Jefferson Lab HALL C Logbook for April 99 - runstarts omitted

  • Main INDEX

    Friday

  • 12710 04/30/99 22:41 mcilhany DAQ crash
  • 12709 04/30/99 22:12 cdaq SOS only LD 0% radiator
  • 12705 04/30/99 21:27 cdaq BPM screen
  • 12701 04/30/99 20:37 bryon set HMS to new momentum
  • 12697 04/30/99 19:57 bryon changed SOS trigger
  • 12696 04/30/99 18:20 bryon SOS hodoscope channel S2y5+ is dead
  • 12695 04/30/99 17:46 bryon change targets to lD2
  • 12693 04/30/99 16:52 bryon SOS ONLY run
  • 12692 04/30/99 16:51 cdaq Q3 crash
  • 12690 04/30/99 16:19 cdaq Beam Time Accounting
  • 12688 04/30/99 16:05 reinhold shift summary
  • 12687 04/30/99 15:44 hcf Dipole, Q3 trip
  • 12686 04/30/99 15:26 reinhold change SOS prescale
  • 12685 04/30/99 14:31 reinhold new HMS setting
  • 12684 04/30/99 14:26 reinhold HMS rotation problem
  • 12683 04/30/99 14:04 Fenker triple magnet trip
  • 12682 04/30/99 13:17 reinhold MCC is ready
  • 12681 04/30/99 12:34 reinhold accelerator down
  • 12679 04/30/99 10:36 reinhold junk in HMS DC2
  • 12677 04/30/99 09:34 reinhold changed SOS prescale
  • 12674 04/30/99 09:01 reinhold change target to h2
  • 12673 04/30/99 08:29 garrow shift summary
  • 12672 04/30/99 08:15 cdaq Beam Time Accounting
  • 12670 04/30/99 07:57 csa Where does hs1x13+ show up in Egamma?
  • 12668 04/30/99 07:20 garrow shift checklist
  • 12667 04/30/99 07:11 garrow BCM calibration not done
  • 12666 04/30/99 07:04 garrow HMS Q2 trip
  • 12664 04/30/99 06:36 garrow reading slits
  • 12662 04/30/99 05:51 garrow HMS h1x13+ dead
  • 12661 04/30/99 05:45 garrow HMS Pedestals changed
  • 12658 04/30/99 04:05 garrow HMS Q1
  • 12656 04/30/99 03:17 garrow Raster back
  • 12655 04/30/99 03:16 garrow MCC entry
  • 12654 04/30/99 02:30 garrow MCC Access
  • 12653 04/30/99 02:27 garrow DAQ crash
  • 12650 04/30/99 01:47 garrow ROC4 and HMS HV CRATE
  • 12649 04/30/99 00:03 cdaq Beam Time Accounting
  • 12648 04/30/99 00:02 bryon shift summary
  • Thursday

  • 12646 04/29/99 23:55 bryon ROC 4 crashed again
  • 12645 04/29/99 23:04 bryon DAQ problems
  • 12641 04/29/99 21:44 bpm screens bpm screens
  • 12640 04/29/99 21:31 bryon dipole tripped at 20:50
  • 12636 04/29/99 20:01 bryon ROC 4 crashed again
  • 12634 04/29/99 19:20 bryon SOS HV problems from early afternoon
  • 12633 04/29/99 19:18 bryon DAQ crashed
  • 12631 04/29/99 19:03 Bryon Junk runs 24717,24718
  • 12627 04/29/99 16:47 mmiller HMS cerenkov pressure readout
  • 12626 04/29/99 16:43 cdaq Beam Time Accounting
  • 12625 04/29/99 16:22 mmiller target rotated out, beam status
  • 12624 04/29/99 16:18 mmiller HMS and SOS triggers
  • 12623 04/29/99 14:37 MMiller status report from MCC
  • 12619 04/29/99 13:31 eschulte Beam Restoration Today
  • 12618 04/29/99 10:59 MMiller third power glitch
  • 12617 04/29/99 10:50 MMiller power glitch, loop 1 fan
  • 12616 04/29/99 10:42 MMiller HMS cerenkov pressure
  • 12615 04/29/99 09:59 S. Strauch Charge calibration of run #24611.
  • 12614 04/29/99 08:50 MMiller Hall A "sweet spot"
  • 12613 04/29/99 08:49 MMiller BCM callibration due soon
  • 12612 04/29/99 08:45 MMiller target cryo flow
  • 12611 04/29/99 08:43 MMiller Injector work
  • 12610 04/29/99 08:33 csa Before we get going again...
  • 12609 04/29/99 04:56 csa Changes to replay_example_latest and online_replay
  • Wednesday

  • 12608 04/28/99 18:10 bryon close SOS doors
  • 12607 04/28/99 18:09 bryon Day shift work
  • 12604 04/28/99 17:12 Mmiller Target rotated OUT
  • 12603 04/28/99 17:11 Mmiller Injector problems
  • 12601 04/28/99 17:07 Mmiller HMS shield blocks
  • 12599 04/28/99 16:35 Mmiller Summary of Maintenance Day
  • 12598 04/28/99 16:11 Meekins Collimator
  • 12597 04/28/99 15:30 MMiller raster setting
  • Tuesday

  • 12594 04/27/99 16:19 mmiller BPM screen
  • 12593 04/27/99 15:33 Bryon SOS HV replacements
  • 12592 04/27/99 10:33 Bryon SOS gas Cerenkov
  • 12591 04/27/99 07:16 zihlmann owl shift summary
  • 12590 04/27/99 07:15 cdaq Beam Time Accounting
  • 12581 04/27/99 00:12 cdaq Beam Time Accounting
  • 12580 04/27/99 00:10 bryon shift summary
  • Monday

