Difference between revisions of "Main Page"
From HallCWiki
Jump to navigationJump to searchLine 263: | Line 263: | ||
* D(e,e'p)n Run Plan | * D(e,e'p)n Run Plan | ||
** Calibration run at low missing momentum used as a cross check with existing data | ** Calibration run at low missing momentum used as a cross check with existing data | ||
− | |||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
Line 271: | Line 270: | ||
|- | |- | ||
|} | |} | ||
+ | ** Measure the D(e,e'p)n Cross Section at unexplored high missing momentum kinematics settings | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! LD2 || 12.169 deg || -8.70 GeV/c || 54.961 deg || +2.2622 GeV/c || 580 MeV || 20 hrs | ||
+ | |- | ||
+ | ! LD2 || 12.169 deg || -8.70 GeV/c || 58.404 deg || +2.1557 GeV/c || 750 MeV || 42 hrs | ||
+ | |- | ||
+ | |} | ||
== Alternative Run Plan (Assuming Beam Current of 65-70 uA) == | == Alternative Run Plan (Assuming Beam Current of 65-70 uA) == | ||
*The initial H(e,e'p) checkout and D(e,e'p)n at low missing momentum is the SAME as above. | *The initial H(e,e'p) checkout and D(e,e'p)n at low missing momentum is the SAME as above. |
Revision as of 21:21, 18 February 2018
CT Experiment (E1206107) Run Plan
The 6.4 GeV Run Plan (52 hrs)
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- Start with 30uA on lower 6% Carbon, after a 2 hr run, increase to 40 uA and after another 2 hr run move to the upper 6% Carbon and ask for 50 uA.
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 10000 events for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time | Complete |
---|---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 12 hrs | Y |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min | Y |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 4 hrs | Y |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 36 hrs | Y |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min | Y |
The 10.6 GeV Run Plan (282 hrs)
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | LARGE , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- H(e,e'p) Check
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time | Complete |
---|---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 23.2 deg | -5.539 | 21.6 deg | +5.925 | 4 hrs (3 Hz) | Y |
- Q^2 = 14.3 GeV^2 Run Plan
- Cycle SHMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 1000 events each for LH2 and Carbon and take two singles run 30 mins each at the beginning and end of the running on a particular target.
- For the singles runs the prescale factor on SHMS should be adjusted as needed to get about equal rate in HMS and SHMS (ie equal rates for PS1 and PS4).
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time | Complete |
---|---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 36 hrs | Y |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 1 hr | Y |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 3 hrs | Y |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 122 hrs | Y |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 39.3 deg | -2.982 | 12.8 deg | +8.505 | 1 hr | Y |
- Q^2 = 11.5 GeV^2 Run Plan
- Cycle HMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 1000 events each for LH2 and Carbon
- For the singles runs the prescale factor on SHMS should be adjusted as needed to get about equal rate in HMS and SHMS (ie equal rates for PS1 and PS4).
Target , current | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time | Complete |
---|---|---|---|---|---|---|---|
6% C, 50uA | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 28.5 deg | -4.478 | 17.8 deg | +7.001 | 18.5 hrs | In progress |
6% C, 50 uA | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 28.5 deg | -4.478 | 17.8 deg | +7.001 | 30 min | Y |
LH2, 65 uA | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 28.5 deg | -4.478 | 17.8 deg | +7.001 | 3.5 hrs | Y |
LH2, 65 uA | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 28.5 deg | -4.478 | 17.8 deg | +7.001 | 30 min | Y |
Al. Dummy, max allowed | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 28.5 deg | -4.478 | 17.8 deg | +7.001 | 1 hrs | Y |
- Q^2 = 10.0 GeV^2 Run Plan for checking radiative corrections.
- Cycle HMS magnets since raising momentum
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 800 events on 1.5% Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time | Complete |
---|---|---|---|---|---|---|---|
1.5% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 24.5 deg | -5.259 | 20.6 deg | +6.209 | 12 hrs | N |
F2 Experiment (E12-10-002) L/T measurement Run Plan
- Experts: Simona Malace, Eric Christy
- Expected time: 2 days at 30 muA
- Goal: Measure one epsilon point to better constrain R at large x
- Conditions: ONLY HMS NEEDED. Prescale to 2 kHz, cycle magnets.
