Jefferson Lab Hall C Logbook for January 08 - runstarts omitted

  • Main INDEX

    Thursday

  • 150262 01/31/08 11:12 L.Pentchev BigCal HV off
  • 150261 01/31/08 09:24 Bosted Target: Target moved from 15 cm LH2 to MT.
  • Wednesday

  • 150260 01/30/08 17:11 Bosted Target: Target jas beem war,ed i[
  • 150259 01/30/08 16:53 puckett Actually, made two separate new maps--
  • 150258 01/30/08 16:38 bogdanw BigBite power
  • 150257 01/30/08 16:32 puckett Made separate map for runs with bad S0 cabling:
  • 150256 01/30/08 16:18 R. Lindgren Shift Summary
  • 150255 01/30/08 16:04 cdaq Beam Time Accounting
  • 150254 01/30/08 16:04 vahe Target: Start os shift: Target screenshot
  • 150253 01/30/08 15:53 mbianda Target: Target screen shot.
  • 150252 01/30/08 11:34 R. Lindgren HMS Power Down
  • 150251 01/30/08 11:29
  • 150250 01/30/08 10:59 R. Lindgren SMS: HMS NMR Comunication failed
  • 150249 01/30/08 10:11 hcf ethane supply -- tag confusion??
  • 150248 01/30/08 08:16 R. Lindgren Beam:
  • 150247 01/30/08 07:37 jmaxwell Target: Target Screenshot
  • 150246 01/30/08 00:22 jmaxwell Target: Lowering Heater Power
  • 150245 01/30/08 00:11 cdaq Beam Time Accounting
  • Tuesday

  • 150244 01/29/08 23:54 mbianda Target: Screen shot for end of swing shift.
  • 150243 01/29/08 19:07 M.M Ethane levels
  • 150242 01/29/08 19:05 Donal Owl Shifts Wednesday January 30
  • 150241 01/29/08 18:42 Donal Down for the night
  • 150240 01/29/08 17:26 Donal Beam line vacuum
  • 150239 01/29/08 16:50 gaskell 3C17 into Moller DAQ
  • 150237 01/29/08 16:14 Donal Valve trip
  • 150236 01/29/08 16:08 cdaq Beam Time Accounting
  • 150235 01/29/08 16:08 R. Lindgren Shift Summary
  • 150233 01/29/08 16:02 vahe Target: End of shift: Target screenshot
  • 150228 01/29/08 15:01 R.Lindgren BPM and BCM
  • 150226 01/29/08 14:05 R. Lindgren Beam down
  • 150225 01/29/08 13:31 E.Chudakov New ethane bottle
  • 150224 01/29/08 11:23 L.Pentchev TDC spectra
  • 150223 01/29/08 11:18 Lindgren Lost target IOC
  • 150221 01/29/08 11:03 M Jones Increase ROC 12 time window back to 512ns
  • 150216 01/29/08 10:14 saw MCC log entries on Ozone
  • 150215 01/29/08 10:12 M Jones Reduced ROC12 TDc time window to 256ns from 512ns
  • 150214 01/29/08 10:05 saw Ozone ppb vs ppm
  • 150212 01/29/08 09:53 R. Lindgren Beam Off
  • 150210 01/29/08 09:47 vahe Target: Target communication loss and lifter status error
  • 150208 01/29/08 09:31 saw Ozone in Hall
  • 150206 01/29/08 09:20 E.Chudakov S0 HV increased by 50V after run 68555
  • 150203 01/29/08 09:12 vahe Hall C ozone level
  • 150202 01/29/08 09:10 vahe Hall C ozone level
  • 150201 01/29/08 09:09 vahe Hall C ozone level
  • 150200 01/29/08 09:04 cdaq Beam Time Accounting
  • 150199 01/29/08 09:03 R. Lindgren Day shift beginning
  • 150196 01/29/08 08:11 vahe Target: Start of shift: Target screenshoot
  • 150195 01/29/08 08:04 cdaq Beam Time Accounting
  • 150194 01/29/08 07:59 Markowitz owl shift summary
  • 150191 01/29/08 07:34 jmaxwell Target: Target Screenshot
  • 150188 01/29/08 06:56 puckett BPM/BCM screenshots
  • 150177 01/29/08 02:29 Markowitz ROCs 13 and 14 hung
  • 150167 01/29/08 00:09 Donal shift report reformatted
  • 150165 01/29/08 00:02 Donal Shift report
  • Monday

  • 150164 01/28/08 23:47 mahbub Target: Snapshot at end of swing shift
  • 150161 01/28/08 23:25 W. Luo channel (15,15) raw adc
  • 150158 01/28/08 22:35 mahbub Target: Beam back, JT valve adjusted
  • 150155 01/28/08 22:26 W. Luo One channel in the middle of BigCal no max hit for run 68539
  • 150154 01/28/08 22:02 Donal beam back
  • 150152 01/28/08 20:58 Donal Beam update
  • 150151 01/28/08 20:07 W. Luo BCM & BPM
  • 150150 01/28/08 20:05 W. Luo swap Ethane bottle due to high pressure is zero
  • 150149 01/28/08 19:58 mahbub Target: Snapshot, beam is off for a few hours
  • 150148 01/28/08 19:40 Donal Update
  • 150147 01/28/08 19:29 Donal Beam unavailable
  • 150143 01/28/08 17:48 L.Pentchev all TDC spectra for BigCal: TDC time window can be reduced by factor of 2
  • 150136 01/28/08 16:11 mahbub Target: Target status at the beginning of swing shift
  • 150135 01/28/08 16:01 cdaq Beam Time Accounting
  • 150134 01/28/08 15:55 slifer shift summary (day)
  • 150133 01/28/08 15:51 vahe Target: End of shift: Target status screenshot
  • 150132 01/28/08 15:48 slifer power cycled ROCS 13 and 14
  • 150130 01/28/08 15:46 E.Chudakov Pedestals at higher beam current
  • 150129 01/28/08 15:42 E.Chudakov Analysis: Replay run 68530 COINCIDENCE
  • 150128 01/28/08 15:34 E.Chudakov Analysis: Replay run 68530 CAL
  • 150126 01/28/08 15:27 E.Chudakov Analysis: Replay run 68530 FPP
  • 150125 01/28/08 15:20 E.Chudakov Analysis: Replay run 68530 HMS
  • 150122 01/28/08 14:37 M Jones Before run 69529 modified ROC12 crl code
  • 150119 01/28/08 14:09 slifer BPM/BCM
  • 150112 01/28/08 12:32 slifer HWP status
  • 150107 01/28/08 10:43 slifer Shift reminder
  • 150104 01/28/08 10:03 slifer run 68521 and 68522
  • 150103 01/28/08 09:51 vahe Target: Target communication lost
  • 150094 01/28/08 08:17 slifer Q3 power supply
  • 150093 01/28/08 08:06 cdaq Beam Time Accounting
  • 150092 01/28/08 08:04 Markowitz owl shift summary
  • 150091 01/28/08 08:02 gaskell Late entry: 2 Moller ioc reboots
  • 150090 01/28/08 07:53 vahe Target: Start of shift: Target screenshot
  • 150087 01/28/08 07:37 jmaxwell Target: Target Screenshot
  • 150086 01/28/08 07:30 dhamilton BPM/BCM screenshots
  • 150083 01/28/08 06:33 jmaxwell Target: Heater Power Alarms
  • 150078 01/28/08 05:05 puckett Mis-cabling of S0 TDC signals dates back to the start of kin. 7 in December
  • 150076 01/28/08 04:41 puckett Apparent dead wire is gone in run 68514
  • 150073 01/28/08 03:59 puckett has FPP chamber 4 x plane developed a dead wire?
  • 150071 01/28/08 03:41 Markowitz Hall A needs to take out half-wave plate
  • 150056 01/28/08 00:03 W. Luo Script to estimate how many events collected in WACS experiment
  • 150055 01/28/08 00:02 cdaq Beam Time Accounting
  • Sunday