  • 12574 04/26/99 20:30 bryon Reboot SOS and HMS HV, problem with SOS scints
  • 12573 04/26/99 20:00 bryon sos hodoscopes which turned off for runs 24690,24691
  • 12567 04/26/99 17:07 bryon change to lD2, reboot dipole PC
  • 12565 04/26/99 16:09 Eschulte Day Shift Summary
  • 12564 04/26/99 16:09 Eschulte Day Shift Log
  • 12563 04/26/99 15:57 cdaq Beam Time Accounting
  • 12561 04/26/99 14:39 Eschulte Q1 trip
  • 12560 04/26/99 14:15 eschulte BPM screen for day shift checklist
  • 12554 04/26/99 10:38 eschulte More Q2 strangeness
  • 12552 04/26/99 09:38 eschulte Q2 Alarm Strangeness
  • 12549 04/26/99 07:58 cdaq Beam Time Accounting
  • 12548 04/26/99 07:51 zihlmann owl shift summary
  • 12536 04/26/99 00:11 bryon run 24660
  • 12535 04/26/99 00:07 cdaq Beam Time Accounting
  • 12534 04/26/99 00:00 geesaman Shift Summary
  • Sunday

  • 12530 04/25/99 21:59 bryon problem during run 24665
  • 12529 04/25/99 21:39 bryon runs 24658,24659
  • 12526 04/25/99 20:05 geesaman BPM screen scan
  • 12524 04/25/99 19:27 bryon Q1,dipole trip
  • 12522 04/25/99 17:32 geesaman Q1 trip
  • 12520 04/25/99 16:03 Mmiller Day Shift Summay
  • 12519 04/25/99 16:00 cdaq Beam Time Accounting
  • 12516 04/25/99 14:18 eschulte Checklists for 4-23 through 4-25
  • 12515 04/25/99 14:11 eschulte Checklists 4-20 through 4-23
  • 12514 04/25/99 13:46 eschulte Day shift BPM screen
  • 12509 04/25/99 10:23 Mmiller DAQ problems, Q2 tripped
  • 12500 04/25/99 07:59 cdaq Beam Time Accounting
  • 12499 04/25/99 07:49 zihlmann owl shift summary
  • 12497 04/25/99 07:08 brownds BPM
  • 12486 04/25/99 00:00 geesaman Shift Summary
  • Saturday

  • 12485 04/24/99 23:59 cdaq Beam Time Accounting
  • 12482 04/24/99 22:46 geesaman Roc 4 crash
  • 12478 04/24/99 20:30 averys radiator
  • 12477 04/24/99 20:24 sawafta bpm screen
  • 12472 04/24/99 17:48 geesaman Q1 problem repaired
  • 12471 04/24/99 17:47 Fowler Q1 fixed.........
  • 12470 04/24/99 16:36 mmiller day shift summay
  • 12469 04/24/99 16:33 mmiller Day Shift Summary
  • 12468 04/24/99 16:30 cdaq
  • 12467 04/24/99 16:14 cdaq Beam Time Accounting
  • 12466 04/24/99 15:16 eschulte Day Shift BPM Screen
  • 12465 04/24/99 15:14 eschulte Q1 trip
  • 12460 04/24/99 10:09 maurice really LD target
  • 12459 04/24/99 10:08 maurice really LD target
  • 12458 04/24/99 08:06 cdaq Beam Time Accounting
  • 12457 04/24/99 08:02 zihlmann owl shift summary (Quad trip shift)
  • 12454 04/24/99 06:24 danagoulian Q1 trip
  • 12452 04/24/99 05:40 brownds BPM medm screen
  • 12449 04/24/99 01:45 zihlmann Q1 trip again
  • 12447 04/24/99 00:48 zihlmann Q1 trip Q3 computer crash
  • 12446 04/24/99 00:03 geesaman Shift Summary
  • 12445 04/24/99 00:02 cdaq Beam Time Accounting
  • Friday

  • 12444 04/23/99 23:45 geesaman BCM calibration.
  • 12442 04/23/99 23:41 geesaman HMS Q1 quench
  • 12440 04/23/99 23:39 geesaman Roc 4 Crash
  • 12433 04/23/99 17:38 Vulcan HMS Hut door interlock repaired
  • 12432 04/23/99 16:42 geesaman Q1 trip
  • 12431 04/23/99 16:03 cdaq Beam Time Accounting
  • 12430 04/23/99 16:02 gabriel Shift Summary
  • 12428 04/23/99 14:31 eschulte medm screen
  • 12427 04/23/99 14:30 eschulte Q3 PC not responsive
  • 12418 04/23/99 08:34 cdaq Beam Time Accounting
  • 12416 04/23/99 07:47 zihlmann Shift Summary
  • 12409 04/23/99 03:06 danagoulian ROC4 crash and replay failure
  • Thursday

  • 12401 04/22/99 23:58 cdaq Beam Time Accounting
  • 12400 04/22/99 23:57 Geesaman Shift Summary
  • 12395 04/22/99 22:04 geesaman HMS Door problem
  • 12394 04/22/99 22:00 geesaman HMS Q1 PC Hard Drive fails
  • 12393 04/22/99 20:08 geesaman HMS Q1 Computer wont reboot
  • 12391 04/22/99 18:30 geesaman hcc18 unavailable
  • 12389 04/22/99 17:15 maurice HV cards in HMS hut (NOT)
  • 12388 04/22/99 16:46 saw Target fan data logged in coda
  • 12387 04/22/99 16:00 cdaq Beam Time Accounting
  • 12386 04/22/99 15:58 gabriel Shift Summary
  • 12380 04/22/99 11:07 Potterveld HMS hall probe GUI
  • 12378 04/22/99 07:57 markowitz shift summary
  • 12377 04/22/99 07:54 cdaq Beam Time Accounting
  • 12376 04/22/99 07:19 markowitz beam gone
  • 12374 04/22/99 06:14 markowitz daq
  • 12372 04/22/99 05:55 markowitz bpm
  • 12369 04/22/99 02:49 markowitz target change
  • 12368 04/22/99 02:43 danagoulian comments to run #24543-2455
  • 12364 04/22/99 00:00 cdaq Beam Time Accounting
  • 12363 04/22/99 00:00 geesaman Shift Summary
  • Wednesday

  • 12361 04/21/99 22:48 geesaman BPM Screen Grab
  • 12359 04/21/99 22:12 geesaman HMS Q2 trip
  • 12358 04/21/99 22:08 geesaman Beam off
  • 12356 04/21/99 21:22 geesaman HMS Q1 and Dipole trip
  • 12353 04/21/99 19:34 geesaman HMS Dipole computer reboot
  • 12351 04/21/99 17:10 geesaman Q1 trip
  • 12349 04/21/99 16:46 geesaman SOS Hall Probe Readout
  • 12348 04/21/99 16:09 geesaman Beam current temp reducesd
  • 12346 04/21/99 16:00 gabriel shift summary
  • 12345 04/21/99 15:59 cdaq Beam Time Accounting
  • 12336 04/21/99 10:23 baker Q2 trip
  • 12333 04/21/99 07:50 markowitz shift summary
  • 12332 04/21/99 07:48 cdaq Beam Time Accounting
  • Tuesday

