Hall C Document 36-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

THA for Beryllium Window Change

Document #:
HallC-doc-36-v1
Document type:
internal
Submitted by:
Andy Kenyon
Updated by:
Andy Kenyon
Document Created:
04 Mar 2008, 15:16
Contents Revised:
04 Mar 2008, 15:16
Metadata Revised:
04 Mar 2008, 16:07
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Abstract:
This is the THA for changing the Be exit window on the beamline. Also included is a list of jobs/tasks that need to be done to replace the beryllium window at the exit of the beam line. RADCON needs this to generate an RWP.
Files in Document:
Authors:
Notes and Changes:
The THA number is C-08-012-T
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators