Jefferson Lab HALL C Logbook for April 99 - runstarts omitted
Main INDEX
Friday
12710 04/30/99 22:41 mcilhany DAQ crash
12709 04/30/99 22:12 cdaq SOS only LD 0% radiator
12705 04/30/99 21:27 cdaq BPM screen
12701 04/30/99 20:37 bryon set HMS to new momentum
12697 04/30/99 19:57 bryon changed SOS trigger
12696 04/30/99 18:20 bryon SOS hodoscope channel S2y5+ is dead
12695 04/30/99 17:46 bryon change targets to lD2
12693 04/30/99 16:52 bryon SOS ONLY run
12692 04/30/99 16:51 cdaq Q3 crash
12690 04/30/99 16:19 cdaq Beam Time Accounting
12688 04/30/99 16:05 reinhold shift summary
12687 04/30/99 15:44 hcf Dipole, Q3 trip
12686 04/30/99 15:26 reinhold change SOS prescale
12685 04/30/99 14:31 reinhold new HMS setting
12684 04/30/99 14:26 reinhold HMS rotation problem
12683 04/30/99 14:04 Fenker triple magnet trip
12682 04/30/99 13:17 reinhold MCC is ready
12681 04/30/99 12:34 reinhold accelerator down
12679 04/30/99 10:36 reinhold junk in HMS DC2
12677 04/30/99 09:34 reinhold changed SOS prescale
12674 04/30/99 09:01 reinhold change target to h2
12673 04/30/99 08:29 garrow shift summary
12672 04/30/99 08:15 cdaq Beam Time Accounting
12670 04/30/99 07:57 csa Where does hs1x13+ show up in Egamma?
12668 04/30/99 07:20 garrow shift checklist
12667 04/30/99 07:11 garrow BCM calibration not done
12666 04/30/99 07:04 garrow HMS Q2 trip
12664 04/30/99 06:36 garrow reading slits
12662 04/30/99 05:51 garrow HMS h1x13+ dead
12661 04/30/99 05:45 garrow HMS Pedestals changed
12658 04/30/99 04:05 garrow HMS Q1
12656 04/30/99 03:17 garrow Raster back
12655 04/30/99 03:16 garrow MCC entry
12654 04/30/99 02:30 garrow MCC Access
12653 04/30/99 02:27 garrow DAQ crash
12650 04/30/99 01:47 garrow ROC4 and HMS HV CRATE
12649 04/30/99 00:03 cdaq Beam Time Accounting
12648 04/30/99 00:02 bryon shift summary
Thursday
12646 04/29/99 23:55 bryon ROC 4 crashed again
12645 04/29/99 23:04 bryon DAQ problems
12641 04/29/99 21:44 bpm screens bpm screens
12640 04/29/99 21:31 bryon dipole tripped at 20:50
12636 04/29/99 20:01 bryon ROC 4 crashed again
12634 04/29/99 19:20 bryon SOS HV problems from early afternoon
12633 04/29/99 19:18 bryon DAQ crashed
12631 04/29/99 19:03 Bryon Junk runs 24717,24718
12627 04/29/99 16:47 mmiller HMS cerenkov pressure readout
12626 04/29/99 16:43 cdaq Beam Time Accounting
12625 04/29/99 16:22 mmiller target rotated out, beam status
12624 04/29/99 16:18 mmiller HMS and SOS triggers
12623 04/29/99 14:37 MMiller status report from MCC
12619 04/29/99 13:31 eschulte Beam Restoration Today
12618 04/29/99 10:59 MMiller third power glitch
12617 04/29/99 10:50 MMiller power glitch, loop 1 fan
12616 04/29/99 10:42 MMiller HMS cerenkov pressure
12615 04/29/99 09:59 S. Strauch Charge calibration of run #24611.
12614 04/29/99 08:50 MMiller Hall A "sweet spot"
12613 04/29/99 08:49 MMiller BCM callibration due soon
12612 04/29/99 08:45 MMiller target cryo flow
12611 04/29/99 08:43 MMiller Injector work
12610 04/29/99 08:33 csa Before we get going again...
