Difference between revisions of "Main Page"
From HallCWiki
(→6.2/8.2 GeV Runplan Overview) |
(→6.2/8.2 GeV Runplan Overview) |
||
Line 26: | Line 26: | ||
=== 6.2/8.2 GeV Runplan Overview === | === 6.2/8.2 GeV Runplan Overview === | ||
− | '''PDF file with run plan details: [https://redmine.jlab.org/attachments/download/632/runplan_6p2gev.pdf 6.2 GeV], [https://redmine.jlab.org/attachments/download/ | + | '''PDF file with run plan details: [https://redmine.jlab.org/attachments/download/632/runplan_6p2gev.pdf 6.2 GeV], [https://redmine.jlab.org/attachments/download/634/runplan_8p2gev.pdf 8.2 GeV]''' |
* [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam checkout] | * [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam checkout] | ||
* Items to be done as soon as possible at 6.2 GeV AND 8.2 GeV | * Items to be done as soon as possible at 6.2 GeV AND 8.2 GeV |
Revision as of 10:06, 20 March 2019
Contents
- 1 Kaon LT experiment
- 2 SIDIS pt experiment E12-09-017 Fall 2018
- 3 SIDIS CSV experiment E12-09-002
- 4 The J/ψ-007 Experiment
- 5 Past run plans
- 6 Hall C Links
- 7 Hall C
- 8 Basic Equipment in Hall C
- 9 Hall C at 12 GeV
Kaon LT experiment
Kaon-LT Redmine Page
Run plans
- Run plans for all energies on RedMine
- KAON-LT specific instructions for Shift Takers (PDF)
- Guidance for SHMS/HMS rotation
- KAON-LT specific intructions
- KAON-LT analysis instructions
- Kaon LT Run List 6.2 GeV
- Kaon LT Run List 3.8 GeV
- Kaon LT Run List 4.9 GeV
- Kaon LT Run List 10.6 GeV
RC Links
Kaon-LT Setting Status
6.2/8.2 GeV Runplan Overview
PDF file with run plan details: 6.2 GeV, 8.2 GeV
- Beam checkout
- Items to be done as soon as possible at 6.2 GeV AND 8.2 GeV
- Arc energy measurement
- BPM calibration check with superharps
- Calibration Runs (HMS/SHMS sieve runs, luminosity scans, heep-check singles and coincidences)
- 6.2 GeV,
- Q2=3.0 W=2.32 x=0.40 , low ε data taking
- Q2=2.115 W=2.95 x=0.21 , low ε data taking
- 8.2 GeV,
- Q2=4.4 W=2.74 x=0.40 , low ε data taking
- Q2=3.0 W=3.14 x=0.25 , low ε data taking
- Q2=5.5 W=3.02 x=0.40 , low ε data taking
3.8/4.9 GeV Runplan Overview
PDF file with run plan details: 3.8 GeV, 4.9 GeV
- SHMS beam deflection test plan
- 3.8 GeV
- Set SHMS to 6.79 degrees, with all magnets ramped to zero
- Jay Benesch will execute his beam deflection test plan
- Shift workers will need to ramp SHMS magnets as directed by Jay (use -3.007 GeV/c settings)
- 4.9 GeV
- Jay has agreed to defer the SHMS beam deflection study until we get to the 6.00 deg setting in the run plan, expected to be morning of Dec 17.
- 3.8 GeV
- Beam checkout
- Items to be done as soon as possible at 3.8 GeV AND 4.9 GeV
- Arc energy measurement
- BCM calibration
- BPM calibration check with superharps
- Calibration Runs (Heep-check singles and coincidences)
- 3.8 GeV, Q2=0.5, W=2.40, x=0.09, low ε data taking
- 4.9 GeV, Q2=0.5, W=2.40, x=0.09, high ε data taking
10.6 GeV Runplan Overview
PDF file with run plan details: [1]
- SHMS beam deflection test plan
- Set SHMS to 6.66 degrees, with all magnets ramped to zero
- Jay Benesch will execute his beam deflection test plan
- Shift workers will need to ramp SHMS magnets as directed by Jay (use -8.035 GeV/c settings)
- Beam checkout
- Detector checkout
- Trigger checkout
- Items to be done as soon as possible at 10.6 GeV
- Arc energy measurement
- BCM calibration
- BPM calibration check with superharps
- Calibration Runs (Optics, Heep-check singles and coincidences)
- Q2=3.0, W=2.32, x=0.40, high ε data taking
- Q2=2.1, W=2.95, x=0.21, high ε data taking
- Q2=4.4, W=2.74, x=0.40, high ε data taking
- Q2=3.0, W=3.14, x=0.25, high ε data taking
- Luminosity scan
- Q2=5.5, W=3.02, x=0.40, high ε data taking
- Run Plan for Kaon LT 10.6GeV End Game
SIDIS pt experiment E12-09-017 Fall 2018
SIDIS CSV experiment E12-09-002
CSV Run Plan
The J/ψ-007 Experiment
Past run plans
Hall C Links
- Commissioning analysis meetings
- List of (legacy) Hall-C HowTo Documents
- HCANA doxygen
- Google Search of this Wiki
- Hall C Home Page
- Hall C Logbook
- Document Database (Publically readable view)
- Hall C Calendar (Google)
- Hall C Weekly Meeting minutes
- Previous Experiments
- Other Wikis
- Misc Links:
- Survey and Alignment Group: Surveys 2001-Present
- Hall C posters
Hall C
Hall C is one of four experimental halls at JLab.
