== Fall 2017 Commissioning Plans ==
 
== Fall 2017 Commissioning Plans ==
*[[Information for Shift Takers]]
+
*[[Information for Shift Takers]] ([https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-2017-2018 2017-2018 Shift Signup])
 
*[[Fall 2017 Commissioning Plan]]  
 
*[[Fall 2017 Commissioning Plan]]  
 
*[[Experts on call]]
 
*[[Experts on call]]

Revision as of 15:33, 4 November 2017

Hallcheader.jpg


Fall 2017 Commissioning Plans

Spring 2017 KPP run

Hall C Links

Hall C

Hall C is one of four experimental halls at JLab.

Hall C Computing.

Hall C in the Press.

Basic Equipment in Hall C

Beamline

SHMS Magnets

  • Formulas used for setting current of SHMS magnets during KPP
Magnet Formula
HB Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3
Q1 Current = 222.4*p - 7.709*p^2 + 0.6684*p^3
Q2 Current = 3661*p/11
Q3 Current = 2434*p/11
Dipole Current = 3450*p/11

Scattering Chamber

  • The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.

SHMS Entrance Window and Vacuum vessel

  • The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
  • The dipole exit window is 0.020 inches thick 5056 aluminum.

Target

Spring 2017 KKP run

Fall 2017 run

  • Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
  • BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
  • Drawing of target ladder with cryo cells and solid target ladder.
  • Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
  • Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
  • Drawing of cryotarget with 1.6 inch diameter for 10cm cell.

HMS Magnets and Vacuum Vessel

HMS Detectors

SHMS Detectors

DAQ & Trigger

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)
  • HMS and SHMS Collimator Control document.

Online Replay

Data Analysis

Monte Carlo