 02:15 silwal Target: LH2 target:: x moved by -8mm (-12800)
200281 10/13/10 02:00 Adesh Target: temperature change in Horizontal motor brake
200278 10/13/10 01:49 silwal Target: LH2 target:: x moved by +4mm (+6400)
200267 10/13/10 00:58 silwal Target: target to LH2; x stage got stuck again, moved x stage manually
Tuesday
200258 10/12/10 23:59 Spayde Target: Moved Target Out of Beam
200254 10/12/10 23:54 Adesh Target: Horizontal motion stuck fix
200251 10/12/10 23:51 Davis, C Target: Target status at 11:45 pm
200250 10/12/10 23:42 covrig Target: h-table temperatures
200248 10/12/10 23:38 smithg Target: Aiming for a new LH2 lifter position
200243 10/12/10 23:06 Davis & Ades Target: Hor. Tgt Motion problem
200239 10/12/10 22:50 Spayde Target: Putting in Downstream Hole Target
200204 10/12/10 19:39 Davis, C Target: Development of 15 K OUT Temp. over time
200175 10/12/10 18:08 Davis Target: Running at 2500 - 2600 W on HPH (little or no beam)
200168 10/12/10 17:43 covrig Target: 2500 W target
200145 10/12/10 14:11 Birchall Target: Target moved to out of beam position
200141 10/12/10 13:52 Birchall Target: US centering hole in beam
200138 10/12/10 13:32 covrig Target: high(est) power test to-day
200137 10/12/10 13:11 birchall Target: HPH max adjustment
200133 10/12/10 12:46 Jiawei Target: relationship between H2 pump frequency and mass flow rate
200119 10/12/10 11:02 birchall Target: White alarm
200111 10/12/10 09:59 birchall Target: Moved target out of beam
200108 10/12/10 09:20 Armstrong Target: beam compensation
200100 10/12/10 08:35 birchall Target: Target during beam on/off
200089 10/12/10 08:07 Armstrong Target: ramping
200087 10/12/10 07:59 Armstrong Target: beam heating data
200074 10/12/10 07:37 silwal Target: LH2 @ 50uA
200058 10/12/10 07:03 Armstrong Target: first try to 50 muA
200055 10/12/10 06:48 silwal Target: LH2 @ 20uA
200043 10/12/10 06:13 Armstrong Target: response to 10 muA and 18 muA beam (with plot this time)
200042 10/12/10 06:11 Armstrong Target: response to 10 muA and 18 muA beam
200038 10/12/10 06:02 silwal Target: H2 @ 10uA
200024 10/12/10 05:31 silwal Target: target to H2
200014 10/12/10 04:30 silwal Target: target to empty; HOME, issue with the vertical motion, both Brake and Busy buttons ON at the same time, fault cleared by pressing RESET on the vertical motion controller gui
200002 10/12/10 03:37 silwal Target: H2 target:: moved +8 mm (+12800) relative in x
199998 10/12/10 03:25 silwal Target: H2 target:: moved -4 mm (-6400) relative again in x
199995 10/12/10 03:18 silwal Target: H2 target:: moved -4 mm (-6400) relative in x
199985 10/12/10 02:41 silwa Target: target to H2
199974 10/12/10 02:08 silwal Target: DS centering hole:: target moved -0.5mm (-800) in x
199971 10/12/10 02:02 silwal Target: DS centering hole:: target moved -2mm (-3200) in x
199968 10/12/10 01:54 silwal Target: DS centering hole:: target moved up 1mm, and +1600 in x
199966 10/12/10 01:42 silwal Target: DS centering target:: target moved down by 4mm
199963 10/12/10 01:24 silwal Target: target moved to DS centering hole
199932 10/12/10 00:10 Jiawei Target: Updated Mass flow study II
199930 10/12/10 00:04 Jiawei Target: Mass flow study II
Monday
199923 10/11/10 23:36 smithg Target: New response plan for future pump trips
199891 10/11/10 20:12 Adesh Target: Mass Flow Study
199889 10/11/10 19:53 Adesh Target: Auxiliary High Power heater
199887 10/11/10 19:49 covrig Target: motion update
199859 10/11/10 16:04 donjones Target: screenshots of tgt screens for day shift
199858 10/11/10 15:57 donjones Target: monitoring effect of changes to auxilary power
199855 10/11/10 15:30 donjones Target: IOC target reboot
199845 10/11/10 11:17 donjones Target: alarm input supply on 15K line
199844 10/11/10 11:15 donjones Target: target alarms
199842 10/11/10 10:54 donjones Target: alarms for target due to ioc down
199831 10/11/10 06:30 silwal Target: target to DS centering hole, moved vertically down by 2 mm
199830 10/11/10 06:28 silwal Target: target fan stopped working, recovered within just over a minute with Jim's help