12609 04/29/99 04:56 csa Changes to replay_example_latest and online_replay
Wednesday
12608 04/28/99 18:10 bryon close SOS doors
12607 04/28/99 18:09 bryon Day shift work
12604 04/28/99 17:12 Mmiller Target rotated OUT
12603 04/28/99 17:11 Mmiller Injector problems
12601 04/28/99 17:07 Mmiller HMS shield blocks
12599 04/28/99 16:35 Mmiller Summary of Maintenance Day
12598 04/28/99 16:11 Meekins Collimator
12597 04/28/99 15:30 MMiller raster setting
Tuesday
12594 04/27/99 16:19 mmiller BPM screen
12593 04/27/99 15:33 Bryon SOS HV replacements
12592 04/27/99 10:33 Bryon SOS gas Cerenkov
12591 04/27/99 07:16 zihlmann owl shift summary
12590 04/27/99 07:15 cdaq Beam Time Accounting
12581 04/27/99 00:12 cdaq Beam Time Accounting
12580 04/27/99 00:10 bryon shift summary
Monday
12574 04/26/99 20:30 bryon Reboot SOS and HMS HV, problem with SOS scints
12573 04/26/99 20:00 bryon sos hodoscopes which turned off for runs 24690,24691
12567 04/26/99 17:07 bryon change to lD2, reboot dipole PC
12565 04/26/99 16:09 Eschulte Day Shift Summary
12564 04/26/99 16:09 Eschulte Day Shift Log
12563 04/26/99 15:57 cdaq Beam Time Accounting
12561 04/26/99 14:39 Eschulte Q1 trip
12560 04/26/99 14:15 eschulte BPM screen for day shift checklist
12554 04/26/99 10:38 eschulte More Q2 strangeness
12552 04/26/99 09:38 eschulte Q2 Alarm Strangeness
12549 04/26/99 07:58 cdaq Beam Time Accounting
12548 04/26/99 07:51 zihlmann owl shift summary
12536 04/26/99 00:11 bryon run 24660
12535 04/26/99 00:07 cdaq Beam Time Accounting
12534 04/26/99 00:00 geesaman Shift Summary
Sunday
12530 04/25/99 21:59 bryon problem during run 24665
12529 04/25/99 21:39 bryon runs 24658,24659
12526 04/25/99 20:05 geesaman BPM screen scan
12524 04/25/99 19:27 bryon Q1,dipole trip
12522 04/25/99 17:32 geesaman Q1 trip
12520 04/25/99 16:03 Mmiller Day Shift Summay
12519 04/25/99 16:00 cdaq Beam Time Accounting
12516 04/25/99 14:18 eschulte Checklists for 4-23 through 4-25
12515 04/25/99 14:11 eschulte Checklists 4-20 through 4-23
12514 04/25/99 13:46 eschulte Day shift BPM screen
12509 04/25/99 10:23 Mmiller DAQ problems, Q2 tripped
12500 04/25/99 07:59 cdaq Beam Time Accounting
12499 04/25/99 07:49 zihlmann owl shift summary
12497 04/25/99 07:08 brownds BPM
12486 04/25/99 00:00 geesaman Shift Summary
Saturday
12485 04/24/99 23:59 cdaq Beam Time Accounting
12482 04/24/99 22:46 geesaman Roc 4 crash
12478 04/24/99 20:30 averys radiator
12477 04/24/99 20:24 sawafta bpm screen
12472 04/24/99 17:48 geesaman Q1 problem repaired
12471 04/24/99 17:47 Fowler Q1 fixed.........
12470 04/24/99 16:36 mmiller day shift summay
12469 04/24/99 16:33 mmiller Day Shift Summary
12468 04/24/99 16:30 cdaq
12467 04/24/99 16:14 cdaq Beam Time Accounting
12466 04/24/99 15:16 eschulte Day Shift BPM Screen
12465 04/24/99 15:14 eschulte Q1 trip
12460 04/24/99 10:09 maurice really LD target
12459 04/24/99 10:08 maurice really LD target
12458 04/24/99 08:06 cdaq Beam Time Accounting
12457 04/24/99 08:02 zihlmann owl shift summary (Quad trip shift)
12454 04/24/99 06:24 danagoulian Q1 trip
12452 04/24/99 05:40 brownds BPM medm screen
12449 04/24/99 01:45 zihlmann Q1 trip again
12447 04/24/99 00:48 zihlmann Q1 trip Q3 computer crash
12446 04/24/99 00:03 geesaman Shift Summary
12445 04/24/99 00:02 cdaq Beam Time Accounting
Friday
12444 04/23/99 23:45 geesaman BCM calibration.
12442 04/23/99 23:41 geesaman HMS Q1 quench
12440 04/23/99 23:39 geesaman Roc 4 Crash
12433 04/23/99 17:38 Vulcan HMS Hut door interlock repaired
12432 04/23/99 16:42 geesaman Q1 trip
12431 04/23/99 16:03 cdaq Beam Time Accounting
12430 04/23/99 16:02 gabriel Shift Summary
12428 04/23/99 14:31 eschulte medm screen
12427 04/23/99 14:30 eschulte Q3 PC not responsive
12418 04/23/99 08:34 cdaq Beam Time Accounting
12416 04/23/99 07:47 zihlmann Shift Summary
12409 04/23/99 03:06 danagoulian ROC4 crash and replay failure
Thursday
12401 04/22/99 23:58 cdaq Beam Time Accounting
12400 04/22/99 23:57 Geesaman Shift Summary
12395 04/22/99 22:04 geesaman HMS Door problem
12394 04/22/99 22:00 geesaman HMS Q1 PC Hard Drive fails
12393 04/22/99 20:08 geesaman HMS Q1 Computer wont reboot
12391 04/22/99 18:30 geesaman hcc18 unavailable
12389 04/22/99 17:15 maurice HV cards in HMS hut (NOT)
12388 04/22/99 16:46 saw Target fan data logged in coda
12387 04/22/99 16:00 cdaq Beam Time Accounting
12386 04/22/99 15:58 gabriel Shift Summary
12380 04/22/99 11:07 Potterveld HMS hall probe GUI
12378 04/22/99 07:57 markowitz shift summary
12377 04/22/99 07:54 cdaq Beam Time Accounting
12376 04/22/99 07:19 markowitz beam gone