  • 12331 04/20/99 23:50 saw Shift summary
  • 12330 04/20/99 23:43 cdaq Beam Time Accounting
  • 12329 04/20/99 22:41 saw Shift checklists
  • 12328 04/20/99 20:49 saw Accelerator Major event
  • 12326 04/20/99 18:49 saw Dipole trip
  • 12322 04/20/99 17:07 Fowler Q1 error
  • 12321 04/20/99 16:25 Johna Run 24531 analysis problem
  • 12320 04/20/99 16:07 bryon Q1 trips off
  • 12319 04/20/99 16:04 mueller shift summary
  • 12318 04/20/99 16:00 cdaq Beam Time Accounting
  • 12317 04/20/99 15:55 baker Loop 3 DP readout
  • 12316 04/20/99 15:00 Fowler Q1 trip/fix
  • 12315 04/20/99 12:37 Dunne D2 diff. pressure
  • 12313 04/20/99 12:22 bryon Hall Access finished
  • 12312 04/20/99 10:17 vulcan Cartridge replacement
  • 12311 04/20/99 08:54 bryon Q1 trip
  • 12310 04/20/99 08:34 saw NOTE: OLD ENTRY FROM SAW Target temperature excursions
  • 12309 04/20/99 08:26 cdaq Beam Time Accounting
  • 12307 04/20/99 08:11 markowitz shift summary
  • 12306 04/20/99 08:05 bryon Q3 trip
  • 12304 04/20/99 06:56 gaskell run 24539 is junk
  • 12300 04/20/99 05:07 gaskell bpm for checklist
  • 12299 04/20/99 04:48 gaskell Q2 trip at end of run 24537
  • 12297 04/20/99 03:56 gaskell Q1 recovery
  • 12295 04/20/99 03:11 gaskell Q1 tripped
  • 12294 04/20/99 02:53 gaskell Q3 tripped
  • 12292 04/20/99 01:54 gueye Energy lock problem
  • 12291 04/20/99 01:41 gaskell beam gone at 1:30
  • 12289 04/20/99 00:10 saw Shift summary
  • 12287 04/20/99 00:00 cdaq Beam Time Accounting
  • Monday

  • 12286 04/19/99 23:53 saw BPM screen
  • 12285 04/19/99 23:46 saw Q1 and dipole
  • 12284 04/19/99 23:41 saw Q1 and Q2 weirdness
  • 12283 04/19/99 23:26 saw Run 24531 analysis problem
  • 12281 04/19/99 22:09 saw DAQ hiccup, run 24530
  • 12277 04/19/99 19:59 saw Target behaviour at 50 microamps
  • 12276 04/19/99 19:50 saw Increase current to 50 microamps
  • 12273 04/19/99 16:27 saw Dipole trip
  • 12272 04/19/99 16:13 cdaq Beam Time Accounting
  • 12271 04/19/99 16:01 bryon shift summary
  • 12270 04/19/99 15:54 bryon bpm screens
  • 12269 04/19/99 15:49 bryon Q2 trips off
  • 12267 04/19/99 15:39 bryon changed HMS angle, momentum
  • 12265 04/19/99 15:24 vulcan hms door controller
  • 12264 04/19/99 15:22 vulcan Reset on spare computer.
  • 12263 04/19/99 13:40 Nathan BPM
  • 12260 04/19/99 12:03 ent beam position
  • 12258 04/19/99 11:03 Potterveld Beam position shifted?
  • 12253 04/19/99 10:06 Fowler Q3 Hall probe
  • 12249 04/19/99 09:35 Fowler Q2/Q3
  • 12247 04/19/99 08:12 markowitz shift summary
  • 12246 04/19/99 08:11 cdaq Beam Time Accounting
  • 12245 04/19/99 07:39 gaskell Q1 tripped
  • 12244 04/19/99 07:26 gaskell run 24511 also junk
  • 12241 04/19/99 07:09 gaskell run 24509 is junk
  • 12234 04/19/99 05:04 markowitz bpm shot
  • 12232 04/19/99 04:54 gaskell run 24502 ended itself
  • 12229 04/19/99 04:08 markowitz beam
  • 12227 04/19/99 03:04 markowitz q1 (and q3)
  • 12223 04/19/99 01:43 gaskell Q1 tripped
  • 12222 04/19/99 01:39 gaskell Q2 tripped
  • 12220 04/19/99 01:21 markowitz dipole pc
  • 12216 04/19/99 00:07 cdaq Beam Time Accounting
  • 12215 04/19/99 00:01 saw Shift Summary
  • Sunday

  • 12206 04/18/99 21:36 saw Dipole problems
  • 12205 04/18/99 21:04 saw Q1 trip
  • 12204 04/18/99 21:03 saw Q2 trip
  • 12203 04/18/99 20:37 X. Jiang results of charge caliberation run 24480.
  • 12197 04/18/99 19:28 X. Jiang Run 24480 current caliberation.
  • 12196 04/18/99 19:01 Bochna HMS magnets set to 4.0 GeV for TOF calib.
  • 12191 04/18/99 16:14 bryon shift summary
  • 12189 04/18/99 16:01 cdaq Beam Time Accounting
  • 12184 04/18/99 14:09 bryon extended hall C access
  • 12182 04/18/99 13:23 fowler HMS Dipole
  • 12179 04/18/99 12:32 nathan dipole trip
  • 12178 04/18/99 12:30 nathan Q3 PC problem fixed
  • 12175 04/18/99 10:51 nathan LD2 confirmed
  • 12174 04/18/99 10:49 nathan LD2 confirmed
  • 12173 04/18/99 10:39 nathan q3 crash
  • 12172 04/18/99 09:18 nathan should this be LD2?
  • 12171 04/18/99 09:17 nathan should this be LD2?
  • 12170 04/18/99 08:52 bryon hms hodoscopes trip off
  • 12167 04/18/99 08:04 bryon q1 tripped
  • 12166 04/18/99 07:57 markowitz shift summary
  • 12165 04/18/99 07:56 cdaq Beam Time Accounting
  • 12162 04/18/99 07:19 markowitz targets
  • 12159 04/18/99 05:33 markowitz daq
  • 12155 04/18/99 05:17 gaskell bpm screen for checklist
  • 12153 04/18/99 04:47 gaskell Q2 trip ends run 24456
  • 12151 04/18/99 04:14 gaskell run 24455 ended itself
  • 12149 04/18/99 03:29 gaskell Q1 trip ends run 24454
  • 12147 04/18/99 03:06 gaskell run 24453 end of run failure
  • 12145 04/18/99 02:17 gaskell Downloaded new HMS thresholds
  • 12144 04/18/99 02:14 markowitz daq
  • 12141 04/18/99 02:09 markowitz magnets
  • 12140 04/18/99 01:34 gaskell HMS dipole trips
  • 12139 04/18/99 01:14 markowitz dipole
  • 12138 04/18/99 01:08 cdaq Beam Time Accounting
  • 12136 04/18/99 00:40 gaskell Q1 is back
  • Saturday

