Al Dummy, 40 uA |
ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 |
24.5 deg |
-5.259 |
20.6 deg |
+6.209 |
2 hr |
N
|
}
F2 Experiment (E12-10-002) L/T measurement Run Plan
- Experts: Simona Malace, Eric Christy
- Expected time: 2 days at 30 muA
- Goal: Measure one epsilon point to better constrain R at large x
- Conditions: ONLY HMS NEEDED. Prescale to 2 kHz, cycle magnets.
beam current (uA): |
max current
|
fast raster: |
2x2mm
|
target: |
10 cm LH2, Al 10 cm Dummy
|
HMS collimator: |
PION
|
HMS trigger: |
ELREAL for physics data taking
|
HMS trigger: |
SCIN 3/4 *for one run only* in the beginning for trigger efficiency calculation (we are running one trigger at the time)
|
HMS angle/momentum: |
65 deg / -1 GeV/c - 100 K electrons
|
HMS angle/momentum: |
65 deg / +1 GeV/c - 10 K positrons
|
F2/EMC Experiment (E12-10-002/E12-10-008) 5 pass Run Plan
- Spokespeople E12-10-002: E. Christy, T. Keppel, S. Malace (contact), I. Niculescu
- Graduate Students E12-10-002: Deb Biswas, Abel Sun, Fernando Araiza Gonzalez
- Spokespeople E12-10-008: J. Arrington, A. Daniel, D. Gaskell (contact), N. Fomin
- Graduate Students E12-10-008: Abishek Karki, Kayla Craycraft
beam current: |
varies per target
|
fast raster: |
2x2 mm2
|
targets: |
10cm LH2 and LD2, 10 cm Al Dummy, Be, 10,11B, C 1.5 %
|
HMS/SHMS collimator: |
Large , COLLIMATOR
|
HMS/SHMS trigger: |
ELREAL/ELREAL for NEG. Polarity runs; ELCLEAN/ELCLEAN for POS. Polarity runs
|
HMS angle/momentum |
Various (check run plan below)
|
SHMS angle/momentum |
Various (check run plan below)
|
- HMS Dipole saturation check run plan (3-4 hrs) Run Plan:
SHMS Production Run Plan
HMS Production Run Plan
- Online Analysis Flow: shift takers! follow closely, please
F2/EMC analysis how-to for shift takers
Daily to do list
Deuteron Electro-Disintegration (E12-10-003) Run Plan
- Experts: Werner Boeglin, Mark Jones
- Graduate Student: Carlos Yero
- Expected Time: 6 days at 40 uA
- Goal: Measure D(e,e'p)n cross section at three kinematic settings, where FSI are small
- Conditions: The SHMS will detect electrons and the HMS will detect protons.
beam energy: |
10.6 GeV
|
beam current: |
40 μA
|
fast raster: |
2x2 mm
|
targets: |
10cm LH2, 10cm LD2
|
HMS/SHMS collimator: |
Pion , Collimator
|
HMS/SHMS trigger: |
Coincidence, HMS: h3/4, SHMS: p3/4
|
HMS angle/momentum |
Various
|
SHMS angle/momentum |
Fixed
|
- H(e,e'p) Check Run Plan
- Check the HMS/SHMS spectrometer pointing
Target |
SHMS angle |
SHMS momentum |
HMS angle |
HMS momentum |
Time
|
LH2 |
12.169 deg |
-8.70 GeV/c |
37.339 deg |
+2.93814 GeV/c |
1 hr
|
- D(e,e'p)n Run Plan
- Calibration run at low missing momentum used as a cross check with existing data
Target |
SHMS angle |
SHMS momentum |
HMS angle |
HMS momentum |
Missing Momentum |
Time
|
LD2 |
12.169 deg |
-8.70 GeV/c |
38.896 deg |
+2.93223 GeV/c |
80 MeV |
1 hr
|
- Measure the D(e,e'p)n Cross Section at unexplored high missing momentum kinematics settings
Target |
SHMS angle |
SHMS momentum |
HMS angle |
HMS momentum |
Missing Momentum |
Time
|
LD2 |
12.169 deg |
-8.70 GeV/c |
54.961 deg |
+2.2622 GeV/c |
580 MeV |
20 hrs
|
LD2 |
12.169 deg |
-8.70 GeV/c |
58.404 deg |
+2.1557 GeV/c |
750 MeV |
42 hrs
|
Alternative Run Plan (Assuming Beam Current of 65-70 uA)
- The initial H(e,e'p) checkout and D(e,e'p)n at low missing momentum is the SAME as above.
Target |
SHMS angle |
SHMS momentum |
HMS angle |
HMS momentum |
Missing Momentum |
Time
|
LD2 |
12.169 deg |
-8.70 GeV/c |
53.252 deg |
+2.305 GeV/c |
500 MeV |
8 hrs
|
LD2 |
12.169 deg |
-8.70 GeV/c |
56.401 deg |
+2.220 GeV/c |
650 MeV |
18 hrs
|
LD2 |
12.169 deg |
-8.70 GeV/c |
59.388 deg |
+2.120 GeV/c |
800 MeV |
36 hrs
|
Fall 2017 Commissioning Plans
Spring 2017 KPP run
Hall C Links
Hall C
Hall C is one of four experimental halls at JLab.
Hall C Computing.
Hall C in the Press.
Basic Equipment in Hall C
Beamline
SHMS Magnets
For the Fall 2017 run, see intructions at https://hallcweb.jlab.org/wiki/index.php/How-to
The formulas and program should be kept in sync with the repository.
- Formulas used for setting current of SHMS magnets during KPP
Magnet |
Formula
|
HB |
Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3
|
Q1 |
Current = 222.4*p - 7.709*p^2 + 0.6684*p^3
|
Q2 |
Current = 3661*p/11
|
Q3 |
Current = 2434*p/11
|
Dipole |
Current = 3450*p/11
|
Scattering Chamber
- The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.
SHMS Entrance Window and Vacuum vessel
- The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
- The dipole exit window is 0.020 inches thick 5056 aluminum.
Target
Spring 2017 KKP run
Fall 2017 run
- Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
- BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
- Drawing of target ladder with cryo cells and solid target ladder.
- Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
- Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
- Drawing of cryotarget with 1.6 inch diameter for 10cm cell.
HMS Magnets and Vacuum Vessel
HMS Detectors
SHMS Detectors
DAQ & Trigger
Controls
- High Voltage
- Spectrometer Controls (Use go_cmagnets command)
- HMS and SHMS Collimator Control document.
Online Replay
Data Analysis
Monte Carlo
Hall C at 12 GeV
|