beam current (uA): | max current |
---|---|
fast raster: | 2x2mm |
target: | 10 cm LH2, Al 10 cm Dummy |
HMS collimator: | PION |
HMS trigger: | ELREAL for physics data taking |
HMS trigger: | SCIN 3/4 *for one run only* in the beginning for trigger efficiency calculation (we are running one trigger at the time) |
HMS angle/momentum: | 65 deg / -1 GeV/c - 100 K electrons |
HMS angle/momentum: | 65 deg / +1 GeV/c - 10 K positrons |
F2/EMC Experiment (E12-10-002/E12-10-008) 5 pass Run Plan
- Spokespeople E12-10-002: E. Christy, T. Keppel, S. Malace (contact), I. Niculescu
- Graduate Students E12-10-002: Deb Biswas, Abel Sun, Fernando Araiza Gonzalez
- Spokespeople E12-10-008: J. Arrington, A. Daniel, D. Gaskell (contact), N. Fomin
- Graduate Students E12-10-008: Abishek Karki, Kayla Craycraft
- Conditions:
beam current: | varies per target |
---|---|
fast raster: | 2x2 mm2 |
targets: | 10cm LH2 and LD2, 10 cm Al Dummy, Be, 10,11B, C 1.5 % |
HMS/SHMS collimator: | Large , COLLIMATOR |
HMS/SHMS trigger: | ELREAL/ELREAL for NEG. Polarity runs; ELCLEAN/ELCLEAN for POS. Polarity runs |
HMS angle/momentum | Various (check run plan below) |
SHMS angle/momentum | Various (check run plan below) |
HMS Dipole saturation check run plan (3-4 hrs):
- Conditions:
- Run Plan:
- Perform HMS e-p elastic checks at 21 degrees and use position of elastic peak to check for dipole saturation for 2 momenta.
- SHMS will be set at 21 degrees and a central momentum of -5.7 GeV for the entire study
- Both HMS and SHMS detecting electrons.
- Use HMS pion collimator and SHMS collimator.
- All runs take with ps1 = 0, ps2 = ps3 = ps4 = ps5 = ps6 = -1
beam current: | 60 μA or maximum available |
---|---|
fast raster: | 2x2 mm2 |
targets: | 10cm LH2, 10cm dummy |
HMS/SHMS collimator: | PION, COLLIMATOR |
HMS/SHMS trigger: | singles |
Target | HMS angle | HMS momentum | Time |
---|---|---|---|
LH2 | 21.00 deg | -6.1 | 1 hr |
10cm Dummy | 21.00 deg | -6.1 | 20 min |
LH2 | 21.00 deg | -5.9 | 1 hr |
10cm Dummy | 21.00 deg | -5.9 | 20 min |
- Production Run Plan:
- Online Analysis Flow: shift takers! follow closely, please
F2/EMC analysis how-to for shift takers
- Simona's notes
Deuteron Electro-Disintegration (E12-10-003) Run Plan
- Experts: Werner Boeglin, Mark Jones
- Graduate Student: Carlos Yero
- Expected Time: 6 days at 70 uA
- Goal: Measure D(e,e'p)n cross section at three kinematic settings, where FSI are small
- Conditions: The SHMS will detect electrons and the HMS will detect protons.
beam energy: | 10.6 GeV |
---|---|
beam current: | 40 μA |
fast raster: | 2x2 mm |
targets: | 10cm LH2, 10cm LD2 |
HMS/SHMS collimator: | Pion , Collimator |
HMS/SHMS trigger: | Coincidence, HMS: h3/4, SHMS: p3/4 |
HMS angle/momentum | Various |
SHMS angle/momentum | Fixed |
- H(e,e'p) Check Run Plan
- Check the HMS/SHMS spectrometer pointing
Target | SHMS angle | SHMS momentum | HMS angle | HMS momentum | Time |
---|---|---|---|---|---|
LH2 | 12.169 deg | -8.70 GeV/c | 37.339 deg | +2.938 GeV/c | 1 hr |
- D(e,e'p)n Run Plan
- Calibration run at low missing momentum used as a cross check with existing data
Target | SHMS angle | SHMS momentum | HMS angle | HMS momentum | Missing Momentum | Time |
---|---|---|---|---|---|---|
LD2 | 12.169 deg | -8.70 GeV/c | 38.896 deg | +2.932 GeV/c | 80 MeV | 1 hr |
- Measure the D(e,e'p)n Cross Section at unexplored high missing momentum kinematics settings
LD2 | 12.169 deg | -8.70 GeV/c | 54.961 deg | +2.2622 GeV/c | 580 MeV | 20 hrs |
---|---|---|---|---|---|---|
LD2 | 12.169 deg | -8.70 GeV/c | 58.404 deg | +2.1557 GeV/c | 750 MeV | 42 hrs |
Alternative Run Plan (Assuming Beam Current of 65-70 uA)
- The initial H(e,e'p) checkout and D(e,e'p)n at low missing momentum is the SAME as above.