12374 04/22/99 06:14 markowitz daq
12372 04/22/99 05:55 markowitz bpm
12369 04/22/99 02:49 markowitz target change
12368 04/22/99 02:43 danagoulian comments to run #24543-2455
12364 04/22/99 00:00 cdaq Beam Time Accounting
12363 04/22/99 00:00 geesaman Shift Summary
Wednesday
12361 04/21/99 22:48 geesaman BPM Screen Grab
12359 04/21/99 22:12 geesaman HMS Q2 trip
12358 04/21/99 22:08 geesaman Beam off
12356 04/21/99 21:22 geesaman HMS Q1 and Dipole trip
12353 04/21/99 19:34 geesaman HMS Dipole computer reboot
12351 04/21/99 17:10 geesaman Q1 trip
12349 04/21/99 16:46 geesaman SOS Hall Probe Readout
12348 04/21/99 16:09 geesaman Beam current temp reducesd
12346 04/21/99 16:00 gabriel shift summary
12345 04/21/99 15:59 cdaq Beam Time Accounting
12336 04/21/99 10:23 baker Q2 trip
12333 04/21/99 07:50 markowitz shift summary
12332 04/21/99 07:48 cdaq Beam Time Accounting
Tuesday
12331 04/20/99 23:50 saw Shift summary
12330 04/20/99 23:43 cdaq Beam Time Accounting
12329 04/20/99 22:41 saw Shift checklists
12328 04/20/99 20:49 saw Accelerator Major event
12326 04/20/99 18:49 saw Dipole trip
12322 04/20/99 17:07 Fowler Q1 error
12321 04/20/99 16:25 Johna Run 24531 analysis problem
12320 04/20/99 16:07 bryon Q1 trips off
12319 04/20/99 16:04 mueller shift summary
12318 04/20/99 16:00 cdaq Beam Time Accounting
12317 04/20/99 15:55 baker Loop 3 DP readout
12316 04/20/99 15:00 Fowler Q1 trip/fix
12315 04/20/99 12:37 Dunne D2 diff. pressure
12313 04/20/99 12:22 bryon Hall Access finished
12312 04/20/99 10:17 vulcan Cartridge replacement
12311 04/20/99 08:54 bryon Q1 trip
12310 04/20/99 08:34 saw NOTE: OLD ENTRY FROM SAW Target temperature excursions
12309 04/20/99 08:26 cdaq Beam Time Accounting
12307 04/20/99 08:11 markowitz shift summary
12306 04/20/99 08:05 bryon Q3 trip
12304 04/20/99 06:56 gaskell run 24539 is junk
12300 04/20/99 05:07 gaskell bpm for checklist
12299 04/20/99 04:48 gaskell Q2 trip at end of run 24537
12297 04/20/99 03:56 gaskell Q1 recovery
12295 04/20/99 03:11 gaskell Q1 tripped
12294 04/20/99 02:53 gaskell Q3 tripped
12292 04/20/99 01:54 gueye Energy lock problem
12291 04/20/99 01:41 gaskell beam gone at 1:30
12289 04/20/99 00:10 saw Shift summary
12287 04/20/99 00:00 cdaq Beam Time Accounting
Monday
12286 04/19/99 23:53 saw BPM screen
12285 04/19/99 23:46 saw Q1 and dipole
12284 04/19/99 23:41 saw Q1 and Q2 weirdness
12283 04/19/99 23:26 saw Run 24531 analysis problem
12281 04/19/99 22:09 saw DAQ hiccup, run 24530
12277 04/19/99 19:59 saw Target behaviour at 50 microamps
12276 04/19/99 19:50 saw Increase current to 50 microamps
12273 04/19/99 16:27 saw Dipole trip
12272 04/19/99 16:13 cdaq Beam Time Accounting
12271 04/19/99 16:01 bryon shift summary
12270 04/19/99 15:54 bryon bpm screens
12269 04/19/99 15:49 bryon Q2 trips off
12267 04/19/99 15:39 bryon changed HMS angle, momentum
12265 04/19/99 15:24 vulcan hms door controller
12264 04/19/99 15:22 vulcan Reset on spare computer.
12263 04/19/99 13:40 Nathan BPM
12260 04/19/99 12:03 ent beam position
12258 04/19/99 11:03 Potterveld Beam position shifted?
12253 04/19/99 10:06 Fowler Q3 Hall probe
12249 04/19/99 09:35 Fowler Q2/Q3
12247 04/19/99 08:12 markowitz shift summary
12246 04/19/99 08:11 cdaq Beam Time Accounting
12245 04/19/99 07:39 gaskell Q1 tripped
12244 04/19/99 07:26 gaskell run 24511 also junk
12241 04/19/99 07:09 gaskell run 24509 is junk
12234 04/19/99 05:04 markowitz bpm shot
12232 04/19/99 04:54 gaskell run 24502 ended itself
12229 04/19/99 04:08 markowitz beam
12227 04/19/99 03:04 markowitz q1 (and q3)
12223 04/19/99 01:43 gaskell Q1 tripped
12222 04/19/99 01:39 gaskell Q2 tripped
12220 04/19/99 01:21 markowitz dipole pc
12216 04/19/99 00:07 cdaq Beam Time Accounting
12215 04/19/99 00:01 saw Shift Summary
Sunday
12206 04/18/99 21:36 saw Dipole problems
12205 04/18/99 21:04 saw Q1 trip
12204 04/18/99 21:03 saw Q2 trip
12203 04/18/99 20:37 X. Jiang results of charge caliberation run 24480.
12197 04/18/99 19:28 X. Jiang Run 24480 current caliberation.
12196 04/18/99 19:01 Bochna HMS magnets set to 4.0 GeV for TOF calib.
12191 04/18/99 16:14 bryon shift summary
12189 04/18/99 16:01 cdaq Beam Time Accounting
12184 04/18/99 14:09 bryon extended hall C access
12182 04/18/99 13:23 fowler HMS Dipole
12179 04/18/99 12:32 nathan dipole trip
12178 04/18/99 12:30 nathan Q3 PC problem fixed
12175 04/18/99 10:51 nathan LD2 confirmed
12174 04/18/99 10:49 nathan LD2 confirmed
12173 04/18/99 10:39 nathan q3 crash
12172 04/18/99 09:18 nathan should this be LD2?
12171 04/18/99 09:17 nathan should this be LD2?