  • 150054 01/27/08 23:47 slifer Shift summary (swing)
  • 150052 01/27/08 23:41 Donal Screen Grab
  • 150050 01/27/08 23:15 Donal Target Screen Grab
  • 150049 01/27/08 23:10 slifer Increased Bigcal thresholds
  • 150043 01/27/08 22:09 slifer ion chamber
  • 150040 01/27/08 21:44 Donal Target Screen Grab
  • 150039 01/27/08 21:19 slifer update
  • 150036 01/27/08 20:46 W. Luo Roc12 reboot automaticly when we start run with 30uA beam
  • 150035 01/27/08 20:38 Donal Target reboot
  • 150031 01/27/08 19:49 Donal Target Reboot
  • 150026 01/27/08 19:11 Donal Target charts
  • 150023 01/27/08 18:55 slifer Day Shift Summary (format)
  • 150022 01/27/08 18:40 slifer beam down
  • 150021 01/27/08 18:40 Donal Screen Grab
  • 150016 01/27/08 17:38 Donal Indicator recovered
  • 150013 01/27/08 17:18 Donal Continuous ignorable alarm?
  • 150012 01/27/08 17:09 Donal Target reboot
  • 150010 01/27/08 16:58 puckett in other words, pedestal positions match the golden run...
  • 150009 01/27/08 16:57 puckett pedestal positions are fine, just the widths are off
  • 150007 01/27/08 16:53 W. Luo run 68486: Pedistal events not reliable
  • 150005 01/27/08 16:51 Donal Target reboot
  • 150004 01/27/08 16:50 W. Luo run 68486: Roc 14 need to power cycle
  • 150003 01/27/08 16:46 W. Luo How to restore BigCal HV in case we lost HV in the crate
  • 150002 01/27/08 16:38 W. Luo Run 68480 junk, for roc13 error
  • 150000 01/27/08 16:29 Donal Target Screen Grab
  • 149997 01/27/08 16:22 Donal Frequent Alarm
  • 149993 01/27/08 16:09 Hovhannes Day Shift summary
  • 149991 01/27/08 16:04 cdaq Beam Time Accounting
  • 149985 01/27/08 15:18 saw SFIGEP1 bootscript change
  • 149980 01/27/08 11:37 R. Lindgren pockel cell high voltages
  • 149977 01/27/08 10:43 mbianda Target: Alarm
  • 149972 01/27/08 10:06 R. Lindgren Reminder of Shift Worker Duties
  • 149968 01/27/08 09:43 mbianda Target: Screen shot.
  • 149964 01/27/08 09:15 Hovhannes Indication of the Problems
  • 149963 01/27/08 09:05 cdaq Beam Time Accounting
  • 149958 01/27/08 08:05 Danagoulian Target: Shift summary and checklist
  • 149956 01/27/08 08:03 Markowitz Owl shift summary
  • 149948 01/27/08 06:38 M.M WACS Goldenrun is 68431
  • 149947 01/27/08 06:27 M.M bpm / bcm
  • 149936 01/27/08 04:06 Danagoulian Target: Target IOC reboot
  • 149918 01/27/08 00:13 Danagoulian Target: target checklist
  • 149916 01/27/08 00:06 cdaq Beam Time Accounting
  • Saturday

  • 149912 01/26/08 23:23 W. Luo BigCal HV crate hctsv12:2002 tripped off, stopped the run
  • 149909 01/26/08 23:05 R. Lindgren Looking for stability
  • 149906 01/26/08 22:55 W. Luo BPM & BCM
  • 149905 01/26/08 22:34 W. Luo HMS drift time still looks stange
  • 149904 01/26/08 22:25 Lindgren Running again
  • 149902 01/26/08 22:20 R. Lindgren Trigger supervisor crashed
  • 149901 01/26/08 22:18 R. Lindgren Production running
  • 149898 01/26/08 22:05 W. Luo Rebooted Roc2 and found HMS door was open
  • 149897 01/26/08 22:02 W. Luo Reboot Roc11 and Roc12 in the bunker at around 6pm
  • 149895 01/26/08 21:43 slifer target: IOC reboot
  • 149894 01/26/08 21:32 R. LIndgren Roc 2 crashed
  • 149891 01/26/08 20:40 puckett "GEp switch" rebooting also helped recover DAQ
  • 149890 01/26/08 20:36 puckett S0 TDCs--fixed cabling
  • 149887 01/26/08 19:58 W. Luo run 68408: HMS drift time looks different
  • 149886 01/26/08 19:46 R.Lindgren lost magnet
  • 149884 01/26/08 19:36 slifer target: HPH setting
  • 149875 01/26/08 18:21 R. Lindgren ROC crashes
  • 149874 01/26/08 18:18 Lindgren ROC 12 crashed
  • 149867 01/26/08 17:06 cdaq Beam Time Accounting
  • 149866 01/26/08 16:44 slifer JT valve
  • 149864 01/26/08 16:39 slifer target checklist
  • 149863 01/26/08 16:39 R.Lindgren Control Access
  • 149861 01/26/08 16:05 Hovhannes Shift Summary (day)
  • 149860 01/26/08 15:35 Hovhannes ROC 12 problem "resolution"
  • 149859 01/26/08 15:33 Hovhannes ROC 13, 14 power cycle procedure
  • 149853 01/26/08 14:28 Hovhannes DAQ problems
  • 149850 01/26/08 14:15 gilman Pockell cell voltages
  • 149848 01/26/08 14:06 Hovhannes ROC 12 reboot
  • 149839 01/26/08 13:03 Hovhannes Problems with DAQ
  • 149838 01/26/08 12:55 Bosted HV for S02P increased : was too low
  • 149833 01/26/08 12:27 gaskell Moller backout
  • 149832 01/26/08 12:26 horn/gaskell Moller Summary
  • 149826 01/26/08 11:58 Hovhannes Half wave Plate
  • 149822 01/26/08 11:51 Bosted Target snapshot
  • 149818 01/26/08 11:40 horn/gaskell Moller tuned
  • 149814 01/26/08 11:27 Hovhannes Half wave plate Position
  • 149807 01/26/08 10:32 cdaq Beam Time Accounting
  • 149804 01/26/08 10:08 Hovhannes Magnet Current
  • 149801 01/26/08 10:04 Bosted Target: Target moved to MT
  • 149800 01/26/08 10:04 Bosted Target: Target moved to 15 cm LH2 + rad
  • 149796 01/26/08 09:45 puckett Updated BigCal, HMS ADC thresholds
  • 149793 01/26/08 09:39 E.Chudakov HV on S0 2p increased to 1700V
  • 149788 01/26/08 09:22 Hovhannes HMS half efficient
  • 149787 01/26/08 09:19 Hovhannes Ion Chambers
  • 149783 01/26/08 07:58 Danagoulian Target: Shift summary
  • 149782 01/26/08 07:50 Hovhannes Rates
  • 149781 01/26/08 07:35 Hovhannes BigBite magnet is on
  • 149780 01/26/08 07:12 Danagoulian Target: 15 cm Dummy
  • 149779 01/26/08 07:10 Markowitz Beam: Owl shift summary
  • 149769 01/26/08 06:02 M.M bpm / bcm
  • 149766 01/26/08 05:34 Danagoulian Target: 15 cm LH2
  • 149737 01/26/08 01:53 Danagoulian Target: Target at the start of the shift
  • 149734 01/26/08 01:13 mahbub Target: target alarm problem
  • 149731 01/26/08 00:42 dhamilton plan for next 2 - 3 hours
  • 149729 01/26/08 00:07 cdaq Beam Time Accounting
  • 149728 01/26/08 00:03 slifer shift summary
  • Friday

