HallC-doc-# | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
1225-v1 | End of the C line (notes for g2p) | Jay Benesch | Beamline 12 GeV Layout Target |
30 Jun 2023 |
968-v15 | Misc BCM docs for the Winter17-Spring18 Run | Dave Mack | Beamline 12 GeV Layout |
07 Feb 2019 |
964-v1 | Unser Monitor Doc | Stephen A. Wood | 6 GeV Layout 12 GeV Layout |
14 Mar 2018 |
792-v1 | Hall A BCM Infrastructure July 2015 | Dave Mack | 12 GeV Layout |
21 Jul 2015 |
667-v1 | Hall-C 12GeV Configuration Perspective Rendering | Mike Fowler | 12 GeV Layout 12 GeV Figures 12 GeV Experiments Documents Magnets General Information |
19 Apr 2010 |
124-v1 | Qweak Detector Status | Dave Mack | 6 GeV Figures 12 GeV Layout 6 GeV Experiments |
25 Apr 2008 |
Number of documents found: 6
DocDB Version 8.8.6, contact
Document Database Administrators
Execution time: 1 wallclock secs ( 0.19 usr + 0.03 sys = 0.22 CPU)