12170 04/18/99 08:52 bryon hms hodoscopes trip off
12167 04/18/99 08:04 bryon q1 tripped
12166 04/18/99 07:57 markowitz shift summary
12165 04/18/99 07:56 cdaq Beam Time Accounting
12162 04/18/99 07:19 markowitz targets
12159 04/18/99 05:33 markowitz daq
12155 04/18/99 05:17 gaskell bpm screen for checklist
12153 04/18/99 04:47 gaskell Q2 trip ends run 24456
12151 04/18/99 04:14 gaskell run 24455 ended itself
12149 04/18/99 03:29 gaskell Q1 trip ends run 24454
12147 04/18/99 03:06 gaskell run 24453 end of run failure
12145 04/18/99 02:17 gaskell Downloaded new HMS thresholds
12144 04/18/99 02:14 markowitz daq
12141 04/18/99 02:09 markowitz magnets
12140 04/18/99 01:34 gaskell HMS dipole trips
12139 04/18/99 01:14 markowitz dipole
12138 04/18/99 01:08 cdaq Beam Time Accounting
12136 04/18/99 00:40 gaskell Q1 is back
Saturday
12134 04/17/99 23:56 saw Shift summary
12133 04/17/99 23:52 saw Q1 Trip
12130 04/17/99 22:43 saw 2 Q1 trips
12128 04/17/99 22:03 saw minor DAQ problem
12123 04/17/99 20:54 saw Change to EPICS logging
12120 04/17/99 19:41 Bochna HMS Door closing
12119 04/17/99 19:33 bochna Q2 trips
12117 04/17/99 19:15 bochna ROC2 rebooted
12115 04/17/99 18:13 saw CODAMASTER is OK
12114 04/17/99 18:09 saw HMS door workaround
12113 04/17/99 18:07 saw HMS drift chamber HV
12111 04/17/99 16:13 cdaq Beam Time Accounting
12110 04/17/99 16:12 cdaq Beam Time Accounting
12109 04/17/99 16:03 Dunne Shift Summary
12108 04/17/99 16:02 Dunne HMS drift chamber hv gone
12107 04/17/99 15:47 emmanuel BPM screen
12106 04/17/99 15:37 danagoulian He gas bottle
12105 04/17/99 15:26 Dunne HMS dipole warning
12104 04/17/99 15:17 Dunne Lost dipole screen
12098 04/17/99 14:01 Dunne Q2 pc frozen
12096 04/17/99 13:11 Dunne Q3 PC frozen
12094 04/17/99 12:40 danagoulian hms_thresholds after CAEN crate replacement
12093 04/17/99 12:26 Dunne Dipole trip
12086 04/17/99 10:31 Dunne HMS door problems
12085 04/17/99 10:22 Dunne H2 (loop 1) pressure readout
12084 04/17/99 10:19 Dunne HV crate replacement
12083 04/17/99 10:11 Markowitz Shift Summary
12082 04/17/99 10:10 cdaq Beam Time Accounting
12081 04/17/99 09:44 nathan Q1 trip
12080 04/17/99 09:03 markowitz hv
12079 04/17/99 07:27 gaskell HMS drift chambers tripped off
12073 04/17/99 05:24 gaskell CODAMASTER problem
12071 04/17/99 05:05 markowitz daq
12069 04/17/99 04:43 markowitz daq
12067 04/17/99 04:19 markowitz Q2, trip
12065 04/17/99 03:25 gaskell rebooted DAQ
12063 04/17/99 03:13 gaskell runs 24410 and 24111 are junk
12061 04/17/99 03:10 markowitz bpm
12059 04/17/99 03:05 gaskell Q3 PC is also frozen.
12058 04/17/99 03:03 gaskell Q2 PC is frozen
12053 04/17/99 00:41 gaskell Running with more than 1 million events..
12051 04/17/99 00:21 cdaq Beam Time Accounting
12050 04/17/99 00:01 saw Shift summary
Friday
12047 04/16/99 23:29 bochna HMS Q1 trips and is reset
12044 04/16/99 22:24 saw Q3 trip
12040 04/16/99 20:55 saw HMS Shower Counter HV
12037 04/16/99 19:10 nathan Casablanca
12036 04/16/99 17:36 gilman system checks extended
12033 04/16/99 16:01 cdaq Beam Time Accounting
12034 04/16/99 16:01 Beck Shift Report 2 (day 16 Apr)
12025 04/16/99 11:44 Beck Shift Report 1 (day, 16 Apr)
12021 04/16/99 09:15 Mack FR is on the shift checklist
12020 04/16/99 09:03 Dunne Slit box communication
12019 04/16/99 08:04 gaskell owl shift summary
12018 04/16/99 08:03 cdaq Beam Time Accounting
12015 04/16/99 06:56 gaskell Q1 crash
12013 04/16/99 06:26 gaskell run 24377 is junk
12010 04/16/99 06:16 gaskell Q2 crash
12007 04/16/99 05:42 gaskell checklist bpm
12005 04/16/99 05:16 gaskell Q3 PSU cur readback
12003 04/16/99 04:45 gaskell HMS dipole, Q3 trip
11999 04/16/99 03:27 gaskell RUN 24368 is JUNK
11996 04/16/99 03:08 gueye Notes on energy measurement
11994 04/16/99 02:44 gaskell changed hodo slop parameters
11992 04/16/99 02:22 gaskell Raster reinitialized
11989 04/16/99 01:59 gaskell Ion chamber readback scale
11988 04/16/99 01:57 gaskell Raster is 0.5 mm radius
11987 04/16/99 01:41 gaskell downloaded new hms thresholds
11984 04/16/99 01:06 gaskell Replaced Crate 1 in HMS
11982 04/16/99 00:09 X. Jiang swing shift activity.