  • 149726 01/25/08 23:52 L.Pentchev two ADCs BigCal modules changed during controlled access today
  • 149724 01/25/08 23:14 mahbub Target: changed to 20 cm LH2
  • 149723 01/25/08 23:11 dhamilton Change prescale factors
  • 149721 01/25/08 22:48 dhamilton Beam Position - Harpsacn completed
  • 149719 01/25/08 22:46 slifer update
  • 149718 01/25/08 22:26 mahbub Target: change to 2 foil C optics target
  • 149717 01/25/08 22:05 dhamilton discriminator and prescale changes
  • 149716 01/25/08 22:02 cdaq Beam Time Accounting
  • 149713 01/25/08 20:03 M Jones S0 scalers
  • 149712 01/25/08 19:57 M Jones Change to HMS trigger
  • 149711 01/25/08 19:42 dhamilton BigCal Move
  • 149710 01/25/08 19:40 dhamilton BigCal threshold change
  • 149709 01/25/08 19:36 mahbub Target: Target screen shots
  • 149708 01/25/08 19:24 L.Pentchev LED run replay: BigCal is OK after movement
  • 149707 01/25/08 19:04 L.Pentchev HV 2006 crate reset
  • 149706 01/25/08 19:00 L.Pentchev took one glass bar out of BigCal
  • 149705 01/25/08 18:41 L.Pentchev BigCal thrsholds set to 700mV
  • 149702 01/25/08 17:38 beaufait big bite power supply
  • 149701 01/25/08 16:51 puckett Added "drift time by wire" to FPP onlineGUI config
  • 149699 01/25/08 16:11 gaskell water in alcove from BSY?
  • 149698 01/25/08 15:08 Bosted Target snapshot
  • 149695 01/25/08 14:34 frw analysis: fixed HMS code for hstart
  • 149693 01/25/08 14:15 M Jones Changed HMS trigger timing
  • 149691 01/25/08 13:50 puckett Raw ADCs for rows 29-30 during test run
  • 149690 01/25/08 13:35 puckett BigCal pedestals for test run 68320
  • 149689 01/25/08 13:18 Bosted Target: Target moved to MT
  • 149687 01/25/08 11:56 Bosted S0 removed from HMS
  • 149685 01/25/08 11:05 W. Luo Turn off HMS HV
  • 149684 01/25/08 11:01 W. Luo Turn of S0 HV
  • 149681 01/25/08 10:48 dhamilton ROC13 and ROC14 power cycle
  • 149680 01/25/08 10:43 bogdanw Beam line valve air
  • 149676 01/25/08 09:28 bogdanw HMS angle 38 deg.
  • 149675 01/25/08 09:20 Bosted Radiation survey done
  • 149674 01/25/08 09:16 Bosted Target: Target parked
  • 149673 01/25/08 08:54 Bosted HMS magnets off
  • 149672 01/25/08 08:52 Bosted HMS angle
  • 149671 01/25/08 08:22 YaLi Owl shift summary
  • 149670 01/25/08 08:22 cdaq Beam Time Accounting
  • 149669 01/25/08 07:12 YaLi ROC13, ROC14 problem
  • 149667 01/25/08 06:48 mbianda run 68314 FPP wire hit
  • 149665 01/25/08 06:45 mbianda FPP wire hit
  • 149664 01/25/08 06:44 Phil Carter Target: yellow alarms
  • 149660 01/25/08 06:22 Phil Carter Target: overall power graph weirdness
  • 149657 01/25/08 05:41 YaLi BPM\BCM screenshot
  • 149654 01/25/08 05:21 YaLi Roc2 error, rebooted
  • 149651 01/25/08 05:10 Phil Carter Target: IOC reboot
  • 149635 01/25/08 02:23 Phil Carter Target: GUI problems. no reboot yet
  • 149624 01/25/08 00:41 Phil Carter Target: lost communication. no reboot
  • 149623 01/25/08 00:30 Phil Carter Target: screen shot
  • 149622 01/25/08 00:26 Phil Carter Target: IOC reboot
  • Thursday

  • 149618 01/24/08 23:58 cdaq Beam Time Accounting
  • 149616 01/24/08 23:53 keppel evening shift summary
  • 149613 01/24/08 23:17 ejensen hv crate hctsv12:2005
  • 149606 01/24/08 22:16 ejensen bcm and bpm
  • 149605 01/24/08 22:06 puckett pedestals are unstable, unfortunately.
  • 149602 01/24/08 21:55 ejensen BigCal ADC and row hits
  • 149595 01/24/08 20:36 smithg Target: disabled hcHe_Supply_1_R alarm
  • 149593 01/24/08 20:30 smithg Target: rebooted IOC
  • 149573 01/24/08 16:58 smithg Target: checklist
  • 149568 01/24/08 16:10 smithg Target: rebooted ioc
  • 149565 01/24/08 16:03 cdaq Beam Time Accounting
  • 149564 01/24/08 15:58 X. Zheng day shift summary
  • 149561 01/24/08 15:19 X. Zheng fire alarm cleared
  • 149558 01/24/08 15:15 X. Zheng fire alarm update
  • 149557 01/24/08 14:58 X Zheng fire alarm flashing
  • 149553 01/24/08 14:18 puckett changed Analyzer code back to normal
  • 149550 01/24/08 13:58 puckett jumpy pedestals: comparison of raw ADCs
  • 149534 01/24/08 11:34 X. Zheng BCM and BPM snap shots
  • 149529 01/24/08 10:38 mbianda Target: L1 hp power read back alarm
  • 149526 01/24/08 10:25 mbianda Target: Transient error as indicated be entry 149508
  • 149523 01/24/08 09:49 mbianda Target: IOC rebooted due to loss of network connection.
  • 149512 01/24/08 08:17 puckett use "kirby" or cdaql3 or cdaql5
  • 149511 01/24/08 08:10 cdaq Beam Time Accounting
  • 149508 01/24/08 07:54 J Mulholland Target: transient errors
  • 149505 01/24/08 07:43 ccbutu Shift Summary
  • 149498 01/24/08 06:09 ccbutu DAQ Reboot
  • 149491 01/24/08 05:50 ccbutu ROC13 &ROC14 Power Cycled!
  • 149485 01/24/08 04:58 J Mulholland Target: network connection lost and IOC reboot
  • 149473 01/24/08 03:00 Hovhannes Replay
  • 149460 01/24/08 00:35 J Mulholland Target: trend in transient alarm?
  • 149457 01/24/08 00:22 J Mulholland Target: GUI scrnshot and note on transients
  • 149456 01/24/08 00:06 cdaq Beam Time Accounting
  • Wednesday

  • 149453 01/23/08 23:49 E. Frlez target: yellow/red alarms
  • 149450 01/23/08 23:35 Ramesh Trippy beam
  • 149449 01/23/08 23:24 Ramesh Power cycled ROC 13/14 again
  • 149446 01/23/08 23:11 YaLi Run 68220 histogram
  • 149443 01/23/08 22:59 Ramesh ROC 13/14 reboot
  • 149441 01/23/08 22:53 frw SHIFT CREW: deal with problems promptly!
  • 149429 01/23/08 20:55 Ramesh Power cycling fixed the missing histogram problem
  • 149428 01/23/08 20:49 puckett Also, please try to do the replay ASAP for every run.
  • 149427 01/23/08 20:47 puckett power cycle ROC14
  • 149425 01/23/08 20:44 Ramesh ROC13/14 power cycled
  • 149423 01/23/08 20:35 YaLi Problem with FPP histogram
  • 149420 01/23/08 19:56 Ramesh TS1 is now ok
  • 149418 01/23/08 19:42 Ramesh TS1 failed
  • 149411 01/23/08 18:03 E. Frlez target: SC pressure changes
  • 149408 01/23/08 17:53 smithg Target: turbopump tripped
  • 149404 01/23/08 17:01 Ramesh Access finished, asked for beam
  • 149403 01/23/08 16:51 Ramesh Controlled access due to target vacuum problem
  • 149402 01/23/08 16:42 E. Frlez target: screenshots
  • 149401 01/23/08 16:09 E. Frlez target: Scattering chamber vacuum
  • 149400 01/23/08 16:06 Margaziotis Sc Chamber vacuum alarm
  • 149398 01/23/08 16:04 cdaq Beam Time Accounting
  • 149397 01/23/08 15:56 X. Zheng day shift summary
  • 149395 01/23/08 15:45 Margaziotis Target: Moved to LH2
  • 149394 01/23/08 15:34 horn Beam Energy Measurement Result
  • 149393 01/23/08 14:14 X. Zheng pulsed beam
  • 149392 01/23/08 13:40 cdaq Beam Time Accounting
  • 149391 01/23/08 11:59 gaskell Moller backout
  • 149390 01/23/08 11:52 horn/gaskell Moller Summary (part 2)
  • 149369 01/23/08 10:33 gaskell/horn Moller summary (part 1)
  • 149353 01/23/08 09:41 Margaziotis Target: Moved to Empty
  • 149349 01/23/08 09:26 Margaziotis Target: Screen shot-beam on
  • 149347 01/23/08 08:42 X. Zheng beam is back
  • 149346 01/23/08 08:17 Margaziotis Target: screen shot-beam off
  • 149345 01/23/08 07:57 J Mulholland Target: Transients throughout
  • 149344 01/23/08 07:52 ccbutu Shift Summary
  • 149343 01/23/08 07:50 Baghdasaryan Software backup
  • 149340 01/23/08 05:27 ccbutu Beam Delivery!
  • 149321 01/23/08 01:53 J Mulholland Target: transient alarm
  • 149319 01/23/08 01:37 J Mulholland Target: transient
  • 149314 01/23/08 00:50 J Mulholland Target: transient alarms
  • 149311 01/23/08 00:41 cdaq Beam Time Accounting
  • 149308 01/23/08 00:10 J Mulholland Target: Gui Screenshot
  • Tuesday