  • 12134 04/17/99 23:56 saw Shift summary
  • 12133 04/17/99 23:52 saw Q1 Trip
  • 12130 04/17/99 22:43 saw 2 Q1 trips
  • 12128 04/17/99 22:03 saw minor DAQ problem
  • 12123 04/17/99 20:54 saw Change to EPICS logging
  • 12120 04/17/99 19:41 Bochna HMS Door closing
  • 12119 04/17/99 19:33 bochna Q2 trips
  • 12117 04/17/99 19:15 bochna ROC2 rebooted
  • 12115 04/17/99 18:13 saw CODAMASTER is OK
  • 12114 04/17/99 18:09 saw HMS door workaround
  • 12113 04/17/99 18:07 saw HMS drift chamber HV
  • 12111 04/17/99 16:13 cdaq Beam Time Accounting
  • 12110 04/17/99 16:12 cdaq Beam Time Accounting
  • 12109 04/17/99 16:03 Dunne Shift Summary
  • 12108 04/17/99 16:02 Dunne HMS drift chamber hv gone
  • 12107 04/17/99 15:47 emmanuel BPM screen
  • 12106 04/17/99 15:37 danagoulian He gas bottle
  • 12105 04/17/99 15:26 Dunne HMS dipole warning
  • 12104 04/17/99 15:17 Dunne Lost dipole screen
  • 12098 04/17/99 14:01 Dunne Q2 pc frozen
  • 12096 04/17/99 13:11 Dunne Q3 PC frozen
  • 12094 04/17/99 12:40 danagoulian hms_thresholds after CAEN crate replacement
  • 12093 04/17/99 12:26 Dunne Dipole trip
  • 12086 04/17/99 10:31 Dunne HMS door problems
  • 12085 04/17/99 10:22 Dunne H2 (loop 1) pressure readout
  • 12084 04/17/99 10:19 Dunne HV crate replacement
  • 12083 04/17/99 10:11 Markowitz Shift Summary
  • 12082 04/17/99 10:10 cdaq Beam Time Accounting
  • 12081 04/17/99 09:44 nathan Q1 trip
  • 12080 04/17/99 09:03 markowitz hv
  • 12079 04/17/99 07:27 gaskell HMS drift chambers tripped off
  • 12073 04/17/99 05:24 gaskell CODAMASTER problem
  • 12071 04/17/99 05:05 markowitz daq
  • 12069 04/17/99 04:43 markowitz daq
  • 12067 04/17/99 04:19 markowitz Q2, trip
  • 12065 04/17/99 03:25 gaskell rebooted DAQ
  • 12063 04/17/99 03:13 gaskell runs 24410 and 24111 are junk
  • 12061 04/17/99 03:10 markowitz bpm
  • 12059 04/17/99 03:05 gaskell Q3 PC is also frozen.
  • 12058 04/17/99 03:03 gaskell Q2 PC is frozen
  • 12053 04/17/99 00:41 gaskell Running with more than 1 million events..
  • 12051 04/17/99 00:21 cdaq Beam Time Accounting
  • 12050 04/17/99 00:01 saw Shift summary
  • Friday

  • 12047 04/16/99 23:29 bochna HMS Q1 trips and is reset
  • 12044 04/16/99 22:24 saw Q3 trip
  • 12040 04/16/99 20:55 saw HMS Shower Counter HV
  • 12037 04/16/99 19:10 nathan Casablanca
  • 12036 04/16/99 17:36 gilman system checks extended
  • 12033 04/16/99 16:01 cdaq Beam Time Accounting
  • 12034 04/16/99 16:01 Beck Shift Report 2 (day 16 Apr)
  • 12025 04/16/99 11:44 Beck Shift Report 1 (day, 16 Apr)
  • 12021 04/16/99 09:15 Mack FR is on the shift checklist
  • 12020 04/16/99 09:03 Dunne Slit box communication
  • 12019 04/16/99 08:04 gaskell owl shift summary
  • 12018 04/16/99 08:03 cdaq Beam Time Accounting
  • 12015 04/16/99 06:56 gaskell Q1 crash
  • 12013 04/16/99 06:26 gaskell run 24377 is junk
  • 12010 04/16/99 06:16 gaskell Q2 crash
  • 12007 04/16/99 05:42 gaskell checklist bpm
  • 12005 04/16/99 05:16 gaskell Q3 PSU cur readback
  • 12003 04/16/99 04:45 gaskell HMS dipole, Q3 trip
  • 11999 04/16/99 03:27 gaskell RUN 24368 is JUNK
  • 11996 04/16/99 03:08 gueye Notes on energy measurement
  • 11994 04/16/99 02:44 gaskell changed hodo slop parameters
  • 11992 04/16/99 02:22 gaskell Raster reinitialized
  • 11989 04/16/99 01:59 gaskell Ion chamber readback scale
  • 11988 04/16/99 01:57 gaskell Raster is 0.5 mm radius
  • 11987 04/16/99 01:41 gaskell downloaded new hms thresholds
  • 11984 04/16/99 01:06 gaskell Replaced Crate 1 in HMS
  • 11982 04/16/99 00:09 X. Jiang swing shift activity.
  • 11981 04/16/99 00:06 cdaq Beam Time Accounting
  • Thursday

