Difference between revisions of "How-to"

From HallCWiki
Jump to: navigation, search
(Polarized He3 Specific Information)
 
(23 intermediate revisions by 10 users not shown)
Line 1: Line 1:
 
NOTE: If you can't solve the problem in 1 hour you ''MUST'' then contact the Run Coordinator!'''  (See also [[Experts on call]])
 
NOTE: If you can't solve the problem in 1 hour you ''MUST'' then contact the Run Coordinator!'''  (See also [[Experts on call]])
 
== Polarized He3 Specific Information ==
 
* [[Media:Glass_Cell_Target_Change_Procedure.pdf | Procedure for Moving Between Target Cells (pdf)]] [[Media:Glass_Cell_Target_Change_Procedure.odp | (ODP)]]
 
* [[Pol He-3 Target Screen Setup|Pol He-3 Target Screen Setup / How-tos]]
 
* [[Pol_He-3_Target_Information|Polarized He3 Target Information]]
 
* [[Pol_He-3_Operational_Restrictions|Pol He3 Operational Restrictions (raster, beam current limits, etc)]]
 
* [[Polarized_Helium-3_Experiments#New_Online_Monitoring_Instructions|Online Analysis Instructions]]
 
* [[How to check for Scraping on Glass Target Cell Walls]]
 
* [[Ramp Rate Lock | How to check if the beam current ramp protection is on (Pol He3)]]
 
* [[Charge Feedback Parity DAQ]]
 
  
 
== General How-to's ==
 
== General How-to's ==
Line 21: Line 11:
 
** [[Shift Checklist Help]]
 
** [[Shift Checklist Help]]
  
* [[Analysis How-to]]
+
* [[https://hallcweb.jlab.org/wiki/index.php/NPS_Online_analysis_(Fall_2023) NPS_Online_analysis_(Fall_2023)]]
  
* [[Beam Checkout Procedures]]
+
* [[Beam Checkout Procedures]] Includes -
 +
** Raster checks
 +
** Harp scans
 +
** Carbon hole check
  
 
* Hall C Raster
 
* Hall C Raster
 
**If problems call Raster experts in order of listed on  [https://hallcweb.jlab.org/wiki/index.php/Experts_on_call#On_call_Experts Expert on call page].
 
**If problems call Raster experts in order of listed on  [https://hallcweb.jlab.org/wiki/index.php/Experts_on_call#On_call_Experts Expert on call page].
 
**Raster procedure is located at [http://opsntsrv.acc.jlab.org/ops_docs/online_document_files/MCC_online_files/hallC_target_raster_proc.pdf Hall C Fast Raster Setup Procedure]
 
**Raster procedure is located at [http://opsntsrv.acc.jlab.org/ops_docs/online_document_files/MCC_online_files/hallC_target_raster_proc.pdf Hall C Fast Raster Setup Procedure]
**The raster X and Y signals that go into the DAQ are also shown on an oscilliscope in rack CH03B14. See [https://logbooks.jlab.org/entry/3748775 logbook entry] for a movie of good oscilliscope signals. The X and Y should be 90 degrees out of phase and the amplitude variation in sync.  
+
**The raster X and Y signals that go into the DAQ are also shown on an oscilliscope in rack CH03B14.
** If raster signal's amplitude variation is not in sync, then ask MMC to go to the "Waveform Generator" page ( top right corner of the Hall C fast raster page). On the "Waveform Generator" page have MCC click on the "SYNC ARB" button.
+
<!--
** If raster signal's phase is not 90 degrees, then ask MMC to go to the "Waveform Generator" page ( top right corner of the Hall C fast raster page). On the "Waveform Generator" page have MCC click on the "SYNC PHASE" button.
+
** Instructions for circular raster ( not using as of AUg 2021)
 +
*** See [https://logbooks.jlab.org/entry/3748775 logbook entry] for a movie of good oscilliscope signals. The X and Y should be 90 degrees out of phase and the amplitude variation in sync.
 +
*** If raster signal's amplitude variation is not in sync, then ask MMC to go to the "Waveform Generator" page ( top right corner of the Hall C fast raster page). On the "Waveform Generator" page have MCC click on the "SYNC ARB" button.
 +
*** If raster signal's phase is not 90 degrees, then ask MMC to go to the "Waveform Generator" page ( top right corner of the Hall C fast raster page). On the "Waveform Generator" page have MCC click on the "SYNC PHASE" button.
 +
-->
  