  • 149305 01/22/08 23:46 E. Frlez target: scattering chamber vacuum
  • 149303 01/22/08 23:32 Ramesh BPM/BCM
  • 149302 01/22/08 23:16 Ramesh Beam away due to manet trip
  • 149296 01/22/08 21:47 Ramesh Smooth data taking
  • 149281 01/22/08 19:14 M.M HMS time offsets HMS, Trigger Time Offsets and HMS drift map
  • 149278 01/22/08 18:43 Ramesh Error due to TS1
  • 149274 01/22/08 18:23 E. Frlez target: transient yellow alarm
  • 149273 01/22/08 18:17 Ramesh Beam is now 80 uA
  • 149269 01/22/08 17:35 Ramesh BBU problem for more than 50 uA
  • 149268 01/22/08 17:35 E. Frlez target: red alarm
  • 149265 01/22/08 16:44 E. Frlez target: screenshots
  • 149264 01/22/08 16:42 Ramesh hms dipole recovering (Steve Lassiter working on)
  • 149263 01/22/08 16:28 Ramesh Dipole NMR srewed up
  • 149257 01/22/08 16:02 Jonathan Mil Shift Summary
  • 149256 01/22/08 16:02 cdaq Beam Time Accounting
  • 149253 01/22/08 15:35 Bosted Target snapshots
  • 149250 01/22/08 14:45 W. Luo restored HV for (29,29)
  • 149248 01/22/08 14:09 puckett Channel 29,29 after fixing pedestal analysis
  • 149245 01/22/08 13:51 puckett pedestal shift problem for 29, 29
  • 149242 01/22/08 13:08 W. Luo (29,29) still very noisy
  • 149241 01/22/08 13:01 W. Luo Stop run 68143, decrease HV on BigCal (29,29) to 1200V
  • 149240 01/22/08 13:00 Jonathan Mil bpm/bcm screenshot
  • 149226 01/22/08 09:20 cdaq Beam Time Accounting
  • 149225 01/22/08 09:18 Bosted Target: Target problems
  • 149221 01/22/08 08:09 Hovhannes Alcohol bubbling
  • 149220 01/22/08 08:01 J Mulholland Target: High Power Heater Problem
  • 149218 01/22/08 07:46 J Mulholland Target: IOC Reboot
  • 149217 01/22/08 07:41 Hovhannes Alcohol in Gas-Shed
  • 149215 01/22/08 07:37 ccbutu Target IOC crashed!
  • 149213 01/22/08 07:32 J Mulholland Target: IOC Reboot
  • 149212 01/22/08 07:28 J Mulholland Target: more transients
  • 149210 01/22/08 07:19 J Mulholland Target: Transient Alarms
  • 149207 01/22/08 06:32 ccbutu ROC 13 & ROC 14 tripped!
  • 149204 01/22/08 05:57 J Mulholland Target: Heater Power Transient Alarm
  • 149197 01/22/08 03:40 J Mulholland Target: transient heater power alarm
  • 149192 01/22/08 01:40 cdaq Beam Time Accounting
  • 149181 01/22/08 00:03 J Mulholland Target: screenshot owl shift
  • Monday

  • 149179 01/21/08 23:50 Margaziotis Target: IOC reboot
  • 149178 01/21/08 23:41 puckett reboot hall c switch
  • 149177 01/21/08 23:26 Ramesh ROC 13/14 froze, web power cycling problem too
  • 149173 01/21/08 22:31 Ramesh Beam will be away for 10 min
  • 149170 01/21/08 21:09 Ramesh Q1 com. err. fixed
  • 149169 01/21/08 21:06 Ramesh ROC 1 error
  • 149166 01/21/08 20:44 Ramesh Q1 communication error
  • 149164 01/21/08 20:36 Ramesh Q1 tripped
  • 149162 01/21/08 20:16 HcF switched ON full argon bottle
  • 149159 01/21/08 19:32 Ramesh No alcohol bubbling, no FPP/HMS gas
  • 149155 01/21/08 18:45 Margaziotis Target: Red alarm-Transient
  • 149154 01/21/08 18:41 Ramesh No problem from the data analysis
  • 149153 01/21/08 18:40 Margaziotis Target screen shot
  • 149152 01/21/08 18:36 Margaziotis Target: IOC reboot
  • 149150 01/21/08 18:23 Ramesh Rebooted all ROCs and TS
  • 149144 01/21/08 17:19 Ramesh ROC 13/14 info (problematic??)
  • 149138 01/21/08 16:04 Abdellah Swing shift summary
  • 149137 01/21/08 16:03 cdaq Beam Time Accounting
  • 149136 01/21/08 16:01 puckett temporary Analyzer code change--set ADC threshold for BigCal rows 29 and 30 to 10 channels
  • 149135 01/21/08 15:34 Abdellah ROC13 power cycled again
  • 149128 01/21/08 14:53 puckett BigCal rows 29,30--shift workers please read
  • 149125 01/21/08 14:08 dhamilton Routine BCM and BPM screenshots
  • 149120 01/21/08 12:34 puckett pedestals for run 68098
  • 149119 01/21/08 12:22 W. Luo Roc13 crashed the run
  • 149118 01/21/08 12:21 abdellah ROC 13 power cycled
  • 149117 01/21/08 12:21 Run 68098, BigCal row 29, 30 cluster finding ok
  • 149116 01/21/08 12:20 puckett bad pedestal examples:
  • 149112 01/21/08 11:50 gaskell/horn Moller backout
  • 149111 01/21/08 11:49 E. Frlez target: out for Moller
  • 149110 01/21/08 11:48 horn/gaskell Moller summary
  • 149109 01/21/08 11:38 puckett more on rows 29,30
  • 149107 01/21/08 11:30 puckett updated BigCal ADC thresholds from replay of run 68088
  • 149091 01/21/08 10:25 W. Luo Run 68088, BigCal row 29,30 problem
  • 149085 01/21/08 09:30 E. Frlez target: Loop 1 temperature
  • 149083 01/21/08 08:33 E. Frlez target: red alarm on hcHe_Supply_1_R
  • 149082 01/21/08 08:31 E. Frlez target: screenshots
  • 149081 01/21/08 08:14 cdaq Beam Time Accounting
  • 149080 01/21/08 07:51 Huber Swing shift summary
  • 149076 01/21/08 06:55 Huber Beam status
  • 149075 01/21/08 06:15 Huber Run 68083 - ROC2
  • 149072 01/21/08 05:38 mbianda IOC reboot
  • 149069 01/21/08 05:14 Hovhannes Problem with GAS shed and Yard
  • 149064 01/21/08 04:29 Huber FPP: Runs 68076-68078
  • 149062 01/21/08 04:25 mbianda IOC reboot
  • 149056 01/21/08 03:20 Huber High deadtime in Run 68076
  • 149050 01/21/08 01:29 mbianda Target
  • 149049 01/21/08 01:23 Huber Initial beam test
  • 149048 01/21/08 00:35 mbianda Target
  • 149047 01/21/08 00:03 cdaq Beam Time Accounting
  • Sunday

  • 149046 01/20/08 23:49 Solvignon Radiation monitor update
  • 149045 01/20/08 23:19 Solvignon Radiation monitor problem
  • 149044 01/20/08 22:13 abdellah Target: Power reduced to 50 w
  • 149043 01/20/08 21:57 Solvignon Beam update
  • 149042 01/20/08 21:32 Ramesh Status update
  • 149041 01/20/08 21:15 Ramesh No beam due to vacuum problem
  • 149039 01/20/08 20:11 Ramesh Vacuum problem stotry still persists
  • 149037 01/20/08 17:58 Ramesh Status update
  • 149035 01/20/08 16:58 Ramesh Beam Status
  • 149034 01/20/08 16:03 jensen bpm and bcm
  • 149033 01/20/08 16:01 cdaq Beam Time Accounting
  • 149031 01/20/08 15:59 hamlet Day Shift Summary, 20 January 2008
  • 149030 01/20/08 15:39 hamlet Going Back to Beam Permit
  • 149029 01/20/08 15:39 Solvignon Target vacuum value with new controller
  • 149028 01/20/08 15:22 hamlet Again Controlled Access. Scattering Chamber vacuum
  • 149027 01/20/08 14:58 A. Shahinyan Target move
  • 149024 01/20/08 14:27 jensen Ethane tank
  • 149023 01/20/08 14:20 hamlet Hall C at Beam Permit
  • 149022 01/20/08 14:13 Fowler HMS Dipole JT5
  • 149021 01/20/08 14:00 smithg Target: Vacuum issue: status & summary
  • 149020 01/20/08 13:19 hamlet HMS Dipole
  • 149019 01/20/08 12:54 hamlet HMS valve JT5 stuck again, now at 24.3%
  • 149018 01/20/08 12:52 A.Shahinyan Target status
  • 149017 01/20/08 12:51 hamlet HMS Dipole tripped OFF, He level below 16%
  • 149016 01/20/08 11:27 A. Shahinyan Target High Power Heater status
  • 149015 01/20/08 11:19 hamlet JT5 valve problem fixed. HMS dipole ON.
  • 149014 01/20/08 11:13 Fowler HMS Dipole JT5
  • 149013 01/20/08 10:42 hamlet HMS Dipole OFF.
  • 149012 01/20/08 10:16 hamlet Experts working to fix problems
  • 149011 01/20/08 09:05 Solvignon Dipole He overflow update
  • 149010 01/20/08 09:02 Solvignon Beam/vacuum situation
  • 149009 01/20/08 08:29 cdaq Beam Time Accounting
  • 149008 01/20/08 07:31 Huber Vacuum valve update
  • 149007 01/20/08 07:02 Huber HMS dipole communication errors
  • 149006 01/20/08 07:01 Huber Hall access
  • 149005 01/20/08 05:44 Solvignon Vacuum issue in the beamline
  • 149004 01/20/08 04:45 Huber Beam update
  • 149003 01/20/08 04:24 mbianda Target: Target moved.
  • 149002 01/20/08 04:14 Huber Try to increase beam current
  • 149000 01/20/08 02:20 Huber Beam status update
  • 148995 01/20/08 00:16 Huber HMS Dipole JT5 status
  • 148994 01/20/08 00:10 Abdellah Swing shift summary
  • 148993 01/20/08 00:06 cdaq Beam Time Accounting
  • Saturday

