CT Experiment (E1206107) Run Plan
The 6.4 GeV Run Plan (52 hrs)
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- Start with 30uA on lower 6% Carbon, after a 2 hr run, increase to 40 uA and after another 2 hr run move to the upper 6% Carbon and ask for 50 uA.
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 10000 events for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 12 hrs |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 4 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 36 hrs |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min |
The 10.6 GeV Run Plan (282 hrs)
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | LARGE , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- H(e,e'p) Check
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 23.2 deg | -5.539 | 21.6 deg | +5.925 | 4 hrs (3 Hz) |
- Q^2 = 14.3 GeV^2 Run Plan
- Cycle SHMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 1000 events each for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 51 hrs |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 30 min |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 2 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 122 hrs |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 30 min |
- Q^2 = 12.4 GeV^2 Run Plan
- Cycle HMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 2000 events each for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 31.5 deg | -3.978 | 16.1 deg | +7.502 | 12 hrs |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 31.5 deg | -3.978 | 16.1 deg | +7.502 | 30 min |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 31.5 deg | -3.978 | 16.1 deg | +7.502 | 1 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 31.5 deg | -3.978 | 16.1 deg | +7.502 | 24 hrs |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 31.5 deg | -3.978 | 16.1 deg | +7.502 | 30 min |
- Q^2 = 10.0 GeV^2 Run Plan
- Cycle HMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 4000 events each for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 6 hrs |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 30 min |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 1 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 12 hrs |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 30 min |
- Q^2 = 10.0 GeV^2 Proton angle (Fermi cone) scan
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 2500 events each for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 17.6 deg | +6.209 | 12 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 23.6 deg | +6.209 | 20 hrs |
F2 Experiment (E12-10-002) L/T measurement Run Plan
- Experts: Simona Malace, Eric Christy
- Expected time: 2 days at 30 muA
- Goal: Measure one epsilon point to better constrain R at large x
- Conditions: ONLY HMS NEEDED. Prescale to 2 kHz, cycle magnets.
beam current (uA): | max current |
---|---|
fast raster: | 2x2mm |
target: | 10 cm LH2, Al 10 cm Dummy |
HMS collimator: | PION |
HMS trigger: | ELREAL for physics data taking |
HMS trigger: | SCIN 3/4 *for one run only* in the beginning for trigger efficiency calculation (we are running one trigger at the time) |
HMS angle/momentum: | 65 deg / -1 GeV/c - 100 K electrons |
HMS angle/momentum: | 65 deg / +1 GeV/c - 10 K positrons |
Deuteron Electro-Disintegration (E12-10-003) Run Plan
- Experts: Werner Boeglin, Mark Jones
- Graduate Student: Carlos Yero
- Expected Time: 6 days at 70 uA
- Goal: Measure D(e,e'p)n cross section at three kinematic settings, where FSI are small
- Conditions: The SHMS will detect electrons and the HMS will detect protons.
beam energy: | 10.6 GeV |
---|---|
beam current: | 70 μA |
fast raster: | 2x2 mm |
targets: | 10cm LH2, 10cm LD2 |
HMS/SHMS collimator: | Pion , Collimator |
HMS/SHMS trigger: | Coincidence, HMS: h3/4, SHMS: p3/4 |
HMS angle/momentum | Various |
SHMS angle/momentum | Fixed |
- H(e,e'p) Check Run Plan
- Check the HMS/SHMS spectrometer pointing
Target | SHMS angle | SHMS momentum | HMS angle | HMS momentum | Time |
---|---|---|---|---|---|
LH2 | 12.169 deg | -8.70 GeV/c | 37.339 deg | +2.938 GeV/c | 1 hr |
- D(e,e'p)n Run Plan
- Calibration run at low missing momentum used as a cross check with existing data
- Measure the D(e,e'p)n Cross Section at unexplored high missing momentum kinematics settings
Target | SHMS angle | SHMS momentum | HMS angle | HMS momentum | Missing Momentum | Time |
---|---|---|---|---|---|---|
LD2 | 12.169 deg | -8.70 GeV/c | 40.061 deg | +2.435 GeV/c | 80 MeV | 1 hr |
LD2 | 12.169 deg | -8.70 GeV/c | 53.252 deg | +2.305 GeV/c | 500 MeV | 8 hrs |
LD2 | 12.169 deg | -8.70 GeV/c | 56.401 deg | +2.220 GeV/c | 650 MeV | 18 hrs |
LD2 | 12.169 deg | -8.70 GeV/c | 59.388 deg | +2.120 GeV/c | 800 MeV | 36 hrs |
Fall 2017 Commissioning Plans
- Information for Shift Takers (2017-2018 Shift Signup)
- Target web page. Target training schedule
- Sign up for hallc_running mailing list. Archive
- Runsheets:
- Update beam schedule Jan 2018
- Fall 2017 Commissioning Plan
- Commissioning analysis logbook
- Experts on call
- How-to
- Detector Working Group Biweekly Meeting Agendas
- Wiki Page for Detector Working Group Biweekly Meetings
Spring 2017 KPP run
- KPP Run Plan
- RC daily meetings and daily runplan for KPP
- Logbook entry with pdf of the run sheets.