 
* DAQ Related Help
 
* DAQ Related Help
 
** [[Hall_C_DAQ|Hall C DAQ Setup / Restart Instructions]]
 
** [[Hall_C_DAQ|Hall C DAQ Setup / Restart Instructions]]
** [[Hall_C_DAQ#Live_Time_Display|DAQ Live Time missing?]]
+
** [[Hall_C_DAQ#Live_Time_Display|DAQ Live Time]]
 
** [[Hall-C_HMS_DAQ_Failure_Modes | "HMS DC may be ringing (check replay now)" alarm]]
 
** [[Hall-C_HMS_DAQ_Failure_Modes | "HMS DC may be ringing (check replay now)" alarm]]
  
Line 41: Line 38:
 
*** The usual collimator settings are HMS : "Large Collimator" and SHMS : "Collimator".
 
*** The usual collimator settings are HMS : "Large Collimator" and SHMS : "Collimator".
 
*** The usual sieve settings are "HMS: Sieve" and SHMS: "Centered Sieve"
 
*** The usual sieve settings are "HMS: Sieve" and SHMS: "Centered Sieve"
** [https://hallcweb.jlab.org/DocDB/0010/001002/002/Instructions-power-cycle-HallC-collimators.pdf Instructions for power cycling the drive controllers for the HMS/SHMS collimators].  
+
** The collimator controls should only be power cycled by a qualified electrical worker (QEW).  Please consult the engineer on call if you think power cycling is required.
 +
*** [https://hallcweb.jlab.org/DocDB/0010/001002/002/Instructions-power-cycle-HallC-collimators.pdf Instructions for power cycling the drive controllers for the HMS/SHMS collimators]. [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1002 DocDB Page]
 
** [https://hallcweb.jlab.org/DocDB/0008/000828/001/hallc_collimators.pdf More detailed info on collimator controls]. Also includes description of the collimators.
 
** [https://hallcweb.jlab.org/DocDB/0008/000828/001/hallc_collimators.pdf More detailed info on collimator controls]. Also includes description of the collimators.
  
Line 48: Line 46:
 
* Gas Shed
 
* Gas Shed
 
** Drift Chamber Gas System
 
** Drift Chamber Gas System
 +
*** If the 'Low PSI' interlock has tripped it may mean that the Argon has run out. Talk to an expert '''first'''.  You can reset the interlock through the 'Hall C Gas Shed Interlocks/Controls' GUI [[EPICS/Accelerator_Screens]]
 
*** See [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Standard Equipment Manual]
 
*** See [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Standard Equipment Manual]
 
***[https://hallcweb.jlab.org/munin/gas_shed-day.html Flow and Temperature Charts] (generated by iochcgs.acc.jlab.org)
 
***[https://hallcweb.jlab.org/munin/gas_shed-day.html Flow and Temperature Charts] (generated by iochcgs.acc.jlab.org)
  
 +
* [[Big Screen / Wall TVs]]
 
* [[High_Voltage|High Voltage Controls]]
 
* [[High_Voltage|High Voltage Controls]]
 
** Run 'go_hv' and follow instructions
 
** Run 'go_hv' and follow instructions
Line 57: Line 57:
 
*[[Hall C Drift Chamber Threshold Controls]]
 
*[[Hall C Drift Chamber Threshold Controls]]
 
* Hall C BPMs: Run '''go_bpms''' from the ''cdaq'' account
 
* Hall C BPMs: Run '''go_bpms''' from the ''cdaq'' account
*[[Target BPMs | How to open target BPM screen]] (This display projects the BPM positions to the target (PolHe3))
 
 
*[[Hall C Harps | How to see results of Hall C harp scans]]
 
*[[Hall C Harps | How to see results of Hall C harp scans]]
 
*[[Hall C YAG Viewer | How to bring up the Hall C YAG Viewer camera]]
 
*[[Hall C YAG Viewer | How to bring up the Hall C YAG Viewer camera]]
 
*[[Hall C Alarm Handler | How to bring up the Alarm Handler]]
 