  • 148992 01/19/08 23:52 Abdellah Called for controlled access
  • 148991 01/19/08 23:42 Ramesh Empty histo (run 68069)
  • 148990 01/19/08 22:40 abdellah Dipole He Overflow, cont'd
  • 148988 01/19/08 22:08 Abdellah Dipole He overflow
  • 148987 01/19/08 22:07 Ramesh ROC 13/14 power cycled from the web
  • 148983 01/19/08 21:30 Ye IOC Rebooted
  • 148982 01/19/08 21:26 Ye IOC Reboot 09:20
  • 148979 01/19/08 20:39 Ramesh Empty ethane cylinder in the gas shade
  • 148976 01/19/08 19:48 Ramesh BPM/BCM
  • 148973 01/19/08 18:03 abdellah MCC and beam trips/current
  • 148970 01/19/08 17:25 W. Luo Modify one typo in /replay/TEMPLATE/gstats.template
  • 148969 01/19/08 17:17 Danagoulian Shift summary
  • 148968 01/19/08 16:49 cdaq Beam Time Accounting
  • 148966 01/19/08 15:13 jensen BPM and BCM
  • 148965 01/19/08 13:30 Danagoulian Hall C vacuum problem
  • 148964 01/19/08 13:28 L.Pentchev changed BigCal thresholds from 166/153 to 150/138 mV
  • 148961 01/19/08 12:04 gaskell water in the beamline alcove
  • 148960 01/19/08 11:38 smithg Target: repairs completed
  • 148959 01/19/08 11:11 smithg Target: repairs in progress
  • 148958 01/19/08 10:29 Danagoulian Vacuum problem
  • 148957 01/19/08 09:40 smithg Target: repair plan
  • 148956 01/19/08 09:01 Danagoulian Vacuum problem at target region?
  • 148953 01/19/08 08:11 cdaq Beam Time Accounting
  • 148952 01/19/08 08:08 puckett shift summary part 2...
  • 148950 01/19/08 08:02 Phil Carter target screen shot
  • 148948 01/19/08 08:00 puckett beam trips on vacuum faults...
  • 148941 01/19/08 06:20 puckett shit summary
  • 148940 01/19/08 06:08 Phil Carter target woes
  • 148938 01/19/08 04:20 puckett HMS dipole recovered, going back to beam permit
  • 148936 01/19/08 02:47 puckett Cannot do anything with HMS dipole PSU.
  • 148935 01/19/08 02:44 puckett still waiting for help with dipole. Beam off.
  • 148934 01/19/08 02:37 puckett Beam is off while magnet not working. No point in running.
  • 148933 01/19/08 01:58 puckett HMS dipole is fubar---Got in touch with Steve L
  • 148932 01/19/08 01:55 Phil Carter Target: IOC reboot; disabling one alarm
  • 148929 01/19/08 00:52 puckett Run 68051 is junk
  • 148925 01/19/08 00:34 puckett changed ps4 to 99999
  • 148920 01/19/08 00:05 Donal Shift Report
  • 148919 01/19/08 00:03 cdaq Beam Time Accounting
  • Friday

  • 148917 01/18/08 23:36 Abdellah Traget screen snapshot
  • 148916 01/18/08 23:28 Ramesh "HMS dipole interlocks" problem again
  • 148913 01/18/08 22:40 Ramesh "HMS dipole interlocks" problem very frequently
  • 148911 01/18/08 22:21 Ramesh hms dipole came back
  • 148909 01/18/08 22:06 Ramesh HMS dipole power supply interlock problem
  • 148907 01/18/08 21:27 abdellah Target: lost connection then came back
  • 148904 01/18/08 20:57 Ramesh BPM/BCM
  • 148902 01/18/08 20:32 Ramesh lost HMS dipole
  • 148897 01/18/08 19:31 Ramesh hctsv12:2004 tripping
  • 148891 01/18/08 17:51 Ramesh Dipole is back, taking data
  • 148889 01/18/08 17:33 Ramesh lost HMS dipole, coming back
  • 148885 01/18/08 16:34 L.Pentchev BigCal thresholds changed before run 68038 to 166/153 mV
  • 148883 01/18/08 16:08 Lassiter Dipole PSU commication error
  • 148882 01/18/08 16:03 cdaq Beam Time Accounting
  • 148881 01/18/08 15:59 jensen Power cycled the power supply
  • 148880 01/18/08 15:56 Shabestari Target screens
  • 148879 01/18/08 15:52 jensen Day shift summary
  • 148878 01/18/08 15:44 jensen Dipole power supply communication error
  • 148877 01/18/08 15:29 Danagoulian online replay
  • 148876 01/18/08 15:19 Danagoulian BPM-BCM screen snapshot
  • 148872 01/18/08 14:02 jensen ROC13 crash
  • 148869 01/18/08 13:52 Shabestari Target screens
  • 148867 01/18/08 13:38 Shabestari Target: Problem with "hcHe_supply" thermometer
  • 148866 01/18/08 13:22 jensen Roc13 crash
  • 148862 01/18/08 11:53
  • 148860 01/18/08 10:58 Shabestari Target: IOC reboot
  • 148859 01/18/08 10:57 eric jensen beam current monitor
  • 148856 01/18/08 09:46 gaskell Polarization 0.3% larger!
  • 148852 01/18/08 09:23 eric jensen dipole trip
  • 148846 01/18/08 08:19 W. Luo Load new HV before run:68010
  • 148843 01/18/08 08:05 cdaq Beam Time Accounting
  • 148842 01/18/08 07:59 puckett Owl shift summary
  • 148836 01/18/08 05:32 puckett trigger rates higher near top left of BigCal
  • 148834 01/18/08 05:06 puckett run 68018 ended on ROC14 crash... power cycled both crates
  • 148828 01/18/08 03:25 Phil Carter target screen shot
  • 148827 01/18/08 03:17 puckett Runs 68014, 68015 are JUNK
  • 148826 01/18/08 03:02 puckett ROC14 failure, lost time
  • 148819 01/18/08 01:22 L.Pentchev no route to gepslo1, can't change thresholds
  • 148816 01/18/08 01:02 puckett for the time being, running without Hall C fast feedback for beam energy
  • 148814 01/18/08 00:37 puckett removed ntuples from online replay
  • 148813 01/18/08 00:36 puckett MCC called--RF problem, expect 15-20 minutes delay
  • 148810 01/18/08 00:03 cdaq Beam Time Accounting
  • 148808 01/18/08 00:01 Donal Shift Summary
  • Thursday