11981 04/16/99 00:06 cdaq Beam Time Accounting
Thursday
11980 04/15/99 23:50 Bochna HMS HV Crate 1 dies
11978 04/15/99 22:50 maurice background at dipole exit
11976 04/15/99 22:05 maurice background at 37degr.
11969 04/15/99 20:04 gilman access for hdc1u1
11968 04/15/99 19:55 maurice bad timing spectrum in hhdc1u1
11966 04/15/99 19:52 nathan operating parameters
11959 04/15/99 16:00 Beck Shift Report 2 (day, 15 Apr)
11958 04/15/99 15:55 cdaq Beam Time Accounting
11957 04/15/99 12:07 Beck Shift Report 1 (15 Apr 99)
11956 04/15/99 11:30 Mack HMS temp too high
11955 04/15/99 10:59 nathan HMS temperature alarm
11954 04/15/99 10:34 Mack replay engine
11953 04/15/99 09:36 gaskell HMS (SOS) beta problem fix
11952 04/15/99 08:00 cdaq Beam Time Accounting
11951 04/15/99 07:58 gaskell owl shift summary
11950 04/15/99 03:12 gaskell Can't check slit positions
11949 04/15/99 02:54 gaskell HMS dipole is set (at last!)
11947 04/15/99 01:35 gaskell Do not rotate HMS to smaller angle!
11946 04/15/99 01:18 meekins SOS angle and lead
11945 04/15/99 01:08 gaskell HMS rotation
11944 04/15/99 00:04 cdaq Beam Time Accounting
Wednesday
11940 04/14/99 17:10 Maurice hs1x7 scint (cont.)
11939 04/14/99 16:53 saw HMS HV controls
11938 04/14/99 16:00 cdaq Beam Time Accounting
11931 04/14/99 11:42 mack mps cavity readback to Hall A
11922 04/14/99 09:02 S. Strauch Charge calibration of run #24310.
11921 04/14/99 00:12 cdaq Beam Time Accounting
11920 04/14/99 00:08 cdaq Beam Time Accounting
Tuesday
11919 04/13/99 18:28 maurice/vulc scint HMS s1x7
11913 04/13/99 15:31 cdaq Beam Time Accounting
11908 04/13/99 11:57 Vulcan s2x12- high voltage
11907 04/13/99 10:56 Bochna HMS HS1X7+ fixed
11906 04/13/99 07:09 cdaq Beam Time Accounting
11905 04/13/99 00:10 Tang Swing shift report
11904 04/13/99 00:09 cdaq Beam Time Accounting
Monday
11902 04/12/99 23:08 gueye Beam Energy Measurement
11894 04/12/99 18:00 maurice TOF HMS
11892 04/12/99 17:05 acochran HMS dipole and Q3 trip
11890 04/12/99 16:06 cdaq Beam Time Accounting
11888 04/12/99 15:58 Beck Shift Summary (4/12)
11880 04/12/99 10:58 Beck Shift Summary 1 (Day 4/12)
11878 04/12/99 10:56 Bochna Target heat load fluctuations
11876 04/12/99 10:44 Bochna HV EPICS display restarted
11875 04/12/99 10:41 Bochna Q1 trip
11874 04/12/99 10:03 Bochna ESR He supply temp rising
11869 04/12/99 08:34 Bochna Dipole, Q3 trip
11868 04/12/99 08:31 cdaq Beam Time Accounting
11864 04/12/99 07:39 gasparian owl shift summary
11854 04/12/99 00:42 cdaq Beam Time Accounting
0 04/12/99 00:41 no_name Beam Time Accounting
Sunday
11849 04/11/99 23:45 gaskell RUN 24272 is SOS only - no radiator
11847 04/11/99 23:36 gaskell HMS dipole, Q3 trip
11846 04/11/99 23:27 gaskell downloaded new HMS thresholds
11842 04/11/99 22:44 maurice inefficiency? s1x7+
11841 04/11/99 22:27 gaskell Q2 PC is frozen
11838 04/11/99 21:50 x. jiang run 24266, sos only run.
11836 04/11/99 21:27 gaskell Changed Ethane, Helium bottles
11832 04/11/99 19:48 gaskell Q1 self reboots
11828 04/11/99 17:46 gaskell Rebooted Q2,Q1 PC's
11827 04/11/99 16:46 gaskell HMS dipole warning
11825 04/11/99 16:32 gaskell Rebooted HMS dipole PC
11824 04/11/99 16:19 gaskell HMS dipole screen frozen
11823 04/11/99 16:15 gaskell Run 24257 might be junk
11821 04/11/99 16:11 nathan day shift summary, part 2
11820 04/11/99 16:09 gaskell DAQ reboot
11819 04/11/99 16:00 cdaq Beam Time Accounting
11813 04/11/99 14:19 nathan incorrect target designation
11809 04/11/99 12:27 nathan more about Q1
11806 04/11/99 11:57 nathan Q1 current
11805 04/11/99 11:54 nathan day shift summary
11804 04/11/99 11:51 nathan DAQ crash
11801 04/11/99 11:09 nathan target change to LD2
11800 04/11/99 10:46 nathan HMS Q2 trip
11798 04/11/99 09:44 nathan HMS dipole and Q3 trip
11796 04/11/99 09:02 Fowler HMS Dipole
11795 04/11/99 08:54 ashot HMS dipol trip
11794 04/11/99 08:45 ashot Gaspar dipole trip
11793 04/11/99 08:43 cdaq Beam Time Accounting
11792 04/11/99 06:12 acochran Target:Loop 2 alarm
11789 04/11/99 04:53 acochran Q2 trip
11781 04/11/99 00:23 gaskell HMS dipole trouble
11780 04/11/99 00:09 Holt swing shift summary
11779 04/11/99 00:03 cdaq Beam Time Accounting
Saturday
11778 04/10/99 23:35 gaskell HMS dipole/Q3 trip
11776 04/10/99 23:12 gaskell RUN 24233 no radiator run for MEEKINS
11774 04/10/99 22:56 gaskell Q1 trip
11772 04/10/99 22:41 gaskell changed target to LD
11770 04/10/99 21:16 gaskell Changed argon bottle
11768 04/10/99 21:02 gaskell Argon bottle getting low - change next shift!