*[[Hall C Alarm Handler | How to bring up the Alarm Handler]]
 +
*Counting House Cameras (Four Halls) &bull; Run '''go_cameras_CH''' from ''cdaq'' or ''cvideo'' account
 
*[[Hall C Cameras | Hall C cameras]]
 
*[[Hall C Cameras | Hall C cameras]]
 
*[[Hall C BCM Temperatures]]
 
*[[Hall C BCM Temperatures]]
 +
*[[Hall C IHWP Change Procedure]]
 
*[[Hall C EDTM Pulser | How to restore the Hall C EDTM Pulser]]
 
*[[Hall C EDTM Pulser | How to restore the Hall C EDTM Pulser]]
 
*[[Hall C HMS/SHMS shutters | How to check the HMS/SHMS shutters]]
 
*[[Hall C HMS/SHMS shutters | How to check the HMS/SHMS shutters]]
Line 73: Line 74:
 
* [https://hallcweb.jlab.org/DocDB/0009/000957/001/NonInvasiveBCMCalibration.pdf How to perform a BCM calibration]
 
* [https://hallcweb.jlab.org/DocDB/0009/000957/001/NonInvasiveBCMCalibration.pdf How to perform a BCM calibration]
 
* [https://hallcweb.jlab.org/DocDB/0010/001006/001/Radiator.pdf How to operate the Hall-C Radiator (J/Psi Experiment)]
 
* [https://hallcweb.jlab.org/DocDB/0010/001006/001/Radiator.pdf How to operate the Hall-C Radiator (J/Psi Experiment)]
 +
 +
=== [[Expert Information]] ===
 +
{{:Expert Information}}
  
 
== Spectrometer Magnets ==
 
== Spectrometer Magnets ==
Line 81: Line 85:
 
*[[Resetting Magnet Interlocks]]
 
*[[Resetting Magnet Interlocks]]
 
*How-to power cycle SHMS PLC I/O chassis: https://logbooks.jlab.org/entry/3625900
 
*How-to power cycle SHMS PLC I/O chassis: https://logbooks.jlab.org/entry/3625900
 +
* [https://logbooks.jlab.org/entry/3933073 Resetting the "ioc heartbeat epics communications" (start by clicking on the heart at upper left of the magnet controls screen]
  
 
== How to Rotate the HMS and SHMS ==
 
== How to Rotate the HMS and SHMS ==
 
*[[Spectrometer Rotation]]
 
*[[Spectrometer Rotation]]
 +
 +
== How to change HMS or SHMS momentum ==
 +
*[https://hallcweb.jlab.org/wiki/index.php/How_to_operate_and_monitor_the_Spectrometer_Magnets Changing momentum]
  
 
== SHMS Detectors ==
 
== SHMS Detectors ==
Line 109: Line 117:
 
* [https://hallcweb.jlab.org/DocDB/0008/000836/001/HallCTargetConfiguration2-6-17.pdf Hall C target configuration for Spring 17 running]
 
* [https://hallcweb.jlab.org/DocDB/0008/000836/001/HallCTargetConfiguration2-6-17.pdf Hall C target configuration for Spring 17 running]
 
* [https://hallcweb.jlab.org/DocDB/0010/001006/001/Radiator.pdf How to operate the Hall-C Bremsstrahlung Radiator for the J/Ψ -007 Experiment (Spring 2019)]
 
* [https://hallcweb.jlab.org/DocDB/0010/001006/001/Radiator.pdf How to operate the Hall-C Bremsstrahlung Radiator for the J/Ψ -007 Experiment (Spring 2019)]
 +
 +
== NPS detectors ==
 +
* [https://hallcweb.jlab.org/wiki/index.php/NPS_Calo_SlowControls NPS Calo Slow Controls] 
 +
* [https://logbooks.jlab.org/entry/4178752 NPS anode and rate monitor]
 +
* [https://logbooks.jlab.org/entry/4193416 NPS radiation monitors]
 +
 +
 +
== Hall C Coffee Machine ==
 +
* Do not use the milk frother; this will just get nasty. Warm up some milk in the microwave before running the machine.
 +
* Regularly empty the drip tray and coffee grounds container.
 +
* You can find a user manual and other information [https://www.usa.philips.com/c-p/EP3241_54/series-3200-fully-automatic-espresso-machines/support here]
 +
* The machine needs regular descaling; a warning light will tell us when. Instructions on how to do this are [https://www.usa.philips.com/c-f/XC000004201/how-to-descale-my-philips-espresso-machine here].
  