  • 148804 01/17/08 23:20 M.M FPP: Analysers IN!!!!
  • 148802 01/17/08 22:52 M.M Run 68008 is the straight through run!
  • 148800 01/17/08 22:22 M.M FPP Analyser open!!!
  • 148796 01/17/08 21:36 W. Luo 1st step calibration result for kinematics 5
  • 148795 01/17/08 21:10 W. Luo BigCal Stopped run:68005, increased threshold again. 0, 1: 185; 2,3: 170
  • 148793 01/17/08 21:03 W. Luo Stopped run:68004 for high dead time, increased BigCal threshold by 15mv, 0,1: 168mv; 2,3: 155mv
  • 148789 01/17/08 20:46 Donal Dipole lNMR lost communication
  • 148788 01/17/08 20:44 gaskell/horn Moller backout
  • 148786 01/17/08 20:15 W. Luo Increased BigCal threshold by 15% due to the new HV increased
  • 148785 01/17/08 20:13 mbianda Target: Target moved from empty to 20 cm LH2 to.
  • 148784 01/17/08 20:10 horn/gaskell Moller Summary
  • 148778 01/17/08 19:56 W. Luo Load new HV for BigCal
  • 148777 01/17/08 19:55 gaskell/horn Moller tuned
  • 148764 01/17/08 18:11 M Jones Lowered BIGCAL thresholds to 133 and 122 to reflected drop in gain
  • 148762 01/17/08 18:10 Donal Status
  • 148761 01/17/08 18:05 gaskell Moller Q1 problems
  • 148760 01/17/08 17:56 mbianda Target: Target moved from 20 cm LH2 to empty.
  • 148758 01/17/08 17:04 Ramesh Online replay GUI crash
  • 148757 01/17/08 16:47
  • 148755 01/17/08 16:42 Donal Beam off
  • 148753 01/17/08 16:16 cdaq Beam Time Accounting
  • 148751 01/17/08 16:04 Danagoulian Shift summary
  • 148750 01/17/08 16:01 smithg Target: fan running a little hotter
  • 148748 01/17/08 15:50 Danagoulian BPM screen
  • 148744 01/17/08 15:21 Bosted Target: Target Fan problems
  • 148742 01/17/08 13:57 Danagoulian Beam status
  • 148741 01/17/08 13:11 Bosted Target: Target moved from MT to 20 cm LH2
  • 148739 01/17/08 11:54 W. Luo Update BigCal angle and distance at this kinematics in KINEMATICS.db
  • 148738 01/17/08 11:52 yprok beam coming back
  • 148737 01/17/08 11:15 Danagoulian Cryo flow glitch
  • 148736 01/17/08 08:02 Phil Carter Owl shift summary
  • 148735 01/17/08 06:28 Phil Carter Dipole communication error
  • 148734 01/17/08 00:17 puckett owl TO is here
  • Wednesday

  • 148733 01/16/08 22:23 puckett Watching target until owl shift
  • 148732 01/16/08 22:00 smithg Hall is in controlled access
  • 148731 01/16/08 20:51 smithg Target: missing target operator
  • 148730 01/16/08 19:15 smithg Target: Cooldown finished
  • 148729 01/16/08 17:57 smithg Target: On cold return now.
  • 148728 01/16/08 17:31 smithg Target: turbo controller replaced. Vacuum reading bad.
  • 148727 01/16/08 17:02 puckett HMS cosmic run looks OK
  • 148726 01/16/08 16:56 smithg Target: turbo controller sick
  • 148725 01/16/08 16:03 smithg Target: began opening JT
  • 148724 01/16/08 13:50 smithg Target: preparing to start cooldown
  • 148723 01/16/08 13:36 puckett Updated BigCal ADC thresholds--lowered "nsparse" to 7 channels
  • 148722 01/16/08 12:37 M Jones Moved HMS to 14.495 deg
  • 148720 01/16/08 12:21 L.Pentchev reading the BigCal thresholds
  • 148718 01/16/08 12:17 L.Pentchev BigCal thresholds set to 191/175mV for (0,1)/(2,3) discriminators
  • 148717 01/16/08 12:03 gaskell ESR back up - Moller recovered
  • 148716 01/16/08 12:02 L.Pentchev BigCal ADC gate changed from 250ns to 170ns
  • 148714 01/16/08 11:56 M Jones Changed HMS trigger delay
  • 148713 01/16/08 10:38 gaskell ESR crash - no flow to Hall C
  • Tuesday

  • 148712 01/15/08 13:25 M Jones Free space in ntup_all directory
  • 148711 01/15/08 12:04 hcf GasMaster Calibration
  • 148710 01/15/08 11:49 saw Freeing some space
  • 148709 01/15/08 09:27 puckett I wonder if we need to delete some ntuples?
  • 148708 01/15/08 08:49 W. Luo Disk space run out on /net/cdaqfs/scratch
  • Monday

  • 148705 01/14/08 17:01 W. Luo LED test result
  • 148698 01/14/08 12:03 W. Luo Turn off HV of BigCal, including booster
  • 148696 01/14/08 11:34 M Jones Rebooted ROC2 (sfihms)
  • 148693 01/14/08 11:04 W. Luo Failed to start a LED run
  • Saturday

  • 148687 01/12/08 16:14 M.M Gas Check
  • 148686 01/12/08 16:14 M.M Gas Check
  • Friday

  • 148685 01/11/08 10:14 Perdrisat all HMS magnet ramped to 0
  • 148684 01/11/08 08:20 dhamilton Owl Shift Summary
  • 148683 01/11/08 08:18 cdaq Beam Time Accounting
  • 148680 01/11/08 06:04 horn Moller summary
  • 148678 01/11/08 05:56 horn Moller done
  • 148654 01/11/08 03:33 eip fpp chambers
  • 148651 01/11/08 03:00 eip chamber efficiencies
  • 148644 01/11/08 00:02 cdaq Beam Time Accounting
  • Thursday

  • 148643 01/10/08 23:59 jensen Swing shift summary
  • 148640 01/10/08 22:52 jmaxwell Target: Screenshot
  • 148637 01/10/08 22:11 jensen Max and cluster distributions
  • 148634 01/10/08 21:54 W. Luo For these runs, max hit ok
  • 148633 01/10/08 21:43 puckett Check "max" and "cluster" distribution for rows 29-30
  • 148632 01/10/08 21:32 puckett BigCal hits distribution
  • 148631 01/10/08 21:09 YaLi Strange hits on bigcal Stats 2
  • 148626 01/10/08 19:52 puckett updated BigCal and HMS ADC thresholds from ped events for run 67954
  • 148621 01/10/08 18:06 jmaxwell Target: Moved to 20cm LH2
  • 148619 01/10/08 18:00 puckett explanation for BigCal pedestal/ADC hits shift
  • 148617 01/10/08 17:45 puckett this happens any time beam is off during the ped. events
  • 148616 01/10/08 17:23 jmaxwell Target: Move to 20cm Dummy
  • 148613 01/10/08 16:23 cdaq Beam Time Accounting
  • 148610 01/10/08 16:02 X. Zheng day shift summary
  • 148606 01/10/08 14:50 cdaq Beam Time Accounting
  • 148604 01/10/08 14:43 L.Pentchev bad pedestals/thrshollds is a possible explanation
  • 148601 01/10/08 14:14 E. Frlez Bigcal: a problem?
  • 148598 01/10/08 13:33 Bosted Target screen shots
  • 148597 01/10/08 13:29 E. Frlez BPM /BCM screenshots
  • 148594 01/10/08 11:53 X. Zheng ROC 13 power cycled
  • 148592 01/10/08 11:36 puckett try rebooting hall C switch?
  • 148591 01/10/08 11:33 Bosted Target: Target: rebooted IOC
  • 148590 01/10/08 11:28 X. Zheng Need power cycle ROC13 but cannot connect to the weblink
  • 148587 01/10/08 11:07 E. Frlez FPP Wire hit, run 67743
  • 148580 01/10/08 08:00 Jonathan Mil Shift Summary
  • 148579 01/10/08 07:21 Phil Carter target screen shot
  • 148578 01/10/08 07:17 Phil Carter Target: rebooted target IOC at 4:30 am
  • 148572 01/10/08 05:25 Jonathan Mil bcm/bpm
  • 148567 01/10/08 03:44 yprok Spike in BigCal ADC hits
  • 148556 01/10/08 01:09 Phil Carter New script to create log entries
  • 148550 01/10/08 00:09 Jonathan Mil Problem with ROC13
  • 148548 01/10/08 00:01 Shabestari Target screens
  • 148547 01/10/08 00:01 cdaq Beam Time Accounting
  • Wednesday