Hall C Computing.
Basic Equipment in Hall C
Beam Energy
Beamline
SHMS Magnets
For the Fall 2017 run, see intructions at https://hallcweb.jlab.org/wiki/index.php/How-to
The formulas and program should be kept in sync with the repository.
- Formulas used for setting current of SHMS magnets during KPP
Magnet | Formula |
---|---|
HB | Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3 |
Q1 | Current = 222.4*p - 7.709*p^2 + 0.6684*p^3 |
Q2 | Current = 3661*p/11 |
Q3 | Current = 2434*p/11 |
Dipole | Current = 3450*p/11 |
Scattering Chamber
- The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.
SHMS Entrance Window and Vacuum vessel
- The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
- The dipole exit window is 0.020 inches thick 5056 aluminum.
Target
Spring 2017 KPP run
- Word doc describing the targets and their thicknesses. Also available at logbook entry.
- Drawing of target ladder. Also available at JLab document repository.
Fall 2017 run
- Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
- BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
- Drawing of target ladder with cryo cells and solid target ladder.
- Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
- Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
- Drawing of cryotarget with 1.6 inch diameter for 10cm cell.
HMS Magnets and Vacuum Vessel
HMS Detectors
SHMS Detectors
- Hodoscopes
- Drift Chambers
- Calorimetry
- Aerogel
- Heavy Gas Cherenkov
- Noble Gas Cherenkov
- GEM
- Miscellaneous Information
DAQ & Trigger
- DAQ/Trigger Run Check Lists
- Spring 2018 Commissioning
- Fall 2017 Commissioning
- Hall C DAQ How-tos
- Scalers
- Trigger
- Electronic/Computer Live Time Studies
Controls
- High Voltage
- Spectrometer Controls (Use go_cmagnets command)
- HMS and SHMS Collimator Control document.
- NOTE: Do not attempt a reset of the collimator controls unless you have reason to believe that the collimator has moved and have checked with the RC
Online Replay
- Basic Hall C replay structure on github.
- Brief overview of the basic Hall C replay structure .
Data Analysis
- Analyzer and other Hall C related software
- Discussion of the HCANA software flow.
- Documentation on the Hall C optics optimization.
- Software task list for summer of 2017.
- Summer 2017 Analysis Workshop
- Agendas for biweekly software meetings.
Monte Carlo
Hall C at 12 GeV
- Hall C 12 GeV Upgrade Web Page
- SHMS-HMS User Group wiki page with list of board members, charter and table of contacts.
- Listing of newsletters on the SHMS/HMS/12GeV .
- SHMS Mailing List (shms_users@jlab.org) is the mailing list for sharing information on the SHMS and 12 GeV upgrade in general.
- Index of 12 GeV software related wiki pages. Go to Hall C Software Mailing List (hallcsw@jlab.org) to see the archives from the mailing list or to subscribe to the mailing list.
- Index of SHMS related wiki pages.
- Polarized 3He target in Hall C
- Wiki pages for 12 GeV experiments:
- b1
- Polarized WACS
- Azz: Azz Meetings
- E12-10-002 F2/EMC/x>1
- E12-10-003 Deuteron Electro-Disintegration At Very High Missing Momenta
- E12-06-107 Color Transparency Experiment
- A1nd2n A1n and d2n Experiments E12-06-110 and E12-06-121
- SIDIS Run group Experiments E12-09-002 (Charge Symmetry Violation) , E12-09-011 (Kaon factorization) and E12-09-017 (P_t scan of SIDIS)
- Elog for 12GeV Preparations
- Commissioning Analysis Meetings Page