  • 11980 04/15/99 23:50 Bochna HMS HV Crate 1 dies
  • 11978 04/15/99 22:50 maurice background at dipole exit
  • 11976 04/15/99 22:05 maurice background at 37degr.
  • 11969 04/15/99 20:04 gilman access for hdc1u1
  • 11968 04/15/99 19:55 maurice bad timing spectrum in hhdc1u1
  • 11966 04/15/99 19:52 nathan operating parameters
  • 11959 04/15/99 16:00 Beck Shift Report 2 (day, 15 Apr)
  • 11958 04/15/99 15:55 cdaq Beam Time Accounting
  • 11957 04/15/99 12:07 Beck Shift Report 1 (15 Apr 99)
  • 11956 04/15/99 11:30 Mack HMS temp too high
  • 11955 04/15/99 10:59 nathan HMS temperature alarm
  • 11954 04/15/99 10:34 Mack replay engine
  • 11953 04/15/99 09:36 gaskell HMS (SOS) beta problem fix
  • 11952 04/15/99 08:00 cdaq Beam Time Accounting
  • 11951 04/15/99 07:58 gaskell owl shift summary
  • 11950 04/15/99 03:12 gaskell Can't check slit positions
  • 11949 04/15/99 02:54 gaskell HMS dipole is set (at last!)
  • 11947 04/15/99 01:35 gaskell Do not rotate HMS to smaller angle!
  • 11946 04/15/99 01:18 meekins SOS angle and lead
  • 11945 04/15/99 01:08 gaskell HMS rotation
  • 11944 04/15/99 00:04 cdaq Beam Time Accounting
  • Wednesday

  • 11940 04/14/99 17:10 Maurice hs1x7 scint (cont.)
  • 11939 04/14/99 16:53 saw HMS HV controls
  • 11938 04/14/99 16:00 cdaq Beam Time Accounting
  • 11931 04/14/99 11:42 mack mps cavity readback to Hall A
  • 11922 04/14/99 09:02 S. Strauch Charge calibration of run #24310.
  • 11921 04/14/99 00:12 cdaq Beam Time Accounting
  • 11920 04/14/99 00:08 cdaq Beam Time Accounting
  • Tuesday

  • 11919 04/13/99 18:28 maurice/vulc scint HMS s1x7
  • 11913 04/13/99 15:31 cdaq Beam Time Accounting
  • 11908 04/13/99 11:57 Vulcan s2x12- high voltage
  • 11907 04/13/99 10:56 Bochna HMS HS1X7+ fixed
  • 11906 04/13/99 07:09 cdaq Beam Time Accounting
  • 11905 04/13/99 00:10 Tang Swing shift report
  • 11904 04/13/99 00:09 cdaq Beam Time Accounting
  • Monday

  • 11902 04/12/99 23:08 gueye Beam Energy Measurement
  • 11894 04/12/99 18:00 maurice TOF HMS
  • 11892 04/12/99 17:05 acochran HMS dipole and Q3 trip
  • 11890 04/12/99 16:06 cdaq Beam Time Accounting
  • 11888 04/12/99 15:58 Beck Shift Summary (4/12)
  • 11880 04/12/99 10:58 Beck Shift Summary 1 (Day 4/12)
  • 11878 04/12/99 10:56 Bochna Target heat load fluctuations
  • 11876 04/12/99 10:44 Bochna HV EPICS display restarted
  • 11875 04/12/99 10:41 Bochna Q1 trip
  • 11874 04/12/99 10:03 Bochna ESR He supply temp rising
  • 11869 04/12/99 08:34 Bochna Dipole, Q3 trip
  • 11868 04/12/99 08:31 cdaq Beam Time Accounting
  • 11864 04/12/99 07:39 gasparian owl shift summary
  • 11854 04/12/99 00:42 cdaq Beam Time Accounting
  • 0 04/12/99 00:41 no_name Beam Time Accounting
  • Sunday

  • 11849 04/11/99 23:45 gaskell RUN 24272 is SOS only - no radiator
  • 11847 04/11/99 23:36 gaskell HMS dipole, Q3 trip
  • 11846 04/11/99 23:27 gaskell downloaded new HMS thresholds
  • 11842 04/11/99 22:44 maurice inefficiency? s1x7+
  • 11841 04/11/99 22:27 gaskell Q2 PC is frozen
  • 11838 04/11/99 21:50 x. jiang run 24266, sos only run.
  • 11836 04/11/99 21:27 gaskell Changed Ethane, Helium bottles
  • 11832 04/11/99 19:48 gaskell Q1 self reboots
  • 11828 04/11/99 17:46 gaskell Rebooted Q2,Q1 PC's
  • 11827 04/11/99 16:46 gaskell HMS dipole warning
  • 11825 04/11/99 16:32 gaskell Rebooted HMS dipole PC
  • 11824 04/11/99 16:19 gaskell HMS dipole screen frozen
  • 11823 04/11/99 16:15 gaskell Run 24257 might be junk
  • 11821 04/11/99 16:11 nathan day shift summary, part 2
  • 11820 04/11/99 16:09 gaskell DAQ reboot
  • 11819 04/11/99 16:00 cdaq Beam Time Accounting
  • 11813 04/11/99 14:19 nathan incorrect target designation
  • 11809 04/11/99 12:27 nathan more about Q1
  • 11806 04/11/99 11:57 nathan Q1 current
  • 11805 04/11/99 11:54 nathan day shift summary
  • 11804 04/11/99 11:51 nathan DAQ crash
  • 11801 04/11/99 11:09 nathan target change to LD2
  • 11800 04/11/99 10:46 nathan HMS Q2 trip
  • 11798 04/11/99 09:44 nathan HMS dipole and Q3 trip
  • 11796 04/11/99 09:02 Fowler HMS Dipole
  • 11795 04/11/99 08:54 ashot HMS dipol trip
  • 11794 04/11/99 08:45 ashot Gaspar dipole trip
  • 11793 04/11/99 08:43 cdaq Beam Time Accounting
  • 11792 04/11/99 06:12 acochran Target:Loop 2 alarm
  • 11789 04/11/99 04:53 acochran Q2 trip
  • 11781 04/11/99 00:23 gaskell HMS dipole trouble
  • 11780 04/11/99 00:09 Holt swing shift summary
  • 11779 04/11/99 00:03 cdaq Beam Time Accounting
  • Saturday