Hall C Links
- List of (legacy) Hall-C HowTo Documents
- HCANA doxygen
- Google Search of this Wiki
- Hall C Home Page
- Hall C Logbook
- Document Database (Publically readable view)
- Hall C Calendar (Google)
- Hall C Weekly Meeting minutes
- Previous Experiments
- Other Wikis
- Misc Links:
- Survey and Alignment Group: Surveys 2001-Present
- Hall C posters
Hall C
Hall C is one of four experimental halls at JLab.
Hall C Computing.
Basic Equipment in Hall C
Beamline
SHMS Magnets
For the Fall 2017 run, see intructions at https://hallcweb.jlab.org/wiki/index.php/How-to
The formulas and program should be kept in sync with the repository.
- Formulas used for setting current of SHMS magnets during KPP
Magnet | Formula |
---|---|
HB | Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3 |
Q1 | Current = 222.4*p - 7.709*p^2 + 0.6684*p^3 |
Q2 | Current = 3661*p/11 |
Q3 | Current = 2434*p/11 |
Dipole | Current = 3450*p/11 |
Scattering Chamber
- The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.
SHMS Entrance Window and Vacuum vessel
- The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
- The dipole exit window is 0.020 inches thick 5056 aluminum.
Target
Spring 2017 KKP run
- Word doc describing the targets and their thicknesses. Also available at logbook entry.
- Drawing of target ladder. Also available at JLab document repository.
Fall 2017 run
- Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
- BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
- Drawing of target ladder with cryo cells and solid target ladder.
- Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
- Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
- Drawing of cryotarget with 1.6 inch diameter for 10cm cell.
HMS Magnets and Vacuum Vessel
HMS Detectors
SHMS Detectors
- Hodoscopes
- Drift Chambers
- Calorimetry
- Aerogel
- Heavy Gas Cherenkov
- Noble Gas Cherenkov
- GEM
- Miscellaneous Information
DAQ & Trigger
- DAQ/Trigger Run Check Lists
- Spring 2018 Commissioning
- Fall 2017 Commissioning
- Hall C DAQ How-tos
- Scalers
- Trigger
- Electronic/Computer Live Time Studies
Controls
- High Voltage
- Spectrometer Controls (Use go_cmagnets command)
- HMS and SHMS Collimator Control document.
Online Replay
- Basic Hall C replay structure on github.
- Brief overview of the basic Hall C replay structure .
Data Analysis
- Analyzer and other Hall C related software
- Discussion of the HCANA software flow.
- Documentation on the Hall C optics optimization.
- Software task list for summer of 2017.
- Summer 2017 Analysis Workshop
- Agendas for biweekly software meetings.
Monte Carlo
Hall C at 12 GeV
- Hall C 12 GeV Upgrade Web Page
- SHMS-HMS User Group wiki page with list of board members, charter and table of contacts.
- Listing of newsletters on the SHMS/HMS/12GeV .
- SHMS Mailing List (shms_users@jlab.org) is the mailing list for sharing information on the SHMS and 12 GeV upgrade in general.
- Index of 12 GeV software related wiki pages. Go to Hall C Software Mailing List (hallcsw@jlab.org) to see the archives from the mailing list or to subscribe to the mailing list.
- Index of SHMS related wiki pages.
- Polarized 3He target in Hall C
- Wiki pages for 12 GeV experiments:
- b1
- Polarized WACS
- Azz: Azz Meetings
- E12-10-002
- E12-10-003 Deuteron Electro-Disintegration At Very High Missing Momenta
- E12-06-107 Color Transparency Experiment
- A1nd2n A1n and d2n Experiments E12-06-110 and E12-06-121
- Elog for 12GeV Preparations