  • 148546 01/09/08 23:59 hamlet Swing Shift summary, 09 January 2008
  • 148545 01/09/08 23:57 Shabestari Target: rebooted IOC
  • 148544 01/09/08 23:56 W. Luo run 67921, FPP chamber probelm
  • 148542 01/09/08 23:10 Shabestari Target: IOC reboot!
  • 148539 01/09/08 22:58 Shabestari Target: rebooted IOC
  • 148532 01/09/08 21:19 Shabestari Target screens
  • 148525 01/09/08 18:01 Shabestari Target screens
  • 148519 01/09/08 16:02 cdaq Beam Time Accounting
  • 148518 01/09/08 15:52 YaLi Day shift summary
  • 148517 01/09/08 14:55 YaLi NMR communication problem, fixed.
  • 148516 01/09/08 13:39 YaLi Beam Line vaccum problem.
  • 148515 01/09/08 13:35 YaLi Roc13 problem again. Reboot Roc13 & Roc14.
  • 148512 01/09/08 12:41 YaLi Roc13 power cycled
  • 148509 01/09/08 12:22 YaLi Roc13 was Rebooted
  • 148506 01/09/08 12:00 YaLi MNR communication problem
  • 148503 01/09/08 11:35 YaLi run 67876 is junk
  • 148501 01/09/08 11:01 M.M FPP Hit rate problems
  • 148499 01/09/08 10:05 YaLi beam position and beam current screenshot
  • 148498 01/09/08 10:04 E. Frlez target: transient/yellow alarms
  • 148497 01/09/08 09:53 E. Frlez target: screenshots
  • 148495 01/09/08 09:38 E. Frlez target: Moller measurement, target out
  • 148494 01/09/08 09:35 horn/gaskell Moller done
  • 148493 01/09/08 09:34
  • 148492 01/09/08 09:31 horn/gaskell Moller Summary
  • 148473 01/09/08 08:16 Eric Jensen Owl shift summary
  • 148472 01/09/08 08:12 cdaq Beam Time Accounting
  • 148471 01/09/08 07:53 Phil Carter test entry -- ignore
  • 148469 01/09/08 06:44 Phil Carter rebooted target IOC
  • 148466 01/09/08 05:44 Eric Jensen HV crate alarm
  • 148457 01/09/08 03:04 Phil Carter target screenshot
  • 148454 01/09/08 01:42 Phil Carter Able to start runs now. Thanks Ramesh Subedi.
  • 148450 01/09/08 00:44 Phil Carter can't start new runs -- ROCs 13 and 14 won't respond
  • 148448 01/09/08 00:06 cdaq Beam Time Accounting
  • 148447 01/09/08 00:01 YaLi Evening shift summary
  • Tuesday

  • 148446 01/08/08 23:59 Shabestari Target screens
  • 148439 01/08/08 22:31 saw Run number fix
  • 148438 01/08/08 22:24 YaLi Run number fixed
  • 148433 01/08/08 21:21 YaLi Run number !!! START WITH 3
  • 148426 01/08/08 19:57 YaLi Beam position and current screenshot
  • 148425 01/08/08 19:53 Shabestari Target screens
  • 148424 01/08/08 19:35 YaLi Beam: Harp Scan result: 3H00: 85*77; 3H00A: 94*74
  • 148423 01/08/08 19:34 Shabestari Target: LH2
  • 148421 01/08/08 18:54 YaLi HMS Magnets Control System Reset
  • 148419 01/08/08 17:57 Shabestari Target: empty
  • 148418 01/08/08 16:11 cdaq Beam Time Accounting
  • 148415 01/08/08 11:30 M Jones Added roc20 (vmec3) back to coin DAQ configuration
  • 148413 01/08/08 11:20 M Jones Moved ROC20 to different ethernet port
  • 148412 01/08/08 10:17 frw Re: FPP wire hit plot run67864-67870
  • 148411 01/08/08 10:03 W. Luo FPP wire hit plot run67864-67870
  • 148410 01/08/08 09:53 Perdrisat kinematics 7, inventory
  • 148409 01/08/08 09:52 W. Luo Checked BigCal channel (46,16), no problem
  • 148406 01/08/08 08:04 cdaq Beam Time Accounting
  • 148405 01/08/08 07:56 Phil Carter target screenshot
  • 148404 01/08/08 07:52 Eric Jensen Owl Shift Summary
  • 148402 01/08/08 07:40 Phil Carter rebooted target IOC; some target alarms
  • 148400 01/08/08 07:04 cdaq Beam Time Accounting
  • 148383 01/08/08 00:32 Phil Carter target screenshot
  • 148382 01/08/08 00:00 YaLi 01/07/08 Evening shift summary
  • Monday

  • 148381 01/07/08 23:47 E. Frlez target: yellow alarm
  • 148378 01/07/08 22:57 W. Luo Stopped run 67859, power cycled roc14.
  • 148375 01/07/08 22:46 W. Luo 4 FPP wires at the edge get hot
  • 148374 01/07/08 22:44 YaLi Roc14 Error, end run 67857, reboot Roc13 & Roc14
  • 148373 01/07/08 22:42 YaLi Roc11 Error, stopped run 67856
  • 148369 01/07/08 22:15 YaLi Roc14 Error, end run 67854, reboot Roc13 & Roc14
  • 148362 01/07/08 20:42 E. Frlez target: hcL1_hp_power_R red alarm
  • 148361 01/07/08 20:18 W. Luo One HMS DC2 wire got hot
  • 148360 01/07/08 20:10 W. Luo This reboot happenned after run67850, run 67852 is good.
  • 148359 01/07/08 19:53 W. Luo Reboot all the rocs
  • 148358 01/07/08 19:52 E. Frlez target: alh problem
  • 148349 01/07/08 16:53 M.M HMS trig time offsets, time offsets, drifmap.
  • 148348 01/07/08 16:17 E. Frlez target: ioc reboot
  • 148346 01/07/08 16:11 cdaq Beam Time Accounting
  • 148345 01/07/08 16:10 ccbutu Shift Summary (The end)
  • 148341 01/07/08 14:44 kumbartzki target screens
  • 148340 01/07/08 14:29 kumbartzki target status
  • 148333 01/07/08 12:38 W. Luo Updated the KINEMATICS.db for the BigCal move
  • 148332 01/07/08 12:02 ccbutu Shift Summary (continuation)
  • 148329 01/07/08 11:18 ccbutu BigCal Move Ended!
  • 148327 01/07/08 10:01 ccbutu Hall C access for BigCal move!
  • 148325 01/07/08 09:10 ccbutu Hall C switch Rebooted!
  • 148324 01/07/08 09:10 ccbutu Hall C switch Rebooted!
  • 148322 01/07/08 08:44 W. Luo run: 67839 Missing wires in FPP chamber C
  • 148320 01/07/08 08:16 cdaq Beam Time Accounting
  • 148319 01/07/08 07:56 Eric Jensen Owl Shift Summary
  • 148316 01/07/08 07:11 Phil Carter target screenshot
  • 148307 01/07/08 03:27 puckett please end old run and start a new one when problems occur.
  • 148306 01/07/08 03:10 ejensen hctsv12 problem, run 67834
  • 148301 01/07/08 01:12 Phil Carter opened target JT valve to 32%
  • 148299 01/07/08 00:53 Shabestari Target: IOC reboot
  • 148298 01/07/08 00:27 YaLi 01/06/08 Evening shift summary
  • 148297 01/07/08 00:03 cdaq Beam Time Accounting
  • Sunday

  • 148289 01/06/08 20:43 Shabestari Target screens
  • 148284 01/06/08 18:49 M.M FPP: Hit time problem, run 67825
  • 148281 01/06/08 18:33 Shabestari Target screens
  • 148280 01/06/08 18:04 W. Luo BigCal HV problems, one or two crates off.
  • 148279 01/06/08 18:03 W. Luo This run, HV crate hctsv12:2003, 2004 was off
  • 148270 01/06/08 16:04 cdaq Beam Time Accounting
  • 148269 01/06/08 15:54 Abdellah Day shift summary
  • 148268 01/06/08 15:41 H. Bghdasary Screen Snapshot of BPM and BMC
  • 148266 01/06/08 15:27 Abdellah Beam back
  • 148265 01/06/08 14:53 kumbartzki Target screens
  • 148264 01/06/08 14:53 Abdellah Energy measurement done
  • 148263 01/06/08 14:48 kumbartzki target moved in
  • 148262 01/06/08 14:44 horn Beam energy measurement results
  • 148261 01/06/08 13:14 abdellah MCC lost arc 2 PS
  • 148260 01/06/08 13:00 horn/gaskell Moller Summary
  • 148259 01/06/08 13:00 gaskell/horn Moller backout
  • 148258 01/06/08 12:49 horn/gaskell Moller tuned
  • 148257 01/06/08 12:49 kumbartzki LH2 target in
  • 148244 01/06/08 10:52 gaskell/horn Moller setup
  • 148243 01/06/08 10:23 gaskell Bad MHZ clock signal on Moller DAQ
  • 148242 01/06/08 09:56 kumbartzki Change target to empty
  • 148239 01/06/08 09:50 Abdellah Moller measurement started
  • 148231 01/06/08 08:03 cdaq Beam Time Accounting
  • 148230 01/06/08 08:03 Jonathan Mil Shift Summary
  • 148225 01/06/08 06:07 puckett updated HMS and BigCal ADC thresholds
  • 148224 01/06/08 05:57 puckett target snapshots with beam back
  • 148223 01/06/08 05:54 Jonathan Mil BPM and BCM
  • 148222 01/06/08 05:44 puckett beam back
  • 148220 01/06/08 04:45 puckett HMS problems, Steve Lassiter is helping...
  • 148219 01/06/08 04:19 puckett target "de--parked" in anticipation of beam
  • 148218 01/06/08 03:36 puckett still waiting for beam though
  • 148217 01/06/08 03:36 puckett HMS is back up and running
  • 148216 01/06/08 01:36 Jonathan Mil Spectrometer off
  • 148215 01/06/08 01:20 Jonathan Mil Cryo Crash
  • 148214 01/06/08 01:12 puckett MCC informed us of CHL crash
  • 148210 01/06/08 00:02 cdaq Beam Time Accounting
  • 148209 01/06/08 00:01 Shabestari Target screens
  • 148208 01/06/08 00:00 abdellah Swing shift Summary
  • Saturday