11761 04/10/99 17:29 gaskell target status
11760 04/10/99 17:25 gaskell Reboot HMS Q2,Q3 and SOS magnet vmec
11756 04/10/99 16:06 gaskell Rebooted SOS and HMS HV epics
11755 04/10/99 15:56 cdaq Beam Time Accounting
11752 04/10/99 14:39 mack reboot list
11748 04/10/99 12:54 mack magnet misc. problems
11746 04/10/99 12:27 mack correction
11745 04/10/99 12:23 mack run 24213 questionable
11742 04/10/99 12:05 mack beam position adjustment
11739 04/10/99 11:22 maurice Dipole trip at the end
11738 04/10/99 11:04 Bochna ESR Supply and Temp Graphs
11737 04/10/99 11:04 maurice comparison TOF calibration
11736 04/10/99 10:14 Bochna Old TOF Calibration File
11735 04/10/99 10:06 mack existing magnet settings II
11734 04/10/99 10:02 mack existing magnet settings I
11733 04/10/99 09:46 mack fast raster screen capture
11732 04/10/99 09:19 mack sos hodo channel inefficient?
11731 04/10/99 09:17 mack inquire: status of TOF calibrations?
11728 04/10/99 07:59 vardan Run Sheets at 04/10/99
11727 04/10/99 07:53 cdaq Beam Time Accounting
11719 04/10/99 00:01 cdaq Beam Time Accounting
Friday
11718 04/09/99 23:58 Holt swing shift summary part II
11714 04/09/99 22:34 gaskell BPM for checklist
11711 04/09/99 21:00 Maurice Accumulated charge
11710 04/09/99 20:45 Holt Shift log part I
11701 04/09/99 16:01 cdaq Beam Time Accounting
11700 04/09/99 15:31 Lung HMS Q2 screen disappears
11699 04/09/99 15:11 bochna Target moved to 12cm LH2
11698 04/09/99 14:53 S. Strauch Charge calibration of run #24167.
11697 04/09/99 14:22 mack He gas bottles
11696 04/09/99 14:18 Lung Beam gone
11693 04/09/99 13:07 mack no obvious DAQ errors?
11691 04/09/99 12:48 mack electronics reconfig.
11688 04/09/99 11:27 Lung Beam gone
11687 04/09/99 11:16 Lung Increase current
11684 04/09/99 10:01 mack SOS magnet settings
11683 04/09/99 09:59 mack activity in electronics room
11680 04/09/99 07:22 Keppel Shift Summary
11679 04/09/99 07:19 cdaq Beam Time Accounting
Thursday
11678 04/08/99 23:55 holt swing shift summary
11677 04/08/99 23:55 cdaq Beam Time Accounting
11675 04/08/99 16:07 Potterveld Shift report
11674 04/08/99 16:00 cdaq Beam Time Accounting
11673 04/08/99 15:41 Potterveld Q3 back
11671 04/08/99 15:30 Potterveld HMS Q3 trip
11669 04/08/99 14:36 Potterveld HMS Dipole PC rebooted
11668 04/08/99 14:14 Dunne BPM Screen
11658 04/08/99 10:50 Potterveld Target and radiator changed
11657 04/08/99 10:49 Potterveld BC calibration
11654 04/08/99 09:31 Bowhuis/Lung Ion chambers: conclusion
11653 04/08/99 09:25 Bowhuis/Lung Ion chamber readings more..
11652 04/08/99 09:20 Bowhuis/Lung Ion chamber readings contd.
11651 04/08/99 08:52 Bowhuis/Lung Ion chamber readings
11648 04/08/99 07:49 cdaq Beam Time Accounting
11647 04/08/99 07:44 Keppel Shift Log and Summary
11646 04/08/99 07:42 Keppel shift checklist
11644 04/08/99 07:18 gabriel bpm medm screen
11628 04/08/99 00:04 eschulte Swing Shift Log
11627 04/08/99 00:03 eschulte Swing Shift Summary
11626 04/08/99 00:01 cdaq Beam Time Accounting
Wednesday
11624 04/07/99 23:26 gaskell Q3 trips
11623 04/07/99 23:21 gaskell dipole trip
11622 04/07/99 23:14 maurice shielding in dipole
11618 04/07/99 22:13 eschulte Beam position screen e96003
11616 04/07/99 16:04 Potterveld Shift summary
11615 04/07/99 15:58 cdaq Beam Time Accounting
11614 04/07/99 15:53 Lung Counting House AC repair work
11613 04/07/99 14:01 Lung Q2 repairs complete
11612 04/07/99 12:16 Lung SOS beta and fptime
11611 04/07/99 11:37 Lung Request access
11608 04/07/99 09:50 Lung HMS Drift Chambers off
11605 04/07/99 07:58 cdaq Beam Time Accounting
11604 04/07/99 07:58 Keppel Shift Summary
11603 04/07/99 07:57 Keppel Magnet Trip Summary
11594 04/07/99 00:06 eschulte Swing Shift Summary
11595 04/07/99 00:05 eschulte Swing Shift Log
11593 04/07/99 00:01 cdaq Beam Time Accounting
Tuesday
11591 04/06/99 16:07 cdaq Beam Time Accounting
11590 04/06/99 16:05 Potterveld Beam accounting backup copy
11589 04/06/99 16:02 Potterveld Shift report
11588 04/06/99 14:56 S. Strauch Charge calibration of run #24108.