  • 11778 04/10/99 23:35 gaskell HMS dipole/Q3 trip
  • 11776 04/10/99 23:12 gaskell RUN 24233 no radiator run for MEEKINS
  • 11774 04/10/99 22:56 gaskell Q1 trip
  • 11772 04/10/99 22:41 gaskell changed target to LD
  • 11770 04/10/99 21:16 gaskell Changed argon bottle
  • 11768 04/10/99 21:02 gaskell Argon bottle getting low - change next shift!
  • 11761 04/10/99 17:29 gaskell target status
  • 11760 04/10/99 17:25 gaskell Reboot HMS Q2,Q3 and SOS magnet vmec
  • 11756 04/10/99 16:06 gaskell Rebooted SOS and HMS HV epics
  • 11755 04/10/99 15:56 cdaq Beam Time Accounting
  • 11752 04/10/99 14:39 mack reboot list
  • 11748 04/10/99 12:54 mack magnet misc. problems
  • 11746 04/10/99 12:27 mack correction
  • 11745 04/10/99 12:23 mack run 24213 questionable
  • 11742 04/10/99 12:05 mack beam position adjustment
  • 11739 04/10/99 11:22 maurice Dipole trip at the end
  • 11738 04/10/99 11:04 Bochna ESR Supply and Temp Graphs
  • 11737 04/10/99 11:04 maurice comparison TOF calibration
  • 11736 04/10/99 10:14 Bochna Old TOF Calibration File
  • 11735 04/10/99 10:06 mack existing magnet settings II
  • 11734 04/10/99 10:02 mack existing magnet settings I
  • 11733 04/10/99 09:46 mack fast raster screen capture
  • 11732 04/10/99 09:19 mack sos hodo channel inefficient?
  • 11731 04/10/99 09:17 mack inquire: status of TOF calibrations?
  • 11728 04/10/99 07:59 vardan Run Sheets at 04/10/99
  • 11727 04/10/99 07:53 cdaq Beam Time Accounting
  • 11719 04/10/99 00:01 cdaq Beam Time Accounting
  • Friday

  • 11718 04/09/99 23:58 Holt swing shift summary part II
  • 11714 04/09/99 22:34 gaskell BPM for checklist
  • 11711 04/09/99 21:00 Maurice Accumulated charge
  • 11710 04/09/99 20:45 Holt Shift log part I
  • 11701 04/09/99 16:01 cdaq Beam Time Accounting
  • 11700 04/09/99 15:31 Lung HMS Q2 screen disappears
  • 11699 04/09/99 15:11 bochna Target moved to 12cm LH2
  • 11698 04/09/99 14:53 S. Strauch Charge calibration of run #24167.
  • 11697 04/09/99 14:22 mack He gas bottles
  • 11696 04/09/99 14:18 Lung Beam gone
  • 11693 04/09/99 13:07 mack no obvious DAQ errors?
  • 11691 04/09/99 12:48 mack electronics reconfig.
  • 11688 04/09/99 11:27 Lung Beam gone
  • 11687 04/09/99 11:16 Lung Increase current
  • 11684 04/09/99 10:01 mack SOS magnet settings
  • 11683 04/09/99 09:59 mack activity in electronics room
  • 11680 04/09/99 07:22 Keppel Shift Summary
  • 11679 04/09/99 07:19 cdaq Beam Time Accounting
  • Thursday

  • 11678 04/08/99 23:55 holt swing shift summary
  • 11677 04/08/99 23:55 cdaq Beam Time Accounting
  • 11675 04/08/99 16:07 Potterveld Shift report
  • 11674 04/08/99 16:00 cdaq Beam Time Accounting
  • 11673 04/08/99 15:41 Potterveld Q3 back
  • 11671 04/08/99 15:30 Potterveld HMS Q3 trip
  • 11669 04/08/99 14:36 Potterveld HMS Dipole PC rebooted
  • 11668 04/08/99 14:14 Dunne BPM Screen
  • 11658 04/08/99 10:50 Potterveld Target and radiator changed
  • 11657 04/08/99 10:49 Potterveld BC calibration
  • 11654 04/08/99 09:31 Bowhuis/Lung Ion chambers: conclusion
  • 11653 04/08/99 09:25 Bowhuis/Lung Ion chamber readings more..
  • 11652 04/08/99 09:20 Bowhuis/Lung Ion chamber readings contd.
  • 11651 04/08/99 08:52 Bowhuis/Lung Ion chamber readings
  • 11648 04/08/99 07:49 cdaq Beam Time Accounting
  • 11647 04/08/99 07:44 Keppel Shift Log and Summary
  • 11646 04/08/99 07:42 Keppel shift checklist
  • 11644 04/08/99 07:18 gabriel bpm medm screen
  • 11628 04/08/99 00:04 eschulte Swing Shift Log
  • 11627 04/08/99 00:03 eschulte Swing Shift Summary
  • 11626 04/08/99 00:01 cdaq Beam Time Accounting
  • Wednesday

  • 11624 04/07/99 23:26 gaskell Q3 trips
  • 11623 04/07/99 23:21 gaskell dipole trip
  • 11622 04/07/99 23:14 maurice shielding in dipole
  • 11618 04/07/99 22:13 eschulte Beam position screen e96003
  • 11616 04/07/99 16:04 Potterveld Shift summary
  • 11615 04/07/99 15:58 cdaq Beam Time Accounting
  • 11614 04/07/99 15:53 Lung Counting House AC repair work
  • 11613 04/07/99 14:01 Lung Q2 repairs complete
  • 11612 04/07/99 12:16 Lung SOS beta and fptime
  • 11611 04/07/99 11:37 Lung Request access
  • 11608 04/07/99 09:50 Lung HMS Drift Chambers off
  • 11605 04/07/99 07:58 cdaq Beam Time Accounting
  • 11604 04/07/99 07:58 Keppel Shift Summary
  • 11603 04/07/99 07:57 Keppel Magnet Trip Summary
  • 11594 04/07/99 00:06 eschulte Swing Shift Summary
  • 11595 04/07/99 00:05 eschulte Swing Shift Log
  • 11593 04/07/99 00:01 cdaq Beam Time Accounting
  • Tuesday