LD2 | 12.169 deg | -8.70 GeV/c | 53.252 deg | +2.305 GeV/c | 500 MeV | 8 hrs |
---|---|---|---|---|---|---|
LD2 | 12.169 deg | -8.70 GeV/c | 56.401 deg | +2.220 GeV/c | 650 MeV | 18 hrs |
LD2 | 12.169 deg | -8.70 GeV/c | 59.388 deg | +2.120 GeV/c | 800 MeV | 36 hrs |
Fall 2017 Commissioning Plans
- Information for Shift Takers (2017-2018 Shift Signup)
- Target web page. Target training schedule
- Sign up for hallc_running mailing list. Archive
- Runsheets:
- Update beam schedule Jan 2018
- Fall 2017 Commissioning Plan
- Commissioning analysis logbook
- Experts on call
- How-to
- Detector Working Group Biweekly Meeting Agendas
- Wiki Page for Detector Working Group Biweekly Meetings
Spring 2017 KPP run
- KPP Run Plan
- RC daily meetings and daily runplan for KPP
- Logbook entry with pdf of the run sheets.
Hall C Links
- List of (legacy) Hall-C HowTo Documents
- HCANA doxygen
- Google Search of this Wiki
- Hall C Home Page
- Hall C Logbook
- Document Database (Publically readable view)
- Hall C Calendar (Google)
- Hall C Weekly Meeting minutes
- Previous Experiments
- Other Wikis
- Misc Links:
- Survey and Alignment Group: Surveys 2001-Present
- Hall C posters
Hall C
Hall C is one of four experimental halls at JLab.
Hall C Computing.
Basic Equipment in Hall C
Beamline
SHMS Magnets
For the Fall 2017 run, see intructions at https://hallcweb.jlab.org/wiki/index.php/How-to
The formulas and program should be kept in sync with the repository.
- Formulas used for setting current of SHMS magnets during KPP
Magnet | Formula |
---|---|
HB | Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3 |
Q1 | Current = 222.4*p - 7.709*p^2 + 0.6684*p^3 |
Q2 | Current = 3661*p/11 |
Q3 | Current = 2434*p/11 |
Dipole | Current = 3450*p/11 |
Scattering Chamber
- The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.
SHMS Entrance Window and Vacuum vessel
- The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
- The dipole exit window is 0.020 inches thick 5056 aluminum.
Target
Spring 2017 KKP run
- Word doc describing the targets and their thicknesses. Also available at logbook entry.
- Drawing of target ladder. Also available at JLab document repository.
Fall 2017 run
- Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
- BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
- Drawing of target ladder with cryo cells and solid target ladder.
- Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
- Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
- Drawing of cryotarget with 1.6 inch diameter for 10cm cell.
HMS Magnets and Vacuum Vessel
HMS Detectors
SHMS Detectors
- Hodoscopes
- Drift Chambers
- Calorimetry
- Aerogel
- Heavy Gas Cherenkov
- Noble Gas Cherenkov
- GEM
- Miscellaneous Information
DAQ & Trigger
- DAQ/Trigger Run Check Lists
- Spring 2018 Commissioning
- Fall 2017 Commissioning
- Hall C DAQ How-tos
- Scalers
- Trigger
- Electronic/Computer Live Time Studies
Controls
- High Voltage
- Spectrometer Controls (Use go_cmagnets command)
- HMS and SHMS Collimator Control document.
Online Replay
- Basic Hall C replay structure on github.
- Brief overview of the basic Hall C replay structure .
Data Analysis
- Analyzer and other Hall C related software
- Discussion of the HCANA software flow.
- Documentation on the Hall C optics optimization.
- Software task list for summer of 2017.
- Summer 2017 Analysis Workshop
- Agendas for biweekly software meetings.
Monte Carlo
Hall C at 12 GeV
- Hall C 12 GeV Upgrade Web Page
- SHMS-HMS User Group wiki page with list of board members, charter and table of contacts.
- Listing of newsletters on the SHMS/HMS/12GeV .
- SHMS Mailing List (shms_users@jlab.org) is the mailing list for sharing information on the SHMS and 12 GeV upgrade in general.
- Index of 12 GeV software related wiki pages. Go to Hall C Software Mailing List (hallcsw@jlab.org) to see the archives from the mailing list or to subscribe to the mailing list.
- Index of SHMS related wiki pages.
- Polarized 3He target in Hall C
- Wiki pages for 12 GeV experiments:
- b1
- Polarized WACS
- Azz: Azz Meetings
- E12-10-002
- E12-10-003 Deuteron Electro-Disintegration At Very High Missing Momenta
- E12-06-107 Color Transparency Experiment
- A1nd2n A1n and d2n Experiments E12-06-110 and E12-06-121
- Elog for 12GeV Preparations