11587 04/06/99 12:40 Potterveld HMS hall probes working again
11586 04/06/99 12:18 Lung Hall C Access
11585 04/06/99 12:13 Fenker HV GUI Anomoly
11584 04/06/99 12:10 fenker SOS Cerenkov was off
11583 04/06/99 11:40 Potterveld Q2 tripped
11581 04/06/99 10:36 Potterveld Q2 recovered
11579 04/06/99 10:12 Potterveld Q2 trip
11575 04/06/99 09:43 Potterveld Q2 trip
11574 04/06/99 09:33 Lung Camera survey: water on floor
11573 04/06/99 09:33 Potterveld Q2 recovered
11571 04/06/99 09:21 Potterveld BPM page
11569 04/06/99 09:01 Potterveld Q2 tripped off
11568 04/06/99 08:55 Potterveld HMS hall probes
11567 04/06/99 08:39 Potterveld HMS hall probe data gone again
11565 04/06/99 08:23 Potterveld Beam position, SOS quad adjusted
11564 04/06/99 08:01 cdaq Beam Time Accounting
11563 04/06/99 07:48 meekins Shift summary
11560 04/06/99 07:21 meekins Q2 trip
11553 04/06/99 04:58 Meekins updated HMS thresholds
11551 04/06/99 04:22 meekins SOS threshold file changed
11550 04/06/99 04:16 meekins shift check list
11549 04/06/99 04:11 meekins BPM scan
11547 04/06/99 03:54 meekins Q2 Q3 and dipole tripped
11546 04/06/99 03:40 meekins Q3 back
11545 04/06/99 03:33 meekins target and radiator change
11544 04/06/99 03:21 meekins Q3 trip
11543 04/06/99 03:15 Meekins HMS dipole trip
11542 04/06/99 03:03 meekins Notes for Run 24111
11540 04/06/99 01:05 maurice HMS magnet trips versus time
11539 04/06/99 01:00 Cadman Q2 is on, beam not ready.
11538 04/06/99 00:04 cdaq Beam Time Accounting
11537 04/06/99 00:03 eschulte Swing Shift Log
Monday
11536 04/05/99 23:46 gaskell Q2 trips one more time.
11535 04/05/99 22:46 gaskell Q2 trips again before reset
11534 04/05/99 22:25 gaskell Q2 trips again before reset
11533 04/05/99 22:07 gaskell Q2 trip
11532 04/05/99 21:59 Johna documents directory updates.
11531 04/05/99 20:39 eschulte BPM for shift log
11530 04/05/99 20:19 eschulte Q2 trip
11529 04/05/99 19:00 maurice prop chamber
11528 04/05/99 18:56 maurice hv trouble
11527 04/05/99 18:52 maurice magnet work
11524 04/05/99 18:00 johna ADC/TDC/Scaler map update.
11523 04/05/99 17:05 eschulte Q2 trip
11522 04/05/99 16:37 Potterveld SOS degaussed
11521 04/05/99 16:21 Potterveld SOS magnet control program
11520 04/05/99 16:01 Potterveld SHIFT SUMMARY
11519 04/05/99 16:00 cdaq Beam Time Accounting
11518 04/05/99 14:54 Potterveld HMS hall probe readout fixed
11517 04/05/99 14:39 Potterveld SOS Hall probes
11516 04/05/99 13:18 Potterveld SOS Hall probes
11515 04/05/99 12:24 Potterveld Hall C access
11514 04/05/99 11:54 Potterveld Q2 trip
11512 04/05/99 11:08 Potterveld Q2 recovered
11510 04/05/99 11:05 maurice access plan
11508 04/05/99 10:49 Potterveld HMS Q2 trip
11505 04/05/99 09:27 Potterveld Q2 recovered
11502 04/05/99 09:05 Potterveld HMS Q2 tripped.