  • 11591 04/06/99 16:07 cdaq Beam Time Accounting
  • 11590 04/06/99 16:05 Potterveld Beam accounting backup copy
  • 11589 04/06/99 16:02 Potterveld Shift report
  • 11588 04/06/99 14:56 S. Strauch Charge calibration of run #24108.
  • 11587 04/06/99 12:40 Potterveld HMS hall probes working again
  • 11586 04/06/99 12:18 Lung Hall C Access
  • 11585 04/06/99 12:13 Fenker HV GUI Anomoly
  • 11584 04/06/99 12:10 fenker SOS Cerenkov was off
  • 11583 04/06/99 11:40 Potterveld Q2 tripped
  • 11581 04/06/99 10:36 Potterveld Q2 recovered
  • 11579 04/06/99 10:12 Potterveld Q2 trip
  • 11575 04/06/99 09:43 Potterveld Q2 trip
  • 11574 04/06/99 09:33 Lung Camera survey: water on floor
  • 11573 04/06/99 09:33 Potterveld Q2 recovered
  • 11571 04/06/99 09:21 Potterveld BPM page
  • 11569 04/06/99 09:01 Potterveld Q2 tripped off
  • 11568 04/06/99 08:55 Potterveld HMS hall probes
  • 11567 04/06/99 08:39 Potterveld HMS hall probe data gone again
  • 11565 04/06/99 08:23 Potterveld Beam position, SOS quad adjusted
  • 11564 04/06/99 08:01 cdaq Beam Time Accounting
  • 11563 04/06/99 07:48 meekins Shift summary
  • 11560 04/06/99 07:21 meekins Q2 trip
  • 11553 04/06/99 04:58 Meekins updated HMS thresholds
  • 11551 04/06/99 04:22 meekins SOS threshold file changed
  • 11550 04/06/99 04:16 meekins shift check list
  • 11549 04/06/99 04:11 meekins BPM scan
  • 11547 04/06/99 03:54 meekins Q2 Q3 and dipole tripped
  • 11546 04/06/99 03:40 meekins Q3 back
  • 11545 04/06/99 03:33 meekins target and radiator change
  • 11544 04/06/99 03:21 meekins Q3 trip
  • 11543 04/06/99 03:15 Meekins HMS dipole trip
  • 11542 04/06/99 03:03 meekins Notes for Run 24111
  • 11540 04/06/99 01:05 maurice HMS magnet trips versus time
  • 11539 04/06/99 01:00 Cadman Q2 is on, beam not ready.
  • 11538 04/06/99 00:04 cdaq Beam Time Accounting
  • 11537 04/06/99 00:03 eschulte Swing Shift Log
  • Monday

  • 11536 04/05/99 23:46 gaskell Q2 trips one more time.
  • 11535 04/05/99 22:46 gaskell Q2 trips again before reset
  • 11534 04/05/99 22:25 gaskell Q2 trips again before reset
  • 11533 04/05/99 22:07 gaskell Q2 trip
  • 11532 04/05/99 21:59 Johna documents directory updates.
  • 11531 04/05/99 20:39 eschulte BPM for shift log
  • 11530 04/05/99 20:19 eschulte Q2 trip
  • 11529 04/05/99 19:00 maurice prop chamber
  • 11528 04/05/99 18:56 maurice hv trouble
  • 11527 04/05/99 18:52 maurice magnet work
  • 11524 04/05/99 18:00 johna ADC/TDC/Scaler map update.
  • 11523 04/05/99 17:05 eschulte Q2 trip
  • 11522 04/05/99 16:37 Potterveld SOS degaussed
  • 11521 04/05/99 16:21 Potterveld SOS magnet control program
  • 11520 04/05/99 16:01 Potterveld SHIFT SUMMARY
  • 11519 04/05/99 16:00 cdaq Beam Time Accounting
  • 11518 04/05/99 14:54 Potterveld HMS hall probe readout fixed
  • 11517 04/05/99 14:39 Potterveld SOS Hall probes
  • 11516 04/05/99 13:18 Potterveld SOS Hall probes
  • 11515 04/05/99 12:24 Potterveld Hall C access
  • 11514 04/05/99 11:54 Potterveld Q2 trip
  • 11512 04/05/99 11:08 Potterveld Q2 recovered
  • 11510 04/05/99 11:05 maurice access plan
  • 11508 04/05/99 10:49 Potterveld HMS Q2 trip
  • 11505 04/05/99 09:27 Potterveld Q2 recovered
  • 11502 04/05/99 09:05 Potterveld HMS Q2 tripped.
  • 11499 04/05/99 08:51 vulcan Q2 trip
  • 11495 04/05/99 08:01 cdaq Beam Time Accounting
  • 11494 04/05/99 07:59 Meekins Shift Summary
  • 11492 04/05/99 07:50 meekins Q2 trip
  • 11491 04/05/99 07:29 meekins q2 trip
  • 11489 04/05/99 07:20 meekins HMS trigger changed
  • 11486 04/05/99 06:32 Meekins Q3 trip
  • 11483 04/05/99 06:23 Meekins HMS q1 tripped
  • 11478 04/05/99 04:37 meekins shift checklist
  • 11476 04/05/99 04:20 meekins PBM screen
  • 11474 04/05/99 04:11 meekins Q2 trip
  • 11469 04/05/99 02:35 Meekins Target reboot
  • 11467 04/05/99 01:24 Meekins HMS magnets reset
  • 11465 04/05/99 01:18 meekins sos thresholds updated
  • 11463 04/05/99 01:06 Meekins hms_thresholds.dat update
  • 11461 04/05/99 00:47 Cadman Correction to 24076
  • 11458 04/05/99 00:24 Meekins HMS dipole trip
  • 11455 04/05/99 00:11 eschulte Swing Shift Summary
  • 11454 04/05/99 00:07 eschulte Swing Shift Log
  • 11453 04/05/99 00:05 cdaq Beam Time Accounting
  • Sunday