  • 148207 01/05/08 23:59 abdellah Swing shift Summary
  • 148204 01/05/08 23:31 puckett hot HDC wires
  • 148201 01/05/08 22:20 W. Luo I used some bad cut.
  • 148198 01/05/08 21:48 W. Luo BigCal cued itself
  • 148197 01/05/08 21:10 Shabestari Target screens
  • 148194 01/05/08 20:30 W. Luo Two HMS DC got hot
  • 148193 01/05/08 20:00 M Jones Removed roc20 (vmec3) from the coin configuration
  • 148191 01/05/08 19:42 M Jones Fixed ROC 14 DAQ problems
  • 148189 01/05/08 19:07 W. Luo Updated HMS angle in kinematics.db to 36.105
  • 148188 01/05/08 18:50 Abdellah update on DAQ problems
  • 148186 01/05/08 18:12 W. Luo I restarted the LED display
  • 148183 01/05/08 18:03 Shabestari Target screens
  • 148182 01/05/08 17:47 Perdrisat
  • 148181 01/05/08 17:45 Perdrisat horizontal shift in population of bigcal
  • 148178 01/05/08 16:52 W. Luo One channel of BigCal got hot
  • 148175 01/05/08 16:08 YaLi Target: 20cm LH2 target is in, screenshot
  • 148173 01/05/08 16:04 cdaq Beam Time Accounting
  • 148172 01/05/08 15:56 kumbartzki Day shift summary
  • 148170 01/05/08 10:35 M Jones Run plan for day shift
  • 148169 01/05/08 10:35 M Jones Run plan for day shift
  • 148168 01/05/08 09:12 M Jones Harp 3H00 won't retract, MCC pages for assistance
  • 148167 01/05/08 09:09 M Jones HMS Dipole Communication error
  • 148165 01/05/08 08:01 cdaq Beam Time Accounting
  • 148164 01/05/08 07:59 puckett transient alarm, hcHe_Supply_1_R
  • 148163 01/05/08 07:57 puckett end of shit, target snapshots
  • 148162 01/05/08 07:51 hamlet Owl Shift Summary, 05 January 2008
  • 148161 01/05/08 07:04 puckett rebooted tgt IOC
  • 148160 01/05/08 06:51 puckett "5 sec scantask" still not blinking
  • 148159 01/05/08 06:17 puckett MCC has called to send tune beam
  • 148158 01/05/08 04:32 puckett Calibration of a subsection of BigCal
  • 148157 01/05/08 03:23 puckett Target is "parked" at about 150 W
  • 148156 01/05/08 02:58 puckett target cooldown finished
  • 148155 01/05/08 02:32 puckett Target is cool--IOC reboot needed.
  • 148154 01/05/08 02:27 puckett both GUI value and strip chart are updating, but "5 sec scantask" still stuck
  • 148153 01/05/08 02:02 puckett L1 temp stripchart is updating OK, but value in GUI is stuck...
  • 148152 01/05/08 01:55 puckett Target is getting cool, HMS magnets set
  • 148151 01/05/08 00:29 puckett Dave Meekins is in Hall C for cooldown
  • Friday

  • 148150 01/04/08 23:49 Shabestari HMS
  • 148149 01/04/08 23:30 M JOnes CHL crash at around 21:45
  • 148148 01/04/08 23:29 gaskell Moller cryo recovered
  • 148147 01/04/08 23:24 Shabestari CHL crash
  • 148146 01/04/08 19:13 M.M HMS is good too.
  • 148145 01/04/08 19:09 M.M FPP is in good shape so far...
  • 148144 01/04/08 19:01 abdellah Correction: Beam on for Hall A until 20:00
  • 148143 01/04/08 19:00 abdellah Beam on for Hall B until 20:00
  • 148142 01/04/08 18:35 W. Luo HV chaned since Oct 27
  • 148141 01/04/08 18:32 W. Luo HV changed since Oct. 27
  • 148138 01/04/08 18:13 L.Pentchev BigCal thresholds set to 550mV/515mV for discrim. no. (0 and 1)/(2 and 3)
  • 148136 01/04/08 16:55 abdellah Sweep of Hall
  • 148135 01/04/08 15:59 M JOnes Swing Shift
  • 148134 01/04/08 14:53 M Jones ACC will do a sweep at 4:30 to set the Hall in controlled access
  • 148133 01/04/08 14:46 M Jones Present beam and target situation
  • 148132 01/04/08 13:24 saw HMS Hall Probe EPICS
  • 148129 01/04/08 12:25 M.M FPP: HV ON!!!!
  • 148128 01/04/08 12:21 frw FPP: chamber C threshold back in LOCAL control
  • 148127 01/04/08 11:13 frw HMS gas
  • 148126 01/04/08 11:12 Lassiter HMS up and running
  • 148124 01/04/08 11:09 M Jones Turned on the HMS DC
  • 148123 01/04/08 10:56 Lassiter HMS moved to 36.10 degrees
  • 148122 01/04/08 09:31 M Jones Gas Shed argon/ethane flow rate and pressure
  • 148120 01/04/08 09:12 M Jones Steve Lassiter will come and rotate the HMS spectrometer to 36.10
  • 148119 01/04/08 09:00 M JOnes Problems with beam to Hall A, delay in Hall C target cooldown
  • Thursday

  • 148118 01/03/08 14:43 hcf GasMaster Calibration
  • 148117 01/03/08 14:38
  • 148116 01/03/08 14:34 M Jones Restored vmec3 to coin configuration
  • 148113 01/03/08 14:11 M Jones power supply of VME crate for TS0 fixed
  • 148112 01/03/08 14:08 M Jones Close hall at 6pm for ACC hot checkout
  • 148111 01/03/08 11:48 M Jones target pumpdown successful
  • 148110 01/03/08 10:50 puckett same entry with better formatting...
  • 148109 01/03/08 10:44 puckett added third option for BigCal ADC histograms...
  • 148108 01/03/08 09:43 puckett switched back to old detector map in database
  • 148107 01/03/08 08:24 M Jones Gas Alarm so switched ethane bottles
  • Wednesday

  • 148106 01/02/08 17:11 L.Pentchev few fixes and changes in BigCal
  • 148105 01/02/08 17:00 W. Luo Increase HV for (42,18) for 300v
  • 148104 01/02/08 16:53 M Jones Fixed offset in cable for HMS C1V1 wires 61-76
  • 148090 01/02/08 14:58 M Jones Turn HMS scintillator HV on
  • 148085 01/02/08 14:32 M Jones Short term Beam Schedule
  • 148084 01/02/08 14:20 saw crl make fixed
  • 148083 01/02/08 12:13 M Jones Problem with executing the make for the crl, so can't start the DAQ
  • 148082 01/02/08 12:08 M Jones Leave HV for HMS and FPP chambers OFF !
  • 148081 01/02/08 12:06 frw HMS: greedy use of trigger signals
  • 148080 01/02/08 11:50 M Jones Problem with voltage on TS0 crate in the counting house
  • 148079 01/02/08 11:48 frw HMS chamber gas flow, pressure
  • 148078 01/02/08 11:27 M Jones Modified HMS trigger
  • 148077 01/02/08 11:12 hcf Drift Chamber gas flow restored
  • 148076 01/02/08 11:09 L.Pentchev BigCal and bunker power ON