11499 04/05/99 08:51 vulcan Q2 trip
11495 04/05/99 08:01 cdaq Beam Time Accounting
11494 04/05/99 07:59 Meekins Shift Summary
11492 04/05/99 07:50 meekins Q2 trip
11491 04/05/99 07:29 meekins q2 trip
11489 04/05/99 07:20 meekins HMS trigger changed
11486 04/05/99 06:32 Meekins Q3 trip
11483 04/05/99 06:23 Meekins HMS q1 tripped
11478 04/05/99 04:37 meekins shift checklist
11476 04/05/99 04:20 meekins PBM screen
11474 04/05/99 04:11 meekins Q2 trip
11469 04/05/99 02:35 Meekins Target reboot
11467 04/05/99 01:24 Meekins HMS magnets reset
11465 04/05/99 01:18 meekins sos thresholds updated
11463 04/05/99 01:06 Meekins hms_thresholds.dat update
11461 04/05/99 00:47 Cadman Correction to 24076
11458 04/05/99 00:24 Meekins HMS dipole trip
11455 04/05/99 00:11 eschulte Swing Shift Summary
11454 04/05/99 00:07 eschulte Swing Shift Log
11453 04/05/99 00:05 cdaq Beam Time Accounting
Sunday
11447 04/04/99 21:05 eschulte MEDM beam profile Screen Log
11442 04/04/99 20:17 eschulte Yet another Q2 trip
11441 04/04/99 19:47 eschulte Q2 trip take 2
11437 04/04/99 18:19 eschulte Shift Checklists
11436 04/04/99 18:04 eschulte Shift Checklists
11434 04/04/99 17:41 eschulte Shift Check list
11432 04/04/99 17:37 eschulte Q2 trip
11429 04/04/99 16:03 CDAQ day shift summary
11428 04/04/99 16:01 cdaq Beam Time Accounting
11421 04/04/99 13:50 zeier incorrect pedestal subtraction
11417 04/04/99 12:53 Potterveld SOS ADC problem
11415 04/04/99 11:48 Potterveld Reboot VMEC2
11411 04/04/99 10:30 zeier Q2 trip
11408 04/04/99 09:54 maurice hall A beam energy
11407 04/04/99 09:27 Potterveld Q2 trip recovered
11403 04/04/99 08:37 Potterveld Q2 trip
11402 04/04/99 08:03 cdaq Beam Time Accounting
11401 04/04/99 07:31 Meekins Hall card reader PC
11400 04/04/99 07:28 Meekins Shift Summary
11397 04/04/99 06:56 meekins BPM positions
11394 04/04/99 06:18 Meekins Q3 trip
11393 04/04/99 06:10 meekins Q2 trip
11392 04/04/99 06:03 Cadman Clarification of target number
11390 04/04/99 05:26 Meekins HMS high voltage off
11389 04/04/99 05:24 Meeekins Changed HMS trigger to 4/4
11388 04/04/99 05:23 Meekins Target Change
11385 04/04/99 04:28 Meekins Changed raster size
11383 04/04/99 04:26 Meekins Q2 Trip
11382 04/04/99 04:01 Meekins Q3 and dipole reset
11381 04/04/99 03:57 Meekins Q2 reset
11380 04/04/99 03:53 Meekins HMS Q3 and dipole trip
11379 04/04/99 03:39 Meekins. HMS trigger Chnaged to 3/4
11378 04/04/99 03:35 Cadman 24030 has 0% radiator
11377 04/04/99 03:29 Meekins HMS Q2 trip
11373 04/04/99 01:26 Meekins Dipole back on
11370 04/04/99 01:00 Cadman prescale
11368 04/04/99 00:34 Meekins Q3 and Dipole trip on HMS
11365 04/04/99 00:00 cdaq Beam Time Accounting
Saturday
11364 04/03/99 23:59 L.Tang Swing shift record and summary
11363 04/03/99 23:45 gaskell Q1 PC dies
11362 04/03/99 23:13 gaskell Q2 PC dies- end of run 24022
11356 04/03/99 20:53 gaskell 24017 ends for dipole trip
11353 04/03/99 19:43 gaskell 24015 ends for Q2 trip
11350 04/03/99 18:51 gaskell 24013 ends for Q1 trip
11346 04/03/99 18:05 gaskell changed sos trigger to 3/4
11344 04/03/99 17:59 gaskell Q2 PC reboot
11343 04/03/99 17:36 gaskell Q2 trips 3 times!
11341 04/03/99 17:02 Potterveld Magnet alarm panel rewired
11338 04/03/99 16:08 cdaq Beam Time Accounting
11339 04/03/99 16:07 cdaq Day shift summary
11329 04/03/99 10:48 Potterveld SOS HV problems
11326 04/03/99 09:16 X . Jiang charge caliberation results.
11325 04/03/99 09:14 Meekins Shift Summary
11323 04/03/99 08:00 cdaq Beam Time Accounting
11321 04/03/99 07:39 MEEKINS HMS dipole trip
11319 04/03/99 06:30 meekins SOS LD2 run
11317 04/03/99 06:05 Meekins Q2 and Q3 trip
11313 04/03/99 04:51 Meekins dipole q3 reset
11314 04/03/99 04:51 Meekins q2 trip
11311 04/03/99 04:16 Meekins SOS S2 x5+
11309 04/03/99 03:56 meekins SOS power supplies
11303 04/03/99 02:03 meekins DAQ SFISOS crash
11299 04/03/99 00:02 maurice swing shift summary
11298 04/03/99 00:00 cdaq Beam Time Accounting
Friday
11284 04/02/99 16:06 baker Shift Summary
11283 04/02/99 15:58 cdaq Beam Time Accounting
11281 04/02/99 15:14 baker recommendation
11279 04/02/99 14:47 baker magnet and CODA crashes
11274 04/02/99 12:34 baker No Beam
11271 04/02/99 11:08 mharvey daq crash
11264 04/02/99 09:23 baker HMS magnet trips
11263 04/02/99 09:10 maurice LH target with 0,2,4,6 % radiator
11262 04/02/99 08:06 cdaq Beam Time Accounting
11261 04/02/99 08:03 miller owl shift summary
11260 04/02/99 07:57 zeier Background rates: beam current
11258 04/02/99 06:35 zeier Background rates
11249 04/02/99 00:23 baker shift summary
11248 04/02/99 00:02 cdaq Beam Time Accounting
11247 04/02/99 00:01 maurice swing shift summary
Thursday
11246 04/01/99 23:46 maurice Q3 100A too high
11233 04/01/99 15:56 cdaq Beam Time Accounting
11232 04/01/99 15:15 baker 2% radiator now in
11230 04/01/99 15:05 baker New instructions for setting HMS quads.
11229 04/01/99 14:54 Dunne Target Temp.: Loop 1 control
11228 04/01/99 14:32 baker Q2 trip
11226 04/01/99 13:58 baker beam back
11225 04/01/99 08:32 baker HMS Q2 trip
11224 04/01/99 08:24 cdaq Beam Time Accounting
11223 04/01/99 08:22 cdaq Owl Shift
11216 04/01/99 00:32 cdaq Beam Time Accounting
11215 04/01/99 00:28 R. Tieulent March 31, Swing shift