  • 11447 04/04/99 21:05 eschulte MEDM beam profile Screen Log
  • 11442 04/04/99 20:17 eschulte Yet another Q2 trip
  • 11441 04/04/99 19:47 eschulte Q2 trip take 2
  • 11437 04/04/99 18:19 eschulte Shift Checklists
  • 11436 04/04/99 18:04 eschulte Shift Checklists
  • 11434 04/04/99 17:41 eschulte Shift Check list
  • 11432 04/04/99 17:37 eschulte Q2 trip
  • 11429 04/04/99 16:03 CDAQ day shift summary
  • 11428 04/04/99 16:01 cdaq Beam Time Accounting
  • 11421 04/04/99 13:50 zeier incorrect pedestal subtraction
  • 11417 04/04/99 12:53 Potterveld SOS ADC problem
  • 11415 04/04/99 11:48 Potterveld Reboot VMEC2
  • 11411 04/04/99 10:30 zeier Q2 trip
  • 11408 04/04/99 09:54 maurice hall A beam energy
  • 11407 04/04/99 09:27 Potterveld Q2 trip recovered
  • 11403 04/04/99 08:37 Potterveld Q2 trip
  • 11402 04/04/99 08:03 cdaq Beam Time Accounting
  • 11401 04/04/99 07:31 Meekins Hall card reader PC
  • 11400 04/04/99 07:28 Meekins Shift Summary
  • 11397 04/04/99 06:56 meekins BPM positions
  • 11394 04/04/99 06:18 Meekins Q3 trip
  • 11393 04/04/99 06:10 meekins Q2 trip
  • 11392 04/04/99 06:03 Cadman Clarification of target number
  • 11390 04/04/99 05:26 Meekins HMS high voltage off
  • 11389 04/04/99 05:24 Meeekins Changed HMS trigger to 4/4
  • 11388 04/04/99 05:23 Meekins Target Change
  • 11385 04/04/99 04:28 Meekins Changed raster size
  • 11383 04/04/99 04:26 Meekins Q2 Trip
  • 11382 04/04/99 04:01 Meekins Q3 and dipole reset
  • 11381 04/04/99 03:57 Meekins Q2 reset
  • 11380 04/04/99 03:53 Meekins HMS Q3 and dipole trip
  • 11379 04/04/99 03:39 Meekins. HMS trigger Chnaged to 3/4
  • 11378 04/04/99 03:35 Cadman 24030 has 0% radiator
  • 11377 04/04/99 03:29 Meekins HMS Q2 trip
  • 11373 04/04/99 01:26 Meekins Dipole back on
  • 11370 04/04/99 01:00 Cadman prescale
  • 11368 04/04/99 00:34 Meekins Q3 and Dipole trip on HMS
  • 11365 04/04/99 00:00 cdaq Beam Time Accounting
  • Saturday

  • 11364 04/03/99 23:59 L.Tang Swing shift record and summary
  • 11363 04/03/99 23:45 gaskell Q1 PC dies
  • 11362 04/03/99 23:13 gaskell Q2 PC dies- end of run 24022
  • 11356 04/03/99 20:53 gaskell 24017 ends for dipole trip
  • 11353 04/03/99 19:43 gaskell 24015 ends for Q2 trip
  • 11350 04/03/99 18:51 gaskell 24013 ends for Q1 trip
  • 11346 04/03/99 18:05 gaskell changed sos trigger to 3/4
  • 11344 04/03/99 17:59 gaskell Q2 PC reboot
  • 11343 04/03/99 17:36 gaskell Q2 trips 3 times!
  • 11341 04/03/99 17:02 Potterveld Magnet alarm panel rewired
  • 11338 04/03/99 16:08 cdaq Beam Time Accounting
  • 11339 04/03/99 16:07 cdaq Day shift summary
  • 11329 04/03/99 10:48 Potterveld SOS HV problems
  • 11326 04/03/99 09:16 X . Jiang charge caliberation results.
  • 11325 04/03/99 09:14 Meekins Shift Summary
  • 11323 04/03/99 08:00 cdaq Beam Time Accounting
  • 11321 04/03/99 07:39 MEEKINS HMS dipole trip
  • 11319 04/03/99 06:30 meekins SOS LD2 run
  • 11317 04/03/99 06:05 Meekins Q2 and Q3 trip
  • 11313 04/03/99 04:51 Meekins dipole q3 reset
  • 11314 04/03/99 04:51 Meekins q2 trip
  • 11311 04/03/99 04:16 Meekins SOS S2 x5+
  • 11309 04/03/99 03:56 meekins SOS power supplies
  • 11303 04/03/99 02:03 meekins DAQ SFISOS crash
  • 11299 04/03/99 00:02 maurice swing shift summary
  • 11298 04/03/99 00:00 cdaq Beam Time Accounting
  • Friday

  • 11284 04/02/99 16:06 baker Shift Summary
  • 11283 04/02/99 15:58 cdaq Beam Time Accounting
  • 11281 04/02/99 15:14 baker recommendation
  • 11279 04/02/99 14:47 baker magnet and CODA crashes
  • 11274 04/02/99 12:34 baker No Beam
  • 11271 04/02/99 11:08 mharvey daq crash
  • 11264 04/02/99 09:23 baker HMS magnet trips
  • 11263 04/02/99 09:10 maurice LH target with 0,2,4,6 % radiator
  • 11262 04/02/99 08:06 cdaq Beam Time Accounting
  • 11261 04/02/99 08:03 miller owl shift summary
  • 11260 04/02/99 07:57 zeier Background rates: beam current
  • 11258 04/02/99 06:35 zeier Background rates
  • 11249 04/02/99 00:23 baker shift summary
  • 11248 04/02/99 00:02 cdaq Beam Time Accounting
  • 11247 04/02/99 00:01 maurice swing shift summary
  • Thursday

  • 11246 04/01/99 23:46 maurice Q3 100A too high
  • 11233 04/01/99 15:56 cdaq Beam Time Accounting
  • 11232 04/01/99 15:15 baker 2% radiator now in
  • 11230 04/01/99 15:05 baker New instructions for setting HMS quads.
  • 11229 04/01/99 14:54 Dunne Target Temp.: Loop 1 control
  • 11228 04/01/99 14:32 baker Q2 trip
  • 11226 04/01/99 13:58 baker beam back
  • 11225 04/01/99 08:32 baker HMS Q2 trip
  • 11224 04/01/99 08:24 cdaq Beam Time Accounting
  • 11223 04/01/99 08:22 cdaq Owl Shift
  • 11216 04/01/99 00:32 cdaq Beam Time Accounting
  • 11215 04/01/99 00:28 R. Tieulent March 31, Swing shift