ERR E12-06-105 E12-10-008 E12-16-007
From HallCWiki
Contents
Hall C E12-06-105, E12-10-008, E12-16-007 Experimental Readiness Reviews
Time and Location
- Date: June 8, 2017
- Location: CEBAF Center L102
- ERR Charge: (pdf)
- ERR Committee: Beni Zihlmann (Hall C detector setup & Chair), James Dunne (Targets & Radiator), Jay Benesch (Hall C Beamline), Vashek Vylet (Radiation), Bert Manzlak (EHS&Q), Javier Gomez (Observer), Ed Folts (Observer)
Agenda
- 8:45 (15) Executive Session
- 9:00 (10) Opening and Charge - P. Rossi
- 9:10 (20+10) E12-06-105/E12-10-008 overview - Donal Day Charge Items 3, 6
- Short Physics Overview
- Run plan (kinematics, etc.)
- Collaboration
- Documentation
- 9:40 (20+10) E12-06-105/E12-10-008 details - Nadia Fomin Charge Items 1, 2b, 3, 4, 5
- Detector configuration
- Beamline configuration
- Radiation in Hall
- 10:10 (15+5) E12-06-105/E12-10-008 Targets - Dave Meekins Charge Item 2b
- 10:30 (15) Coffee Break
- 10:45 (20+10) E12-16-007 overview - Sylvester Joostens Charge Items 1, 3, 6
- Short Physics Overview
- Collaboration
- Documentation
- Detector Configuration
- 11:15 (20+10) E12-16-007 beamline/target - Mark Jones Charge Items 1, 2a, 3, 5
- Radiator
- Target
- Beamline configuration
- Radiation in Hall
- 11:45 (20+10) RSAD draft for E12-06-105/E12-10-008 and E12-16-007 - Pavel Degtiarenko Charge Item 5
- 12:15 Executive Session & Lunch
Documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
- Standard Equipment Manual
- Radiation Safety Assessment Document (From Spring 2017 KPP run)
- Hall C Howtos and References (Some operations manual references found here)
- Hall C Document Database (Some operations manual references found here)
Other Hall C Experiment Readiness Reviews
- Commissioning experiments ERR, August 24-25, 2016
- SHMS Q2/Q3/Dipole magnet review, October 12, 2016