199824 10/11/10 06:01 silwal Target: target to DS centering hole, moved vertically down by 2 mm
199816 10/11/10 05:31 silwal Target: target to DS centering hole
199806 10/11/10 04:18 silwal Target: target to US centering hole
199805 10/11/10 04:01 silwal Target: H2 target position changed to 28.29 in x
199793 10/11/10 01:45 silwal Target: target moved to H2
199789 10/11/10 01:25 silwal Target: Target US centering hole: x/y position history from archive
199787 10/11/10 01:18 silwal Target: Target US centering hole: moved 0.5 mm beam left, 0.5 mm beam down
199782 10/11/10 01:03 silwal Target: Target US centering hole: moved 0.5mm beam right, 1.0mm beam down
199779 10/11/10 00:44 silwal Target: Target US centering hole: moved 6mm beam left
199775 10/11/10 00:37 silwal Target: Target US centering hole: moved 3mm beam right
199763 10/11/10 00:10 rob Target: moved to centering target; updated position
199762 10/11/10 00:07 smithg Target: Vacuum leak coming from 15K coolant circuit
Sunday
199761 10/10/10 23:59 rob Target: moved target 4mm to beam left and 2 mm down
199760 10/10/10 23:48 rob Target: moved to BeO viewer
199758 10/10/10 23:40 smithg Target: Vacuum leak coming from 15K coolant circuit
199755 10/10/10 23:33 covrig Target: chocking the 15 K flow improves target chamber vacuum
199753 10/10/10 23:00 covrig Target: vacuum keeps rising
199748 10/10/10 22:33 smithg Target: Action plan for next pump trip
199739 10/10/10 22:01 rob Target: change HPH PID setpoint to 20.00 K
199737 10/10/10 21:47 rob Target: change HPH PID setpoint to 19.50 K
199736 10/10/10 21:35 rob Target: change HPH PID setpoint to 19.00 K
199735 10/10/10 21:25 rob Target: change HPH PID setpoint to 18.50 K
199734 10/10/10 21:00 rob Target: change HPH PID setpoint to 18.00 K
199732 10/10/10 20:51 rob Target: alarm on zero pump voltage, just another glitch
199731 10/10/10 20:46 rob Target: change HPH PID setpoint to 18.25 K
199730 10/10/10 20:32 rob Target: change HPH PID setpoint to 18.50 K
199722 10/10/10 20:09 rob Target: change HPH PID setpoint to 18.75 K
199711 10/10/10 19:43 rob Target: change HPH PID setpoint to 19.00 K
199706 10/10/10 19:38 rob Target: target out of beam; pump glitch goes the other way this time
199699 10/10/10 19:22 rob Target: pump current alarm; apparently just a glitch
199696 10/10/10 19:18 rob Target: still silencing alarms as MCC reboots raster/ion chamber IOC
199695 10/10/10 19:16 rob Target: change HPH PID setpoint to 19.25 K
199691 10/10/10 18:56 rob Target: change HPH PID setpoint to 19.50 K
199689 10/10/10 18:43 rob Target: change HPH PID setpoint from 20.00 K to 19.75 K
199683 10/10/10 18:20 rob Target: change HPH PID setpoint from 20.25 K to 20.00 K
199678 10/10/10 18:11 rob Target: moved target 4mm to beam left
199677 10/10/10 18:05 rob Target: Target: screens snapshot before HPH PID change to 20.25 K
199669 10/10/10 17:37 rob Target: change HPH PID setpoint from 21.00 K to 20.75 K
199662 10/10/10 17:27 rob Target: moved the target 4mm to beam right
199660 10/10/10 17:19 mgericke Target: Target centering take 0
199659 10/10/10 17:13 mgericke Target: Target centering take 1
199651 10/10/10 17:02 rob Target: changed fan speed; changed fan high voltage limit; changed horizontal heater low limit
199635 10/10/10 16:16 covrig Target: horizontal motion limit switches - late entry
199599 10/10/10 12:39 W. Deconinck Target: H2 Pump Triped again
199580 10/10/10 06:32 narayan Target: fan voltage max, Controller stauts: "pump running"
199579 10/10/10 06:25 narayan Target: 15k return line temperature readback alarm
199577 10/10/10 05:12 narayan Target: low limit alarm for g0rate disabled
199576 10/10/10 05:11 narayan Target: low limit alarm for g0rate disabled
199574 10/10/10 04:54 narayan Target: midshift Target status
199573 10/10/10 04:32 Armstrong Target: momentary glitch on fan voltage
Saturday
199551 10/09/10 22:27 jdiefen Target: Target fan voltage lower limits alarm disabled
199549 10/09/10 20:37 jdiefen Target: Increased table heater power and some more things...
199544 10/09/10 17:59 jdiefen Target: changed the HPH PID sensor (again)
199538 10/09/10 16:38 Adesh Target: 4K bypass JT valve closed
199536 10/09/10 15:48 covrig, ades Target: changed the HPH PID sensor
199535 10/09/10 15:28 covrig Target: LH2 @ 21K
199531 10/09/10 14:28 smithg Target: 4K flow: bypass is still open
199529 10/09/10 11:28 Adesh, Jiawe Target: Target: Liquefied again
199526 10/09/10 09:12 Armstrong Target: 4K heater background information
199525 10/09/10 07:57 Armstrong Target: screens snapshot
199523 10/09/10 07:14 Richard Jone Target: Measurements to get at target heat load issues
199519 10/09/10 06:39 Armstrong, J Target: bypass heater study (inconclusive)
199518 10/09/10 03:12 smithg Target: snapshot of tgt GUI
199517 10/09/10 03:05 smithg Target: First look at target performance
Friday
199506 10/08/10 22:36 Smithg,Adesh Target: Target Status Update
199504 10/08/10 22:09 covrig Target: FSD checks during the day shift
199503 10/08/10 18:54 smithg, Ades Target: WAHOOOOOOOOOO!!! THE TARGET IS FULL!!!!!!!!!!
199491 10/08/10 14:26 covrig Target: 4K heater ON
199490 10/08/10 14:10 covrig Target: channel change for chamber vacuum gauge
199488 10/08/10 12:00 covrig Target: status
199486 10/08/10 11:48 covrig Target: vacuum motion
199479 10/08/10 10:47 Armstrong Target: turbopumps are on
199474 10/08/10 08:35 Armstrong, A Target: fan speed to 20 Hz
199473 10/08/10 07:34 Armstrong Target: 15 K flow increase
199472 10/08/10 06:21 Armstrong Target: screens snapshots
199468 10/08/10 05:30 Armstrong Target: Table Heater effect
199466 10/08/10 05:17 Armstrong Target: Target: alarms handler enabled
199465 10/08/10 04:13 smithg,armd Target: turned table htrs on
199464 10/08/10 02:56 smithg Target: need to start table heater soon
199463 10/08/10 02:29 smithg Target: thermal contraction cancels vacuum motion perfectly
199462 10/08/10 01:21 smithg Target: Setback: 4K had to be shut off
Thursday
199455 10/07/10 23:54 smithg Target: Less 4K
199453 10/07/10 22:17 smithg Target: Cooldown status
199452 10/07/10 20:47 smithg Target: Cooldown status
199449 10/07/10 19:58 benesch Target: another cold leak?
199418 10/07/10 14:00 covrig, ades Target: started 15 K cooldown
199409 10/07/10 10:42 covrig Target: status
Wednesday
199391 10/06/10 20:56 smithg Target: scattering chamber vacuum
199387 10/06/10 18:02 smithg Target: Target status
199385 10/06/10 17:41 smithg Target: Target staffing plans
Tuesday
199345 10/05/10 18:17 smithg Target: hydrogen cell survey & alignment
199338 10/05/10 17:36 Adesh Target: Platinum Resistor thermometers connected
Monday
Sunday
Saturday
Friday