 
== Legacy Documentation ==
 
== Legacy Documentation ==
 +
*[https://hallcweb.jlab.org/wiki/index.php/Hall_C_archiver_info  Hall C Archiver Info]
 
*[https://hallcweb.jlab.org/document/howtos/ List of (legacy) Hall-C HowTo Documents]
 
*[https://hallcweb.jlab.org/document/howtos/ List of (legacy) Hall-C HowTo Documents]
 
*[https://hallcweb.jlab.org/DocDB/0008/000837/001/HMS_cycling_2007.pdf How to cycle the HMS quad magnets]
 
*[https://hallcweb.jlab.org/DocDB/0008/000837/001/HMS_cycling_2007.pdf How to cycle the HMS quad magnets]
 
*[http://userweb.jlab.org/~hcf/status.html Howard's page of Archiver magnet trend charts]
 
*[http://userweb.jlab.org/~hcf/status.html Howard's page of Archiver magnet trend charts]

Latest revision as of 16:10, 27 November 2023

NOTE: If you can't solve the problem in 1 hour you MUST then contact the Run Coordinator! (See also Experts on call)

General How-to's

  • Make HCLog entries using the logbook page, or by running 'hclog' in a terminal.
    • Please be concise, but clear. Assume you will need to search for, and understand, an entry 12 months from now (or longer).

Expert Information

This page tries to capture/consolidate some low-level details in the Hall C Counting House configuration. In general every directory/system will contain one or more README files describing the relevant software/philosophy etc. The majority of the configuration files/code are also stored in git repos with remotes on the hallcgit.jlab.org host. Brad Sawatzky and Steve Wood set up a lot of this. Now, Bob Michaels and Chandan Ghosh are running the DAQ. I think this section may need updating.

Before becoming an expert, reminder on the basics: https://hallcweb.jlab.org/wiki/index.php/Hall_C_DAQ

Detector/DAQ 'pre-beam' Checklist

This is a copy of the Detector/DAQ 'pre-beam' Checklist that is generally completed prior to beam delivery into the Hall (after a SAD or an extended down). It is intended to ensure that basic operational things like crate fans, crates, HVs, gas configuration, etc are confirmed and logged. This is typically requested by the Hall Work Coordinator (ie. Walter Kellner) and gets logged to the HCLOG. An example can be found here HCLog 3968308.

Print out two copies. One for HMS, one for SHMS: File:Detector readiness checklist.pdf, (File:Detector readiness checklist.ods)

Spare Hardware Locations

  • CAMAC, NIM: Hall C Counting House cabinets (in electronics room by door to the outside)
  • VME: Counting House, 2nd floor, blue module cabinet in Jack Segal's area
  • HV: Counting House, 2nd floor, cabinet in "G0 cage"
  • PMTs, HV bases: EEL/126 cabinet at rear of room (labelled, standard 'A12' keyed lock)
  • Wiener Crate control units (front panel, ethernet, etc): EEL/126 cabinet

ESB / Building 23 (NE corner)

This has been my staging and test area for a number of years and contains several DAQ test beds supporting several groups. The hardware, cabling, modules in that space should generally be considered as either 'in-use' or as being staged for a near-term future experiment (ie. NPS/LAD/GEn-RP). The experiment on the floor takes priority, of course, but don't steal from future experiments without actively following up on replacing that hardware.

  • CAEN Sy45xx crates and modules (NPS)
  • Wiener VXS crates (NPS)
  • FADCs, SD, TI, boards etc (NPS)
  • Cabling (NPS, GEn-RP)

Spectrometer Magnets

How to Rotate the HMS and SHMS

How to change HMS or SHMS momentum

SHMS Detectors

HMS Detectors

Polarized 3He target in Hall C

Hall C Cryo-target

NPS detectors


Hall C Coffee Machine

  • Do not use the milk frother; this will just get nasty. Warm up some milk in the microwave before running the machine.
  • Regularly empty the drip tray and coffee grounds container.
  • You can find a user manual and other information here
  • The machine needs regular descaling; a warning light will tell us when. Instructions on how to do this are here.

Legacy Documentation